Anglo Asian Mining plc

Published : October 14th, 2015

Q3 2015 Production Update

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Q3 2015 Production Update

RNS Number : 1614C

Anglo Asian Mining PLC

14 October 2015



Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

14 October 2015

Anglo Asian Mining plc

Q3 2015 operations and production update - Gedabek gold, copper and silver mine, Azerbaijan

Anglo Asian Mining plc ('Anglo Asian' or 'the Company'), the AIM listed gold, copper and silver producer focused in Azerbaijan, is pleased to provide an operations and production update from its Gedabek gold, copper and silver mine ('Gedabek') in western Azerbaijan for the three months to 30 September 2015 ('Q3 2015'). Note that all references to '$' are to United States dollars.

Production overview

· Gold production for Q3 2015 remained on track with 18,165 ounces produced, of which 11,795 ounces was from the agitation leach plant, 6,363 ounces from heap leach operations and 7 ounces from SART processing (Q2 2015: total 18,745 ounces)

· Copper production for Q3 2015 totalled 216 tonnes from SART processing (Q2 2015: 236 tonnes)

· Silver production for Q3 2015 totalled 4,439 ounces with 588 ounces from the agitation leach plant, 319 ounces from heap leach operations and 3,532 ounces from SART processing (Q2 2015: total 4,527 ounces)

· Cumulative production in the nine months to 30 September 2015 ('Cumulative Q3 2015') was as follows:

o Gold - 54,103 ounces (25 per cent. higher than the same period of the previous year)

o Silver - 10,916 ounces

o Copper - 634 tonnes

· On target to achieve between 70,000 to 75,000 ounces of gold for the year to 31 December 2015 ('FY 2015') which represents an increase of approximately 16 to 24 per cent. compared to the FY 2014 production of 60,285 ounces of gold

Operational update

· Small scale flotation plant (the fourth processing line to be added at Gedabek) has been commissioned and is now in production

· 6,944 tonnes of ore with average gold content of 8.69 grammes per tonne from the Gadir underground mine was processed by the agitation leach plant in Q3 2015

Sales

· Q3 2015 gold sales of 14,871 ounces at an average of $1,123 per ounce - Cumulative Q3 2015 gold sales of 48,165 ounces at an average of $1,179 per ounce

· Q3 2015 copper concentrate shipments to the customer totalled 460 dry metric tonnes ('dmt'), containing 246 tonnes of copper - sales of copper concentrate were $0.9 million

Company financials

· Net debt, being interest-bearing loans and borrowings less cash and cash equivalents, totals $51.0 million at 30 September 2015 ($48.9 million at 30 June 2015) following completion of the flotation plant

Anglo Asian CEO Reza Vaziri commented, 'We are pleased to report continuation of the exceptional gold, copper and silver production from Gedabek, as seen in our H1 2015 results. The final quarter of the year has historically been our best performing quarter and we are confident of meeting our original production target for 2015 of between 70,000 and 75,000 ounces of gold.

'I am also delighted to report that our small scale flotation plant has now been successfully commissioned. It is now processing the tailings of the agitation leach plant with the objective of increasing Gedabek's gold, copper and silver production profile.

'Our production target for 2015 represents a significant increase compared to the FY 2014 production and as such we expect our total sales for the year to increase. In tandem with increasing our production and sales, we have been continually working to lower our production costs which at H1 2015 were $736 per ounce of gold. I look forward to providing further updates in due course as we continue to improve our production performance in order to deliver the utmost value for shareholders.'

Full details

Gedabek is a polymetallic deposit from which Anglo Asian produces gold, copper and silver from its open pit mining operation and its co-located Gadir underground mine. The Company also processes ore from its Gosha mine, approximately 50 kilometres away from Gedabek. Three different processing methods, agitation leaching, heap leaching and Sulphidisation, Acidification, Recycling, and Thickening ('SART') are used to produce precious metal and copper with a fourth processing line of flotation now commencing production.

During Q3 2015, the Company produced 18,165 ounces of gold at Gedabek; 11,795 ounces from the agitation leach plant, 6,363 ounces from heap leach operations and 7 ounces from SART processing. Anglo Asian completed gold sales of 14,871 ounces of gold at an average of $1,123 per ounce.

The Company's SART plant has been performing well producing copper concentrate and for Q3 2015 copper production totalled 216 tonnes. Anglo Asian has a strategic three year sales partnership in place with Industrial Minerals (SA) which commenced in May 2014 for the sale of Anglo Asian copper concentrates. Sales of copper concentrate for Q3 2015 totalled 460 dmt.

Silver production for Q3 2015 totalled 4,439 ounces; with 588 ounces from the agitation leaching plant, 319 ounces from heap leaching operations and 3,532 ounces from SART.

The following table summarizes metal production and sales at Gedabek for Q3 2015:

Gold produced*
(ounces)
Gold sales**
(ounces)
Gold Sales price
($)
Copper produced (tonnes)
Copper Concentrate sales
(dmt)
Silver Produced
(ounces)
FY 2014 - total
Quarter ended
60,285
50,615
1,267
784
1,316
31,177
31 March 2015
17,193
17,206
1,214
182
272
1,950
30 June 2015
18,745
16,088
1,193
236
420
4,527
30 Sept 2015
18,165
14,871
1,123
216
460
4,439
Cumulative
Q3 2015 - total
54,103
48,165
1,179
634
1,152
10,916

* including Government of Azerbaijan's share

** excludes Government of Azerbaijan's share

As previously reported, low grade ore (less than 1.5 grammes per tonne of gold) is being treated by heap leaching, whilst higher grade ore (more than 1.5 grammes per tonne of gold) is being processed through the agitation leach plant.

During Q3 2015, Anglo Asian stacked 72,817 (Cumulative Q3 2015: 292,913) tonnes of dry crushed ore on to heap leach pads with an average gold content of 1.48 (Cumulative Q3 2015: 1.47) grammes per tonne. The Company also heap leached uncrushed (Run of Mine - 'ROM') ore. During Q3 2015, Anglo Asian stacked 135,731 (Cumulative Q3 2015: 514,708) tonnes of ROM ore on to heap leach pads with an average gold content of 1.07 (Cumulative Q3 2015: 0.96) grammes per tonne.

During Q3 2015, the Company processed 150,370 (Cumulative Q3 2015: 428,639) tonnes of ore with an average gold content of 3.27 (Cumulative Q3 2015: 3.42) grammes per tonne through the agitation leach plant.

There was a 75 per cent. gold recovery in agitation leaching for Q3 2015, the same as the previous two quarters. Gold doré is produced from both heap and agitated leach intermediate solutions, which are combined for final processing and also recirculated around the plant, heap leach pads and tailings dam. Heap leaching is also a long term process and recoveries are therefore only estimates calculated from available metallurgical statistics.

The Company's small scale flotation plant has now been commissioned. It is now producing a concentrate from the tailings of the agitation leach plant with a throughput of around 90 tonnes per hour. The Company is currently optimising the metal recovery rates and quality of the concentrate produced.

The Company had net debt at 30 September 2015 of $51.0 million, a reduction of $1.4 million since 31 December 2014. The net debt at 30 September 2015 was as follows:

$m
Amsterdam Trade Bank - Agitation plant loan
29.6
International Bank of Azerbaijan - loan
12.8
Atlas Copco equipment finance loan
YapiKredit
Pasha Bank
Reza Vaziri
0.8
0.9
3.7
3.9
Total Loans
51.7
Cash on hand and at bank
(0.7)
Net debt
51.0

**ENDS**

For further information please visitwww.angloasianmining.comor contact:

Reza Vaziri
Anglo Asian Mining plc
Tel: +994 12 596 3350
Bill Morgan
Anglo Asian Mining plc
Tel: +994 502 910 400
Ewan Leggat
SP Angel Corporate Finance LLP
Nominated Adviser and Broker
Tel: +44 (0) 20 3470 0470
Stuart Gledhill
SP Angel Corporate Finance LLP
Tel + 44 (0) 20 3470 0470
Felicity Winkles
St Brides Partners Ltd
Tel: +44 (0) 20 7236 1177
Lottie Brocklehurst
St Brides Partners Ltd
Tel: +44 (0) 20 7236 1177

Notes:

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company has a 1,962 square kilometre portfolio, assembled from analysis of historic Soviet geological data and held under a Production Sharing Agreement modelled on the Azeri oil industry.

The Company developed Azerbaijan's first operating gold/copper/silver mine, Gedabek, which commenced gold production in May 2009. Gold production for the year ended 31 December 2014 from Gedabek totaled 60,285 ounces with 784 tonnes of copper also produced. The Company has a second mine, Gosha, which is 50 kilometres from Gedabek, and the ore produced at Gosha is processed at Anglo Asian's Gedabek plant. The Company is also developing the Gadir underground mine which is co-located at the Gedabek site. The Company's production target for full year 2015 is between 70,000 ounces and 75,000 ounces of gold. Gedabek is a polymetallic deposit and its ore has a high copper content, and as a result the Company produces copper concentrate from its Sulphidisation, Acidification, Recycling, and Thickening (SART) plant. Anglo Asian has also commenced production of a copper and precious metal concentrate using a small scale, low capital expenditure flotation plant which it has just commissioned. This will initially process tailings from its agitation leach plant.

Anglo Asian is also actively looking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for other properties in order to fulfil its expansion ambitions and become a mid-tier gold and copper metal production company.


This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCFFLFMDFISEES

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Azerbaijan | All
Gold and Silver Prices for these countries : Azerbaijan | All

Anglo Asian Mining plc

PRODUCER
CODE : AAZ.L
ISIN : GB00B0C18177
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Anglo Asian Mining is a gold and copper development stage company based in United kingdom.

Anglo Asian Mining produces gold, copper, silver in Azerbaijan.

Its main asset in production is GEDABEK in Azerbaijan and its main exploration properties are GOSHA and ORDUBAD in Azerbaijan.

Anglo Asian Mining is listed in United Kingdom. Its market capitalisation is GBX 7.8 billions as of today (US$ 9.1 billions, € 8.5 billions).

Its stock quote reached its lowest recent point on July 10, 2009 at GBX 10.00, and its highest recent level on April 03, 2020 at GBX 99.80.

Anglo Asian Mining has 113 761 024 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Project news of Anglo Asian Mining plc
7/14/2016(Gedabek)Substantial increase in gold production at Gedabek mine, Aze...
5/25/2016FY2015 Results - Record gold production of 72Koz; 28.6Koz si...
5/28/2013Live alert - Market Movers: Leyshon Resources, Northcote Ene...
6/2/2006(Gedabek)encouraging results at Gedabek
Corporate news of Anglo Asian Mining plc
7/14/2016Q2 & H1 2016, Production Update, Operations Review
6/29/2016Hedging of gold sales for remainder of 2016
6/28/2016Result of AGM
6/27/2016AGM Statement
5/25/2016Final Results
4/13/2016Q1 2016 operations and production update, Gedabek
12/21/2015Floating exchange rate regime
11/24/2015Copper Concentrate Shipment from Floatation Plant
10/14/2015Q3 2015 Production Update
7/31/2015Total Voting Rights
7/22/2015Issue of Shares / Directors Dealing
4/14/2015Q1 2015 Gedabek Update
3/19/2015Director Dealing
3/16/2015Flotation Plant Update - Gedabek Mine Azerbaijan
3/16/2015Director Dealing
11/5/2014Q3 2014 Production and Operational Update
4/12/2006(Gosha)Preliminary results for the 11 month period ended 31 Dec 200...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
LSE (AAZ.L)
68.50+0.00%
LSE
GBX 68.50
04/19 17:36 -
0%
Prev close Open
68.50 67.90
Low High
67.00 71.00
Year l/h YTD var.
51.50 -  68.50 14.17%
52 week l/h 52 week var.
42.00 -  114.50 -35.68%
Volume 1 month var.
219,881 23.42%
24hGold TrendPower© : -31
Produces Copper - Gold - Silver
Develops
Explores for Copper - Gold - Molybdenum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/26/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-0.72%
2023-29.23%99.00100.00
2022-13.33%99.75100.00
2021-14.45%165.00104.60
2020-14.05%99.80102.02
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :