Rare Element Resources Ltd.

Published : November 06th, 2015

Rare Element Resources Reports Third Quarter Results

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Rare Element Resources Reports Third Quarter Results


Nov 06, 2015


Achieved Positive Preliminary Results from Phase I of Separation Pilot Plant Testing

Permitting Continues

November 6, 2015 - Lakewood, Colorado - Rare Element Resources Ltd. (NYSE MKT: REE and TSX: RES) (the 'Company'), a publicly traded, strategic materials company focused on delivering rare earth products for technology and defense applications by advancing the Bear Lodge Critical Rare Earth Project in northeast Wyoming, reported today that it has filed its unaudited consolidated financial statements on Form 10-Q for the three and nine months ended September 30, 2015 on www.sec.gov and www.sedar.com.

'We continue to make progress on multiple fronts with the Bear Lodge Project,' said Randall J. Scott, President and Chief Executive Officer. 'We are excited with the success at taking our innovative separation technology to the next level by completing the first phase of pilot plant testing. This work confirmed our ability to upgrade the Bear Lodge concentrate to more than 99.9% pure while selectively removing 85% of the cerium and all the detectable thorium in the initial stage of separation using only three steps. This also indicates a significantly more efficient and environmentally attractive process than traditional separation methods and sets an excellent foundation for the remaining separation test work. While permitting remains generally on track, the draft environmental impact statement (EIS) is now not expected until the end of the year, which likely means the final record of decision (ROD) will be in late 2016. We continue to work closely with the relevant government agencies for timely completion of the process.'

Financial Results (Please note that financial results published by the Company are all stated in U.S. Dollars.)

The Company does not have production-related revenues at this time. The net loss for the quarter ended September 30, 2015, totaled $2.6 million, or $0.05 per share, compared with a net loss of $3.6 million, or $0.08 per share, for the same period in 2014. The key drivers behind the year-over-year decrease in net loss for the quarter were:

  • A decrease in exploration and evaluation expenses of $0.8 million, from a reduction in exploration and technical and economic evaluation work with the focus shifting to permitting and separation testing; and
  • Lower corporate administrative costs of $0.2 million, primarily due to the Company's cost containment efforts and a reduction in stock-based compensation.

The consolidated net loss for the nine-month period ended September 30, 2015 was $7.1 million, or $0.14 per share, compared with $11.1 million, or $0.23 per share, for the same period in 2014. The key drivers behind the decrease in net loss were:

  • A decrease in exploration and evaluation expenses of $3.3 million;
  • Lower corporate administrative cost of $0.8 million;
  • Partially offset by an unfavorable variance in currency translation and unrealized gains on derivatives, collectively of $0.2 million.

Cash Balance

As of September 30, 2015, the Company had cash and cash equivalents of $6.2 million, compared with $8.4 million at June 30, 2015. Cash used during the quarter was $2.2 million. Cash and cash equivalents at September 30, 2015 are believed to be sufficient to conduct our current planned activities for the next 12 months.

During the next 12 months, we expect to:

  • Support the U.S. Forest Service in their preparation of the draft EIS on the Project, currently expected before the end of 2015;
  • Complete the evaluation of Phase One of the elemental separation pilot plant test work, the successful preliminary results were announced on October 14, 2015;
  • Continue to work with regulatory agencies on permit applications, with the goal of having all the necessary permits/licenses at the same time as the final record of decision (ROD), currently expected at the end of 2016;
  • Incorporate the results of the geotechnical confirmation and condemnation drilling work into detailed engineering studies;
  • Pursue strategic relationships and continue discussions with potential offtake partners, including providing upgraded, separated product samples and regular Project updates: and
  • Seek additional funding to support the 2016 planned activities.

The Company will look to support continued advancement of the Bear Lodge Project on the preferred timeline by raising additional capital, most likely through strategic relationships or offtake agreements. The Company continues to monitor market conditions, both in the rare earth sector and in the equities markets. If it is not successful in raising additional capital, the Company has the ability to defer certain activities to reduce its rate of expenditures.

Pilot Plant Success

During the quarter, the Company designed, built and operated a pilot plant for testing its patent-pending rare earth separation technology. The results of the first phase of testing, reported in early October, confirmed the ability to upgrade the concentrate coming from the hydrometallurgical plant to over 99.9% pure total rare earth oxide. Equally significant was the ability to remove 85% of the cerium and all the detectable thorium from the concentrate in only three initial solvent extraction (SX) steps. The process represents meaningful improvement over traditional SX methods, and it is expected to reduce capital and operating costs associated with separation, be more efficient and result in no waste discharge, making it more environmentally friendly.

Unique to the process was the ability to strip the separated cerium and thorium from the metal-bearing organic solution outside of SX with the barren organic and stripping agent being recycled. While additional test work is planned, the demonstrated success of Phase One represents a solid foundation for the next level of testing aimed at separating the >99.9% pure concentrate into separate, sellable products. For additional details on the preliminary results of the pilot plant, please see the Company's press release dated October 14, 2015.

Permitting Update

The U.S. Forest Service (USFS) continues their work on the draft EIS, expected to be complete in December. While the EIS is not a permit, it does result in the USFS ROD for the construction, operation and closure of mining operations on public lands. Because the final EIS and related ROD are the overarching decision documents relating to operations at Bear Lodge, all other permits are dependent on it. The USFS has stated it will complete the final EIS and the final ROD within one year after completion of the draft EIS. Other permit applications are being made to align with the proposed USFS EIS timeline.

Development Tasks and Timing

The Company has a number of other activities to undertake on the Project prior to a construction decision by the Board of Directors. These include engineering studies and advanced metallurgical work in support of a feasibility study; design, construction and operation of a planned, larger-scale demonstration plant; completion of a feasibility study; and securing off-take agreements and/or identification of strategic partners. Because of the success of the Company's separation technology test work and the anticipated value it represents, we plan to evaluate the means and economic benefit of incorporating separation into our planned operations as part of the feasibility study.

These activities are subject to additional financing and other factors. A construction decision will be dependent on the completion of these activities as well as receipt of all necessary permits, the availability of adequate capital, completion of a positive feasibility study and securing of off-take customer agreements for some or all of the Project output. From the time of the successful completion of the tasks listed above and a development decision from the Board, Project construction is expected to take 12 to 16 months.

The unaudited quarterly financial statements are available through the Canadian securities regulatory authorities at www.sedar.com, and with the U.S. Securities and Exchange Commission at www.sec.gov. They are also available on the Company's website at www.rareelementresources.com.

Rare Element Resources Ltd. is a publicly traded, strategic materials company focused on delivering rare earth products for technology and defense applications by advancing the Bear Lodge Critical Rare Earth Project in northeast Wyoming. Bear Lodge is a significant mineralized district containing many of the less common, more valuable critical rare earths that are essential for electronics, fiber optics, laser systems for health and defense, as well as many evolving green technologies, like hybrid cars, solar panels and wind turbines. Permitting and feasibility work on the Project continue to advance. The Company is an affiliate member of the U.S. Department of Energy's Critical Materials Institute, a combined government and private sector organization committed to eliminating supply chain issues for rare earths and other critical elements.

For additional information, please visit the Company's website at www.rareelementresources.com or contact Robbin Lee at 720-278-2462 or [email protected]

Forward Looking Statements

This news release contains forward-looking statements and forward-looking information within the respective meanings of securities legislation in the United States and Canada. Except for statements of historical fact, certain information contained herein constitutes forward-looking statements. Forward-looking statements are usually identified by our use of certain terminology, including 'will', 'believes', 'may', 'expects', 'should', 'seeks', 'anticipates', 'plans', 'has potential to', or 'intends' (including negative or grammatical variations thereof) or by discussions of strategy or intentions. Such forward-looking statements include statements regarding the expecting timing and outcomes relating to state and federal permit applications and approvals, metallurgical and separation test work progress and outcome, feasibility study timing and outcomes, rare earth price fluctuations and demand and expectations regarding financing needs and the Company's expectations regarding its ability to raise capital.

Such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results or achievements to be materially different from any future results or achievements expressed or implied by such forward-looking statements.

Factors that could cause actual results to differ materially include, but are not limited to, the development plans for the Bear Lodge Project, delay or failure to receive government approvals and permits; the progress and results of the feasibility study; fluctuations in demand for, and price of, rare earth products; success of process technology under testing or development and timing; results from geological evaluations and programs; timing of and unexpected events at the Bear Lodge property and in connection with construction of the demonstration plant; changes in U.S. and Canadian securities markets; and our ability to raise additional financing necessary to construct the demonstration plant and conduct our business. There can be no assurance that future developments affecting the Company will be those anticipated by management. Please refer to the discussion of these and other factors set out in our filings made from time-to-time with the United States Securities and Exchange Commission, and the Canadian securities regulators, including without limitation, the Company's most recent reports on Form 10-K and Form 10-Q. We do not undertake to update any statements or estimates at any particular time or in response to any particular event. Investors and others should not assume that any forecasts in this news release represent management's estimate as of any date other than the date of this news release.

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Rare Element Resources Ltd.

EXPLORATION STAGE
CODE : RES.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Rare Element Res. is a gold exploration company based in Canada.

Rare Element Res. holds various exploration projects in USA.

Its main exploration properties are BEAR LODGE and SUNDANCE GOLD in USA.

Rare Element Res. is listed in Canada and in United States of America. Its market capitalisation is CA$ 10.9 millions as of today (€ 10.0 millions).

Its stock quote reached its highest recent level on August 12, 2011 at CA$ 9.95, and its lowest recent point on January 01, 2016 at CA$ 0.21.

Rare Element Res. has 52 940 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Option Grants of Rare Element Resources Ltd.
3/24/2011Grants 985,000 stock options at $10,50
6/11/2010(Bear Lodge)Drilling Begins; Stock options granted
Nominations of Rare Element Resources Ltd.
12/12/2013Appoints Paul H. ZInk as CFO
8/6/2013Appoints Gerald Grandey to Board of Directors
4/29/2013Appoints Robbin Lee as Director of Investor Relations
4/24/2013Announces Appointment of Lowell A. Shonk to Board of Directo...
11/13/2012Appoints Dr. Henry Kasaini as Director of Science and Techno...
7/2/2012Appoints Kelli C. Kast, Esq., as Vice President and General ...
2/6/2012Announces Randall J. Scott & Paul Zink Appointed to the Boar...
12/19/2011Appoints Randall J. Scott as President and CEO - Former Pres...
12/15/2011Appoints Randall J. Scott as President and CEO
8/24/2011appoints Chief Financial Officer
7/13/2011Appoints Paul Schlauch as Director and Norman Anderson as Ch...
3/24/2011Appoints 2011 Geological Team & Grants Options
3/14/2011Appoints Jaye Pickarts as Chief Operating Officer
2/17/2011 Appoints George Byers as VP - Government & Community Relati...
Financials of Rare Element Resources Ltd.
3/29/2016Reports Year-End 2015 Financial Results
8/9/2013Reports June 30, 2013 Financial Results
5/8/2013Reports March 31, 2013 Financial Results
11/6/2012Announces September 30, 2012 First Quarter Financial Results
5/10/2012Files March 31, 2012 Third Quarter Financial Results
2/14/2011Reports Second Quarter Financial Results
Project news of Rare Element Resources Ltd.
2/6/2014(Bear Lodge)EIS Begins on Rare Element's Bear Lodge Project
12/19/2013Increases Resource at Whitetail Ridge
11/11/2013Pilot Plant Testing Validates Advantanges
9/19/2013(Bear Lodge)Enters into Memorandum of Understanding with US Forest Servi...
8/14/2013(Bear Lodge)Extends 2013 Bear Lodge Development Drilling Program
5/23/2013(Bear Lodge)Development Milestone Achieved at Rare Element's Bear Lodge ...
3/18/2013(Bear Lodge)Reports 65 Percent Increase of Total M&I Rare-Earth Mineral...
10/10/2012(Bear Lodge)Reports on Progress of Metallurgical Testwork on Bear Lodge ...
9/26/2012Reports Positive 2012 Drilling Program Results
6/26/2012Reports 2012 Drilling and Exploration Program Underway
5/7/2012Reports 10 Percent Increase of M & I Rare-Earth Mineral Reso...
12/5/2011(Bear Lodge)Announces Completion of 2011 Drilling Program at Bear Lodge
7/28/2011Applauds U.S. House Committee Passage of Strategic Resource...
5/18/2011(Bear Lodge)Summarizes Results from its 2010 REE Exploration Program and...
4/6/2011(Bear Lodge)Reports Final REE Assay Results from 2010 Drilling at the Bu...
3/17/2011(Sundance Gold)Reports Inferred Mineral Resource Estimate for Sundance Gold...
2/17/2011(Bear Lodge) Appoints George Byers as VP - Government & Community Relati...
2/7/2011(Bear Lodge)Reports Additional REE Assays From Resource Areas and a New ...
1/6/2011(Sundance Gold)Reports Final 2010 Gold Drilling Assay Results, Including So...
5/27/2010(Bear Lodge)0% Increase in Rare-Earth Mineral Resources
4/28/2010(Bear Lodge)Initiates Government Affairs Program
3/9/20102009 Rare Earth Drilling Results from the Bull Hill Northwes...
2/9/2010Reports Additional 2009 Rare-Earths Drilling Results
10/20/2009(Bear Lodge)Begins a Scoping Study on Rare-Earth-Element Potential at Be...
9/29/2009(Bear Lodge)Makes Significant Progress with Rare-Earths Metallurgical Te...
8/24/2009(Bear Lodge)Initiates 2009 Rare-Earths Drilling Program
7/13/2009(Bear Lodge) Receives Permit for Expanded Drill Program
Corporate news of Rare Element Resources Ltd.
2/1/2016Rare Element Resources Announces Intention to Voluntarily De...
1/22/2016Rare Element Resources Announces Suspension of Permitting Ac...
1/19/2016Rare Element Resources Achieves Important Permitting Milesto...
12/17/2015Rare Element Resources Implements Extensive Cost Cutting Mea...
12/17/2015Rare Element Resources Implements Extensive Cost-Cutting Mea...
12/16/2015Rare Element Resources Expands on Advantages of Its Patent-P...
11/6/2015Rare Element Resources Reports Third Quarter Results
10/14/2015Rare Element Resources Successfully Completes First Phase of...
10/7/2015Rare Element Resources Completes Summer Condemnation Drillin...
9/8/2015Rare Element Resources to Participate in 17th Annual Rodman ...
8/24/2015Rare Element Files Canadian Preliminary Shelf Prospectus to ...
8/12/201510-Q for Rare Element Resources Ltd.
8/7/2015Rare Element Resources reports 2Q loss
8/7/2015Rare Element Resources Reports Second Quarter Results
7/15/2015Exploration at Rare Element Resources’ Bear Lodge Mineraliza...
5/15/201510-Q for Rare Element Resources Ltd.
5/7/201510-K for Rare Element Resources Ltd.
3/30/2015Rare Element Resources Confirms Revised EIS Schedule Support...
3/24/2015Rare Element Resources to Participate in the John Tumazos Ve...
3/12/2015Rare Element Resources Reports Year-End 2014 Financial Resul...
3/3/2015Rare Element Resources Names Lowell A. Shonk as Interim Chai...
3/3/2015Rare Element reports Unanimous Support from Wyoming Legislat...
2/11/2015Rare Element Resources Reports on Significant Progress in 20...
11/13/2014Rare Element Resources to Participate in the 32nd Annual Wyo...
11/10/2014Rare Element Resources Reports Third Quarter Results
2/27/2014to Participate in Largest Mining Conference of the Year
2/3/2014Transitions Geological Team
1/21/2014Files for Utility Patent on Recovery Technology
12/19/2013Trouble with the tables?
12/16/2013Announce EIS Contractor and PM
11/12/20133rd Quarter Results
9/25/2013Announces $8.0 Million Offering
6/11/2013Files Shelf Registration
6/5/2013Independent Labs Confirm Success of Rare Element's Proprieta...
5/3/2013Files NI 43-101 Technical Report Detailing Previously Announ...
4/19/2013Mark T. Brown Resigns as Director of Rare Element
3/18/2013Reports December 31, 2012 Financial Results, Substantial Inc...
3/11/2013Reports Additional Drilling Results High in Critical Rare Ea...
2/25/2013to Present at Upcoming PDAC 2013 Investor Exchange
2/20/2013provides information of cease trade on TSX
12/10/2012Drilling Results Expand District-wide Enrichment Zones of Cr...
11/8/2012Announces Annual General Meeting and Director Nominees; Adop...
10/16/2012Provides Support to Colleges and Universities for REE Resear...
9/21/2012Added to S&P/TSX SmallCap Index
9/13/2012(Bear Lodge)Announces June 30, 2012 Year End and Fourth Quarter Financia...
8/13/2012s Its Community Relations Activities
5/7/2012Reports 10 Percent Increase of M & I Rare-Earth Mineral Reso...
4/13/2012(Bear Lodge)Announces Revised and Improved Economic Results from Pre-Fe...
4/12/2012Schedules Conference Call for Tuesday, April 17, 2012, 3:30p...
3/26/2012Reports Additional 2011 Rare Earth Element and Gold Drilling...
3/15/2012Commences Separation Testing and Heavy Rare Earth Testing
3/1/2012(Bear Lodge)Announces Positive Economic Results from Pre-Feasibility Stu...
2/27/2012Reports 2011 Gold Drilling Assay Results, Including the Best...
2/10/2012(Bear Lodge)Files December 31 Second Quarter Financial Results and Updat...
1/22/2012Chairman Don Ranta interviewed by Charles Payne on Fox Busin...
1/4/2012(Bear Lodge)Reports 38 Percent Increase of M & I Rare-Earth Mineral Reso...
12/21/2011Reports Additional Drilling Results And Progress with Pilot ...
9/7/2011Releases Rare Earth Metallurgical Test Results and Begins Pi...
8/15/2011Ringing the Opening Bell of the NYSE Amex on August 16, 2011
8/5/2011(Bear Lodge)Discovers Heavy Rare Earths at Whitetail Ridge, East Taylor ...
8/4/2011Discovers Heavy Rare Earths at Whitetail Ridge, East Taylor ...
7/27/2011Applauds U.S. House Committee Passage of Strategic Resources...
6/28/20112011 REE Drilling Underway
6/14/2011(Bear Lodge)Reports Upgrade and Significant Increase of Rare-Earth Miner...
5/26/2011shares to trade on the Toronto Stock Exchange on May 27, 201...
7/13/2010Drilling Begins at Rare Element's Sundance Gold Project
6/28/2010Makes Progress with Government Affairs Program
5/12/2010Maintains 100% Interest in gold
4/13/2010Closes $8.8 Million Financing
3/18/2010$7.8 Million Offering
2/23/2010Definitive Eden Lake Rare-Earth Property Agreement Completed...
2/5/2010Named to 2010 TSX Venture 50
1/8/2010Acquires Nuiklavik REE Project in Labrador, Canada
12/7/20092009 Drill Program Tests Gold Targets at Bear Lodge
12/1/2009Options Eden Lake Rare-Earth Property to Medallion
11/19/2009Files US SEC Registration Form 20F
10/22/2009US government begins to focus on rare earths
10/13/2009Identifies High-Potential Whitetail Ridge Rare-Earth Target
7/21/2009Drilling Begins at Rare Element's Sundance Gold Venture
5/23/2009increases financing to $1,500,000, files Tier One applicatio...
7/15/2008s Resources' Gold Exploration Program Initiated
5/29/2008Reports on Gold Metallurgical Test Results
2/18/2008's Rare-Earths Metallurgical Testing Underway
1/17/2008' new corporate profile
1/11/2008Upcoming conference
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (RES.TO)Other OTC (RRLMF)
0.205+0.00%0.100+11.11%
TORONTO
CA$ 0.205
01/01 15:41 -
0%
Prev close Open
0.205 0.205
Low High
0.205 0.205
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.205 -%
Volume 1 month var.
500 -%
24hGold TrendPower© : -37
Produces
Develops
Explores for Copper
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 9/24/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.68-0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.89-1.36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.36-3.28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.64+2.69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+7.89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+6.25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.67-0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03-2.94%Trend Power :