Athabasca Potach Inc.

Published : September 27th, 2013

Alpha Minerals JV has Strike Length Extension of the R390E Zone to 255m at PLS=2C Athabasca Basin

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Boron | Gold | Uranium | Water |

Breaking News Release 

Alpha Minerals JV has Strike Length Extension of the R390E Zone to 255m at PLS, Athabasca Basin

VANCOUVER, BRITISH COLUMBIA--(Sept. 27, 2013) - Alpha Minerals Inc. (TSX VENTURE:AMW)(FRANKFURT:E2GA), (the "Company" or "Alpha"), and its 50% Joint Venture partner Fission Uranium Corp. are pleased to announce results for an additional eight holes drilled on the R390E zone. With a new strike length of approximately 255m, the R390E zone has more than quadrupled in length since the winter 2013 program. Holes PLS13-095 and PLS13-102 are of particular note with 61.5m (within 61.5m to 158.5m depth interval) and 59.0m (within 93.0m to 186m depth interval) total composite mineralization respectively, including narrow intervals of "off-scale" radioactivity.

Holes PLS13-087A, PLS13-088, PLS13-091, PLS13-093, PLS13-094, PLS13-095, PLS13-100 and PLS13-102 tested lines 225E, 300E, 450E and 480E of the R390E zone. All holes intersected zones of mineralization with varying degrees of radioactivity.

Drilling Highlights include:

  • Increased strike length of the R390E zone from 60m at the end of the winter 2013 drill program to presently 255m and remains open
  • The width of the R390E zone also remains open with line (390E) showing a width of over 40m
  • PLS13-095 (line 300E) intersected 61.5m total composite mineralization within a 97.0m section (61.5m to 158.5m), including narrow intervals of off-scale
  • PLS13-102 (line 300E) intersected 59.0m total composite mineralization within a 93.0m section (93.0m to 186.0m), including narrow intervals of off-scale

Drill hole PLS13-091 intersected mineralization approximately 20m south of the PL-3B ground EM conductor axis. This is the first mineralized intersection south of the ground conductor axis, and increases the possibility of extending the zone laterally to the south along the entire length of the corridor as it becomes further delineated.

R390E Zone:

These new drill holes represent shallow, very broad intervals of radioactivity and, importantly, extend the R390E zone an additional 90m west and 45m east from previous delineation. The relevant geological features of the holes are as follows:

Line 225E: Two vertically collared holes were drilled on and close to line 225E.

  • Drillhole PLS13-091 was collared as a vertical hole and drilled to a depth of 373.0m. The collar is located approximately 105m grid west and 30m grid south of hole PLS13-075. The hole was collared to test a coincident radon in water and sediment anomaly. Bedrock was encountered at 53.5m depth. A locally pegmatite rich quartzitic gneiss was encountered from 53.5m to 234.3m. From 234.3m to the end of hole depth of 373.0m the lithology transitions to a dominantly pelitic gneiss with local mylonites. Two narrow intervals of weakly anomalous radioactivity were intersected between 258.0m to 272.5m (1.5m and 4.0m wide respectively) occurring within the pelitic gneiss. It is interpreted that this hole intersected the quartzitic gneiss hanging wall and pelitic gneiss contact too deep to hit the stronger mineralization generally seen associated with the PL-3B corridor.
  • Drillhole PLS13-093 was collared as a vertical hole and drilled to a depth of 278.0m. Similar to hole -091, this drill hole was designed to test a coincident radon in water and sediment anomaly, but testing further up-dip to the north within the prospective pelitic corridor. Pelitic gneiss was encountered at the top of the basement at 50.4m, continuing to 171.1m, then transitioning to a semipelitic gneiss to the end of hole depth of 278.0m. Four narrow zones of anomalous moderate radioactive mineralization were intersected in widths ranging from 0.50m to 5.0m, from 117.0m to 148.5m.

Drill hole PLS13-091 is located close to line 225E and was drilled further south on the prospective corridor than previously tested in the R390E zone. This drill hole intersected anomalous radioactive mineralization about 20m south of the PL-3B ground EM conductor.

Line 300E: Two vertically collared holes were drilled on line 300E.

  • Drillhole PLS13-095 is located approximately 30m grid west from hole PLS13-075 (see news release July 29, 2013). Devonian sandstone was encountered from 47.6m to 51.7m, which was underlain with a basement sequence comprising an intercalated mixture of mylonite, semipelitic gneiss, pelitic gneiss, and quartzitic gneiss to 68.1m. From 68.1m to 137.6m the lithology is dominantly a pelitic gneiss with alternating sequences of mylonites and cataclasites. From 137.6m to the end of drill hole depth of 275.0m the lithology is a semipelitic gneiss. Anomalous radioactivity begins at 61.5m coincident with the first appearance of pelitic gneiss. A total composite of 61.5m of mineralization within a 97.0m section (61.5m to 158.5m) occurs in several variably radioactive mineralized intervals ranging in width from 1.5m to 33.0m. Two narrow intervals of off-scale radioactivity were intersected (0.49m and 0.19m respectively).
  • Drillhole PLS13-102 was collared 10m south of hole -095. Devonian sandstone was encountered from 58.3m to 58.8m, which is underlain by quartzitic gneiss to 63.1m. From 63.1m to 218.7m the lithology is dominantly a pelitic gneiss with alternating sequences of mylonites and cataclasites. From 218.7m to the end of drill hole depth of 275.0m the lithology is a semipelitic gneiss. A broad zone of anomalous radioactive mineralization comprised of several intervals ranging in width of from 0.5m to 29.0m for a total composite interval of 65.0m was intersected over a 93.0m wide section (93.0m to 186.0m). The intervals are separated by barren sections in intervals from 2.0m to 6.0m wide. Two narrow intervals of off-scale radioactivity were intersected (0.24m and 0.1m wide respectively).

A vertical offset of 7.1m from the top of basement rocks appears to exist between PLS13-095 and -102, which are located 10m apart. This is the first time at PLS that a vertical offset of this magnitude has been observed in basement rocks across such a short horizontal distance, and, if this offset is a true measurement, it may represent an important structural feature related to uranium mineralization.

Line 315E:

  • Drillhole PLS13-087A was collared as a vertical hole and drilled to a depth of 227.0m. The collar is located approximately 15m grid west of PLS13-075. Basement was intersected at 50.9m, immediately below a narrow 0.9m wide veneer of Devonian sandstone. Lithology consists of a pelitic gneiss from 50.9m to 87.5m, and a semipelitic gneiss from 87.5m to the end of hole depth of 227.0m. Mineralization starts at the top of the basement and extends 0.4m up into the overlying Devonian sandstone unit. A total composite of 44.5m of mineralization within a 68.5m section (50.5m to 119.0m) occurs in several variably radioactive mineralized intervals ranging in width from 1.0m to 17.0m, separated by barren intervals ranging from 2.5m to 9.5m wide. A narrow occurrence of off-scale radioactivity (0.25m wide) was intersected at 74.08m depth.

Line 450E: Two vertically collared holes were drilled on line 450E.

  • Drillhole PLS13-094 is located approximately 15m grid east from hole PLS13-073 (see news release Sept 25, 2013) and drilled to a depth of 272.3m. Devonian sandstone was encountered from 50.7m to 53.4m. Basement was intersected at 53.4m, with a quartzitic gneiss from 53.4m to 103.6m. From 103.6m to the end of hole depth of 272.3m the basement is comprised dominantly of a pelitic gneiss, with localized mylonites and pegmatite-rich sections. A total composite of 24.0m of mineralization within a 55.5m section (105.5m to 161.0m) occurs in several variably radioactive mineralized intervals ranging in width from 0.5m to 12.0m. A narrow (0.15m wide) interval of off-scale radioactivity was encountered at 131.35m.
  • Drillhole PLS13-100 was collared 10m grid north of hole PLS13-094. Devonian sandstone was encountered from 53.0m to 53.3m. Pelitic gneiss was intersected from 53.3m to 59.2m, which is underlain by semipelitic gneiss to 74.0m. From 74.0m to 219.0m the basement is comprised dominantly of alternating pelitic gneiss and mylonite with localized cataclasites. Semipelitic gneiss was encountered from 219.0m to the end of hole depth of 263.0m. A broad zone of anomalous radioactive mineralization comprised of several mineralized intervals ranging in width of from 2.0m to 20.0m for a total composite of 57.5m of mineralization intersected over a 104.0m wide section (53.0m to 157.0m). The mineralized intervals are separated by barren sections that range from 3.0m to 26.0m wide. Two narrow intervals of off-scale radioactivity were intersected (0.2m and 0.34m wide respectively).

Line 480E:

  • Drillhole PLS13-088 was collared as a vertical hole and completed to a depth of 296.0m. The collar is located approximately 30m grid east of PLS13-094. Devonian sandstone was intersected from 53.0m to 54.3m. Basement rocks consist of pelitic gneiss from 53.4m to 210.0m with several undifferentiated mylonite sequences throughout. The rock transitions into a semipelitic gneiss from 210.0m to the end of hole depth of 296.0m. A broad 160.0m section (54.0m to 214.0m) hosts alternating mineralized and barren intervals with mineralized zones ranging from 0.5m to 23.5m separated by barren intervals ranging from 2.5m to 40.0m wide. A narrow interval (0.12m) of off-scale radioactivity was intersected at 148.77m.

R390E zone

Collar * Hand-held Scintillometer Results On Mineralized Drillcore (>300 cps / >0.5M minimum) Devonian
Sandstone
Base-
ment
Uncon-
formity
Total
Drill-
hole
Hole ID Grid
Line
Az Dip From
(m)
To
(m)
Width
(m)
CPS
Peak
Range
From -
To (m)
Depth
(m)
Depth
(m)
PLS13-087A 315E 151 -85 50.5 55.5 5.0 <300 - 7100 50.0 - 50.9 50.9 227.0
58.0 62.0 4.0 305 - 630
68.5 83.0 14.5 <300 - >9999
85.5 88.5 3.0 <300 - 490
98.0 115.0 17.0 <300 - 2100
118.0 119.0 1.0 350 - 1200
PLS13-088 480E 82 -84 54.0 54.5 0.5 800 53.0 - 54.3 54.3 296.0
62.0 77.0 15.0 <300 - 1500
80.0 103.5 23.5 <300 - 9800
135.0 143.0 8.0 400 - 8100
148.5 149.5 1.0 440 - >9999
152.0 155.0 3.0 330 - 3800
158.5 159.0 0.5 390
162.5 168.0 5.5 360 - 3600
208.0 214.0 6.0 <300 - 3000
PLS13-091 225E 102 -89 258.0 259.5 1.5 380 - 620 No Sandstone 53.5 373.0
268.5 272.5 4.0 <300 - 1000
PLS13-093 225E 232 -86 117.0 118.0 1.0 360 - 420 No Sandstone 50.4 278.0
124.0 125.0 1.0 420 - 1100
134.5 139.5 5.0 <300 - 3300
148.0 148.5 0.5 340
PLS13-094 450E 216 -88 105.5 115.5 10.0 <300 - 2800 50.7 - 53.4 53.4 272.3
130.0 142.0 12.0 <300 - >9999
151.5 152.5 1.0 300 - 320
156.5 157.0 0.5 310
160.5 161.0 0.5 350
193.0 194.5 1.5 <300 - 450
PLS13-095 300E 37 -87 61.5 63.0 1.5 320 - 1000 47.6 - 51.7 51.7 275.0
68.0 79.5 11.5 <300 - >9999
93.5 100.5 7.0 <300 - >9999
104.5 111.5 7.0 <300 - 2000
116.0 149.0 33.0 <300 - 5800
155.0 158.5 3.5 <300 - 660
PLS13-100 450E 351 -86 53.0 59.0 6.0 790 - >9999 53.0 - 53.3 53.3 263.0
85.0 94.5 9.5 <300 - 4200
99.5 119.5 20.0 <300 - 8000
122.5 131.0 8.5 <300 - 1200
134.0 142.5 8.5 <300 - >9999
146.5 149.5 3.0 <300 - 420
155.0 157.0 2.0 880 - 3000
PLS13-102 300E 2 -89 93.0 98.0 5.0 <300 - 710 58.3 - 58.8 58.8 275.0
103.0 132.0 29.0 <300 - 6000
137.5 148.0 10.5 <300 - >9999
154.0 163.5 9.5 <300 - 5300
167.0 167.5 0.5 1000
171.5 175.5 4.0 850 - 8000
179.5 186.0 6.5 <300 - >9999
* Scintillometer Instrument: GR-110G

A $6.95M, 44 hole, 11,000m drill program and ground geophysics surveys continues at PLS.

  Past News Releases
  Wed, Sept 25, 2013

Alpha Minerals JV Intersects 34.5m of 8.15% U3O8 Starting at 61.0m in Drill Hole PLS13-072 at PLS, Athabasca Basin
 

  Mon, Sept 23, 2013

Alpha Minerals JV Intersects Significant Mineralization at Radon Anomaly on Line 585E: Expanding Potential at PLS, Athabasca Basin

  Wed, Sept 18, 2013

Fission Uranium and Alpha Minerals Execute Definitive Agreement
 

Natural gamma radiation in drill core that is reported in this news release was measured in counts per second (cps) using a hand held Exploranium GR-110G total count gamma-ray scintillometer. The reader is cautioned that scintillometer readings, like the down hole gamma probe readings, are not directly or uniformly related to uranium grades of the rock sample measured, and should be used only as a preliminary indication of the presence of radioactive materials. The degree of radioactivity within the mineralized intervals is highly variable and associated with visible pitchblende mineralization. All intersections are down-hole, core interval measurements and true thickness is yet to be determined.

Radiometric surveys are planned for all holes using a Mount Sopris 2GHF-1000 Triple Gamma probe, which allows for more accurate measurements in high grade mineralized zones.

Split core samples from the mineralized section of core will be taken continuously through the mineralized intervals and submitted to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) of Saskatoon for analysis, which includes U and fire assay for gold. All samples sent for analysis will include a 63 element ICP-OES, uranium by ICP-MS and boron. Assay results will be released when received.

For additional comments about the Summer 2013 Program, please watch a corporate video at the Alpha Minerals website: http://www.alphaminerals.ca/corporate-videos/

Patterson Lake South Property

The 31,000 hectare (76,000 acres) PLS project is a 50%/50% Joint Venture held by Alpha Minerals Inc (AMW) and Fission Uranium (FCU). The Joint Venture property is 100% owned with no underlying royalties or vendor payments. For the present work, the exploration is still being operated as a Joint Venture under the direction of the Joint Venture Management Committee with Fission Uranium acting as the operator and further work is still planned by the Joint Venture Committee for targets on land to the SW of the discovery zone R00E.

The property is accessible by road with primary access from all-weather Highway 955, which runs 74km north to the former Cluff Lake mine, (>60M lbs of U3O8 produced from multiple open pit and underground mines), and passes through the claims covering the UEX-Areva Shea Creek discoveries located 58km to the north, currently under active exploration and development.

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43- 101 and reviewed on behalf of Alpha Minerals Inc, by Garrett Ainsworth, P.Geo., Vice President Exploration, a qualified person.

On behalf of the Board of Directors of Alpha Minerals Inc.

Ben Ainsworth, PEng BC/SK, President, CEO and Director

Please refer to the Alpha Minerals Inc. website (www.alphaminerals.ca) for the video and further updated information.

Alpha Minerals Inc.

Suite 408 - 1199 West Pender Street
Vancouver British Columbia V6E 2R1
T: 604.629.0293

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This press release contains "forward-looking information" that is based on Alpha's current expectations, estimates, forecasts and projections. This forward-looking information includes, among other things, statements with respect to Alpha's development plans. The words "will", "anticipated", "plans" or other similar words and phrases are intended to identify forward-looking information.

Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause Alpha's actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information. Such factors include, but are not limited to: uncertainties related exploration and development; the ability to raise sufficient capital to fund exploration and development; changes in economic conditions or financial markets; increases in input costs; litigation, legislative, environmental and other judicial, regulatory, political and competitive developments; technological or operational difficulties or inability to obtain permits encountered in connection with exploration activities; and labour relations matters. This list is not exhaustive of the factors that may affect our forward-looking information. These and other factors should be considered carefully and readers should not place undue reliance on such forward-looking information. Alpha disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.


    

vantagewire.com

Disclaimer: Vantage Communications Ltd. was paid to distribute this bulletin. Vantage Communications may or may not own securities in this particular company. THIS IS NOT A RECOMMENDATION TO BUY OR SELL ANY SECURITY! You are on this mailing list because you registered for VantageWire News. Past performance of Companies mentioned does not guarantee future performance. This email complies with the US Federal CAN-SPAM Act of 2003

If you would like to opt out of You are receiving this email because you opted in at VantageWire.com . For more information about this service, please contact: Vantage Communications Ltd. at 1.604.288.9119, Suite 150 - 666 Burrard St, Vancouver, British Columbia V6C 2X8

� 2013 Copyright Vantage Communications Ltd. All Rights Reserved.

Athabasca Potach Inc.

CODE : API.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Athabasca is a exploration company based in Canada.

Athabasca holds various exploration projects in Canada.

Its main exploration property is THE BURR PROJECT in Canada.

Athabasca is listed in Canada. Its market capitalisation is CA$ 315.8 millions as of today (US$ 309.2 millions, € 231.9 millions).

Its stock quote reached its highest recent level on May 16, 2008 at CA$ 9.47, and its lowest recent point on December 24, 2008 at CA$ 0.75.

Athabasca has 37 824 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Athabasca Potach Inc.
2007 Annual report
2006 Annual report
Nominations of Athabasca Potach Inc.
8/6/2009Potash Appoints New President and CEO
1/29/2009Appoints A New Board Member
Financials of Athabasca Potach Inc.
8/17/2009Second Quarter Results
Project news of Athabasca Potach Inc.
2/20/2014on Hatchet Lake Uranium Project, Athabasca Basin, Saskatchew...
2/20/2014The Western Athabasca Syndicate Identifies 23 Gravity Low An...
2/20/2014The Western Athabasca Syndicate Identifies 23 Gravity Low An...
2/18/2014ALPHA EXPLORATION=E2??S WINTER PROGRAM AT MIDDLE LAKE=2C ATH...
2/11/2014Uracan/UEX Begin Winter Drilling Campaign on the Black Lake ...
2/3/2014Noka - Alpha Commence Airborne VTEM Survey at Carpenter Lake...
1/20/2014Drilling Begins on Hatchet Lake Uranium Project, Athabasca B...
1/20/2014ALPHA EXPLORATION TO START WORK AT MIDDLE LAKE PROPERTY=2C A...
1/16/2014Makena=3A Smallest Market Capitalized Company Bordering the ...
1/15/2014Makena Commences VTEM Max Survey on Uranium Prospects in the...
1/14/2014Noka and Alpha Exploration enter into option on Carpenter La...
1/11/2014Lakeland / Declan Identify Uranium Drill Targets in Athabasc...
1/8/2014Basin Exploration Update - January 1, 2014
1/7/2014The Western Athabasca Syndicate Updates the Ongoing Winter E...
12/4/2013(LAN:TSX-V) Declan Announces Option on Gibbon's Creek Uraniu...
12/2/2013Basin Exploration Update - December 1, 2013
11/29/2013Feature: Subject of a research report, uranium junior Lakel...
11/28/2013UEX/AREVA Announce Western Athabasca Exploration Budget of $...
11/27/2013Western Athabasca Syndicate Discovers Additional Radon Anoma...
11/5/2013The Western Athabasca Syndicate Identifies Eight High Potent...
11/5/2013The Western Athabasca Syndicate Identifies Eight High Potent...
11/4/2013Basin Exploration Update - November 1, 2013Recieved:
10/2/2013Basin Exploration Update - October 1, 2013Recieved:
9/26/2013Western Athabasca Syndicate Discovers Strong Radon Anomalies...
9/26/2013Western Athabasca Syndicate Discovers Strong Radon Anomalies...
9/23/2013Alpha Minerals JV Intersects Significant Mineralization at R...
9/20/2013Makena Receives Approval for Athabasca Uranium Prospect Bord...
9/12/2013Alpha Minerals JV Hits 4.7m Total Composite "Off=2DScale" Ra...
9/5/2013Western Athabasca Syndicate Provides Update on Fieldwork at ...
9/3/2013Basin Exploration Update - September 1, 2013Recieved:
8/29/2013Makena (MKN) Acquires Athabasca Uranium Prospect Bordering t...
8/22/2013Alpha Minerals JV Hits 47m Mineralization Including 5.27m To...
8/13/2013“OFF-SCALE” RADIOACTIVITY IN 48.5M OF MINERALIZATION in the...
8/6/2013VC Infographic | Athabasca Basin=3A The World's Highest Grad...
8/1/2013Basin Exploration Update - August 1, 2013Recieved:
7/23/2013Skyharbour=3A Western Athabasca Syndicate Extends VTEM Plus ...
7/17/2013Alpha Minerals Reports Summer Drilling Has Commenced at Patt...
7/10/2013Skyharbour=2C Athabasca Nuclear=2C Noka and Lucky Strike Agr...
7/2/2013Basin Exploration Update - July 1, 2013Recieved:
7/2/2013Alpha Minerals Receives Permits for Summer Drilling at PLS U...
7/2/2013Alpha Minerals Receives Permits for Summer Drilling at PLS U...
6/4/2013Basin Exploration Update - June 1, 2013Recieved:
5/30/2013Exploration Company Options Five Uranium Athabasca Basin Pro...
5/1/2013Basin Exploration Update - May 1, 2013Recieved:
4/10/2013Alpha Minerals Reports on Successful Winter Drill Program wi...
4/3/2013Alpha Minerals Extends Strike of R390E Zone to 60 m at Patte...
3/19/2013Alpha Minerals JV R00E Zone=2C Grows With More "Off=2DScale"...
3/18/2013Alpha Minerals Discovers Third Zone of Uranium Mineralizatio...
3/14/2013ASHBURTON ACQUIRES URANIUM PROJECT ADJOINING FISSION ENERGY ...
2/14/2013Regarding Uracan's Option for Black Lake Project in the Atha...
2/4/2013Basin Exploration Update - February 1, 2013
1/24/2013Uracan Options Black Lake Project In The Athabasca Basin Fro...
8/9/2012DNI RESUMES IN-FILL AND EXPLORATORY DRILLING ON ITS POLYMETA...
5/9/2012Forum Uranium Corp.: Drilling Discovers Basement-Hosted Uran...
10/13/2011Provides Update on Red Willow North Project in Athabasca Bas...
9/29/2011Continues to Stake New Property in Athabasca BasinRecieved:
3/7/2011DNI CONCLUDES DRILLING ON ITS ALBERTA POLYMETALLIC BLACK SHA...
2/24/2011UEX/AREVA 2011 Western Athabasca Basin Drilling Programs Und...
2/14/2011Athabasca Basin Exploration Update - February 1, 2011
7/17/2009(The Burr Project)Potash Provides Update on Strategic Review Process
3/3/2009(The Burr Project)Has Engaged Thyssen Mining For Shaft, Hoist & Headframe Stud...
1/23/2009(The Burr Project)Potash Inc. Has Identified a Preferred Shaft and Mill Site L...
1/19/2009(The Burr Project)Has Engaged SNC-Lavalin to Provide Pre-feasibility Study Ser...
Corporate news of Athabasca Potach Inc.
2/20/2014TAD (TJ) Acquires over 11,000 acres bordering NexGen in the ...
2/19/201404 cent PLS Athabasca Uranium Junior
2/17/2014Basin and Beyond (Feb 8-14)
2/3/2014ALPHA =E2?? NOKA COMMENCE AIRBORNE VTEM SURVEY AT CARPENTER ...
2/3/2014Week in Review: Uranium and the Athabasca Basin
1/30/2014TAD Commences VTEM Max Survey on Uranium Prospect in the Ath...
1/14/2014Alpha =2D Noka Sign Option Agreement for Carpenter Lake Uran...
1/14/2014ALPHA =E2?? NOKA SIGN OPTION AGREEMENT FOR CARPENTER LAKE UR...
12/5/2013Well Known Athabasca Basin Geologist Joins Makena
11/27/2013Alpha Minerals JV Reports Recently Discovered R600W Zone Exp...
11/12/2013Alpha Minerals JV Reports 16.8m Total Composite Mineralizati...
11/4/2013Alpha Minerals JV Reports New Land Discovery Hole Located 52...
10/15/2013Skyharbour Leads Syndicate Uranium Group into Largest Ground...
10/10/2013Western Athabasca Syndicate Identifies Uranium Anomalies at ...
9/27/2013Alpha Minerals JV has Strike Length Extension of the R390E Z...
9/24/2013Noka Resources (NX:TSX-V) Provides Exploration Update on its...
9/16/2013Uranium and the Athabasca Basin
8/15/2013Alpha JV Drills 3rd Radon Zone at PLS and Expands Mineralize...
8/15/2013Alpha Discovers Fourth Zone at PLS to Expand Mineralized Str...
8/9/2013Special: Uranium and the Athabasca Basin
8/8/2013Alpha JV Drilling Extends Mineralization at R00E Zone=2C Pat...
8/8/2013Western Athabasca Syndicate Completes VTEM and Radiometric S...
8/8/2013Western Athabasca Syndicate Completes VTEM and Radiometric S...
8/8/2013Alpha JV Drilling extends Mineralization at R00E Zone=2C Pat...
7/29/2013Significant results in the Athabasca Basin
7/23/2013Western Athabasca Syndicate Extends VTEM Plus Geophysical Co...
7/19/2013“Off-Scale” Radioactivity at Patterson Lake South, Athabasca...
6/24/2013Alpha Minerals Gold Assays and Important Geochemical Data fr...
6/5/2013Alpha Minerals Reports Remaining Assays on R00E=2C R390E and...
5/21/2013Alpha Minerals Agrees to JV Budget for Patterson Lake South=...
5/13/2013Basin Updated: A Review of Saskatchewan Uranium Activity
5/6/2013Alpha Minerals: Radon Survey Confirms 11 Discrete Radon Anom...
5/6/2013Alpha Minerals=3A Radon Survey Confirms 11 Discrete Radon An...
4/11/2013Tad Acquires North Patterson Lake Athabasca Basin Uranium Pr...
4/3/2013Alpha Minerals Extends Strike of R390E Zone to 60 m at Patte...
4/1/2013Alpha Minerals Extends Off=2DScale Radioactivity at R780E Zo...
3/27/2013International Enexco Reports on the Mann Lake Uranium Projec...
3/20/2013Skyharbour Acquires Significant U3O8 Land-Package in Patters...
1/31/2013Mid-Day Breaking News From Alpha Minerals, Intertainment, Ca...
4/23/2012Got Uranium? Looming Supply Crunch & Junior Activity Heat Up...
10/13/2011Mid-Day Breaking News From Pacific North West, Canada Rare E...
8/3/2011Basin Exploration Update - August 1, 2011Recieved:
10/1/2009Potash Announces Resignation of Chief Executive Officer
9/4/2009Shareholders Elect the Alternative Board of Directors
9/1/2009Independent Leading Proxy Advisory Firm Recommends in Favour...
8/28/2009Shareholders should not hand control to former CEO Zhou slat...
7/6/2009Annual Meeting Date of September 3, 2009
6/26/2009Termination of President and Establishment of Special Execut...
5/29/2009Updated Potash Resource Estimate for the Burr Project
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (API.TO)
8.35+0.00%
TORONTO
CA$ 8.35
03/24 15:41 -
0%
Prev close Open
8.35 -
Low High
8.35 8.35
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  8.35 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : 26
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :