Dundee Precious Metals Inc

Published : November 30th, 2015

AVALA RESOURCES ANNOUNCES EARN-IN AND JOINT VENTURE AGREEMENT WITH RIO TINTO ON ITS LENOVAC PROJECT IN SERBIA

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

AVALA RESOURCES ANNOUNCES EARN-IN AND JOINT VENTURE AGREEMENT WITH RIO TINTO ON ITS LENOVAC PROJECT IN SERBIA

_


AVALA RESOURCES ANNOUNCES EARN-IN AND JOINT VENTURE AGREEMENT WITH RIO TINTO ON ITS LENOVAC PROJECT IN SERBIA


Longueuil, November 30, 2015 - Avala Resources Ltd. (TSXV: AVZ) (the 'Company' or 'Avala') is pleased to announce that it has granted an option to Rio Tinto Mining & Exploration Limited ('Rio Tinto') to acquire up to 75% of its wholly-owned Lenovac exploration license (the 'Lenovac Project') by incurring US$40 million in exploration expenditures.


The Agreement


Avala, its wholly owned Serbian subsidiary and Rio Tinto have entered into a binding earn-in and joint venture agreement (the 'Agreement') under which Rio Tinto has the right but not the obligation to earn up to a 75% interest in the Lenovac Project by funding project expenditures of up to US$40 million as follows:


  1. if Rio Tinto incurs total project expenditures of US$3 million by December 31, 2017, it will earn a 51% interest in the Lenovac Project ('Stage 1 earn-in project expenditure');


  2. if Rio Tinto incurs additional project expenditures of US$5 million by December 31, 2019, it will earn an additional 14% interest in the Lenovac Project, resulting in its total interest being 65%; and


  3. if Rio Tinto incurs additional project expenditures of US$32 million prior to December 31, 2023, it will earn an additional 10% interest in the Lenovac Project, resulting in its total interest being 75%.


Rio Tinto has agreed to incur minimum project expenditure of US$1 million by December 31, 2016 which is to be part of the Stage 1 earn-in project expenditure.


A management committee will be formed and comprised of two representatives from each of Rio Tinto and Avala. Avala Resources will be the Manager of the Lenovac Project until at least December 31, 2016. Rio Tinto will then have the right to assume the role of Manager.


'We are extremely pleased to partner with Rio Tinto to explore the potential of the Lenovac Project' said David Fennell, Executive Chairman of Avala. 'The Company anticipates initiating a drill campaign early in 2016.'


The Lenovac Project


The Lenovac Project consists of the 100%-held Lenovac license, granted to the Company in 2013. The license covers 132 km2 and is located 170 km south-east of Belgrade. The project area is strategically located 10km due south of the Reservoir Minerals/Freeport-McMoran Cukaru Peki high-sulphidation epithermal and porphyry copper-gold discovery, along the eastern margin of the Timok Magmatic Complex. Surface geology is dominated by volcanic derived epiclastics (with occasional mineralized clasts) and other sediments that are interpreted as being post-mineral with respect to the mineralization observed at Bor. A location map of the project is shown in Figure 1.


To date, exploration efforts by the Company have focused on the potential for a mineralized system to be located beneath exposed post-mineral cover. The Company has carried out early stage exploration work on


the Lenovac licence, including detailed stratigraphic and structural mapping, as well as a CSAMT geophysical survey consisting of 28 line km. Interpretation and modelling of the resulting resistivity data has indicated a number of deep structural corridors that are viewed as potential exploration drill targets.


Qualified Person


Mr. Justin van der Toorn, CGeol FGS, EurGeol, the Company's Exploration Manager in Serbia, and a 'qualified person' as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has approved the scientific and technical information in this press release.


About Avala Resources Ltd.: Avala Resources is a mineral exploration company focused on the exploration and development of gold and copper projects in Serbia. The Company's key projects are the Timok Gold Project which comprises the Korkan, Bigar Hill and Kraku Pester deposits, the Tulare Project which comprises the Kiseljak and Yellow Creek porphyry copper-gold deposits, and the Lenovac Project in the southeast of the Timok Magmatic Complex.

The common shares of Avala trade on the TSX Venture Exchange under the symbol 'AVZ'. Avala's issued and outstanding share capital totals 43,598,138 common shares, of which approximately 50.1% is held by Dundee Precious Metals Inc. (TSX: DPM).


Cautionary Statement Regarding Forward-Looking Information


This press release contains 'forward-looking information' within the meaning of applicable Canadian securities legislation. Forward looking information in this press release includes information about the amount of expenditures that may be funded by Rio Tinto on the Lenovac Project. Rio Tinto does not have any obligation to spend more than $1,000,000 on the project. Since forward-looking information are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Rio Tinto may elect not to proceed with earning an interest on the Lenovac Project for many reasons such as: the results of exploration programs, general economic conditions and conditions in the financial markets; changes in demand and prices for metals; legislative, environmental and other regulatory, political and competitive developments; operational difficulties encountered in connection with the activities on the project. This list is not exhaustive of the factors that may affect any of the Company's forward-looking information. These and other factors made in public disclosures and filings by the Company should be considered carefully and readers should not place undue reliance on the Company's forward-looking information. The Company does not undertake to update any forward-looking statement that may be made from time to time by the Company or on its behalf, except in accordance with applicable securities laws.


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.


For further information, please contact: Avala Resources Ltd.

David Fennell, Executive Chairman

Telephone: +1.450.640.0810 Email: [email protected] Website: www.avalaresources.com


Figure 1: Location of the Lenovac Project shown with respect to the location of historic resources near Bor, and the Reservoir Minerals/Freeport McMoran Cukaru Peki joint venture project.


Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Serbia | All
Gold and Silver Prices for these countries : Serbia | All

Dundee Precious Metals Inc

PRODUCER
CODE : DPM.TO
ISIN : CA2652692096
CUSIP : 265269-20-9
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Dundee Precious Metals is a zinc and gold producing company based in Canada.

Dundee Precious Metals produces zinc, gold, copper and silver in Armenia, develops copper, gold and silver in Bulgaria.

Its main asset in production is KAPAN in Armenia, its main assets in development are CHELOPECH and KRUMOVGRAD in Bulgaria and its main exploration property is SURDULICA in Bulgaria.

Dundee Precious Metals is listed in Canada. Its market capitalisation is CA$ 1.9 billions as of today (US$ 1.4 billions, € 1.3 billions).

Its stock quote reached its lowest recent point on January 22, 2016 at CA$ 0.84, and its highest recent level on April 22, 2024 at CA$ 10.40.

Dundee Precious Metals has 178 440 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Dundee Precious Metals Inc
2/27/2019Exyn introduces robots into Dundee Precious Metals' gold min...
4/13/2010Discovers New Gold Deposits in Bulgaria
Financings of Dundee Precious Metals Inc
10/9/2013Issued Shares and Warrants of Sabina Gold & Silver Corp. on ...
6/11/2013Announces Result of Early Warrant Exercise Program
Nominations of Dundee Precious Metals Inc
3/21/2013DPM Board Announces Executive Transition and Senior Officer ...
11/14/2012DPM Board Announces Senior Appointment
9/19/2012Eira Thomas Joins Dundee Precious Metals' Board of Directors
Financials of Dundee Precious Metals Inc
10/15/2013NOTICE: DPM 2013 Third Quarter Financial Results
8/1/2013Announces 2013 Second Quarter Results
7/10/2013NOTICE: DPM 2013 Second Quarter Financial Results
5/9/2013Announces 2013 First Quarter Results
4/17/2013NOTICE: DPM 2013 First Quarter Financial Results
2/15/2013Announces 2012 Fourth Quarter and Annual Results and 2013 Gu...
1/24/2013NOTICE: DPM Fourth Quarter and Year End 2012 Results
11/7/2012Announces 2012 Third Quarter Results
10/18/2012NOTICE: Dundee Precious Metals 2012 Third Quarter Results
8/1/2012Announces 2012 Second Quarter Results and Updated 2012 Guida...
7/9/2012NOTICE: DPM 2012 Second Quarter Results
5/8/2012DPM First Quarter 2012 Financial Results
10/14/2011NOTICE: DPM Third Quarter 2011 Results
7/11/2011NOTICE: DPM Second Quarter 2011 Results
4/27/2011Notice: DPM Annual General Meeting and 2011 First Quarter Re...
2/23/2011DPM Reports Fourth Quarter 2010
Project news of Dundee Precious Metals Inc
9/16/2013s 2013 Production Guidance
5/16/2013(Chelopech)Confirms Fundamentals Unchanged; Chelopech Mine Operating at...
9/10/2012(Chelopech)DPM Files Technical Report on Chelopech Pyrite Recovery Proj...
1/13/2012(Krumovgrad)Files Technical Report on Krumovgrad Gold Project
11/24/2011(Krumovgrad)Bulgarian Government Approves EIA for DPM's Krumovgrad Gold ...
2/23/2011(Chelopech)DPM Reports Fourth Quarter 2010 and Year-End Results and Upd...
Corporate news of Dundee Precious Metals Inc
7/28/2016Dundee Precious Metals Announces 2016 Second Quarter Results
7/25/2016Dundee Precious Metals Announces Power Blackout in Namibia R...
7/11/2016DPM Announces Closing of C$54.65 Million Bought Deal Financi...
7/7/2016Dundee Precious Metals Announces Second Quarter Production R...
6/20/2016DPM Announces C$50 Million Bought Deal Financing
12/21/2015Dundee Precious Metals Announces 15% Increase to Measured an...
12/21/2015AVALA RESOURCES STARTS DRILLING ON THE LENOVAC PROJECT
11/30/2015AVALA RESOURCES ANNOUNCES EARN-IN AND JOINT VENTURE AGREEMEN...
11/19/2015Dundee Precious Metals Announces Approval of Main Detailed D...
11/5/2015Dundee Precious Metals Announces 2015 Third Quarter Results
11/4/2015Dundee Precious Metals Announces Changes to Board of Directo...
10/8/2015Dundee Precious Metals Announces Third Quarter Production Re...
9/15/2015Dundee Precious Metals Announces Maintenance of the Tsumeb S...
7/30/2015Dundee Precious Metals Announces 2015 Second Quarter Results
7/9/2015Dundee Precious Metals Announces Second Quarter Production R...
4/14/2015Dundee Precious Metals Announces First Quarter Production Re...
4/14/2015Announces First Quarter Production Results and Provides Noti...
3/31/2015Dundee Precious Metals Announces Reserve and Resource Update...
3/31/2015Announces Reserve and Resource Update for 2015
3/18/2015Dundee Precious Metals Announces Commencement of Annual Tsum...
3/18/2015Announces Commencement of Annual Tsumeb Smelter Shutdown
2/26/2015AVALA RESOURCES PROVIDES AN EXPLORATION UPDATE
2/18/2015Tags to Riches: Mining Company Tracks Production With Sensor...
2/13/2015Dundee Precious Metals Announces 2014 Fourth Quarter and Ann...
2/13/2015Dundee Precious Metals Announces 2014 Fourth Quarter and Ann...
1/22/2015NOTICE: Dundee Precious Metals 2014 Fourth Quarter and Year ...
1/14/2015Dundee Precious Metals Announces Record Fourth Quarter Produ...
1/14/2015(Chelopech)Announces Record Fourth Quarter Production at Chelopech and ...
11/6/2014Dundee Precious Metals Announces 2014 Third Quarter Results
11/5/2014Dundee Precious Metals Announces 2014 Third Quarter Results
10/16/2014NOTICE: Dundee Precious Metals 2014 Third Quarter Results
10/16/2014NOTICE: Dundee Precious Metals 2014 Third Quarter Results
10/8/2014Dundee Precious Metals Announces a Favourable Preliminary Ec...
10/8/2014Dundee Precious Metals Provides Third Quarter 2014 Productio...
10/3/2014Dundee Precious Metals Acquires Shares and Warrants of Avala...
7/30/2014Dundee Precious Metals Announces 2014 Second Quarter Results
7/14/2014NOTICE: DPM 2014 Second Quarter Results
7/10/2014Dundee Precious Metals Announces Krumovgrad Municipal Counci...
7/10/2014Dundee Precious Metals Announces Krumovgrad Municipal Counci...
6/26/2014Dundee Precious Metals Increases Revolving Credit Facility b...
5/20/2014Dundee Precious Metals Strengthens Senior Management Team
8/29/2013Announces First Underground Mineral Resource Estimate for th...
7/24/2012Reports on Progress of Acid Plant at Smelter in Namibia
4/30/2012Receives First Contact from Namibian Government on Tsumeb Sm...
4/23/2012DPM Exercises Warrants of Dunav Resources Ltd.
2/16/2012DPM Announces 2011 Deno Gold Open Pit Project and Undergroun...
1/26/2012(Krumovgrad)Bulgarian Court Dismisses Appeal of DPM's Krumovgrad Mining ...
11/30/2011(Krumovgrad)DPM: New Krumovgrad Feasibility Study Confirms Low Cash Cost...
9/15/2011Improves Safety and Operational Efficiency With AeroScout Re...
9/2/2011Dunav Resources and Dundee Precious Metals Complete Transact...
8/23/2011DPM to Acquire Shares and Warrants of Dunav Resources Ltd. o...
5/10/2011(Chelopech)DPM and Chelopech Mining Raise Final US$14.5 Million of Chel...
3/23/2011DPM Exercises Warrants of Avala Resources Ltd.
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (DPM.TO)
10.40-3.70%
TORONTO
CA$ 10.40
04/22 17:00 -0.400
-3.7%
Prev close Open
10.80 10.46
Low High
10.30 10.64
Year l/h YTD var.
7.98 -  10.80 23.37%
52 week l/h 52 week var.
7.98 -  10.80 2.26%
Volume 1 month var.
655,328 6.01%
24hGold TrendPower© : -11
Produces Copper - Gold - Silver - Zinc
Develops Copper - Gold - Silver
Explores for Molybdenum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202422.50%
202330.41%9.9210.00
2022-14.00%8.415.41
2021-17.27%9.956.99
202058.30%9.9610.03
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.72-0.19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.87-3.12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.18%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-4.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.79-0.32%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.86+0.54%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.13+0.58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :