Scorpio Mining Reports Fourth Quarter and Year-End 2014 Financial Results

TORONTO, March 30, 2015 /CNW/ - Scorpio Mining Corporation (TSX: SPM)(OTCQX: SMNPF) ("Scorpio Mining" or "the Company") today reported fourth quarter and year-end financial and operation results for 2014.

This earnings release should be read in conjunction with the Company's MD&A, Financial Statements and Notes to Financial Statements for the corresponding period, which have been posted on SEDAR at www.sedar.com and are also available on the Company's website at www.scorpiomining.com. All figures are in U.S. dollars unless otherwise noted.

Financial Highlights

For the fourth quarter of 2014, the Company reported the following results from continuing operations:

  • Consolidated production of 647,000 silver ounces and 1.11 million silver equivalent1 ounces at a by-product cash cost of $14.33 and an all-in sustaining cost of $23.052 per ounce.
  • Galena Complex production of 357,870 silver ounces and 542,114 silver equivalent ounces at a by-product cash cost of $17.14 per ounce and an all-in sustaining cost of $21.60 per ounce. 
  • Cosalá Operations production of 289,173 silver ounces and 563,960 silver equivalent ounces at a by-product cash cost of $10.84 per ounce and an all-in sustaining cost of $24.85 per ounce.
  • Revenues of $6.8 million and adjusted net loss of ($1.8) million or ($0.01) cents per share;  including a non-cash impairment charge, depletion and tax expenses recognized on mineral properties and deferred tax assets from the Cosalá Operations, the  net loss for the fourth quarter would be ($73.5) million or ($0.35) cents per share.

For the full year 2014, the Company reported the following results from continuing operations:

  • Consolidated production of 2.80 million silver ounces and 4.37 million silver equivalent ounces at a by-product cash cost of $13.83 and an all-in sustaining cost of $21.15 per silver ounce for the year.
  • Consolidated guidance for 2015 is 2.6 - 3.0 million silver ounces and 4.6 - 5.2 million silver equivalent ounces at cash costs of $11.50 - $12.50 per ounce and all-in sustaining cash costs of $16.50 - $17.50 per ounce.
  • Galena Complex production of 1.62 million silver ounces and 2.14 million silver equivalent ounces at a by-product cash cost of $15.79 per ounce and an all-in sustaining cost of $20.04 per ounce. Cosalá Operations production of 1.18 million silver ounces and 2.22 million silver equivalent ounces at a by-product cash cost of $11.12 per ounce and an all-in sustaining cost of $22.67 per ounce.
  • Revenues of $31.5 million and adjusted net loss of ($3.2) million or ($0.02) cents per share; including a non-cash impairment charge, depletion and tax expenses recognized on mineral properties and deferred tax assets from the Cosalá Operations, the net loss for the full year 2014 would be ($78.7) million or ($0.39) per share.
  • Cash balance of $15.2 million at December 31, 2014 with net working capital of approximately $21.2 million.

____________________________________
1Silver equivalent production is based on prices of $20 per ounce silver; $0.90 per pound zinc; $0.95 per pound lead and $3.00 per pound copper for Q4 2014.

2Cost per silver ounce unless otherwise noted. Comprised of silver industry cash cost plus all development, capital expenditures, exploration spending and mine-related general and administrative expenditures.

 

"With the merger integration now behind us, we are focusing on productivity improvements and cost reductions at the Cosalá Operations," said Scorpio Mining President and CEO Darren Blasutti.  "We are tapping into our recent experiences at Galena, where we have successfully reduced our all-in sustaining costs by 50% since 2012.   Our first quarter is on budget both for silver production and costs, and we expect to see a declining cost trend as the year progresses.  We continue to fast-track our low capital San Rafael silver and zinc project and expect it to be in production in early 2017.  Once up and running, it will make a step-change improvement in the Company's cost profile."

2015 Consolidated Guidance

Consolidated silver production for 2015 is forecast between 2.6 - 3.0 million silver ounces and 4.6 - 5.2 million silver equivalent ounces.  Cash costs are projected to fall approximately 15% to between $11.50 - $12.50 per ounce, and all-in sustaining cash costs are projected to drop approximately 20% to $16.50 - $17.50 per ounce compared with 2014, with steady quarter-over-quarter cost improvement expected throughout 2015.

Consolidated Production

In 2014, the Company produced 2.80 million silver ounces and 4.37 million silver equivalent ounces at a by-product cash cost of $13.83. These results compare to production of 3.09 million silver ounces and 4.57 million silver equivalent ounces at a by-product cash cost of $16.13 during 2013. A year-over-year cash cost reduction of 14% resulted from operating cost improvements at the Galena Complex and higher silver grade at the Cosalá Operations.  Over the course of 2015, further cost controls will be implemented and productivity improvements realized at both operations. The first quarter of 2015 will have lower silver production and a higher cost per ounce, and operating results will improve steadily over the course of the year.

The Company recorded a net loss of $78.7 million for the year ended 2014, compared to net loss of $8.9 million for the year ended 2013.  The increase in net loss was primarily attributable to an impairment charge of $53.3 million and a related eduction in deferred taxes which was recognized against the carrying value of mineral properties at the Cosalá Operations as at December 31, 2014, due to declining metal prices and suspension of the El Cajón project. Additional factors include lower realized metal prices, higher depletion and amortization, higher corporate general and administrative expenses, and unrealized loss on derivative liability, partially offset by lower impairment of investment.

Galena Complex Production

As previously announced in the February 5, 2015 press release, fourth quarter production at the Galena Complex totalled 357,870 silver ounces and 542,114 silver equivalent ounces at a cash cost of $17.14 per ounce and an all-in sustaining cost of $21.60.  Total production for the year was 1.62 million silver ounces at a cash cost of $15.79 compared with 2.12 million silver ounces at a by-product cash cost of $17.76 in 2013, which represents a cost reduction of 12% year-over-year. Production of lead during 2014 increased 39% compared with 2013. Investments made during 2014 and more working faces will facilitate a continued ramp up in lead production and a 15-20% increase in silver production in 2015.

Cosalá Operations Production

Fourth quarter production at the Cosalá Operations totalled 289,173 silver ounces and 563,960 silver equivalent ounces at a by-product cash cost of $10.84 and an all-in sustaining cost of $24.85.  Total production for the year was 1.18 million silver ounces at a cash cost of $11.12 per ounce compared with 969,025 silver ounces and a cash cost of $12.55 in 2013. This represents an 11% cost reduction year-over-year, primarily attributable to increased tonnage at higher average silver head grades.  All-in sustaining cost was affected by $6.9 million in capital spending at El Cajón and would have been roughly $17.00 per ounce without this spending.

Reserves and Resources

As at December 31, 2014, the Company had estimated proven and probable reserves totalling 22.0 million ounces, measured and indicated resources of 57.8 million ounces silver and inferred resources at 25.2 million ounces.  


Table 1

Proven and Probable Mineral Reserves 

December 31, 2014


Grade

Contained Metal


Tonnes

000s

Silver

g/t

Copper

%

Lead

%

Zinc

%

Silver

koz

Copper

Mlbs

Lead

Mlbs

Zinc

Mlbs

Cosalá Operations











Proven

69

96

0.38

0.86

1.61

214

0.6

1.3

2.5


Probable

247

109

0.32

0.80

1.57

865

1.7

4.4

8.6

Total Cosalá P&P

317

106

0.33

0.81

1.58

1,079

2.3

5.7

11.0

Galena Complex











Proven

549

415

0.28

3.88

--

7,326

3.4

47.0

--


Probable

940

448

0.25

3.76

--

13,545

5.1

77.9

--

Total Galena P&P

1.490

635

0.26

3.80

--

20,871

8.5

124.9

--

TOTAL P&P

1,806





21,950

10.9

130.6

11.0

2014 reserves were calculated using assumed long-term average metal prices of $20.00 per ounce of silver, $3.00 per pound of copper, $0.92 per pound of lead and $0.90 per pound of zinc.  Reserve calculations incorporate current and/or expected mine plans and cost levels at each property. 

Totals may not add or multiply accurately due to rounding.



Table 2

Measured & Indicated Mineral Resources (exclusive of Reserves)

December 31, 2014


Grade

Contained Metal


Tonnes

000s

Silver

g/t

Copper

%

Lead

%

Zinc

%

Silver

koz

Copper

Mlbs

Lead

Mlbs

Zinc

Mlbs

Cosalá Operations











Measured

3,941

93

0.09

1.17

2.59

11,811

7.8

101.3

225.3


Indicated

10,591

82

0.15

0.80

1.89

27,901

35.5

187.9

440.8

Total Cosalá M&I

14,532

85

0.14

0.90

2.08

39,712

43.3

289.2

666.1

Galena Complex











Measured

247

476

0.51

2.21

--

3,781

2.8

12.0

--


Indicated

1,302

342

0.23

3.18

--

14,319

6.6

91.4

--

Total Galena M&I

1,550

363

0.27

3.03

--

18,099

9.4

103.5

--

TOTAL M&I

16,801





57,811

52.6

392.7

666.1

 


Table 3

Inferred Mineral Resources

December 31, 2014


Grade

Contained Metal


Tonnes

000s

Silver

g/t

Copper

%

Lead

%

Zinc

%

Silver

koz

Copper

Mlbs

Lead

Mlbs

Zinc

Mlbs

Cosalá Operations










Total Cosalá Inferred

3,572

87

0.19

0.77

0.88

9,984

15.3

60.7

69.3

Galena Complex










Total Galena Inferred

1,762

269

0.14

4.49

--

15,262

5.3

174.5

--

TOTAL INFERRED

5,334





25,246

20.5

235.2

69.3

 Cosalá Mineral Resources for Nuestra Señora are based on a 60 gram per tonne silver equivalent cut off; San Rafael and Zone 120 are based on 2.5% zinc equivalent cut off.  Metal price assumptions used to calculate silver equivalent grade: $24.00 per ounce silver; $0.85 per pound zinc; $2.70 per pound copper; and, $0.85 per pound lead.

Galena Mineral Resources are based on a 290 gram per tonne silver equivalent for silver-copper mineralization and 310 gram per tonne silver equivalent for silver-lead material.  Metal price assumptions used to calculate silver equivalent grade are:  $20.00 per ounce silver; $0.90 per ounce lead; and, $3.00 per pound copper.

Totals may not add or multiply accurately due to rounding.

Reserves and resources were calculated as at December 31, 2014 in accordance with definitions adopted by the Canadian Institute of Mining, Metallurgy and Petroleum and incorporated into National Instrument 43-101.  Changes to the Mineral Reserve and Resource estimates from those contained in the respective Reports3 for the Cosalá Operations and Galena Complex are mainly due to depletion by mining operations.  Mineral Resources are reported exclusive of Mineral Reserves, and as such Mineral Resources do not have demonstrated economic liability. Estimates of Mineral Resources and Reserves may be materially affected by external factors.

Varying cut-off grades have been used depending on the mine, methods of extraction and type of ore contained in the reserves.  Mineral resource metal grades and material densities have been estimated using industry-standard methods appropriate for each mineral project with support of various commercially available mining software packages.  Scorpio's normal data verification procedures have been employed in connection with the calculations.  Verification procedures include industry-standard quality control practices.  Sampling, analytical and test data underlying the stated mineral resources and reserves have been verified by employees of Scorpio under the supervision of Qualified Persons, and/or independent Qualified Persons for the purposes of NI 43-101.  Additional details regarding Mineral Reserve and Mineral Resource estimation, classification, reporting parameters, key assumptions and associated risks for each of Scorpio Mining's mineral properties are provided in the respective NI 43-101 Technical Reports which are available at www.sedar.com.

_________________________________
3The Cosalá Technical Report means the Technical Report and Preliminary Economic Assessment, Nuestra Señora, San Rafael and El Cajón Deposits dated April 12, 2013 and prepared by Mine Development Associates;
The Galena Technical Report means the Technical Report, Galena Complex, Shoshone County, Idaho dated March 22, 2013 and prepared by Fred Barnard PhD., C.P.G.; Steve Milne, P.E. and Robert L. Sandefur, P.E. of Chlumsky, Armbrust & Meyer, LLC.

 

As previously reported4, in light of the unresolved boundary discrepancy at El Cajón, no resources from that deposit have been included in the current resource estimate.  Management again cautions that the mineral resource estimate or future development plans with respect to the El Cajón deposit contained in the Cosalá Technical Report should no longer be relied upon.  The Company will make a decision as to whether to prepare an updated mineral resource estimate for the El Cajón deposit and a revised technical report, prepared in accordance with NI 43-101, following the Dirección General de Regulacion de Minería's final confirmation of the concession boundaries underlying the El Cajón deposit.

About Scorpio Mining

Scorpio Mining Corporation is a silver and gold mining company focused on growth from its existing asset base and execution of targeted accretive acquisitions.  It owns and operates the Cosalá Operations in Sinaloa, Mexico, the Galena Mine Complex in the Silver Valley/Coeur d'Alene Mining District, Shoshone County, Idaho and the Drumlummon Mine Complex in Lewis and Clark County, Montana.

Mr. Jim Atkinson, Vice-President Exploration and a Qualified Person under Canadian Securities Administrators guidelines, has approved the applicable contents of this news release.

Quality Assurance / Quality Control ("QA/QC")

The Company maintains a QA/QC Program for assays, including the use of standards, blanks and duplicates. All QA/QC results are routinely evaluated using a program of QA/QC monitoring. Details of the program are provided in the Company's NI 43-101 compliant Technical Report on the Galena Project and Cosalá Operations which are available www.sedar.com  

For further information please see SEDAR or scorpiomining.com.          

Cautionary Statement on Forward-Looking Information:

This news release contains "forwardlooking information" within the meaning of applicable securities laws. Forwardlooking information includes, but is not limited to, the Company's expectations intentions, plans, assumptions and beliefs with respect to, among other things, the Cosalá Complex, Galena Complex and the Drumlummon Mine. Often, but not always, forwardlooking information can be identified by forwardlooking words such as "anticipate", "believe", "expect", "goal", "plan", "intend", "estimate", "may", "assume" and "will" or similar words suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions, or statements about future events or performance. Forwardlooking information is based on the opinions and estimates of the Company as of the date such information is provided and is subject to known and unknown risks, uncertainties, and other factors that may cause the actual results, level of activity, performance, or achievements of the Company to be materially different from those expressed or implied by such forward looking information. This includes the ability to develop and operate the Cosalá, Galena and Drumlummon properties, risks associated with the mining industry such as economic factors (including future commodity prices, currency fluctuations and energy prices), failure of plant, equipment, processes and transportation services to operate as anticipated, environmental risks, government regulation, actual results of current exploration activities, possible variations in ore grade or recovery rates, permitting timelines, capital expenditures, reclamation activities, social and political developments and other risks of the mining industry. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forwardlooking information, there may be other factors that cause results not to be as anticipated, estimated, or intended. Readers are cautioned not to place undue reliance on such information. By its nature, forwardlooking information involves numerous assumptions, inherent risks and uncertainties, both general and specific those contribute to the possibility that the predictions, forecasts, and projections of various future events will not occur. The Company undertakes no obligation to update publicly or otherwise revise any forwardlooking information whether as a result of new information, future events or other such factors which affect this information, except as required by law.

_______________________________
4See press releases dated October 29, 2014, November 6, 2014 and February 5, 2015.

 

SOURCE Scorpio Mining Corporation

For further information: Darren Blasutti, President and CEO, 416-848-9503; Nikki Richard, Investor Relations, 416-848-9503
Data and Statistics for these countries : Canada | Mexico | All
Gold and Silver Prices for these countries : Canada | Mexico | All

Scorpio Mining Corporation

PRODUCER
CODE : SPM.TO
ISIN : CA80917V1058
CUSIP : 80917V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Scorpio Mining is a silver and zinc development stage company based in Canada.

Scorpio Mining produces silver, zinc, copper, gold and lead in Mexico, and holds various exploration projects in Mexico.

Its main asset in production is NUESTRA SENORA in Mexico and its main exploration properties are SAN RAFAEL - MAIN & UPPER ZONE, SAN RAFAEL - 120 ZONE, EL CAJON DEPOSIT, LA VERDE SINALOA, COSALA DISTRICT and LA REVANCHA in Mexico.

Scorpio Mining is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 27.8 millions as of today (US$ 20.0 millions, € 17.9 millions).

Its stock quote reached its highest recent level on April 16, 2004 at CA$ 4.00, and its lowest recent point on February 05, 2016 at CA$ 0.06.

Scorpio Mining has 347 230 016 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Scorpio Mining Corporation
2007 Annual Report
Financings of Scorpio Mining Corporation
5/5/2011Debt Free with Repayment of Debentures
5/6/2008Closes Bought Deal Financing
Option Grants of Scorpio Mining Corporation
3/6/2007Announces Grant of Incentive Stock Options
Nominations of Scorpio Mining Corporation
10/25/2013Announces Resignation of COO Tom McGrail and Subsequent Appo...
6/14/2013Reports Voting Results of Election of Directors
3/13/2013Appoints Chief Executive Officer
4/18/2011Appoints New CFO
1/22/2011Scorpio Mining Announces Appointment of Jonathan Berg Resig...
7/22/2010Appoints New Chairman
3/2/2010Appoints Pierre Lacombe, Eng., to the Board
2/17/2010Appoints Mexico Country Manager
1/5/2010Appoints New Director to the Board
1/30/2008Appoints New Director To The Board
Financials of Scorpio Mining Corporation
11/6/2014Reports Third Quarter 2014
5/13/2014Reports First Quarter 2014
11/11/2013Reports Financial Results for its Third Quarter 2013
8/14/2013Reports Financial Results for its Second Quarter 2013
5/10/2013Reports Financial Results for First Quarter 2013
3/18/2013Reports Fourth Quarter and Year-End Financial Results for 20...
11/8/2012Reports Third Quarter Results - Cost reduction programs are ...
5/19/2011Reports Record Silver Production in Q1 2011 and Increases Mi...
4/1/2011Announces Fourth Quarter and Year-End Financial Results for ...
4/1/20102009 Year-end and Fourth Quarter Financial Results
8/15/2009Announces Second Quarter 2009 Results
Project news of Scorpio Mining Corporation
4/30/2013Announces Granting of Environmental Permitfor El Caj=F3n an...
4/4/2013Announces 2013 Exploration Program
1/18/2013Reports Q4 Operating Results and 2012 Production for Nuestra...
10/9/2012Deepens Hole EC-109 at New El Caj=F3n La Emma Zone and Inter...
10/1/2012Announces Increased Mineral Resources and Contained Metals a...
9/24/2012Announces Increase in Resource Estimate for El Caj=F3n
1/30/2012(Nuestra Senora)Advances Expansion Planning to Increase Production Capacity ...
1/27/2012Reports Record 2011 Production Results and2012 Guidance for ...
6/27/2011(Nuestra Senora)to Advance Feasibility Study of an Additional Plant and Plan...
3/17/2011(Cosala District)Acquires Additional Mineral Concessions inCosal=E1 District ...
3/13/2011(Nuestra Senora)Reports Nuestra Senora Mineral Reserve of 2.764 Mt @287 AgEq...
5/6/2010(Nuestra Senora)Drilling Reports 42.4 metres grading 198.03 g/t Silver, 1.37...
11/5/2009(San Rafael - Main & Upper Zone)Reports Drill Highlights of Platte River Gold=E2??s La Verde...
2/26/2009(Nuestra Senora)Reports on Drilling of the Main Zone from the 9th Level
11/6/2008 Drilling of the North West Main Zone from the 10th Level Co...
11/4/2008(Nuestra Senora)Provides October Operations Update on Nuestra Senora Mine, M...
9/6/2008(Nuestra Senora)?s Drilling of the North West Main Zone Intersects 13,671 g/...
9/3/2008(Nuestra Senora)Provides Operations Update on Nuestra Senora Project, Mexico
7/3/2008(Nuestra Senora)Drilling on 9th Level of the Main Zone Reports 5.80 metres g...
6/16/2008(Nuestra Senora)Mexican Subsidiary Enters Into Agency Agreement for Marketin...
5/13/2008(Nuestra Senora)Receives New Resource Estimate
5/5/2008(Nuestra Senora)Drilling of the Main Zone from the 8th Level of the Nuestra ...
4/24/2008(Nuestra Senora) Commences Production Mining at the Nuestra Senora Project, ...
4/11/2008(Nuestra Senora)Discovers Another New Zone Reporting 11.50 metres grading 16...
3/31/2008(Nuestra Senora)Receives Mill Facility Construction Completion Certificate A...
3/18/2008(Nuestra Senora)Santa Teresa Extension Continues to Produce High-Grade Resul...
3/12/2008(Nuestra Senora)Nuestra Senora Main Zone Increases In Size With Underground ...
2/28/2008(Nuestra Senora)Santa Teresa Deposit Continues to Deliver with Underground D...
2/26/2008(Nuestra Senora) Reports on Mineralized Stockpile for Initial Mill Throughpu...
2/14/2008(Nuestra Senora) Provides Nuestra Senora Project Update, Sinaloa State, Mexi...
1/16/2008(Nuestra Senora)Underground Drilling of Santa Teresa Deposit Reports 32.8 me...
11/2/2007(Nuestra Senora)Deep Drilling of Nuestra Senora Deposit From 11th level Hits...
10/2/2007Reports High-Grade Intercept of 1,158 g/t Ag, 29.95% Zn, 4.2...
9/25/2007(Nuestra Senora)Scorpio's Underground Drilling of Sept 9 Zone Hits 1,483 g/t...
9/19/2007(Nuestra Senora)Underground Drilling of Nuestra Señora Deposit Hits 21 metr...
8/30/2007(Nuestra Senora)Mexico Team Fully Staffed and Ready for Production
8/20/2007(Nuestra Senora)Scorpio's Underground Drilling from the 9th Level of Nuestra...
8/13/2007(Nuestra Senora)Scorpio's Underground Drilling of Nuestra Senora Deposit Hi...
8/8/2007(Nuestra Senora) Provides Nuestra Senora Project Update, Sinaloa State, Mexi...
7/30/2007(Nuestra Senora)First Ever Surface Drilling of Santo Domingo Satellite Depos...
7/10/2007(Nuestra Senora)8 Level Underground Drilling of Nuestra Señora Deposit Repor...
6/14/2007AMENDED: Scorpio Receives Positive Results from the Pre-Feas...
6/13/2007(Nuestra Senora)Receives Positive Results from the Pre-Feasibility Study on ...
6/8/2007(Nuestra Senora)2007 Technical report
4/23/2007(Nuestra Senora)Drilling of Nuestra Señora Main Zone Reports 4.4 metres grad...
3/26/2007(Nuestra Senora)Drilling of Nuestra Senora Zone Hits 11 Mineralized Intercep...
3/19/2007(Nuestra Senora)Drilling of Nuestra Senora Zone Hits 8 Mineralized Intercept...
2/21/2007(Nuestra Senora)Receives Metallurgical Test Work and Moves Forward
Corporate news of Scorpio Mining Corporation
8/28/2015Americas Silver Corporation. Announces Completed Private Pla...
8/14/2015Americas Silver Reports Second Quarter 2015 Financial Result...
7/23/2015Americas Silver Corporation Provides Second Quarter Producti...
4/20/2015Scorpio Mining Provides First Quarter Production Update
4/15/2015Scorpio Mining Adopts Shareholder Rights Plan
4/15/2015Adopts Shareholder Rights Plan
3/30/2015Scorpio Mining Reports Fourth Quarter and Year-End 2014 Fina...
12/4/2014Announces Purchase Option Agreement for Concession near Curr...
11/6/2014Scorpio Mining Reports Third Quarter 2014
10/29/2014Scorpio Mining Provides Update on El Cajón Project and Provi...
10/16/2014Scorpio Mining Reports Third Quarter 2014 Production Results
9/5/2014Scorpio Mining's Board Determines Not to Accept Director Res...
8/11/2014Reports Second Quarter 2014 and Resignation of Vice Presiden...
8/11/2014Scorpio Mining Reports Second Quarter 2014 and Resignation o...
8/2/2014Reports Contractor Fatality at its Nuestra Señora Mine
8/2/2014Scorpio Mining Reports Contractor Fatality at its Nuestra Se...
7/14/2014Scorpio Mining Reports Second Quarter 2014 Production Result...
4/14/2014Development Projects Update and New AGM Date
12/16/2013Receives Final Permit to Proceed with Development of the Und...
10/16/2013Reports Third Quarter 2013 Production Results
6/3/2013s El Cajón Project Status and Signs Letter of Intent for Con...
5/22/2013Reports New Mineral Reserve Estimate for Nuestra Señora and ...
4/25/2013Reports First Quarter 2013 Production Results
10/15/2012Reports Third Quarter Production Results
10/9/2012Deepens Hole EC-109 at New El Cajón La Emma Zone and Int...
9/17/2012Announces 2012 Corporate Update, Action Plan
8/22/2012Intercepts 1.64 Meters of 3.23 g/t gold, 2,510 g/t Silver, 1...
8/13/2012Reports Second Quarter Results=2C Signs Land Agreement on Co...
7/20/2012Names Peter Hawley President and CEO
3/28/2012Reports Record Revenues=2C Mine Operating Earnings and Cash ...
7/18/2011Provides Exploration Update on its Projects in Mexico
7/13/2011Maintains Strong Production Levels in Second Quarter 2011
5/26/2009Provides April 2009 Update
12/22/2008Provides November-December Update and January 2009 Forecast
8/5/2008Begins Shipments Of Concentrates From Its 100% Owned Nuestra...
8/6/2008GOLD CORPORATION SIGNS LETTER OF INTENT WITH CINCORO CAPITAL...
7/7/2008Drilling of Santa Teresa Zone reports 1.60 metres grading 1,...
4/18/2008Granted Increase on Mill Processing Permit and Connects Nues...
3/25/2008Defines the "Jewel Box" Trend within the Northwest Sector of...
3/19/2008Announces Termination of Merger Between Scorpio Gold and Bac...
12/6/2007and BacTech Mining Corporation Seek Shareholder Approval to ...
11/19/2007NEWS OUT(GOLD): RSM.TSXV-ROYAL STANDARD MINERIALS-PRODUCTION
11/8/2007Additional Deep Drilling of Sept 9 Zone from 11th level of t...
10/30/2007 Signs Definitive Agreement for Merger with BacTech and Move...
9/7/2007Sign Letter of Intent with Bactech Mining Corporation for Sa...
6/27/2007Surface Drilling of Satellite Santa Teresa Deposit Reports 1...
6/25/2007Makes Production Decision on its 100% Owned Nuestra Senora P...
5/28/2007Pre-Feasibility Update
5/16/2007Creates Gold Subsidiary
4/30/2007Announces Change of Officer
4/10/2007Construction of a 33-Kv Line to Connect the Comederos Hydro ...
4/4/2007Infill Drilling of the Hoag Zone Continues to Demonstrate Co...
3/13/2007Receives Positive Metallurgical Test Work on the Hoag Zone, ...
2/26/2007Hits 5.2 metres of 171.96 g/t Ag, 11.36% Zn, 2.27% Cu, 4.81%...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (SPM.TO)FRANKFURT (SZ7.F)
0.080+0.00%0.184-5.64%
TORONTO
CA$ 0.080
02/05 15:54 -
0%
Prev close Open
0.080 0.080
Low High
0.060 0.080
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.080 -%
Volume 1 month var.
972,393 -%
24hGold TrendPower© : -7
Produces Copper - Gold - Lead - Silver - Zinc
Develops
Explores for Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/9/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.68-0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.42%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.50+5.93%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.99+2.24%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+7.89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.92+2.67%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.48-0.37%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03-2.94%Trend Power :