SilverCrest Mines

Published : March 30th, 2015

Announces Surface Drilling Results at Santa Elena Mine

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

SilverCrest Announces Surface Drilling Results at Santa Elena Mine

Dear Eric LEMAIRE <.COM>,

VANCOUVER, BC � March 30, 2015 � SilverCrest Mines Inc. (the �Company� or �SilverCrest�) is pleased to announce results of the exploration and resource expansion drilling program completed in late 2014 at the 100% owned Santa Elena Mine in Sonora, Mexico.  Twenty-one (21) drill holes, totalling 9,393 metres were completed to explore the western and eastern extensions of the Santa Elena Main Mineralized Zone (�MMZ�) along strike and down dip as well as the adjacent Tortuga and El Cholugo Zones (See attached Figures). The results of all holes will be included in the Santa Elena Resource and Reserve update, scheduled to be released on March 31, 2015. Please refer to the Company�s website at www.silvercrestmines.com for more information.

N. Eric Fier, CPG, P.Eng, Chief Operating Officer stated; �This drill program was successful in confirming continuity of the Santa Elena MMZ beyond current resource model limits and better defining geological boundaries where future infill underground drilling might be required. Moving forward, our focus for expanding Santa Elena resources with subsequent conversion to reserves will be on the El Cholugo (I & II), Tortuga and Santa Elena East. We also look to our 30/60 kilometre regional exploration program to provide new discoveries that might be treated at the Santa Elena facility.�

The most significant assay results from this drilling program are shown in the following table. Intervals are considered near-true thickness. A location map for the drill holes is attached.

Hole # From (m) To (m) Intercept (m) Au gpt Ag gpt
Santa Elena West (includes Tortuga deep intercepts)
SE-14-02 172.8 183.8 11.0 0.72 28.7
includes 174.4 175.6 1.2 2.00 60.8
SE-14-02 241.1 242.1 1.0 1.17 176.2
SE-14-02 299.7 302.9 3.2 1.33 103.6
includes 302.0 302.9 1.0 3.94 201.6
SE-14-03 79.8 82.8 3.0 2.15 98.0
SE-14-06 283.8 285.0 1.3 0.77 34.9
SE-14-06 289.3 293.8 4.5 0.64 43.5
SE-14-06 308.0 323.6 15.6 1.60 104.4
includes 308.0 312.0 4.0 2.87 161.5
includes 314.0 315.9 1.9 3.35 150.0
SE-14-06 326.2 328.7 2.5 0.69 56.3
SE-14-06 333.0 335.1 2.1 0.13 12.9
SE-14-06 216.8 217.7 0.9 0.27 96.0
SE-14-06 252.0 270.0 18.0 0.20 43.2
SE-14-10 283.8 285.9 2.1 0.55 59.7
SE-14-10 295.1 301.0 5.9 0.60 53.6
SE-14-12 304.1 308.3 4.2 0.68 17.0
SE-14-12 313.9 315.5 1.6 0.34 59.8
SE-14-14 396.6 398.6 1.8 0.33 48.9
Tortuga
SE-14-04 76.6 77.5 0.9 5.46 108.0
SE-14-04 90.0 91.1 1.1 2.99 38.3
SE-14-04 261.6 262.6 1.0 2.96 1110.0
SE-14-07 73.3 78.2 4.9 0.27 35.8
SE-14-07 273.5 276.0 2.5 0.36 38.3
SE-14-07 311.4 315.3 3.9 0.53 46.1
SE-14-07 382.5 383.5 1.0 0.17 82.1
SE-14-09 15.9 18.0 2.1 6.68 27.2
El Cholugo (I & II)
SE-14-11 158.7 159.6 0.9 0.97 29.8
SE-14-11 209.1 211.1 2.0 0.38 27.6
SE-14-11 299.4 300.5 1.1 0.56 43.2
SE-14-11 340.7 342.0 1.3 1.53 83.2
SE-14-11 345.6 355.2 9.6 0.77 69.0
SE-14-15 59.4 79.8 20.4 3.15 41.2
includes 59.4 62.5 3.1 8.66 102.6
includes 67.1 70.1 3.0 8.52 112.7
includes 74.6 78.0 3.4 2.91 18.2
SE-14-15 95.0 96.0 1.0 1.24 35.2
SE-14-15 194.2 195.5 1.3 2.50 158.0
SE-14-15 236.3 241.4 5.1 0.47 37.1
includes 236.3 237.9 1.6 1.19 84.1
Santa Elena East
SE-14-16 256.5 259.8 1.2 0.14 28.4
SE-14-17 513.1 522.0 8.9 0.76 46.4
includes 514.5 518.9 4.4 1.26 75.2
SE-14-18A 623.8 629.5 5.7 0.21 33.2
SE-14-21 1,060.2 1,061.2 1.0 0.17 44.4
SE-14-21 1,070.1 1,074.7 4.6 0.52 89.3
includes 1,072.2 1,072.6 0.5 4.60 773.0
SE-14-21 1,092.2 1,094.6 2.4 1.94 5.5
SE-14-21 1,143.0 1,147.2 4.2 0.02 78.9
includes 1,144.4 1,145.3 0.8 0.07 376.0

All samples were independently prepared and assayed at Inspectorate Labs of Reno, NV.

The purpose of this surface drill program was to further explore the western extension (�Santa Elena West�) of the MMZ, better define and expand the current resources at both Tortuga and El Cholugo, and to explore the eastern extension (�Santa Elena East�) of the high grade plunging MMZ that is currently being mined.

Hole SE-14-01 was a geotechnical hole and was not meant to intercept mineralization. Holes SE-14-05, 8, 13, 19, and 20 did not intercept significant mineralization or were lost before intercepting the target area. Hole SE-14-18A is a wedge hole off of hole 18 that was lost while drilling.

The drill hole SE-14-21 represents a step out of 250 metres down plunge along the Santa Elena Vein from the closest existing drill hole results (see attached Figures), supporting continuity of the MMZ with similar mineralogy and hydrothermal textures of a low sulphidation Ag-Au system.

The Santa Elena West drilling showed that the MMZ becomes discontinuous and lower grade beyond the current ultimate pit west wall. Further drilling in this area is not warranted except for follow up of deep intercepts associated with Tortuga.

Tortuga and El Cholugo zones were better defined with higher grade near the intersection with MMZ with decreasing grades in more distal intercepts. Further interpretation work is ongoing with the anticipation of follow up underground drilling in the future.

Santa Elena East drilling showed lower grade intercepts within the MMZ outside the projected high grade plunge (see attached long section. Follow up drilling to intercept the projected high grade plunge will be completed in H1 2015. Further drilling from underground is anticipated only when the underground ramp bottom (est. 325 metre elevation) is reached in late 2015 or early 2016. The Company is planning on driving an exploration drift to the east once the current underground ramp reaches the target depth. This drift will be utilized to explore for potential deeper resources as the MMZ continues to the east.

Note that the depths of drill hole intercepts are within vertical elevations currently planned for underground mining except for hole SE-14-21.

The Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects for this News Release is N. Eric Fier, CPG, P.Eng., Chief Operating Officer of SilverCrest Mines Inc., who has reviewed and approved its contents.

SilverCrest Mines Inc. (NYSE MKT: SVLC; TSX: SVL) is a Canadian precious metals producer headquartered in Vancouver, BC. SilverCrest�s flagship property is the 100%-owned Santa Elena Mine, located 150 kilometres northeast of Hermosillo, near Banamichi in the State of Sonora, Mexico. The mine is a high-grade, epithermal silver and gold producer, with a current reserve estimated life of mine of eight years. Exploration programs continue to result in discoveries at Santa Elena and have advanced the definition of a large polymetallic deposit at the La Joya Project in Durango State, Mexico.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This news release contains �forward-looking statements� within the meaning of Canadian securities legislation and the United States Securities Litigation Reform Act of 1995. These include, without limitation, statements with respect to: the economic viability of a project; strategic plans and expectations for the development of the Company�s operations and properties; estimates of mineral reserves and mineral resources; the amount of future production of gold and silver over any period; the amount of expected grades and ounces of metals and minerals; expected cash operating costs and outflows; life of mine and prices of metals and minerals.

These forward-looking statements relate to analyses and other information that are based on, without limitation, the following estimates and assumptions: presence of and continuity of metals at the Company�s projects; cost of production and productivity levels at the Santa Elena Mine; availability and costs of mining equipment and skilled labour; accuracy of the interpretations and assumptions used in calculating reserve and resource estimates; operations not being disrupted or delayed by unusual geological or technical problems; and ability to develop and finance projects.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements, including, without limitation: risks related to precious and base metal price fluctuations; risks related to the fluctuations in the price of consumed commodities; risks related to fluctuations in the currency markets (particularly the Mexican peso, Canadian dollar and United States dollar); risks related to the inherently dangerous activity of mining, including conditions or events beyond our control, and operating or technical difficulties in mineral exploration, development and mining activities; uncertainty in the Company�s ability fund the exploration and development of its mineral properties; uncertainty as to actual capital costs, operating costs, production and economic returns, and uncertainty that development activities will result in profitable mining operations; risks related to reserves and mineral resource figures being estimates based on interpretations and assumptions which may result in less mineral production under actual conditions than is currently estimated and to diminishing quantities or grades of mineral reserves as properties are mined; and risks related to governmental regulations and obtaining necessary licenses and permits.

Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the forward-looking statements. The Company�s forward-looking statements are based on beliefs, expectations and opinions of management on the date the statements are made. For the reasons set forth above, investors should not place undue reliance on forward-looking statements. The Company undertakes no obligation to update or revise any forward-looking statements, except as otherwise required by applicable law.

Contact:             Fred Cooper
Telephone:        (604) 694-1730 ext. 108
Fax:                     (604) 694-1761
Toll Free:           1-866-691-1730
Email:                  info@silvercrestmines.com
Website:            www.silvercrestmines.com
Suite 501 - 570 Granville Street, Vancouver, BC Canada V6C 3P1 


Data and Statistics for these countries : Canada | Mexico | All
Gold and Silver Prices for these countries : Canada | Mexico | All

SilverCrest Mines

PRODUCER
CODE : SVL.V
ISIN : CA8283651062
CUSIP : 828365
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

SilverCrest Mines is a silver and gold producing company based in Canada.

SilverCrest Mines develops silver, gold and zinc in El Salvador, and holds various exploration projects in Mexico.

Its main asset in production is SANTA ELENA in Mexico, its main asset in development is EL ZAPOTE in El Salvador and its main exploration properties are SILVER ANGEL, CRUZ DE MAYO and LA JOYA DURANGO in Mexico.

SilverCrest Mines is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 287.2 millions as of today (US$ 259.0 millions, € 188.5 millions).

Its stock quote reached its lowest recent point on December 17, 2002 at CA$ 0.08, and its highest recent level on March 02, 2012 at CA$ 3.17.

SilverCrest Mines has 107 952 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of SilverCrest Mines
6/1/2010Greg McCoach - Mining Speculator June 2010
6/1/2010Corporate Presentation - June 2010
3/31/2010 Funding In Place, Construction on Schedule for 2010 Product...
1/1/2010Why invest in SilverCrest Mines?
6/10/2009Corporate report June 2009
3/31/2008New Recommendation
11/22/2006Corporate Presentation
In the News and Medias of SilverCrest Mines
3/14/2012Scott Drever=2C President of SilverCrest Interview on BNN
9/22/2008Objective Capital research
10/25/2007Analysis by David and Eric Coffin
11/17/2006Follow up N° 4
Annual reports of SilverCrest Mines
2009 Annual Report
2008 annual report
Annual Report 2006
Financings of SilverCrest Mines
5/20/2011Closes $30 Million Bought Deal Financing
4/28/2011Announces CAD$30.0 Million Bought Deal Common Share Financin...
3/20/2008Completes Private Placement; Amends $3.0 Million Macquarie F...
3/13/2008Announces First Closing Of Private Placement
Option Grants of SilverCrest Mines
3/29/2008 Engages Marketing Consultant and Grants Stock Options
Nominations of SilverCrest Mines
6/13/2013Reports Results of AGM Announces Officer and Director Appoin...
1/31/2013Appoints Vice President, Corporate Development
2/15/2011SilverCrest Appoints of Mr. Brent McFarlane Vice President, ...
Financials of SilverCrest Mines
8/13/2015Announces Q2, 2015 Financial Results; Operating Cash Flow of...
11/14/2013Reports Q3, 2013 Financial Results Cash Flow from Operations...
8/15/2013Reports Q2, 2013 Financial Results Cash Flow from Operations...
8/15/2013Reports Q2, 2013 Financial Results
5/15/2013Reports Q1, 2013 Financial Results Cash Flow from Operations...
3/14/2013Announces 2012 Financial Results Cash Flow from Operations o...
11/14/2012Reports Q3, 2012 Financial Results Cash Flow From Operations...
8/15/2012Reports Q2=2C 2012 Financial Results
5/15/2012Reports Q1 2012 Financial Results Cash Flow from Operations ...
4/10/2012Announces 2011 Financial Results Cash Flow from Operations o...
11/29/2011Reports $5.1 Million Third Quarter Cash Flow from Operation...
8/30/2011Announces Second Quarter Earnings of $790,000 and Cash Flow ...
8/2/2011Form 40-F Registration Statement Effective
Project news of SilverCrest Mines
2/25/2014(Santa Elena)Receives US$10 Million Commitment from Sandstorm Gold for Un...
1/14/2014Evrim Options Ermita=F1o Property to SilverCrest Mines
12/24/2013Files La Joya Preliminary Economic Assessment Report
10/21/2013Announces Positive La Joya Preliminary Economic Assessment ...
10/15/2013Announces Q3 Record Silver Production 202,736 Ounces Silver-...
9/5/2013(Santa Elena)Reports Additional Drill Results at Santa Elena Mine; Anothe...
7/25/2013(Santa Elena)Announces Santa Elena Expansion Pre-Feasibility Study; Base...
7/17/2013Announces Q2 Record Silver Production 194,022 Ounces Silver ...
5/29/2013(Santa Elena)Announces Updated Santa Elena Reserves and Resources; Silver...
4/24/2013Announces Q1 Production 153,481 Ounces Silver & 7,225 Ounces...
3/28/2013Files La Joya Technical Report Updated Resources & Positive ...
1/29/2013Announces Updated La Joya Resources
1/16/2013Exceeds 2012 Production Market Guidance Announces Q4 Results...
1/14/2013(Santa Elena)Expands Santa Elena Deposit; More High Grade Intercepts 13m ...
1/7/2013(Santa Elena)Discovers Bonanza Grades and New Zone at Santa Elena 15.6m ...
11/13/2012(Santa Elena)Drilling Update for Santa Elena Mine
11/7/2012Pays Out Gold Hedge Facility Gold and Silver Production Now ...
10/16/2012Announces Q3 Production 151,368 Ounces Silver & 7,184 Ounces...
7/23/2012Announces Q2 Production 139=2C850 Ounces Silver & 8=2C584 Ou...
7/6/2012(Santa Elena)=E2??s Santa Elena Mine Expansion Continues on Schedule
4/19/2012Announces Q1 Silver and Gold Production 134=2C528 Silver Ou...
3/20/2012(La Joya Durango)Reports 58m @ 164.7 gpt Ag Eq* at La Joya
2/16/2012(La Joya Durango)Reports Coloradito Target Results at La Joya Property=3B Pot...
1/23/2012(La Joya Durango)s Corporate Resources Silver Equivalent Inferred Resources ...
1/23/2012(Cruz De Mayo)s Corporate Resources Silver Equivalent Inferred Resources ...
1/23/2012(Cruz De Mayo)s Corporate Resources Silver Equivalent Inferred Resources ...
1/23/2012(Santa Elena)s Corporate Resources Silver Equivalent Inferred Resources ...
1/12/2012(Santa Elena)Reports Record Production in Q4 at Santa Elena=3B =E2?=A2 Si...
1/5/2012(La Joya Durango)Announces Initial Resources at La Joya Property=3B +100 mill...
11/30/2011(La Joya Durango)Commences Phase II Drilling at La Joya=3B Phase II Surface S...
10/14/2011(Santa Elena)Reports Increased Santa Elena Production in Q3 Silver Produc...
9/22/2011(Santa Elena)Begins Drilling at Cruz de Mayo, Reports on Santa Elena Nort...
9/22/2011(Cruz De Mayo)Begins Drilling at Cruz de Mayo, Reports on Santa Elena Nort...
8/10/2011(La Joya Durango)Video Tour of La Joya Mine Project, Durango Mexico
7/13/2011(Santa Elena)Declares Commercial Production at Santa Elena Mine; Pours 74...
6/7/2011(La Joya Durango)Reports Additional La Joya Drill Results, More High Grade Si...
4/26/2011(Santa Elena)Files NI 43-101 Technical Report for Santa Elena Reserve Up...
4/13/2011(Santa Elena)Santa Elena Mine Commissioning Phase Update, Silver And Gold...
4/12/2011(Santa Elena)Announces Santa Elena Expansion Plan Net Present Value of US...
3/13/2011(La Joya Durango)Reports La Joya Initial Drill Results; Up to 19.2 Metres of ...
1/6/2011(Santa Elena)Santa Elena Mine Start-Up Phase Update
12/1/2010(La Joya Durango)Acquires New Major Mexico Property
8/14/2009(Santa Elena)to Acquire 100% of the Santa Elena Project
6/9/2009(Santa Elena)Announces Agreement With MacQuarie Bank Limited For US12.5 M...
8/15/2008Receives Environmental Impact Assessment Approval; NI43-10...
6/30/2008(Santa Elena)Santa Elena prefeasibility study completed
6/26/2008(Santa Elena)Pre-Feasibility Results at Santa Elena, Mexico
6/5/2008(Santa Elena)Main Zone Expansion Drilling 11.2 metres (36.73 feet) gradin...
5/21/2008(Santa Elena) Submits Environmental Impact Assessment; Receives Land Use ...
4/8/2008(Santa Elena)Continues to Expand Main Zone at Santa Elena, Mexico
2/21/2008(Santa Elena)Updates Progress at the Santa Elena Project, Mexico
1/9/2008(Santa Elena)Continues to Intercept High Grade Gold and Silver at the San...
1/4/2008(Santa Elena)Resource Expansion at Santa Elena and Cruz de Mayo
12/20/2007(Santa Elena)Secures Surface Rights for Santa Elena Project, Mexico
11/29/2007(Santa Elena)Intercepts 32.9 Metres of 367 gpt (10.7 Ounces) Silver & Sil...
11/15/2007(Cruz De Mayo)SilverCrest Announces Resource Increase Indicated Resources ...
10/18/2007(Santa Elena)SilverCrest Intercepts 51.4 Metres of 1.53 gpt Gold and 126 ...
9/26/2007(Santa Elena) Continues to Expand Santa Elena Deposit, Northern Mexico
9/11/2007(Santa Elena)Mobilizes Second Drill Rig to Santa Elena Project, Mexico
9/6/2007(Santa Elena)Significantly Expands Mineralization at Santa Elena Project,...
7/26/2007(Cruz De Mayo)Reports Final RC Drill Results and Preliminary Metallurgy at...
7/5/2007(Cruz De Mayo)Reports More Silver at Cruz de Mayo, Mexico
5/24/2007(Cruz De Mayo)Reports New Silver Discovery at Cruz de Mayo, Mexico
5/10/2007(Cruz De Mayo)Updates Progress at the Santa Elena Project, Mexico
Corporate news of SilverCrest Mines
2/24/2014Graduates to Toronto Stock Exchange Trading Commences Februa...
2/20/2014Announces $20 Million Bought Deal
2/17/2014(Santa Elena)Confirms U/G High Grades at Santa Elena 11.6m @ 5.83 gpt Au ...
12/14/2013Announces Grant of Stock Options
11/19/2013SilverSeek LIVE! Wed. Nov, 20th @ 2PM EST -- David Morgan (S...
10/21/2013Announces Positive La Joya Preliminary Economic Assessment B...
7/12/2013Arranges $40 Million Credit Facility with Scotiabank
5/27/2013Completes Exercise of La Joya West Option
5/27/2013Completes Exercise of La Joya West Option
4/25/2013Announces 2013 Annual Meeting and Adoption of Corporate Gove...
4/8/2013(Santa Elena)Continues to Expand Santa Elena Deposit More High Grade Inte...
10/30/2012Closes $34.5 Million Prospectus Offering, Over-Allotment Opt...
10/5/2012Announces Increase in Bought Deal to $30 Million
10/5/2012Announces $26.1 Million Bought Deal
9/27/2012Reports High Grade Surface Sampling and Additional Drill Res...
8/22/2012ANNOUNCES TRADING ON NYSE MKT TO COMMENCE AUGUST 27=2C 2012
7/17/2012Reports 50m @ 151.8 gpt Ag Eq* at La Joya Main Mineralized...
6/29/2012Reports Annual General Meeting Results
5/7/2012Reports 127.4m @ 65.6 gpt Ag Eq* at La Joya Expands Main M...
2/21/2012Files NI43=2D101 Resource Report for La Joya Property
1/30/2012Presenting At the Silverseek Online Forum
1/9/2012Retires Bank Debt Ahead of Schedule
10/7/2011Commences Trading on OTCQX
6/17/2011Announces Appointment of New Director, Reconfirmation of Sha...
5/31/2011Files Form 40-F Registration Statement with SEC
7/29/2010Initial Gold & Silver Production Imminent
5/6/2010& Goldsource Appoint Director of Communications
9/22/2009Analyst Coverage by Jennings Capital
7/13/2009New office
6/24/2009Eric Fier on Newsmakers
11/17/2008At Hard Assets Conference, San Francisco
9/24/2008New Video Tour: Underground Silver Deposits at Santa Elena
7/13/2008Report
7/10/2008Signs Agreement For $3.0 Million Feasibility Finance Facilit...
4/21/2008Initiation Report
3/1/2008Announces US$3.0 Million Feasibility Finance Facility & Prop...
9/19/2007Intercepts 10.1 Metres of 6.53 gpt Gold and 218.7 gpt Silve...
3/8/2007Completes Second Phase Drill Program at Cruz de Mayo, Mexico
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (SVL.V)Other OTC (STVZF)
2.66-0.37%1.89-4.55%
TSX-V
CA$ 2.66
02/21 17:00 -0.010
-0.37%
Prev close Open
2.67 2.69
Low High
2.63 2.71
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  2.66 -%
Volume 1 month var.
493,509 -%
24hGold TrendPower© : 27
Produces Gold - Silver
Develops Gold - Silver - Zinc
Explores for Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.69-0.39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.42%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.51+6.36%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+7.89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.92+2.94%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :