Talon Metals Announces New Discovery at Tamarack
Published : May 28, 2015
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   British Virgin Islands | Cobalt |

ROAD TOWN, BRITISH VIRGIN ISLANDS--(Marketwired - May 28, 2015) - Talon Metals Corp. ("Talon" or the "Company") (News - Market indicators) is pleased to provide an exploration update on the Tamarack North Nickel-Copper-PGE project ("Tamarack North Project") located in Minnesota, USA. Massive nickel-copper-PGE sulphide mineralization has been intercepted approximately 1.6 km away from the Tamarack Zone, which is the area that comprises the Company's current independent mineral resource estimate.

  • As reported in the Company's press release on May 11, 2015, one of the main goals of the 2015 winter exploration program was to explore areas along the Tamarack Igneous Complex ("TIC") that are significant step-outs from the current Massive Sulphide Unit Mineral Zone ("MSU"), Semi Massive Sulphide Unit Mineral Zone ("SMSU") and the 138 Zone.
  • As a result, during the 2015 winter exploration program four large step-out reconnaissance holes were drilled by Kennecott Exploration Company, with the drill holes 15TK0221 and 15TK0228 being drilled approximately 1.6 km northeast of the Tamarack Zone, and drill holes 15TK0215 and 15TK0225 being drilled approximately 3 km north of the Tamarack Zone The specific area within which these holes were drilled is known as the 480 Zone (see Annexes "A", "B" and "C").
  • Drill hole 15TK0221 intercepted massive nickel-copper-PGE sulphide mineralization, with 0.30 meters assaying 2.00% Nickel ("Ni"), 0.56% Copper ("Cu"), 0.53 g/t PGEs and 0.51 g/t gold ("Au"), which equates to a 2.46% nickel equivalent ("NiEq") grade basis(1). This is the first time that massive nickel-copper-PGE sulphide mineralization has been intersected in in the southern part of the 480 Zone. Note that the north-south strike length of the 480-zone is approximately 3 km.
  • Following the drilling of 15TK0221, a downhole electromagnetic ("DHEM") survey showed an off-hole anomaly located approximately 80 to 100 meters to the northwest of the hole at a depth of 700 - 800 meters below surface. Consequently, drill hole 15TK0228 was initiated. Unfortunately, due to warmer than normal seasonal temperatures, the drilling of 15TK0228 had to cease, leaving the hole approximately 110 meters short of the projected depth of the DHEM plate. Drill hole 15TK0228 is the priority drill target planned when exploration recommences at the Tamarack North Project.
  • In regards to drill hole 15TK0225, which was drilled approximately 3 km north of the Tamarack Zone, massive nickel-copper-PGE sulphide mineralization was intercepted, with 0.49 meters assaying 1.15% Ni, 0.55% Cu, 0.15 g/t PGEs and 0.04 g/t Au, which equates to a 1.42% NiEq grade basis. Notably, drill hole 15TK0225 consists of massive nickel-copper-PGE sulphide mineralization found at the base of the fine grained peridotite (FGO)/mixed zone mineralization (MZ), which is similar to the geological setting of the Tamarack Zone.

"This is a modern day example of how prolific nickel producing complexes came into being in years past. The discovery of massive nickel-copper-PGE sulphide mineralization, located nearly 2 km away from the Company's resource area (the Tamarack Zone), in conjunction with the off-hole DHEM anomoly located a signficant distance away from drill hole 15TK0221, is indeed a testament to the exploration potential at Tamarack and Kennecott's exploration program effectiveness," said Henri van Rooyen, CEO of Talon Metals. "We are pleased with these results and look forward to further updating our shareholders on the results from the remaining 10 holes drilled during the 2015 winter exploration program."

Quality Assurance, Quality Control and Qualified Persons

Please see the technical report entitled "First Independent Technical Report on the Tamarack North Project, Tamarack, Minnesota" dated October 6, 2014 (the "Tamarack North Technical Report") prepared by independent "Qualified Persons" Brian Thomas (P. Geo) of Golder, Paul Palmer (P. Eng) of Golder and Manochehr Oliazadeh Khorakchy (P. Eng) of Hatch Ltd. for information on the QA/QC, analytical and testing procedures employed by Kennecott Exploration Company at the Tamarack North Project. Copies are available on the Company's website (www.talonmetals.com) or on SEDAR at (www.sedar.com).

Widths are drill intersections and not true widths. True widths cannot be consistently calculated for comparison purposes between holes because of the irregular shapes of the mineralized zones.

Drill intersections have been independently selected by Talon. Drill composites have been independently calculated by Talon.

James McDonald, Vice President, Resource Geology of Talon and Mike Shaw, Vice President, Exploration of Talon are both Qualified Persons within the meaning of NI 43-101. Messrs. McDonald and Shaw are satisfied that the analytical and testing procedures used are standard industry operating procedures and methodologies, and they have reviewed, approved and verified the technical information disclosed in this news release, including sampling, analytical and test data underlying the technical information.

About Talon

Talon is a TSX-listed company focused on the exploration and development of the Tamarack Nickel-Copper-PGE Project in Minnesota, USA (which comprises the Tamarack North Project and the Tamarack South Project). The Company has a well-qualified exploration and mine management team with extensive experience in project management.

For additional information on Talon, please visit the Company's website at www.talonmetals.com.

Forward-Looking Statements

This news release contains certain "forward-looking statements". All statements, other than statements of historical fact that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future are forward-looking statements. These forward-looking statements reflect the current expectations or beliefs of the Company based on information currently available to the Company. Such forward-looking statements include, among other things, statements relating to the Tamarack Project with respect to the form and extent of mineralization, targets, goals, objectives and plans, including plans for the release of remaining 2015 winter exploration program results. Forward-looking statements are subject to significant risks and uncertainties and other factors that could cause the actual results to differ materially from those discussed in the forward-looking statements, and even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on the Company. Factors that could cause actual results or events to differ materially from current expectations include, but are not limited to: failure to establish estimated mineral resources, the grade, quality and recovery of mineral resources varying from estimates, the uncertainties involved in interpreting DHEM surveys, drilling results and other geological data, inaccurate geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral reserves and resources, uncertainties relating to the financing needed to further explore and develop the properties or to put a mine into production and other factors (including exploration, development and operating risks)).

Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although the Company believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

Annex "A"

To view Figure 1: Map of TIC showing all Winter Exploration Program Drill Holes, please visit the following link: http://media3.marketwire.com/docs/tlo0528fig1.pdf.

Annex "B"

Table 1: Holes Drilled during the 2015 Winter Exploration Program

Hole ID Easting Northing Elevation Azimuth Dip Length
15TK0215 491106.1 5172077.3 387.9 4.7 -85.2 364.54
15TK0217 496841.4 5163275.0 394.4 359.9 -84.4 831.49
15TK0218 492028.0 5164542.1 388.4 127.5 -86.2 1134.00
15TK0219 490852.7 5168602.7 388.8 242.1 -83.8 579.00
15TK0221 492042.5 5170155.6 388.7 315.6 -85.1 741.12
15TK0222 490862.3 5167538.0 387.9 82.3 -85.3 785.17
15TK0223 497008.7 5158652.1 401.9 195.2 -80.9 394.50
15TK0225 490995.2 5172067.1 387.2 96.3 -85.9 552.30
15TK0226 490949.4 5166197.5 387.8 323.1 -83.3 693.00
15TK0227 491005.1 5167694.1 388.7 96.9 -86.0 821.13
15TK0228 491771.0 5170278.0 388.3 115.6 -82.7 593.75
15TK143A 490957.3 5167889.4 390.7 270.4 -84.5 798.00

Annex "C"

Table 2: Assay Results 480 Zone

Hole ID From
(m)
To
(m)
True
Width
(m)
Sample
Length
(m)
Total
Hole
Length
(m)
Ni
%
Cu
%
Co
%
Pt
g/t
Pd
g/t
Au
g/t
NiEq
%
15TK0215 280.88 282.00 UNK 1.12 364.54 0.36 0.18 0.02 0.11 0.10 0.02 0.48
15TK0221 682.60 682.90 UNK 0.30 741.12 2.00 0.56 0.06 0.32 0.21 0.51 2.46
15TK0225 335.45 335.94 UNK 0.49 552.30 1.15 0.55 0.04 0.07 0.08 0.04 1.42
15TK0228 - - - - 593.75 NSM NSM NSM NSM NSM NSM NSM

UNK: True Width unknown as these assay results are in new geological location.

NSM: No Significant Mineralization: Target depth not reached due to weather conditions.

Please refer to Table 1 in Annex B for Easting, Northing, Elevation, Azimuth and Dip for each hole indicated.

All samples were analysed by ALS Chemex. Nickel, copper, and cobalt grades were first analysed by a 4 acid digestion and ICP AES (ME-4ACD81). Grades reporting approximately 1%, using ME-4ACD81, triggered an AAS finish. If the results were greater than 1% then a Sodium Peroxide Fusion with ICP-AES finish was used (ICP81). Platinum, palladium and gold are initially analysed by fire assay with a mass spectral finish (PGM-MS24). Over limits triggered an ICP-AES finish (PGM-ICP27).

Drill intersections have been independently selected by Talon. Drill composites have been independently calculated by Talon.

NiEq percentages are calculated using the following formula: NiEq% = Ni%+ Cu% x 2.91/9.20 + Co% x 14/9.20 + Pt [g/t]/31.103 x 1,400/9.2/22.04 + Pd [g/t]/31.103 x 600/9.2/22.04 + Au [g/t]/31.103 x 1,300/9.2/22.04.

Sample lengths and grades have been rounded to two decimals.

(1) NiEq percentages quoted in this news release are calculated using the following formula: NiEq% = Ni%+ Cu% x 2.91/9.20 + Co% x 14/9.20 + Pt [g/t]/31.103 x 1,400/9.2/22.04 + Pd [g/t]/31.103 x 600/9.2/22.04 + Au [g/t]/31.103 x 1,300/9.2/22.04

Data and Statistics for these countries : British Virgin Islands | All
Gold and Silver Prices for these countries : British Virgin Islands | All

Talon Metals Corp.

EXPLORATION STAGE
CODE : TLO.TO
ISIN : VGG866591024
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Talon Metals is a gold exploration company based in Brazil.

Talon Metals holds various exploration projects in Brazil.

Its main exploration properties are SAO JORGE, TRAIRAO, CAMPO GRANDE, SERRITA PROJECT and AGUA BRANCA in Brazil.

Talon Metals is listed in Canada and in United States of America. Its market capitalisation is CA$ 22.7 millions as of today (US$ 16.5 millions, € 15.5 millions).

Its stock quote reached its highest recent level on April 01, 2011 at CA$ 3.14, and its lowest recent point on April 02, 2018 at CA$ 0.05.

Talon Metals has 129 649 992 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Talon Metals Corp.
11/14/2018Talon Metals tables PEA at Tamarack North
Nominations of Talon Metals Corp.
3/11/2014Announces Board Appointment and Resignations
Financials of Talon Metals Corp.
11/14/2014Reports Third Quarter 2014 Results
11/14/2013reports third quarter 2013 results
Project news of Talon Metals Corp.
3/26/2015Talon Metals announces unsecured loan provided by Kennecott ...
1/15/2015Talon Metals update: 2014 exploration program at Tamarack co...
7/3/2014Dr. Tony Naldrett, the leading expert on magmatic sulphide d...
Corporate news of Talon Metals Corp.
7/13/2016Talon Metals Winter 2016 Exploration Update: 11.26 Meters of...
6/28/2016Talon Metals Announces Results of AGM
6/28/2016Talon Metals Winter 2016 Exploration Update
6/25/2016Talon Metals Announces Results of AGM
6/2/2016Talon Metals Winter 2016 Exploration Update: Significant Mas...
5/20/2016Talon Metals Announces the Sale of its Shares in Tlou Energy
5/14/2016Talon Metals Reports First Quarter 2016 Results
4/13/2016Talon Metals Announces Board Appointment
4/1/2016Talon Reports Results for the Year Ended December 31, 2015
12/29/2015Talon Metals Receives Shareholder Approval and Closes Financ...
9/1/2015Talon Metals Update: Step-out Drilling at Tamarack Intersect...
8/25/2015Talon Metals Completes the Sale of the São Jorge Royalty for...
8/25/2015Talon Metals Completes the Sale of the Sao Jorge Royalty for...
8/17/2015Talon Metals Announces the Sale of the Sao Jorge Royalty for...
8/14/2015Talon Metals Reports Second Quarter 2015 Results
7/29/2015Talon Metals Update: Results from Winter Program Confirm the...
7/29/2015Talon Metals Update: Results from Winter Exploration Program...
6/25/2015announces results of AGM
4/8/2015Talon Metals Announces 167% Increase in Tonnage for the Infe...
4/8/2015announces 167% increase in tonnage for the inferred massive ...
4/1/2015Talon Reports Results for the Year Ended December 31, 2014
3/31/2015Talon Reports Results for the Year Ended December 31, 2014
3/26/2015announces unsecured loan provided by Kennecott Exploration C...
1/15/20152014 exploration program at Tamarack concludes with a new in...
12/1/2014Talon Metals update: Drilling at Tamarack intercepts 15.94 m...
11/14/2014Talon Metals Reports Third Quarter 2014 Results
10/23/2014IIROC Trade Resumption - TLO
10/23/2014IIROC Trading Halt - TLO
10/6/2014announces filing of NI 43-101 technical report on the Tamara...
10/6/2014Talon Metals announces filing of NI 43-101 technical report ...
9/2/2014Talon Metals announces its initial resource estimate on the ...
8/13/2014Talon Metals Reports Second Quarter 2014 Results
7/3/2014Dr. Tony Naldrett, the leading expert on magmatic sulphide d...
6/27/2014Talon Metals Announces Results of AGM
6/26/2014IIROC Trade Resumption - TLO
6/26/2014Enters Definitive Agreement with Kennecott Exploration to Ac...
6/26/2014Talon Metals Enters Definitive Agreement with Kennecott Expl...
6/26/2014IIROC Trading Halt - TLO
5/14/2014Talon Metals reports first quarter 2014 results
3/31/2014Talon Reports Results for the Year Ended December 31, 2013
3/11/2014Talon Metals Announces Board Appointment and Resignations
6/24/2013announces results of AGM
6/13/2013Provides Update on Investments
3/22/2013reports results for the year ended December 31, 2012
3/14/2013announces closing of acquisition of Rio Verde Minerals by B&...
10/6/2011announces positive results of trench sampling at its Inajá S...
7/21/2011confirms effective date for the distribution of Rio Verde sh...
6/29/2011PROVIDES UPDATE ON UPCOMING DISTRIBUTION OF RIO VERDE SHARES
5/11/2011ANNOUNCES RESULTS FROM A DETAILED DRILLING PROGRAM ON TARGET...
4/13/2011FILES UPDATED NI 43-101 REPORT ON THE TRAIRÃO IRON PROJECT O...
4/8/2011ANNOUNCES PLAN TO DISTRIBUTE ITS RIO VERDE SHARES TO TALON ...
3/30/2011REPORTS RESULTS FOR THE YEAR ENDED DECEMBER 31, 2010
3/22/2011ANNOUNCES AN INCREASE IN MINERAL RESOURCES DELINEATED ON THE...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (TLO.TO)OTHER OTC (TLOFF)
0.175+9.37%0.130+12.07%
TORONTO
CA$ 0.175
04/19 13:11 0.020
9.37%
Prev close Open
0.160 0.160
Low High
0.160 0.195
Year l/h YTD var.
0.120 -  0.190 -2.78%
52 week l/h 52 week var.
0.120 -  0.380 -46.15%
Volume 1 month var.
556,027 34.62%
24hGold TrendPower© : 20
Produces
Develops
Explores for Gold - Iron
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-41.67%
2023-39.39%0.500.23
2022-14.66%0.870.38
202113.73%0.900.44
2020240.00%0.570.08
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.16+1.09%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.49-1.19%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.81-1.50%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.26+6.25%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+0.00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.91+0.93%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :