In the same category

Canadian Zinc Corp

Published : May 17th, 2016

Reports Financial Results for Q1 2016 and Operations Update

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

 

NEWS RELEASE

 For Immediate Release


CANADIAN ZINC REPORTS FINANCIAL RESULTS FOR FIRST QUARTER OF 2016 AND OPERATIONS UPDATE

Canadian Zinc Corporation
Suite 1710 - 650 West Georgia Street, Vancouver, BC, V6B 4N9

Tel: (604) 688-2001
Fax: (604) 688-2043
Toll free: 1-866-688-2001


invest@canadianzinc.com
www.canadianzinc.com


Stock Exchange: TSX
Stock Symbol: CZN
Stock Quote: Click Here

TwitterTwitter Updates

Vancouver, British Columbia, May 17, 2016 - Canadian Zinc Corporation (TSX: CZN; OTCQB: CZICF) (�?othe Company�?� or �?oCanadian Zinc�?�) reports its interim financial results and development activities for the three month period ended March 31, 2016.

This news release should be read in conjunction with the Company�?Ts unaudited financial statements for the first quarter ended March 31, 2016 and the related management�?Ts discussion and analysis (MD&A) which are available on the Company�?Ts website at www.canadianzinc.com, under the �?oFinancials�?� section, or on SEDAR (www.sedar.com). 

Financial Results for First Quarter of 2016

The Company reported a net loss and comprehensive loss of $777,000 for the three month period ended March 31, 2016 compared to a net loss and comprehensive loss of $3,822,000 for the three month ended March 31, 2015. Included in the loss for the current period, were exploration and evaluations costs of $368,000, compared to $3,846,000 for the comparable period ended March 31, 2015.

At March 31, 2016, the Company had a positive working capital balance of $1,808,000 including cash and cash equivalents of $1,939,000 and short term investments of $32,000.

Updated Preliminary Feasibility for Prairie Creek Project

On May 12, 2016, Canadian Zinc filed a new Technical Report on the Company�?Ts 100% owned Prairie Creek lead, zinc, silver mine in the Northwest Territories. The Technical Report, entitled �?oPrairie Creek Property Prefeasibility Update NI 43-101 Technical Report�?�, effective March 31, 2016, was prepared by AMC Mining Consultants (Canada) Ltd., (�?oAMC�?�) with contributions from Tetra Tech Inc. and Canadian Zinc consultants and personnel (collectively �?othe Authors�?�), in accordance with National Instrument 43-101 (�?oNI 43-101�?�) and is available under the Company�?Ts profile on SEDAR at www.sedar.com and on the Company�?Ts website at www.canadianzinc.com.

The Technical Report provides results of the 2016 Prefeasibility Study (�?oPFS�?�) Update that included optimization work completed over the past three years, including the 2015 underground exploration program at Prairie Creek. This program increased total Measured and Indicated Mineral Resource tonnages by 32% and increased total Proven and Probable Mineral Reserves by 46% from the previous 2012 estimates.

Summary and Conclusions from Prefeasibility Study

The PFS indicates average annual production of approximately 60,000 tonnes of zinc concentrate and 55,000 tonnes of lead concentrate, containing approximately 86 million pounds of zinc (in both zinc and lead concentrates), 82 million pounds of lead (in both lead and zinc concentrates) and 1.7 million ounces of silver over an initial mine life of 17 years.

The 2016 PFS indicates average annual earnings before interest, taxes, depreciation and amortization (�?oEBITDA�?�) of $90 million per year and cumulative EBITDA earnings of $1.4 billion, using Base Case metal price forecasts of US$1.00 per pound for both zinc and lead and US$19.00 per ounce for silver. The Base Case pre-tax Net Present Value (�?oNPV�?�) at 8% discount rate of $509 million , with an Internal Rate of Return (�?oIRR�?�) of 32%; the post-tax NPV is $302 million, with a post-tax IRR of 26%. The Pre-production Capital Cost, including the new all season road, is estimated at $244 million, including contingency, with payback of three years from first year of revenue.

In its conclusions AMC considers the Prairie Creek Project to be viable based on the Mineral Reserves, mine plan, production and economic parameters set out in the PFS and recommends that Canadian Zinc proceeds with the development of the Prairie Creek Project.

The base case economic model indicates a robust project at consensus forecasts for the long term prices of lead and zinc and AMC considers that there is excellent potential for additional project optimization, enhanced economics and further extending the projected mine life.

MOUs Signed for Concentrate Production

As announced on March 3, 2016, Canadian Zinc has signed MOUs with Korea Zinc and Boliden for the sale of zinc and lead concentrates to be produced at Canadian Zinc�?Ts 100% owned Prairie Creek Mine. These offtake arrangements with two of the pre-eminent smelting companies in the world, confirm the marketability of Prairie Creek�?Ts zinc and lead concentrates, represent a major step forward in the development of the Prairie Creek Mine and move Canadian Zinc closer to production.

These sale agreements will represent all of the planned production of zinc concentrate and about half of the planned production of lead concentrate for the first five years of operation at the Prairie Creek Mine. It is expected that shipments will be made from the Port of Vancouver with the exact shipping schedule and lot sizes in each delivery to be mutually agreed within the project�?Ts shipping season.

Prairie Creek Permitting Update

In April 2014, the Company submitted an application to the Mackenzie Valley Land and Water Board and to Parks Canada for Land Use Permits to permit the possible future upgrade of the current winter access road to all season use.. The application is now undergoing environmental assessment before the Mackenzie Valley Review Board.

On April 11, 2016, Canadian Zinc submitted an Addendum to its Developer's Assessment Report and on May 11, 2016 the Company submitted its responses to Information Requests. A Technical Session is scheduled to be held in Yellowknife beginning June 13, 2016 and concluding June 16, 2016.

Incorporation of an all season road for future operations has significant financial implications, both in additional capital cost but also in potential savings and lower finance costs. The all season road will reduce energy costs and also enable the consideration of more environmentally friendly alternative energy sources. Local gas fields in the area may be producing LNG in the near future, which may provide an opportunity to reduce reliance on diesel fuel. An all season road would also have environmental and safety benefits, in that spreading out the trucking schedule over the full year would avoid high or congested traffic in winter months, therefore lower the risk of any accidents or spills.

The Company anticipates the environmental assessment process for this all season road application will take most of  2016 to complete.

Outlook

Canadian Zinc�?Ts focus for 2016 will be to continue to advance the Prairie Creek Mine towards production.

The updated 2016 Pre-Feasibility Study indicates a robust project at consensus forecasts for the long term prices of lead and zinc and there is good potential for additional project optimization, enhanced economics and further extending the mine life.

As part of the Technical Report, the Authors identified a number of project opportunities that, if implemented, could yield economic, operational and environmental benefits. The Prairie Creek Mineral Resource would support a substantial increase in mining/milling rates and a high-level assessment is envisaged of substantially increasing the mill capacity with various scenarios of mining and milling, including possible mill expansion, that could lead to improved economics with more metal being mined and milled per year.

A recommendation from the Technical Report is the creation of a composite bulk sample, collected from recent underground drilling, on which to carry out Locked Cycle Tests, for better definition of the milling process, recoveries and reagent consumption, together with a high-level assessment of substantially increasing the mill capacity with various scenarios of mining and milling, including possible mill expansion. In addition, Tetra Tech has recommended further metallurgical variability tests be carried out from different mineralization zones for better understanding of metallurgical performances.

It is intended that these recommended metallurgical testing and mill capacity studies will be carried out in 2016, subject to the availability of financing, and that the ongoing environmental assessment and permitting of the proposed all season road will be continued. As part of that environmental assessment CZN submitted its responses to Information Requests on May 10, 2016 and a Technical Session is scheduled to be held in Yellowknife in June. Some front-end detailed engineering and design, and some site maintenance and early works programs, may be undertaken as financing permits.

Meanwhile, the RDC financially supported metallurgical testing program on the central Newfoundland properties is continuing and will be followed-up by the development of a process simulation and cost assessment model which will be used to help focus on the key factors that are critical to realizing the economic potential of the base metal deposits in central Newfoundland. This program will continue throughout 2016 and is scheduled to be completed by November 2016.

At March 31, 2016, Canadian Zinc had working capital of $1.8 million and expects it will be able to meet its minimum commitments for 2016, but not beyond. Canadian Zinc does not currently generate any cash flow from its operations and will need to generate additional financial resources in the short term to fund its corporate administration costs and working capital and to continue the development of the Prairie Creek Project and in the longer term to put the Prairie Creek Mine into production.

The Company is currently evaluating various opportunities and seeking additional sources of financing. There is no assurance that such financing will be available on a timely basis or on acceptable terms. Careful management and preservation of cash is a top priority. Site programs have been reduced to a minimum. Cost reduction measures have been implemented across the Company, including reductions in staff, corporate salaries and expenses and directors fees.

The long term outlook for lead and zinc remains very positive and, supported by the results of the 2016 PFS, Canadian Zinc will continue to evaluate all alternatives and possibilities for raising the financing necessary to complete the development and construction and put the Prairie Creek Mine into production. However the ability to raise financing is impacted by conditions beyond the control of the Company, including depressed commodity prices, continued uncertainty in the capital markets and the current lack of investor interest in the resource sector.

About Canadian Zinc

Canadian Zinc is a TSX-listed exploration and development company trading under the symbol �?oCZN�?�. The Company�?Ts key project is the 100%-owned Prairie Creek Project, a fully permitted, advanced-staged zinc-lead-silver property, located in the Northwest Territories. Canadian Zinc also owns an extensive land package in central Newfoundland.

The Prairie Creek Mine contains a partially developed infrastructure including a 1,000 tonne per day flotation mill, workshops, accommodations, and support facilities. The Company holds a Type �?oA�?� Water Licence which, along with previously issued permits and licences, permits the operation of a mine at Prairie Creek. A positive updated Preliminary Feasibility Study was completed in March 2016. The Company also continues the Environmental Assessment process as part of its application to upgrade the access road into the Prairie Creek Mine for use on an all season basis.

Canadian Zinc also owns an extensive land package in central Newfoundland that it is exploring for copper-lead-zinc-silver-gold deposits. These include the South Tally Pond project (Lemarchant deposit); Tulks South project (Boomerang-Domino and Tulks East deposits) and Long Lake project (Long Lake deposit). The Company�?Ts exploration strategy in central Newfoundland is to continue to build on its existing polymetallic resource base with the aim of developing either a stand-alone mine, similar to the past-producing mines at Buchans and Duck Pond, or a number of smaller deposits that could be developed simultaneously and processed in a central milling facility.

For further information contact:

John F. Kearney
Chairman & Chief Executive
(
416) 362-6686
220 Bay Street
12th Floor

Toronto, ON M5J 2W4
Alan B. Taylor
Vice President Exploration & Chief Operating Officer
(
604) 688-2001
Suite 1710 - 650 West Georgia Street
Vancouver, BC V6B 4N9
Tollfree:1-866-688-2001
Steve Dawson
Vice President
Corporate Development
(416) 203-1418

220 Bay Street
12th Floor
Toronto, ON M5J 2W4

E-mail: invest@canadianzinc.com   Website: www.canadianzinc.com

Cautionary Statement �?" Forward-Looking Information
This press release contains certain forward-looking information, including, among other things, the expected completion of acquisitions and the advancement of mineral properties. This forward looking information includes, or may be based upon, estimates, forecasts, and statements as to management�?Ts expectations with respect to, among other things, the completion of transactions, the issue of permits, the size and quality of mineral resources, future trends for the company, progress in development of mineral properties, future production and sales volumes, capital costs, mine production costs, demand and market outlook for metals, future metal prices and treatment and refining charges, the outcome of legal proceedings, the timing of exploration, development and mining activities, acquisition of shares in other companies and the financial results of the company. There can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Inferred mineral resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that mineral resources will be converted into mineral reserves.

This press release has been reviewed and approved by Alan Taylor, P.Geo., COO & VP Exploration and director of Canadian Zinc who is a Non-Independent QP under NI 43-101.

Cautionary Note to United States Investors
The United States Securities and Exchange Commission (�?oSEC�?�) permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce.. We use certain terms in this press release, such as �?omeasured,�?� �?oindicated,�?� and �?oinferred�?� �?oresources,�?� which the SEC guidelines prohibit U.S. registered companies from including in their filings with the SEC. 

 



This message was sent to .com from:

Canadian Zinc | invest@canadianzinc.com | Canadian Zinc Corporation | Suite 1710, 650 West Georgia Street | Vancouver, BC V6B 4N9, Canada

Email Marketing by iContact - Try It Free!

Data and Statistics for these countries : Canada | Georgia | All
Gold and Silver Prices for these countries : Canada | Georgia | All

Canadian Zinc Corp

DEVELOPMENT STAGE
CODE : CZN.TO
ISIN : CA1368021053
CUSIP : 136802-10-5
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Canadian Zinc is a zinc and silver development stage company based in Canada.

Canadian Zinc develops zinc, silver and gold in Fiji.

Its main asset in development is TUVATU in Fiji and its main exploration property is PRAIRIE CREEK in Canada.

Canadian Zinc is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 30.6 millions as of today (US$ 23.2 millions, € 20.1 millions).

Its stock quote reached its highest recent level on February 20, 2004 at CA$ 2.04, and its lowest recent point on December 04, 2015 at CA$ 0.06.

Canadian Zinc has 265 920 016 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Canadian Zinc Corp
2007 Annual Report
Financings of Canadian Zinc Corp
7/7/2016Announces Closing of $10,200,000 FInancing
8/1/2014CZN Closes $15.8 Million Bought Deal Financing
8/2/2013ANNOUNCES C$4 MILLION BOUGHT DEAL FLOW-THROUGH PRIVATE PLAC...
Nominations of Canadian Zinc Corp
6/13/2013Reports on Election of Directors at Annual General Meeting o...
Financials of Canadian Zinc Corp
5/17/2016Reports Financial Results for Q1 2016 and Operations Update
3/31/2016CZN Reports Financial Results for 2015
11/13/2015Reports Results for Third Quarter 2015
8/14/2015Reports Financial Results for Second Quarter 2015
3/31/2015Reports Financial Results for Fiscal 2014
11/15/2013CZN Reports Financial Results for Third Quarter 2013
8/13/2013Reports Financial Results for Second Quarter 2013
5/13/2013Reports Financial Results for First Quarter 2013
3/20/2013REPORTS FINANCIAL RESULTS FOR FISCAL 2012
8/10/2012Reports Financial Results for Second Quarter 2012
3/16/2012Reports Financial Results for Fiscal 2011
3/17/2011Reports Financial Results for Fiscal 2010
11/17/20092009 Third Quarter Results
8/17/2009Reports Second Quarter 2009 Results
5/16/20092009 First Quarter Results
8/8/2008Reports Second Quarter 2008 Results
5/15/2008First Quarter Results
Project news of Canadian Zinc Corp
4/19/2017Drilling Extends Mineralization at Lemarchant, NFLD
9/15/2016CZN Modifies 2016 Preliminary Feasibility Study
1/21/2014Engineering and Procurement Contracts awarded for Prairie Cr...
12/12/2013Assay Results of 2013 Drill Program at South Tally Pond
12/9/2013(Prairie Creek)Assay Results of 2013 Drill Program at Prairie Creek
9/18/2013(Prairie Creek)Granted Water Licence for Prairie Creek Mine
6/21/2013(Prairie Creek)CZN RECEIVES PERMITS FOR OPERATION OF PRAIRIE CREEK MINE
3/25/2013(Prairie Creek)RECEIVES PROPOSED WATER QUALITY CONDITIONS IN DRAFT WATER LI...
3/18/2013(Prairie Creek)Receives Draft Water Licence and Permits for Operation of Pr...
1/15/2013to Drill South Tally Pond Project, Newfoundland
1/8/2013(Prairie Creek)oration: Permitting Progress for Prairie Creek Mine
8/28/2012(Prairie Creek)and Government of Northwest Territories Advance Co-operation...
6/14/2012(Prairie Creek)oration: Minister Confirms Environmental Impact Review Not R...
5/15/2012(Prairie Creek)oration: Additional Permits Approved for Prairie Creek Mine ...
10/3/2011(Prairie Creek)Reports Success With Prairie Creek Exploration Drilling
9/26/2011(Prairie Creek)oration: Environmental Assessment of Prairie Creek Mine Ente...
8/22/2011(Prairie Creek)and Government of the Northwest Territories Sign Socio-Econo...
6/19/2011(Prairie Creek)and Liidlii Kue First Nation Sign Impact and Benefits Agreem...
6/8/2011(Prairie Creek)oration: Exploration Drill Program Commences at Prairie Cree...
2/28/2011(Prairie Creek)oration: Prairie Creek Mine Feasibility Study Commissioned
2/2/2011(Prairie Creek)CZN Obtains Permit Extension
1/24/2011(Prairie Creek)CZN Signs Agreement with NDDB
1/21/2011(Prairie Creek)and Nahanni Butte Dene Band Sign Impact and Benefit Agreemen...
9/2/2009(Tuvatu)Diamond Drilling Commences at Tuvatu
7/21/2009(Prairie Creek)Federal Minister Visits Prairie Creek Mine
6/5/2009(Prairie Creek)Prairie Creek Metallurgical Results
5/20/2009(Tuvatu)Tuvatu gold project option
8/21/2008Permitting Update
7/22/2008(Prairie Creek)Prairie Creek Permitting Update
6/11/2008(Prairie Creek)Submits Permit Applications for Production at the Prairie Cr...
Corporate news of Canadian Zinc Corp
8/10/2017Reports Financial Results for Q2 and Provides Project Update...
7/15/2016DEH CHO DRUM - July 14, 2016 Public voices thoughts on road
7/7/2016JULY 7, 2016: CANADIAN ZINC ANNOUNCES CLOSING OF $10,200,000...
6/29/2016JUNE 29, 2016: CANADIAN ZINC ANNOUNCES FILING OF FINAL PROSP...
6/21/2016JUNE 21, 2016: CANADIAN ZINC REPORTS ON ANNUAL GENERAL MEETI...
6/16/2016JUNE 16, 2016: CANADIAN ZINC ANNOUNCES C$8.0 MILLION UNDERWR...
6/16/2016JUNE 16, 2016: CANADIAN ZINC PRICES $8-MILLION OVERNIGHT OFF...
6/15/2016JUNE 15, 2016: CANADIAN ZINC ANNOUNCES PUBLIC EQUITY OFFERIN...
5/30/2016Minco Press Release First Quarter 2016 Financial Results
5/27/20162016 First Quarter Managements Discussion and Analysis
5/24/2016MAY 24, 2016: CANADIAN ZINC ANNOUNCES NEW NOMINEES TO BOARD ...
1/25/2016JANUARY 25, 2016: UPDATE ON RESEARCH PROGRAM TO INVESTIGATE ...
1/25/2016Canadian Zinc provides update on research program to investi...
12/2/2015DECEMBER 2, 2015: RESEARCH FUNDING AWARDED TO CANADIAN ZINC ...
12/2/2015Research Funding awarded to Canadian Zinc to investigate cen...
10/24/2015Sandstorm Gold Provides Asset Updates
10/23/2015Sandstorm Gold Provides Asset Updates
9/17/2015SEPTEMBER 17, 2015: MINERAL RESOURCES INCREASE AT PRAIRIE CR...
9/17/2015Canadian Zinc Corporation : Mineral Resources Increase at Pr...
8/14/2015AUGUST 14, 2015: CANADIAN ZINC REPORTS FINANCIAL RESULTS FOR...
8/14/2015Canadian Zinc Reports Financial Results for Second Quarter 2...
8/11/2015AUGUST 11, 2015: UNDERGROUND DRILL PROGRAM AT PRAIRIE CREEK ...
8/11/2015Canadian Zinc Corporation: Underground Drill Program at Prai...
3/31/2015MARCH 31, 2015: CANADIAN ZINC REPORTS FINANCIAL RESULTS FOR ...
3/31/2015Canadian Zinc Reports Financial Results for Fiscal 2014
3/26/2015MARCH 26, 2015: NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK...
3/26/2015(Prairie Creek)oration: New Mineral Resource Update at Prairie Creek Mine
1/29/20142014 Winter Drill Program Commences at South Tally Pond, NFL...
10/31/2013Drilling Extends Massive Sulphide Mineralization at Lemarcha...
10/31/2013oration: Drilling Extends Massive Sulphide Mineralization at...
9/16/2013Drill Program Underway for South Tally Pond, Newfoundland
9/12/2013and Messina Minerals Announce Agreement on Proposed Acquisit...
9/5/2013(Prairie Creek)CZN Receives Permits from Parks Canada for Prairie Creek Min...
9/4/2013(Prairie Creek)Commencing New Drill Program at Prairie Creek
8/20/2013Announces Closing of C$4 Million Bought Deal Flow-Through Pr...
8/1/2013announces C$4 million bought deal flow-through private place...
7/15/2013OtcbbJournal.com Sheds Light on Micro-Cap Companies Under th...
7/8/2013oration: Water Board Completes Regulatory Process; Water Lic...
5/31/2013Raises US$10.0 Million
5/10/2013oration: Annual General Meeting and Adoption of Advance Noti...
4/17/2013Completes Winter Drill Program at South Tally Pond
1/29/2013(Prairie Creek)First Operating Permit Received For Prairie Creek Mine:
1/25/2013CZN Submits Final Responses To Water Board Ahead Of Public H...
1/22/2013Submits Final Responses to Water Board Ahead of Public Heari...
1/15/2013to Drill Lemarchant Massive Sulphide Deposit at South Tally ...
10/31/2012Visit Canadian Zinc Booth # 418 Hard Assets San Francisco
9/24/2012Acquires Paragon Minerals Corporation
7/31/2012Announces Merger and Private Placement With Paragon Minerals...
6/27/2012(Prairie Creek)Reports Results of Prairie Creek Preliminary Feasibility Stu...
3/5/2012and Parks Canada Sign Renewed Memorandum of Understanding
2/29/2012Reports Significant Assay Results from Final Holes of 2011 D...
2/10/2012(Prairie Creek)Closes $4 Million Second Tranche of Zhongrun Private Placeme...
1/6/2012Announces the Closing of $5.1 Million Bought Deal Public Off...
12/30/2011Announces Closing of: $2.5 Million Private Placement of Flow...
12/9/2011Receives Environmental Approval
8/29/2011Federal Government Provides $3 Million Funding to Assist in ...
6/28/2011oration: Environmental Assessment Hearings Completed
3/26/2010Developers Assessment Report Filed
9/30/2009Vatukoula Finance - Operations Update
6/24/2009Gold Production Up at Vatukoula Mine
6/12/2009Vatukoula Approves Share Purchase
5/27/2009Normal Course Issuer Bid
2/24/20092009 Convention - Prospectors & Developers Association of Ca...
11/18/2008SULPHIDE VENT COMPLEX/FEEDER ZONE IDENTIFIED AT THE NORTH LE...
11/4/2008Memorandum of Understanding Signed With Nahanni Butte Dene B...
8/1/2008Memorandum Of Understanding Signed With Parks Canada
4/1/20082007 Year End Results
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (CZN.TO)FRANKFURT (SRS.F)
0.115+4.55%0.017-5.56%
TORONTO
CA$ 0.115
09/10 16:58 0.010
4.55%
Prev close Open
0.110 0.110
Low High
0.110 0.115
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.115 -%
Volume 1 month var.
122,370 -%
24hGold TrendPower© : 11
Produces
Develops Gold
Explores for Copper - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.72-0.19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.02+1.33%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.41+1.26%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.18-3.86%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.84-1.08%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.60+0.91%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :