Monument Reports First Quarter Fiscal 2016 Results

Gold Production of 5,063 Ounces with Cash Cost of $468/Oz

Vancouver, B.C., November 30, 2015, Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) 'Monument' or the 'Company' today announced its first quarter financial results for the three months ended September 30, 2015. All amounts are in thousands of United States dollars unless otherwise indicated (refer to www.sedar.com for full financial results).

President and CEO Robert Baldock commented on first quarter fiscal 2016 financial results: 'Monument continues to maintain its low cash cost gold production at the Selinsing gold mine. Cash flow from Selinsing production has been invested in the acquisition, exploration and development of the expanding project portfolio. The business strategy continues to be the strategic acquisition of mineral resources to take advantage of under-valued mineral properties to development a diversified project portfolio with a clear focus on gold. Despite the decline in commodity prices, Monument believes that acquiring high quality undervalued resources and developing cash flow from multiple production sites and jurisdictions is the key for the Company's growth and success.'

First Quarter Highlights:

• Gold production of 5,063 ounces ('oz') (Q1 fiscal 2015: 9,745oz);
• Cash cost per ounce decreased by 33% to US$468/oz (Q1 fiscal 2015: US$699/oz);
• Gross Revenue from gold sales of $8.33 million on 10,000oz sold (Q1 fiscal 2015: $8.18 million on 6,300oz sold);
• Profit margin generated from gold production of $2.33 million (Q1 fiscal 2015: $2.10 million);
• Ore mined increased by 42% to 0.11 million tonnes (Q1 fiscal 2015: 0.07 million tonnes);
• Ore processed decreased by 8% to 0.23 million tonnes (Q1 fiscal 2015: 0.25 million tonnes);
• Commenced heap leaching production initiatives and engineering work at Burnakura;
• Completed construction and commenced commissioning the Intec Pilot Plant at Selinsing;
• Continued exploration programs in Malaysia and Western Australia focused on increasing gold inventory;
• Settled gold forward sale contract.

First Quarter Production and Financial Highlights
Three months ended September 30
2015 2014
Production
Ore mined (tonnes) 105,327 74,384
Ore processed (tonnes) 232,118 253,514
Gold production(1) (ounces) 5,063 9,745
Gold sold (ounces) 10,000 6,300

Financial $'000 $'000
Revenue 8,329 8,179
Net income before other items 1,569 1,201
Net and comprehensive income 116 1,525
Cash flow (used)/from operations (734) 1,387
Working capital including restricted cash 39,307 39,778

EPS before other items -- basic $0.00 $0.01
EPS -- basic $0.00 $0.01

Three months ended September 30
(Continued) 2015 2014

Other $/oz $/oz
Average realized gold price per ounce sold(2) 1,147 1,298
Cash cost per ounce(3)
Mining 90 267
Processing 346 368
Royalties 31 63
Operations, net of silver recovery 1 1
Total cash cost per ounce 468 699
(1) Defined as good delivery gold bullion according to London Bullion Market Association ('LBMA'), net of gold doŕe in transit and refinery adjustment.
(2) Monument realized US$/oz for the three months ended September 30, 2015 excludes gold forward sales.
(3) Total cash cost includes production costs such as mining, processing, tailing facility maintenance and camp administration, royalties, and operating costs such as storage, temporary mine production closure, community development cost and property fees, net of by-product credits. Cash cost excludes amortization, depletion, accretion expenses, capital costs, exploration costs and corporate administration costs.

Production Results

Gold production, net of gold doré in transit and refinery adjustment, was 5,063oz (defined as good delivery gold bullion according to the London Bullion Market Association), a 48% reduction compared to 9,745oz in the corresponding period last year due to the continued processing of super low grade material blended with low grade ore reclaimed from the old tailing ponds. This trend is expected to continue until the commencement of mining oxide ore at Felda Land. Plant throughput from the Selinsing gold processing plant decreased by 8% to 232,118t for the quarter (Q1 fiscal 2015: 253,514t) due to power supply interruptions and the clay consistency of the ore with periods of heavy rain that caused a slowdown in the crushing circuit. Average ore head grade decreased by 42% to 0.96g/t (Q1 fiscal 2015: 1.65g/t) compared to the corresponding quarter last year. Gold recovery rate decreased by 51% for the quarter to 5,532oz (Q1 fiscal 2015: 11,324oz) and process recovery rate decreased 9% to 77.0% (Q1 fiscal 2015: 84.4%) compared to the corresponding period last year.

Financial Results and Discussion

Gold sales of 10,000oz generated $8.33 million for the quarter compared to 6,300oz generated $8.18 million in the corresponding period last year. During the quarter mining operations at Selinsing generated a profit margin of $2.33 million (Q1 fiscal 2015: $2.10 million). Included in the profit margin is a net loss in the amount of $0.23 million, the result from a gold forward sale settlement. Gold sold for the quarter before gold forward sales was 5,000oz (Q1 fiscal 2015: 6,300oz) for profit margin of $2.56 million (Q1 fiscal 2015: $2.10 million) at a realized average gold price of $1,147 per ounce (Q1 fiscal 2015: $1,298 per ounce). The average London Fix PM gold price for the quarter was $1,124 per ounce (Q1 fiscal 2015: $1,282 per ounce).

Total production cost of $6.00 million in the first quarter was in line with $6.08 million from the corresponding period last year. The cash cost per ounce of gold sold for the quarter decreased by 33% to $468 per ounce, compared to $699 per ounce was mainly attributed to reclassification of super low material to ore from waste, which in turn reduced cost per tonne mined, partially offset by increase in processing cost due to lower average mill feed grade and recovery rate. The production team at the Selinsing Mine has continued improvements to boost productivity and the bottom line during the quarter through reduction of mill down time and process efficiency.

Net income for the quarter was $0.12 million, or $0.00 per share (basic) a decrease from the corresponding period last year of $1.53 million or $0.01 per share (basic). The decrease in earnings quarter over quarter is mainly due to loss from other items of $1.50 million. Cash used from operating activities for the quarter was $0.73 million compared to cash provided $1.39 million for the corresponding period last year. Working capital as at September 30, 2015 was $39.31 million (September 30, 2014: $37.19 million).

Development

Intec Technology and Commercialization Test Work

Following completion of the Intec laboratory test work in fiscal 2015 at the Selinsing Gold Mine, which successfully demonstrated the technical ability of Intec to recover gold from the sulphide material on a bench scale, the pilot trial testing program was initiated in the first quarter of fiscal 2016 with the completion of the pilot plant construction and commencement of commissioning. Subsequent to the first quarter, commissioning of the pilot plant continued and was completed in preparation for the operations test work. The aim of test work through the pilot plant is to operate the proposed Intec Process unit on a continuous basis, demonstrating the liberation of gold for subsequent extraction and recovery through cyanidation and generate key data for the design of subsequent project stages.

The pilot plant test work is anticipated to be complete in the second quarter of fiscal 2016 and result in a continuous flow process, to further demonstrate scale-up capability. Orway Metallurgical Consultants Pty Ltd of Perth, Western Australia was engaged as a Qualified Person to oversee and observe the pilot plant operation and conduct a critical review on technical and financial operating and capital expenditure results. The economic analysis of the Intec process will be complete by December 2015, and will be included into an updated NI43-101 report targeted for end of Q3, 2016.

Burnakura Gold Project

The Burnakura Gold Project continues to progress aggressively, following confirmation drilling success over Alliance/New Alliance ('ANA') deposits, open pit mine optimization, and metallurgical test work for heap leach processing from fiscal 2015. During the first quarter of fiscal 2016 progress included crushing plant engineering design, tailing storage facilities study and environmental studies. The project is advancing in parallel with exploration to demonstrate the economics of early production.

Como Engineers, a Perth based engineering company, was engaged to assess and assist with the first phase of heap leach production development including capital and operating cost estimates, construction and commissioning a heap leach plant and a heap leach pad. The Company's engineers have being working with Como and are targeting commissioning and start-up of the heap leach facilities at the Burnakura site before the end June 2016.

During the quarter, several milestones were met towards completing the Front End Engineering Design ('FEED') scope of work. The work progress includes: the current mining schedule and metallurgical/data review for ANA and Federal City ('FC') deposits, modelling for the crusher specifications, the final crushing circuit configuration, finalise heap leach pad and absorption tank locations, equipment refurbishment pricing and pad fill material identified.

In the second quarter of fiscal 2016, the FEED Final Report will be completed and work will commence on the Detailed Engineering Design ('DED'), refurbishment of the Heap Leach Plant and procurement of long lead items. In addition, project development will continue in the areas of: infrastructure, communications, administration, governmental approvals and technical support.

Exploration

Malaysia

In Malaysia 2016 exploration programs include resource definition drilling at Buffalo Reef Central ('BRC') and Felda Lands, and further exploration drilling at the area between Buffalo Reef North and Central ('Buffalo Reef Gap') and the Bukit Ribu prospect, located west of Buffalo Reef. The exploration programs are designed to focus on replacement of gold inventory to sustain and extend mine life. The geological and economic studies will be carried in parallel and an updated NI43-101 technical report is anticipated to complete in the third quarter of fiscal 2016.

During the quarter, a total of 18 Diamond drill ('DD') holes were drilled for 2,302 metres ('m'), consisting of 17 exploration holes for 2,147m at Buffalo Reef Central and 1 exploration hole for 155m at FELDA Block 7 areas. A total of 2,437 of PQ-core samples were submitted to SGS Mengapur for chemical assays. Regional exploration also collected 724 trenching and channel samples in the quarter from the Bukit Ribu ridge-cut prospect and the Buffalo Reef Gap areas.

Western Australia

At the Murchison Gold Project 2016 exploration programs are planned at East of ANA and South Banderol, comprised of 15,500m RC drilling, 30,000m air core drilling and 700m Diamond drilling. These programs are designed to validate the historical resource, study geological continuity of the mineralization at the Burnakura area and increase gold inventory to extend life of mine, supporting sustainable early stage of production at Burnakura.

In the first quarter, the Company selected drilling contractors through a tender process, conducted drill hole rehabilitation work and prepared drill pads to commence drilling. Subsequent to the quarter, Diamond drilling commenced at NOA. In addition, sterilization drilling was carried out at the NOA waste dump area to characterize materials for use as a potential base to the proposed heap leach pad.

During the quarter, historical data and new drilling data for Gabanintha and Burnakura was transitioned to an in-house database and standard operating procedures and workflow were developed for database management. The Company is compiling Tuckanarra historical data to be uploaded and validated in the database.

About Monument

Monument Mining Limited (TSX-V:MMY, FSE:D7Q1) is an established Canadian gold producer that owns and operates the Selinsing Gold Mine in Malaysia. Its experienced management team is committed to growth and is advancing several exploration and development projects including the Mengapur Polymetallic Project, in Pahang State of Malaysia, and the Murchison Gold Projects comprising Burnakura, Gabanintha and Tuckanarra in the Murchison area of Western Australia. The Company employs over 300 people in both regions and is committed to the highest standards of environmental management, social responsibility, and health and safety for its employees and neighboring communities.

Robert F. Baldock, President and CEO
Monument Mining Limited
Suite 1580- 1100 Melville Street
Vancouver B.C. Canada V6E 4A6

FOR FURTHER INFORMATION visit the company web site at www.monumentmining.com or contact:
Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102 [email protected]
Wolfgang Seybold, Axino GmbH T: +49 711-82-09-7211 [email protected]

'Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.'

Forward-Looking Statement
This news release includes statements containing forward-looking information about Monument, its business and future plans ('forward-looking statements'). Forward-looking statements are statements that involve expectations, plans, objectives or future events that are not historical facts and include the Company's plans with respect to its mineral projects and the timing and results of proposed programs and events referred to in this news release. Generally, forward-looking information can be identified by the use of forward-looking terminology such as 'plans', 'expects' or 'does not expect', 'is expected', 'budget', 'scheduled', 'estimates', 'forecasts', 'intends', 'anticipates' or 'does not anticipate', or 'believes', or variations of such words and phrases or state that certain actions, events or results 'may', 'could', 'would', 'might' or 'will be taken', 'occur' or 'be achieved'. The forward-looking statements in this news release are subject to various risks, uncertainties and other factors that could cause actual results or achievements to differ materially from those expressed or implied by the forward-looking statements. These risks and certain other factors include, without limitation: risks related to general business, economic, competitive, geopolitical and social uncertainties; uncertainties regarding the results of current exploration activities; uncertainties in the progress and timing of development activities; foreign operations risks; other risks inherent in the mining industry and other risks described in the management discussion and analysis of the Company and the technical reports on the Company's projects, all of which are available under the profile of the Company on SEDAR at www.sedar.com. Material factors and assumptions used to develop forward-looking statements in this news release include: expectations regarding the estimated cash cost per ounce of gold production and the estimated cash flows which may be generated from the operations, general economic factors and other factors that may be beyond the control of Monument; assumptions and expectations regarding the results of exploration on the Company's projects; assumptions regarding the future price of gold of other minerals; the timing and amount of estimated future production; the expected timing and results of development and exploration activities; costs of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; exchange rates; and all of the factors and assumptions described in the management discussion and analysis of the Company and the technical reports on the Company's projects, all of which are available under the profile of the Company on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not undertake to update any forward-looking statements, except in accordance with applicable securities laws.

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | Canada | Malaysia | All
Gold and Silver Prices for these countries : Australia | Canada | Malaysia | All

Monument Mining Limited

PRODUCER
CODE : MMY.V
ISIN : CA61531Y1051
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Monument Mining is a gold producing company based in Canada.

Its main asset in production is SELINSING in Malaysia and its main exploration properties are MENGAPUR and BUFFALO REEF in Malaysia.

Monument Mining is listed in Canada and in Germany. Its market capitalisation is CA$ 53.2 millions as of today (US$ 39.0 millions, € 36.4 millions).

Its stock quote reached its highest recent level on January 21, 2011 at CA$ 0.74, and its lowest recent point on April 09, 2020 at CA$ 0.04.

Monument Mining has 322 720 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Monument Mining Limited
2/13/2013Announces Closing of First Tranche of Brokered Private Place...
10/17/2012Announces Private Placement
10/12/2011Announces Private Placement of up to $70=2C000=2C000
8/12/2010Closes $13.0 Million Financing
7/22/2008Closes $38.1 M Private Placement and Convertible Note Financ...
Nominations of Monument Mining Limited
1/8/2014Receives Notice of Nominations for Election of Directors
1/8/2014Receives Notice of Nominations for Election of Directors
10/28/2013Appoints Executive General Manager, Monument Malaysia Group
9/20/2012Appoints Chief Operating Officer
6/29/2012Appoints Gerald Ruth to Board
1/25/2012Grants Share Purchase Options to its Directors
12/21/2011Appoints Graham Dickson as Chairman of the Board
6/9/2010Grants 1,600,000 options to CHF investor relation firm
6/9/2010Engages CHF in Investor Relations and Updates $12 Million Fi...
6/30/2009Appoints New Director
12/17/2008Appoints New Directors and Names George Brazier Chairman of ...
8/25/2008Appoints General Manager and Mine Manager
6/20/2008Appoints AXINO AG to provide Investor Relation Services (Rev...
Financials of Monument Mining Limited
11/29/2013Reports First Quarter Fiscal 2014 Results
5/30/2013Reports Third Quarter Fiscal 2013 Results
6/1/2012=E2??s 2012 Third Quarter Results
3/1/20122012 Second Quarter Results
1/5/2012=E2??s 2012 First Quarter Results
5/30/2011 2011 Third Quarter Results
5/9/2011 Third Quarter Production and Sales Results
3/1/2011 2011 Second Quarter Results
Project news of Monument Mining Limited
5/15/2013Central Australian Phosphate and Monument Mining to Establi...
5/1/2013s Its Interest In Central Australian Phosphate Limited
4/30/2013(Selinsing)s Selinsing and Buffalo Reef Resources
3/19/2013Abandons Earn=2DIn on Mersing Project
10/26/2012Attending Singapore and German Resource Conferences
10/25/2012(Selinsing)to Vigorously Defend Opportunistic Claim Filed Against Seli...
10/9/2012(Mengapur)Signs Harmonization Agreement on Mengapur Project
3/26/2012(Selinsing)Exposes Gold Thieves at Selinsing Gold Mine
2/21/2012(Mengapur)Closes Acquisition of 70% of the Mengapur Polymetalic Projec...
2/2/2012(Mengapur)Receives Final Acceptance from the TSX=2DV to Close the Meng...
12/3/2011(Mengapur)Enters into Definitive Agreement for Acquisition of 70% of ...
9/15/2011Grows Gold Project Pipeline
7/26/2011(Selinsing)Releases Positive Drill Results from Selinsing Property in M...
7/22/2011(Selinsing)to Expand Tailings Storage Facility at Selinsing Gold Mine i...
6/1/2011(Mengapur)Agrees to Acquire a 70% interest in the Mengapur Polymetalic...
5/29/2011(Buffalo Reef)REPORTS NI43-101 RESOURCES AT BUFFALLO REEF PROPERTY
3/3/2011(Selinsing)to Increase Gold Production
2/21/2010(Selinsing)Starts Commissioning CIL Circuit While Gravity Circuit is in...
11/4/2009(Selinsing)Pours First Gold From Gravity Circuit
9/1/2009(Selinsing)Obtains Power Connection at the Selinsing Gold Project and
7/20/2009(Selinsing)Commences Open-Pit Mining at the Selinsing Gold Project
2/11/2009(Buffalo Reef)Confirms Amended Plan for Gold Production from Phase I Gravi...
2/2/2009(Buffalo Reef)Releases Drill Results, Selinsing Developments and Director’...
3/7/2008(Buffalo Reef)Releases Positive Drill Results?Phase II Program at Buffalo ...
3/4/2008(Buffalo Reef)Positive Drill Results?Phase II Program at Buffalo Reef
2/7/2008(Buffalo Reef)'s Phase I Drill Program Confirms Previous Drill Results on ...
Corporate news of Monument Mining Limited
7/11/2016Monument Announces Significant Intercepts Assay Results at N...
6/13/2016Monument Collects Judgment and Adds Peter Kestel Personally ...
5/31/2016Monument Reports Third Quarter Fiscal 2016 Results
5/9/2016Monument Announces Not to Proceed with Matala
5/2/2016Monument Withdraws Technical Disclosure regarding Matala Pro...
4/11/2016Monument Announces Significant Intercepts Assay Results at B...
3/24/2016Monument Comments on Unusual Trading Activity
3/23/2016Monument files NI43-101Technical Report for Resource Estimat...
11/30/2015Monument Reports First Quarter Fiscal 2016 Results
11/21/2015Monument Mining Announces Results of Annual General Meeting ...
9/30/2015Monument Commissions Intec Pilot Plant at Selinsing
9/30/2015Monument's Fiscal 2015 Results
9/28/2015Monument Progresses Mine Development at Burnakura Site
8/17/2015Monument Murchison Gold Project Update
8/12/2015Monument Files Amended Technical Report for Murchison Gold P...
7/31/2015Monument Litigation Update
4/2/2015Monument files NI43-101Technical Report for Resource Estimat...
4/2/2015Monument files NI43-101 Technical Report for Resource Estima...
3/23/2015Monument Mining Announces Results of Annual General Meeting ...
3/8/2015Monument Reports Second Quarter Fiscal 2015 Results
2/27/2015Monument Reports Second Quarter Fiscal 2015 Results
2/27/2015Monument Delays Start-up of Iron and Copper Project at Menga...
2/18/2015Monument Announces Mineral Resource on Alliance/New Alliance...
2/16/2015Monument Files Claim Against Summer Empire Sdn. Bhd. and Kes...
2/13/2015Monument Announces Adjournment of Shah Alam High Court Trial...
2/7/2015Monument Issues Shares for Intec Transaction
2/6/2015Monument Issues Shares for Intec Transaction
2/2/2015Monument Secures Intec License to Exploit Sulphide Gold and ...
1/21/2015Monument Update Selinsing Litigation
1/20/2015Monument Update Selinsing Litigation
1/19/2015Monument Announce RC Assay Results from Federal City Drillin...
12/23/2014Monument Announces Termination of Proposed Transaction with ...
12/1/2014Monument Reports First Quarter Fiscal 2015 Results - Gold Pr...
11/30/2014Monument Reports First Quarter Fiscal 2015 Results
11/18/2014Monument Receives Order to Extend Time for Holding Annual Ge...
11/18/2014Monument Announces Second Round of RC Assay Results at Murch...
11/18/2014Extension of Closing Date for Proposed Transaction, 189 KB
11/17/2014Monument Extends Closing Date of Proposed Transaction with G...
11/12/2014Monument Completes Tuckanarra Gold Project Acquisition in We...
11/8/2014Monument to Extend Time for Holding Annual General Meeting
10/27/2014Monument Extends Close Date of Tuckanurra Acquisition
10/20/2014Monument Updates Selinsing Litigation
10/6/2014Monument Updates Selinsing Litigation
9/30/2014Monument's Fiscal 2014 Results
1/28/2014Files Lawsuit Against GoldMet and George Molyviatis to enfor...
1/28/2014Files Lawsuit Against GoldMet and George Molyviatis to enfor...
1/20/2014Warns Shareholders to Be Wary of the Dissident Group Attempt...
5/23/2013(Selinsing)Files Technical Report for Selinsing and Buffalo Reef
5/1/2013Reports Third Quarter Gold Production of 13=2C255 Ounces
4/24/2013Confirms Indicative Non=2DBinding Conditional Proposal to ac...
4/15/2013(Buffalo Reef)Starts Mining and Processing Oxide Materials at Buffalo Reef
4/2/2013Announces Results of Annual General Meeting of Shareholders
3/13/2013President and CEO to Speak at Hong Kong Conference
2/22/2013Settles Legal Disagreement
2/21/2013Welcomes Support from Major Shareholder
2/8/2013Further Comments on GoldMet Disclosure
2/8/2013Comments on GoldMet Disclosure=3A No Agreement Reached
1/17/2013Provides Update to Shareholders
1/11/2013Reports Record Second Quarter Gold Production of 15=2C902 Ou...
11/14/2012Has Engaged Mackie Research Capital Corporation as Financial...
11/10/2012to Extend Time for Holding Annual General Meeting
10/2/2012=E2??s 2012 Annual Results=3A Gross Revenue of $61.7 M with ...
8/24/2012(Mengapur)Confirms Historic Drilling Results at Mengapur Polymetalic P...
8/16/2012(Selinsing)Completed Selinsing Gold Plant Expansion
8/7/2012(Mengapur)Provides Updates on Mengapur Project and Private Placement
7/30/2012=E2??s 2012 Fourth Quarter Production Result
7/24/2012Received $12 Million through Exercise of Stock Purchase Warr...
6/19/2012and PLSB Working Together Harmonizing Oxide Magnetite Iron O...
5/14/2012=E2??s 2012 Third Quarter Production
5/9/2012Announces Senior Management Appointments
4/25/2012to Attend The INVEST 2012 Conference in Stuttgart
1/25/2012=E2??s 2012 Second Quarter Production
1/4/2012Announces Results of Annual and Special General Meeting of S...
12/20/2011Reminds Shareholders to Vote
12/16/2011(Mengapur)Discusses Mengapur Property Iron Ore Production Information
12/15/2011Provides Details of Annual General and Special Meeting
12/13/2011Annual General and Special Meeting Important Reminder
10/26/2011=E2??s 2012 First Quarter Production
9/29/2011=E2??s 2011 Annual Results
8/8/2011=E2??s 2011 Fourth Quarter Production and Sales Results
1/15/2010Fundamental Research Report Update #2
12/21/2009to Raise $12.0 M in Convertible Debenture and Forward Gold S...
9/18/2009to Issue Shares for Debt to Avocet Mining PLC
7/8/2009Moves to New Office
5/13/2009Releases Selinsing Gold Project Update
2/13/2009 Grants Stock Purchase Options to its Key Staff and Consulta...
12/24/2008Amends Selinsing Gold Project Construction Plan
9/24/2008Fundametal Initial Research Report
8/20/2008Announces TSXV’s Acceptance of its Ball Mill Acquisition fro...
8/15/2008Grants Stock Purchase Options to its Directors Officers unde...
8/8/2008Commences Action for Injunction and Damages
7/28/2008Closes Avocet Mill Transaction For Future Plant Upgrade
7/8/2008Acquires Package of Additional Adjacent Land - Update
6/20/2008Notice of Change of Business Address
5/26/2008Acquires Second Mill for Future Production Plant Upgrade
5/13/2008Monument Announces $38.0 M Capital Raising to Commence Plant...
1/21/2008Acquires Package of Additional Adjacent Land
10/25/2007 Q1 Project Development Update
9/13/2007Commences Exploration Program
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (MMY.V)FRANKFURT (D7Q1.F)
0.165+6.45%0.100+3.09%
TSX-V
CA$ 0.165
04/25 16:20 0.010
6.45%
Prev close Open
0.155 0.150
Low High
0.150 0.165
Year l/h YTD var.
0.130 -  0.195 -2.94%
52 week l/h 52 week var.
0.080 -  0.195 65.00%
Volume 1 month var.
244,489 3.13%
24hGold TrendPower© : -40
Produces Gold
Develops
Explores for Copper - Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 3/19/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202422.22%
202392.86%0.150.07
2022-41.67%0.130.06
202133.33%0.210.09
2020125.00%0.120.04
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :