In the same category
Amerigo Closes Bank Financing for Cauquenes Expansion
Published : March 26, 2015
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

VANCOUVER, BRITISH COLUMBIA--(Marketwired - March 26, 2015) - Amerigo Resources Ltd. (News - Market indicators) ("Amerigo" or the "Company") announced today that Amerigo has now closed the bank syndicate financing (the "Bank Facility") with Banco Bilbao Vizcaya Argentaria ("BBVA") and Export Development Canada ("EDC") for the Cauquenes expansion as announced in the Company's March 19, 2015 press release. Initial funding of $23.6 million from the $64.4 million Tranche A construction portion of the facility and approximately $760,000 in Chilean pesos from the $9 million Tranche B "IVA" (value added tax) loan is expected to be received by Minera Valle Central S.A. ("MVC"), Amerigo's operating subsidiary in Chile, before the end of the week.

Dr. Klaus Zeitler, Amerigo's Chairman and CEO, stated, "We are pleased to announce closing of the Bank Facility agreement on what we consider to be very favorable terms for the Company. Terms of the Tranche A portion of the loan include interest at a fixed rate of 6.11% during construction and 5.86% thereafter for 75% of the facility. The remaining 25% of the Tranche A facility is subject to a variable rate based on the US Libor 6 month rate, which at today's rate would be 4.15% during construction and 3.90% thereafter. The Tranche A facility has a maximum repayment term of 5 years commencing in 2016 that may be shortened without penalty in accordance with the provisions of the agreement. The Tranche B Portion of the Loan will bear interest at a variable rate, which today would be 5.47% per annum, with all principal and interest payable on or before June 30, 2016".

Dr. Zeitler continued, "I would like to take this opportunity to thank BBVA and EDC for agreeing to provide this financing to the Company which will assist in the achievement of the Company transforming milestone of putting the Cauquenes deposit into production. I would also like to thank all members of our team in both Chile and Canada for their hard work in the successful completion of the transaction."

Rob Henderson, Amerigo's President and COO, added, "Construction of the first phase of the Cauquenes Expansion Project is 28% complete and is scheduled for commissioning in Q4 2015, after which it is anticipated MVC's annual copper production will increase to 70 million pounds at a cash cost of $1.60 - $1.75/lb Cu."

All amounts in this press release are in US dollars.

Amerigo Resources Ltd. produces copper and molybdenum under a long term partnership with the world's largest copper producer, Codelco, by means of processing fresh and old tailings from the world's largest underground copper mine, El Teniente near Santiago, Chile. Tel: (604) 681-2802; Fax: (604) 682-2802; Web: www.amerigoresources.com; Listing: ARG:TSX

Certain of the information and statements contained herein that are not historical facts constitute "forward-looking information" within the meaning of the Securities Act (British Columbia), Securities Act (Ontario) and the Securities Act (Alberta) ("Forward-Looking Information"). Forward-Looking Information is often, but not always, identified by the use of words such as "expect", "seek", "anticipate", "believe", "plan", "estimate", "expect" and "intend"; statements that an event or result is "due" on or "may", "will", "should", "could", or might" occur or be achieved; and, other similar expressions. More specifically, Forward-Looking Information contained herein includes, without limitation, information concerning the processing of tailings pursuant to the agreement for the purchase by MVC of the processing rights for the Cauquenes tailings deposit, extending the contract for the processing of Fresh Tailings to 2037 and consolidating all contracts between MVC and Codelco's El Teniente Division ("DET") (the "Master Agreement"), continued availability of funds from the Bank Facility, and completion of and draw down of funds, if required, from the $17 million support agreement with DET and the $13 million standby line of credit with certain of Amerigo's insider shareholders, completion of construction of the planned expansion of MVC's operations required for the processing of old tailings from the historic Cauquenes tailings deposit, including the first and subsequent phases of such expansion (the "Cauquenes Expansion"), future tailings production volumes and the Company's copper and molybdenum production, all of which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such Forward-Looking Information including, without limitation, material factors and assumptions relating to, and risks and uncertainties associated with, the performance of the Master Agreement, the receipt of adequate debt financing required for the Cauquenes Expansion, the successful completion of the Cauquenes Expansion, the continued supply of fresh tailings from El Teniente and successful extraction of historic tailings from the Cauquenes and Colihues tailings deposits, the achievement and maintenance of planned production rates, the evolving legal and political policies of Chile, the volatility in the Chilean economy, military unrest or terrorist actions, metal price fluctuations, governmental relations, the availability of financing for activities when required and on acceptable terms, the estimation of mineral resources and reserves, current and future
environmental and regulatory requirements, the availability and timely receipt of permits, approvals and licenses, industrial or environmental accidents, equipment breakdowns, availability of and competition for future mineral acquisition opportunities, availability and cost of insurance, labour disputes, land claims, the inherent uncertainty of production and cost estimates, currency fluctuations, expectations and beliefs of management and other risks and uncertainties, including those described under Risk Factors in the Company's Annual Information Form and in Management's Discussion and Analysis in the Company's financial statements. Such Forward-Looking Information is based upon the Company's assumptions regarding global and Chilean economic, political and market conditions and the price of metals, including copper and molybdenum, and future tailings production volumes and the Company's copper and molybdenum production, including estimated production increases and cost reductions expected to result from the Cauquenes Expansion. Among the factors that have a direct bearing on the Company's future results of operations and financial conditions are changes in project parameters as plans continue to be refined, financing and construction of, and estimated production increases and cost reductions expected to result from, the Cauquenes Expansion, interruptions in the supply of fresh tailings from El Teniente, delays in the extraction of historic tailings from the Colihues and Cauquenes tailings deposits, a change in government policies, competition, currency fluctuations and restrictions and technological changes, among other things. Should one or more of any of the aforementioned risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from any conclusions, forecasts or projections described in the Forward-Looking Information. Accordingly, readers are advised not to place undue reliance on Forward-Looking Information. Except as required under applicable securities legislation, the Company undertakes no obligation to publicly update or revise Forward-Looking Information, whether as a result of new information, future events or otherwise.

Data and Statistics for these countries : Canada | Chile | All
Gold and Silver Prices for these countries : Canada | Chile | All

Amerigo Resources Ltd

PRODUCER
CODE : ARG.TO
ISIN : CA03074G1090
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Amerigo Res. is a copper and molybdenum producing company based in Canada.

Its main asset in production is MINERA VALLE CENTRAL in Chile.

Amerigo Res. is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 300.0 millions as of today (US$ 219.7 millions, € 206.1 millions).

Its stock quote reached its lowest recent point on February 21, 2003 at CA$ 0.08, and its highest recent level on April 27, 2007 at CA$ 2.77.

Amerigo Res. has 175 440 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Amerigo Resources Ltd
3/26/2015Closes Bank Financing for Cauquenes Expansion
3/19/2015Secures Cauquenes Bank Financing Without Dilution to Shareho...
2/14/2009Closing of Private Placement
2/7/2009Non-brokered Private Placement
8/28/2008Acquisition of Common Shares and Warrants of Los Andes Coppe...
Nominations of Amerigo Resources Ltd
6/5/2012Pleased to Announce New Appointments
Financials of Amerigo Resources Ltd
8/6/2013Announces Q2-2013 Financial Results
5/9/2013Announces Q1-2013 Financial Results
11/8/2012Announces Q3-2012 Financial Results
8/3/2012Announces Q2-2012 Financial Results
5/7/2012Announces Q1-2012 Financial Results
3/5/2012Announces 2011 Financial Results
8/11/2011Announces Q2-2011 Financial Results
6/14/2011Announces Q1-2011 Financial Results
7/28/2008Q2-2008 Financial Results
Project news of Amerigo Resources Ltd
10/15/2013Announces Q3-2013 Production Results
7/12/2013Announces Q2-2013 Copper Production Results
7/12/2013Announces Q2-2013 Copper Production Results
4/15/2013Announces Q1-2013 Copper Production Results
1/16/2013Q4-2012 and Full Year Production Results Exceed Guidance
7/17/2012Announces Q2-2012 Production Results
4/18/2012Announces Record Q1-2012 Copper Production Results
1/27/2012Announces Q4 2011 Production Results and Provides 2012 Produ...
7/21/2011Announces Q2 2011 Production Results
6/7/2011Provides Production Update
5/5/2011Announces Record Q1 2011 Production Results
1/30/2009 Q4 2008 Production Results
7/15/2008Announces Q2 2008 Production Results Copper Production 7.08M...
4/21/2008Announces Q1 2008 Production Results
Corporate news of Amerigo Resources Ltd
5/3/2016Amerigo Announces Results of AGM
4/14/2016Amerigo Announces 2016 First Quarter Production Results
11/4/2015Amerigo Announces Q3-2015 Financial Results
10/20/2015Amerigo Announces Q3-2015 Production Results
9/29/2015Amerigo Announces Management and Board Changes
9/24/2015Amerigo Announces Successful Start-up of Phase 1 of Cauquene...
8/12/2015Amerigo Announces Q2-2015 Financial Results
7/22/2015Amerigo Announces Results of AGM
7/17/2015Amerigo Announces Q2-2015 Production Results
4/17/2015Amerigo Announces Q1-2015 Production Results
4/13/2015Amerigo Announces Appointment of Alberto Salas as President ...
3/19/2015Amerigo Secures Cauquenes Bank Financing Without Dilution to...
2/23/2015Amerigo Announces 2014 Financial Results
2/5/2015Amerigo Announces Q4-2014 and Full Year Production Results
11/6/2014Amerigo Announces Q3-2014 Financial Results
10/16/2014Amerigo Announces Q3-2014 Production Results
8/7/2014Amerigo Announces Q2-2014 Financial Results
7/18/2014Amerigo Announces Q2-2014 Production Results
7/14/2014Amerigo Announces Receipt of Environmental Approval for Cauq...
5/8/2014Amerigo Announces Q1-2014 Financial Results
4/24/2014Amerigo Announces Filing of NI 43-101 Technical Report
4/22/2014Amerigo and Codelco/El Teniente Sign Agreement Extending Tai...
10/30/2013Executes Mandate Agreement With BBVA to Arrange Project Debt...
9/30/2013Announces Management Changes
7/22/2013Announces Cauquenes Approval and Contract Extension to 2037
1/24/2013Announces 2013 Operations and Capital Guidance
10/16/2012Reports Strong Q3-2012 Production Results: Year to Date Copp...
5/26/2011Announces Dates for Release of Q1 2011 Results and Investor ...
3/28/2011Declares Semi-Annual Dividend
3/1/2010Update on Chilean Earthquake
12/29/2008New Debt Facilities and Cost Reductions
12/16/2008Announces Shareholder Rights Plan
11/7/2008Cash flow from operations of US$7.6M in Q3-2008
7/15/2008on Amerigo Q2 Power Costs
7/7/2008Announces Release of Q2 2008 Results
5/7/2008Q1 08 Results
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ARG.TO)FRANKFURT (RE8.F)
1.71+0.00%1.15+0.00%
TORONTO
CA$ 1.71
04/23 17:00 -
0%
Prev close Open
1.71 1.66
Low High
1.65 1.72
Year l/h YTD var.
1.23 -  1.77 23.91%
52 week l/h 52 week var.
1.12 -  1.77 0.588%
Volume 1 month var.
166,667 15.54%
24hGold TrendPower© : 20
Produces Copper - Molybdenum
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/29/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202423.91%
20234.55%1.851.28
2022-5.71%2.010.85
202175.00%1.610.68
202048.15%0.860.12
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.11+2.21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.47+3.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.25-3.42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.79-3.76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.57+0.84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :