Endeavour Silver Corp.

Published : July 11th, 2016

Endeavour Silver Produces 1,551,851 oz Silver and 15,649 oz Gold (2.6 Million oz Silver Equivalents) in the Second Quarter, 2016; Revises 2016 Operating Plan and Raises 2016 Production Guidance

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Endeavour Silver Produces 1,551,851 oz Silver and 15,649 oz Gold (2.6 Million oz Silver Equivalents) in the Second Quarter, 2016; Revises 2016 Operating Plan and Raises 2016 Production Guidance

VANCOUVER, BC --(Marketwired - July 11, 2016) - Endeavour Silver Corp. (TSX: EDR) (NYSE: EXK) reports production results for the Second Quarter, 2016 from the Company's three operating silver mines in Mexico: the Guanaceví mine in Durango State and the Bolañitos and El Cubo mines in Guanajuato State (Please click here for an audio review of Q2 highlights).

Silver production in the Second Quarter, 2016 was 1,551,851 ounces (oz) and gold production was 15,649 oz for silver equivalent production of 2.6 million oz using a 70:1 silver gold ratio. Quarterly silver and gold production were both ahead of plan in Q2, 2016 but silver production was lower compared to Q2, 2015 as per the Company's previous 2016 guidance. Management has revised its 2016 operating plan and raised its 2016 production guidance to reflect the higher metal prices and renewed focus on growth.

Production Highlights for Second Quarter, 2016 (Compared to Second Quarter, 2015)

  • Silver production decreased 14% to 1,551,851 oz
  • Gold production increased 17% to 15,649 oz
  • Silver equivalent production was 2.6 million oz (at a 70:1 silver: gold ratio)
  • Silver oz sold down 22% to 1,493,790 oz
  • Gold oz sold up 11% to 15,364 oz
  • Bullion inventory at quarter-end included 113,064 oz silver and 221 oz gold
  • Concentrate inventory at quarter-end included 71,361 oz silver and 1,192 oz gold

Endeavour CEO Bradford Cooke commented, 'Having successfully minimized our all-in sustaining costs and boosted our free cash flows in recent quarters, management returned its attention to optimizing near-term production and long-term growth in Q2, 2016. Our production is well ahead of plan for the year and as a result, we revised our operating plan and raised our production guidance by about 13% for 2016.

'We augmented our management team with the recent appointment of Dale Mah as Vice President, Corporate Development and closed the acquisition of Oro Silver Resources Ltd. and its small but permitted, high-quality El Compas gold-silver mine in Zacatecas, Mexico. El Compas should boost our near-term production and cash flow while we develop the larger Terronera silver-gold mining project.

'At Terronera, mapping extended the vein system to cover an area of 7 km by 7 km, and our exploration group identified an additional nine veins on the northern half of the property. Grab, selected and chip sampling confirmed that high-grade, bonanza, low-sulfidation epithermal silver-gold mineralization is present in many of the newly identified veins, with assays up to 2,880 gpt silver and up to 26.7 gpt gold.'

Production Tables for Second Quarter, 2016

Production Tonnes
Tonnes
Grade
Grade
Recovery
Recovery
Silver
Gold
by mine Produced per day Ag gpt Au gpt Ag % Au % Oz Oz
Guanaceví 98,756 1,085 232 0.49 85.4% 87.7% 629,221 1,365
Bolañitos 136,322 1,498 80 2.38 79.0% 81.2% 276,885 8,470
El Cubo 142,120 1,562 156 1.56 90.6% 81.6% 645,745 5,814
Consolidated 377,198 4,145 148 1.58 86.2% 81.9% 1,551,851 15,649
gpt = grams per tonne

Production Tables for First Half, 2016

Production Tonnes Tonnes Grade Grade Recovery Recovery Silver Gold
by mine Produced per day Ag gpt Au gpt Ag % Au % Oz Oz
Guanaceví 197,532 1,085 241 0.52 83.7% 88.8% 1,280,952 2,933
Bolañitos 273,450 1,502 87 2.35 79.9% 81.9% 611,454 16,919
El Cubo 314,769 1,730 131 1.46 88.2% 79.6% 1,169,510 11,757
Consolidated 785,751 4,317 143 1.53 84.6% 81.6% 3,061,916 31,609
gpt = grams per tonne
Three Months Ended June 30
Q2 2016 Highlights Six Months Ended June 30
2016 2015 % Change 2016 2015 % Change
377,198 371,745 1% Throughput (tonnes) 785,751 752,537 4%
1,551,851 1,805,569 (14%) Silver ounces produced 3,061,916 3,625,619 (16%)
15,649 13,430 17% Gold ounces produced 31,609 29,238 8%
1,511,109 1,761,926 (14%) Payable silver ounces produced 2,984,791 3,531,850 (15%)
15,200 13,122 16% Payable gold ounces produced 30,718 28,551 8%
2,725,526 2,745,669 (1%) Silver equivalent ounces produced 5,432,591 5,672,279 (4%)
1,493,790 1,912,595 (22%) Silver ounces sold 3,005,109 3,774,570 (20%)
15,364 13,797 11% Gold ounces sold 30,619 29,596 3%
Silver equivalent ounces calculated using 70:1 silver:gold ratio

Operations Update, Revised Operating Plan

At Guanaceví, throughput of 1,085 tonnes per day (tpd) in Q2, 2016 lagged behind plan as the new mining contractor focused on mine development in order to provide better stope access in H2, 2016. Ore grades were lower and metal recoveries were higher compared to Q1, 2016. Management expects production to meet the low range of 2016 production guidance.

Endeavour has made a production decision to develop a new mine on the Santa Cruz Sur ore-body discovered in 2014. The Company plans to invest $2.8 million in H2, 2016, part of a three-year, $8.4 million capital investment, to commence mine development and ramp down into the Santa Cruz Sur ore-body to access an indicated resource of over 650,000 tonnes grading 250 g/t silver and 0.70 g/t gold. The currently defined ore-body is open to the south and at depth. Underground drilling is planned to continue exploring the mineralized zone once underground access is available.

At Bolañitos, throughput averaging 1,498 tpd exceeded plan as mining at LL-Asunción uncovered new extensions of the ore-body beyond the resource blocks and also in and around historic mine workings. Ore grades were lower and metal recoveries were higher compared to Q1, 2016. Management has revised 2016 production guidance higher to 900,000-1,000,000 oz silver and 24,000-26,000 oz gold, with throughput decreasing to 800 tpd in H2, 2016 as originally guided.

The Company plans a $1.7 million capital investment in H2, 2016 to develop the Plateros orebody located only 50 metres from the existing LL-Ascunción mine workings. The development will access an indicated resource of over 130,000 tonnes grading 116 g/t silver and 1.61 g/t gold, still open at depth. Underground drilling is planned to continue exploring the mineralized zone once underground access is available.

At El Cubo, throughput was above plan at 1,562 tpd as management elected to continue mine development sufficient to sustain 1,500 tpd in Q2, 2016 and 1,000 tpd in H2, 2016 given the rising precious metal prices. Endeavour has also made a decision not to ramp down production to care and maintenance by year-end as previously guided, and various operating plans are under evaluation for production to return to 1,500 tpd with additional mine development. Management has revised the 2016 production guidance higher to 1,700,000-1,900,000 silver ounces and 19,000-21,000 gold ounces.

The Company will invest $1.6 million in H2, 2016 to extend the V-Asunción ramp an additional 1.6 km in order to access an indicated resource of more than 300,000 tonnes grading 141 g/t silver and 1.55 g/t gold. The V-Asunción ore-body extends well south of the current mine plan, but further evaluation work is needed before Endeavour can commit to any additional development. A pilot test using optical scanning technology on two tonnes of El Cubo run-of-mine ore successfully separated up to 80% of the ore into a higher grade ore fraction. Additional tests are being conducted to improve ore recovery into the ore fraction and reduce the ore losses into the waste fraction. Results are expected in Q3, 2016.

Revised Production Guidance

Mine Ag (M oz) Au (K oz) Ag Eq (M oz) Tonnes/Day (tpd)
Guanaceví 2.9-3.1 6.0-7.0 3.4-3.7 1,100-1,300
Bolañitos 0.9-1.0 24.0-26.0 2.6-2.8 800-1,500
El Cubo 1.7-1.9 19.0-21.0 3.0-3.3 1,000-2,000
Total 5.5-6.0 49.0-54.0 9.0-9.8 2,900-4,800

Revised Capital Plan

In January, the Company guided capital expenditures totaling $11.3 million in 2016, primarily for mine development at Guanaceví, in order to access reserves for mining and replace reserves by converting measured and indicated resources. A contingent budget was also prepared to invest $4.5 million on additional mine development at Guanaceví, subject to financing, plus small capital investments at Bolañitos and El Cubo, subject to higher metal prices. Endeavour has therefore revised its 2016 capital investment guidance as follows:

Original Capital Updated Capital
Guanaceví $11.3 million $14.1 million
Bolañitos - $1.7 million
El Cubo - $1.6 million
Total $11.3 million $17.4 million

Revised Exploration Plan

In January, the Company guided exploration expenditures totaling $2.5 million on exploration drilling at Guanaceví and property holding costs in Mexico, with a contingent budget to invest an additional $7.0 million on additional exploration, engineering and land acquisition, primarily at Terronera, subject to financing. Endeavour's cash and working capital positions grew substantially during H1, 2016 thanks to higher metal prices, stronger cash flows, and two At-the-Market equity offerings.

As a result, management recently approved the contingent budget, as well as additional expenditures for the newly acquired El Compas project. The Company now expects to spend $10.8 million on exploration this year, of which $8.0 million is budgeted for H2, 2016. This includes 23,400 metres of drilling, primarily at Terronera and secondarily at Guanaceví, El Cubo, El Compas and Guadalupe y Calvo. In addition to exploration work focused on growing the Company's silver and gold resources, the budget includes acquisitions, engineering and permitting work for the pre-feasibility study at Terronera and the preliminary economic assessment at El Compas.

Project H2 2016 Activity Drill Metres Expenditures (millions)
Terronera PFS, Drilling, Permitting 9,000 $3.4
Guanaceví Drilling 6,400 $1.3
El Compas PEA, Drilling, Infrastructure 3,000 $2.0
Guadalupe Drilling 3,000 $0.6
El Cubo Drilling 2,000 $0.3
Various Mapping, Permitting - $0.4
Total 23,400 $8.0

Release of Second Quarter, 2016 Financial Results and Conference Call

The Second Quarter, 2016 financial results will be released before market on Wednesday, August 3, 2016 and a telephone conference call will be held the same day at 10:00 am PDT (1:00 pm EDT).

About Endeavour - Endeavour Silver Corp. is a mid-tier precious metals mining company with three high grade, underground, silver-gold mines in Mexico. Since start-up in 2004, we have expanded our mining operations organically to produce 11.4 million ounces of silver equivalents in 2015. Endeavour's growing discovery of high-grade silver-gold mineralization on the Terronera property in Jalisco state, combined with the recent acquisition of the permitted El Compas mine and plant in Zacatecas state, should facilitate the Company's goal to become a premier senior producer in the silver mining sector.

Cautionary Note Regarding Forward-Looking Statements

This news release contains 'forward-looking statements' within the meaning of the United States private securities litigation reform act of 1995 and 'forward-looking information' within the meaning of applicable Canadian securities legislation. Such forward-looking statements and information herein include but are not limited to statements regarding Endeavour's anticipated performance in 2015 and the timing and results of various activities. The Company does not intend to, and does not assume any obligation to update such forward-looking statements or information, other than as required by applicable law.

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Endeavour and its operations to be materially different from those expressed or implied by such statements. Such factors include, among others, changes in national and local governments, legislation, taxation, controls, regulations and political or economic developments in Canada and Mexico; operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of mineral exploration, development and mining; the speculative nature of mineral exploration and development, risks in obtaining necessary licenses and permits, and challenges to the Company's title to properties; as well as those factors described in the section 'risk factors' contained in the Company's most recent form 40F/Annual Information Form filed with the S.E.C. and Canadian securities regulatory authorities.

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the continued operation of the Company's mining operations, no material adverse change in the market price of commodities, mining operations will operate and the mining products will be completed in accordance with management's expectations and achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or information, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Contact Information

For more information, please contact:
Meghan Brown
Director Investor Relations
Toll free: 1-877-685-9775
Tel: 604-640-4804
Fax: 604-685-9744
Email: [email protected]
Website: www.edrsilver.com

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Mexico | All
Gold and Silver Prices for these countries : Mexico | All

Endeavour Silver Corp.

PRODUCER
CODE : EDR.TO
ISIN : CA29258Y1034
CUSIP : 29258Y 10 3
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Endeavour Silver is a gold and silver producing company based in Canada.

Endeavour Silver holds various exploration projects in Chile and in Mexico.

Its main assets in production are GUANAJUATO (BOLANITOS) and GUANACEVI in Mexico and its main exploration properties are ARROYO SECO and PARRAL in Mexico and LA PRESIDENTA CHILE in Chile.

Endeavour Silver is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 443.0 millions as of today (US$ 321.9 millions, € 302.0 millions).

Its stock quote reached its lowest recent point on January 25, 2002 at CA$ 0.01, and its highest recent level on September 14, 2012 at CA$ 9.99.

Endeavour Silver has 127 300 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Endeavour Silver Corp.
5/28/2010Morning notes - Christopher Berry, MBA
In the News and Medias of Endeavour Silver Corp.
3/1/2010 Endeavour Silver - Silver Producer Focused On Growth
3/1/2010Silver Fundamentals - Endeavour Silver
3/28/2006Follow up N° 2
Annual reports of Endeavour Silver Corp.
2009 Annual report
2008 Annual Report
Financings of Endeavour Silver Corp.
1/1/2009Closes CA$3 Million in Two Private Placement Financings
12/17/2008Arranges CA$4 Million Special Warrant Private Placement
Nominations of Endeavour Silver Corp.
1/22/2013Announces Three New Management Appointments
8/20/2012Appoints New Director to the Board and New Manager of Corpor...
3/19/2008Announces Change of CFO for Health Reasons and New Appointme...
1/3/2008Appoints New CFO
12/3/2007Announces Four New Appointments to Operations Team in Mexico
10/11/2007(Guanacevi)Appoints New Vice President, Mexico Operations; Provides Upd...
Financials of Endeavour Silver Corp.
7/15/2013Adjusts Second Quarter 2013 Revenues 12% Higher; Second Quar...
10/13/2011Production Continued to Rise in 3rd Quarter, 2011; Revenues ...
8/3/2011Reports $10.6 Million Adjusted Earnings in Q2, 2011 Thanks t...
5/5/2011Reports $14.5 Million Adjusted Earnings in Q1, 2011, Thanks ...
3/22/2011Reports Record Earnings, Cash-Flow and Revenues in 2010
5/16/2009Reports Financial and Operating Results for Q1, 2009; Silver...
7/9/2008(Guanajuato (bolanitos))Production on Target in Second Quarter, 2008;
4/7/2008Reports Financial and Operating Results for 2007; Revenues U...
11/15/2007 Reports Record Silver Production and Sales Revenues in Thir...
Project news of Endeavour Silver Corp.
9/3/2013(Guanacevi)Reports Fatality at Guanacevi Mine
1/14/2013Delivers 8th Consecutive Year of Production Growth in 2012; ...
1/31/2012(Guanajuato (bolanitos))Forecasts Eighth Consecutive Year of Production Growth, 60% ...
1/10/2012(Guanajuato (bolanitos))Sets New Production Records in 4th Quarter, 2011; Silver Pro...
12/13/2011(Guanajuato (bolanitos))Discovers Two New High Grade Silver-Gold Veins at the Guanaj...
12/6/2011(Guanajuato (bolanitos))Continues to Extend High Grade Silver-Gold Mineralization in...
9/22/2011(Guanajuato (bolanitos))Intersects 448 gpt Silver and 14.0 gpt Gold Over a 4.6 Meter...
9/6/2011(La Presidenta Chile)Options La Presidenta Silver Property in Chile
6/28/2011(Guanajuato (bolanitos))Drilling Continues to Intersect High Grade Silver-Gold Miner...
6/1/2011(Guanacevi)Acquires Several New Properties Covering Unexplored Vein Sys...
3/1/2011(Parral)Expands Indicated and Inferred Silver-Gold-Zinc-Lead Resourc...
1/7/2009Drilling Extends High Grade Silver Mineralization in Alex Br...
9/23/2008(Guanacevi)Additional Drilling Continues to Expand Three New Silver Zon...
9/9/2008(Guanajuato (bolanitos))Discovers Four New Zones of High Grade Silver-Gold Mineraliz...
8/6/2008(Guanajuato (bolanitos))Drilling Extends "3785" Silver-Gold Zone at Cebada Mine, Out...
6/12/2008(Guanacevi)Drilling Intersects Thicker, Deeper Extension of Santa Cruz ...
3/3/2008 Announces NI 43-101 Reserve/Resource Update: Proven/Probab...
2/26/2008(Guanajuato (bolanitos))Drilling Intersects New Gold-Silver Zone at Cebada Mine, Gua...
2/12/2008(Parral)Exploration Review Of 2007 And Exploration Outlook For 2008
6/12/2007Discovers New High Grade Lead- Zinc-Copper-Gold-Silver Miner...
Corporate news of Endeavour Silver Corp.
8/3/2016Endeavour Silver posts 2Q profit
7/27/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
7/20/2016Here’s Why These Five Stocks Are on the Move on Wednesday
7/11/2016Endeavour Silver Produces 1,551,851 oz Silver and 15,649 oz ...
6/27/2016Endeavour Silver Outlines Several Prospective New Silver-Gol...
6/2/2016Endeavour Silver Appoints New Vice President, Corporate Deve...
5/30/2016Endeavour Silver Completes Acquisition of Oro Silver Resourc...
5/27/2016Endeavour Silver Announces Annual General Meeting Results
1/29/2016Silver Could Spike $10 In A Day In Global Collapse Scenario
1/28/2016Endeavour Silver to cut output in Mexico on low prices
1/28/2016Endeavour Silver Provides Production and Cost Guidance for 2...
1/21/2016Endeavour Silver Updates Reserve and Resource Estimates; Dee...
11/25/2015Endeavour Silver Announces At-the-Market Offering of Up to U...
11/24/2015Is Endeavour Silver Corp. (CAN) (EXK) A Good Stock To Buy?
11/4/2015Should Endeavour Silver (EXK) Be On Your Radar Now?
11/2/2015Endeavour Silver Reports Financial Results for Third Quarter...
11/2/2015Endeavour Silver reports 3Q loss
10/28/2015Endeavour Silver Announces Revised Date for Release of Third...
10/28/2015Endeavour Silver Announces Revised Date for Release of Third...
10/28/2015Endeavour Silver Announces Revised Date for Release of Third...
10/28/2015Endeavour Silver Announces Revised Date for Release of Third...
10/28/2015Endeavour Silver Announces Revised Date for Release of Third...
10/28/2015Endeavour Silver Announces Revised Date for Release of Third...
10/28/2015Endeavour Silver Announces Revised Date for Release of Third...
10/28/2015Endeavour Silver Announces Revised Date for Release of Third...
10/28/2015Endeavour Silver Announces Revised Date for Release of Third...
10/28/2015Endeavour Silver Announces Revised Date for Release of Third...
10/28/2015Endeavour Silver Announces Revised Date for Release of Third...
10/28/2015Endeavour Silver Announces Revised Date for Release of Third...
10/28/2015Endeavour Silver Announces Revised Date for Release of Third...
10/28/2015Endeavour Silver Announces Revised Date for Release of Third...
10/16/2015Will Endeavour Silver (EXK) Continue to Surge Higher?
10/8/2015Endeavour Silver Produces 1,820,282 oz Silver and 15,319 oz ...
9/22/2015Endeavour Silver Infill Drilling Confirms High Grade, Gold-S...
9/9/2015Endeavour Silver Drilling Extends Three Zones of High Grade,...
8/17/2015Endeavour Silver Drilling Intersects High Grade, Gold-Silver...
8/6/2015Endeavour Silver reports 2Q loss
8/6/2015Endeavour Silver Reports Financial Results for Second Quarte...
7/9/2015Endeavour Silver Produces 1,769,741 oz Silver and 13,047 oz ...
4/23/2015Endeavour Silver Makes Minor Amendments to Stock Option Plan
4/8/2015Endeavour Silver Produces 1,820,050 oz Silver and 15,808 oz ...
4/8/2015Produces 1,820,050 oz Silver and 15,808 oz Gold (2.9 Millio...
3/17/2015Endeavour Silver Initiates Major Mine Expansion at El Cubo; ...
3/17/2015Endeavour Silver Reports 2014 Financial Results; Conference ...
3/17/2015Initiates Major Mine Expansion at El Cubo; Raises Production...
11/1/2013to Report Third Quarter 2013 Financial Results Before Market...
10/9/2013Sets New Production Record in Third Quarter, 2013; Produces ...
9/16/2013Raises 2013 Production Guidance to 6.0 Million oz Silver and...
9/11/2013Drilling Intersects New Silver-Gold Mineralization Near Hist...
8/6/2013Reports Second Quarter, 2013 Financial Results; Conference C...
7/22/2013Drilling Intersects Three Gold-Silver Mineralized Zones Near...
7/10/2013Sets New Production Record in Second Quarter, 2013; Produces...
6/11/2013Drill Program Continues to Intersect High Grade Silver-Gold ...
5/23/2013Reports Results of Annual General Shareholder Meeting
5/6/2013Reports First Quarter 2013 Financial Results, Conference Cal...
5/6/2013Reports First Quarter 2013 Financial Results, Conference Cal...
4/29/2013Implements Cost Reductions, Revises 2013 Financial Plan to R...
4/19/2013Reports Fatality of Contractor Employee at El Cubo Mine
4/8/2013Reports Record Production in First Quarter, 2013; Produces 1...
3/12/2013Reports Record Earnings, Cash Flow and Revenue in 2012, Conf...
2/25/2013Reports Strong Reserve and Resource Growth in 2012
2/13/2013Sustainability Review 2012 and Outlook 2013
1/30/2013Forecasts Ninth Consecutive Year of Production Growth, El Cu...
11/12/2012Appoints Luis Castro, Ing., as Vice President, Exploration
11/12/2012Appoints Luis Castro, Ing., as Vice President, Exploration
11/12/2012Appoints Luis Castro, Ing., as Vice President, Exploration
11/6/2012Reports Third Quarter 2012 Financial Results; Q3, 2012 Confe...
10/9/2012Illegal Work Stoppage at El Cubo Lease Facilities
9/24/2012Continues to Extend High Grade Silver-Gold Mineralization in...
9/18/2012Extends High Grade Silver-Gold Mineralization in the Lana Ve...
9/10/2012Provides El Cubo Capital Budget and Operational Update
8/7/2012Reports Second Quarter 2012 Financial Results; Arranges $75 ...
7/10/2012Production Continues to Climb in Second Quarter, 2012; Produ...
6/29/2012and AuRico Gold Extend Closing of the Purchase/Sale of the E...
6/19/2012Options Lourdes Property in Guanajuato, Mexico
6/5/2012Clarifies Technical Disclosure for the El Cubo Mine and Guad...
5/22/2012Discovers High Grade Silver-Gold Mineralization at the San S...
5/8/2012Reports Record Adjusted Earnings for Q1, 2012, Up 35% to $19...
4/24/2012to Release First Quarter 2012 Financial Results on May 8, 20...
4/15/2012and AuRico Gold Sign Definitive Agreement
4/11/2012Reports Record Production in First Quarter, 2012; Produces 1...
3/19/2012Expands Its Reserves/Resources for 8th Consecutive Year
3/7/2012to Release 2011 Financial Results on March 20, 2012, Confere...
1/24/2012Review of Exploration Results in 2011 and Plans for 2012
1/17/2012Initiates Two $500,000, 5 Year Scholarship Programs for Eart...
7/19/2011to Release Second Quarter 2011 Financial Results on August 3...
7/11/2011Reports Continued Production Growth in 2nd Quarter, 2011; Pr...
4/26/2011to Release First Quarter 2011 Financial Results on May 5, 20...
4/11/2011Reports Record Production in First Quarter, 2011; Produces 9...
3/7/2011Announces Transfer of Common Share Listing From NYSE Amex to...
2/1/20112010 Exploration Review and Exploration Plans for 2011
1/6/2011Sets New Production Records in 4th Quarter, 2010, Silver Pro...
12/1/2010Cream Board of Directors Recommends Acceptance of Amended En...
12/24/2008David Morgan's Latest Commentary
11/21/2008David Morgan's Latest Commentary on Silver
11/10/2008Webcast Rodman & Renshaw Conference, Monday November 10
9/16/2008Chairman and CEO Comments to Shareholders: Fundamentals Rem...
9/5/2008Present at The Silver Summit, Coeur d'Alene, Idaho
3/26/2008 David Morgan Exclusive Interview -Third in a Series
2/22/2008 & David Morgan - February Interview
2/19/2008Endeavour Acquires Navegantes Properties Near Parral Distric...
12/12/2007Acquires San Pedro Properties In Guanacevi Silver District, ...
11/27/2007Acquires El Milache Properties Along Trend from Porvenir Min...
10/17/2007 Sets New Record For Quarterly Silver Production, Up Sharply...
9/25/2007Update of Exploration and Acquisition Programs in Mexico
9/17/2007Review of Operations and Revised 2007 Forecast
8/31/2007Reports Update on Cash Position and Short Term Investments
8/15/2007Reports Higher Quarterly Sales Revenues, Silver Production, ...
8/10/2007Silver Supply & Demand
8/1/2007 Reports Higher Silver Production In Q2, 2007, Up 23% to 430...
7/11/2007Raises 2007 Production Forecast to 2.8 million Oz Silver; Bo...
6/20/2007Shareholders Re-Elect Board, Appoint New Director
5/17/2007Brien Lundin's Latest Review and Recommendation
5/15/2007Reports Record Quarterly Sales Revenues, Mine Operating Cash...
1/27/2007Lists on the American Stock Exchange Trading Symbol "EXK"
1/13/2006Silver Gold Newsletter
10/16/2005Update from Goldletter International
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (EDR.TO)NYSE (EXK)
3.48-1.14%2.53-0.78%
TORONTO
CA$ 3.48
04/18 17:00 -0.040
-1.14%
Prev close Open
3.52 3.57
Low High
3.46 3.65
Year l/h YTD var.
1.96 -  3.96 35.94%
52 week l/h 52 week var.
1.96 -  5.71 -36.84%
Volume 1 month var.
691,614 24.29%
24hGold TrendPower© : -1
Produces Gold - Silver
Develops
Explores for Copper - Gold - Lead - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/27/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-3.87%
2023-17.35%6.083.43
2022-22.61%7.273.40
2021-11.98%9.324.77
2020110.13%6.691.30
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :