Golden Dawn Minerals Inc.

Published : August 04th, 2011

and Nass Valley Gateway Announce NI 43-101

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Gold | Gold Mines | Lithium | Molybdenum | Nickel |
Email not displaying correctly? View it in your browser.

Nass Valley Gateway and Golden Dawn Completed National Instrument 43-101 Report on its KIRKLAND LAKE GOLD PROJECT, Ontario, Canada




Vancouver, August 3rd, 2011 - Nass Valley Gateway Ltd. (CNSX: �NVG�) and Golden Dawn Minerals Inc. (TSX-V: GOM, FRANKFURT: 3G8) have received the National Instrument 43-101 Report on the Kirkland Lake project located in the Larder Lake Mining Division of northern Ontario, in which Nass Valley Gateway has an option to acquire an 80% interest. The project consists of three blocks of claims totalling 1,896 hectares. The property includes the Link-Catherine , the Central�Catherine, and the 80 Foot Fall properties within the Boston-Skead gold belt. All three properties lie close together on a north trending linear and are underlain by Precambrian volcanics in contact with granitic intrusives. Extensive historical work has revealed complex gold-bearing quartz vein systems similar to the richly productive Kirkland Lake District and the Kerr-Addison Mine located to the northeast of this area.

Extensive drilling in multiple campaigns by several companies between 1993 and 2009 has yielded encouraging gold mineralization in several zones. Work to date also indicates the possibility of tellurium associated with the gold veins, nickel associated with ultramafic rock units, pegmatite-hosted lithium, molybdenum and rare metals, and volcanogenic massive sulphides within the volcanic units.

The majority of recent work has been concentrated on the Link-Catherine block between 1999 and 2009 which was explored by 29 holes of which 15 holes were focused in a zone of 375 meters by 300 meters where a number of auriferous and barren quartz and quartz-carbonate vein systems from 1.0 to 20.0 meters in thickness have been intersected. These vein systems carry individual veins of up to 0.3-1.5 meters thick which are flanked by a stockwork of 2.0 to 10.0 cm thick veins and veinlets. Within this area, 16 prospective composite intercepts ranging from 0.89-7.77 g Au/t over 1.5-31.3 meters occur in 12 of the holes. Also 17 other 0.5-2.0 meter individual intervals assaying greater than 1.0 g/t Au were observed in 15 holes. These results provide a strong incentive for additional work to further evaluate the complex gold-bearing system.

Work recommended on the property includes evaluating the potential for structural and lithological controls similar to the setting for the Terry deposit lying only 5 km to the northwest of the property where a relatively flat tabular quartz vein deposit has been drilled yielding a historical non compliant 43-101 resource of 365,000 tonnes at 4.2 g/t gold (Scott, 1994). A structural linear projects to the southeast from the Terry deposit, suggesting a possible extension onto the Central Catherine portion of the Company�s property.

The entire belt of claims lies only 20 km south of the southwesterly projection of the Kirkland Lake-Larder Lake structural break that controls a plethora of gold mines, both historic and currently productive.

The report concludes that considerable potential remains to be evaluated within the area of most recent drilling. Within the drill cores from the last phase of drilling, numerous zones of pyritic materials on the Link-Catherine remain to be assayed in order to check for disseminated gold content possibly extending some distance from the veins and veinlets that returned encouraging gold values.

Review of all geophysical data and a program of three dimensional computer-assisted modeling of all drill data assembled to date are recommended to elucidate targets for continued exploration of the gold zones encountered to date on the Link-Catherine property. These gold zones lie within altered volcanics, transected by numerous northeast and northwest trending linears on the eastern flank of the intrusive mass on the west side of the Link-Catherine property. The report concludes that this mineralized belt warrants additional work.

The National Instrument 43-101 report was completed by L. Alex Scarbrough, Jr., Centennial, Colorado and Stewart A. Jackson, PhD, PGeol., of Winterhaven, California in accordance with the standards of disclosure for mineral projects as defined by National Instrument 43-101 and was filed on SEDAR.

The information in this release has been prepared on behalf of the Company by Dr. Stewart A. Jackson, PGeol., of Winterhaven, California, Qualified Person as defined by National Instrument 43-101.

The reader is cautioned that the historical data has not been verified. A qualified person has not done sufficient work to classify the historical estimate as current mineral resources and Nass Valley Gateway is not treating the historical estimate as current mineral resources and the historical estimate should not be relied upon.

On behalf of the Board of Directors:

 

GOLDEN DAWN MINERALS INC.

 

­­­­­­­­­�Wolf Wiese�

­­­­_______________________________

Wolf Wiese

Chief Executive Officer

 

For Further Information, please contact:

Mike Poulin                                                             Lindsay Malcolm

Investor Relations                                                 Corporate Development

604-630-6793                                                        604-221-8936

mike@goldendawnminerals.com                     Lindsay.nux@gmail.com

THIS PRESS RELEASE WAS PREPARED BY MANAGEMENT WHO TAKES FULL RESPONSIBILITY FOR ITS CONTENTS. NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. THIS DOCUMENT CONTAINS CERTAIN FORWARD LOOKING STATEMENTS WHICH INVOLVE KNOWN AND UNKNOWN RISKS, DELAYS, AND UNCERTAINTIES NOT UNDER THE COMPANY�S CONTROL WHICH MAY CAUSE ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS OF THE COMPANY TO BE MATERIALLY DIFFERENT FROM THE RESULTS, PERFORMANCE, OR ACHIEVEMENTS IMPLIED BY THESE FORWARD LOOKING STATEMENTS. WE SEEK SAFE HARBOR.


About Golden Dawn Minerals

Golden Dawn Minerals Inc. is a junior exploration company with a well positioned portfolio of properties prospective for precious and base metals in British Columbia, Canada. If you would like to learn more about us, please visit www.goldendawnminerals.com. You can also visit us on Twitter: www.twitter.com/goldendawninc


You are receiving this email because you a) are a shareholder b) have signed up on our website to receive updates. If we have mistakenly sent you an email without your permission, please click the unsubscribe button to be removed from our contact list.

.com from this list | Forward to a friend | Update your profile
Our mailing address is:
Golden Dawn Minerals
575 1111 West Hastings Street
Vancouver, BC V6E 2J3

Add us to your address book

Copyright (C) 2011 Golden Dawn Minerals All rights reserved.
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Golden Dawn Minerals Inc.

EXPLORATION STAGE
CODE : GOM.V
ISIN : CA3808956070
CUSIP : 380895 10 2
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Golden Dawn is a gold exploration company based in Canada.

Golden Dawn holds various exploration projects in Canada.

Its main exploration properties are TAM O'SHANTER, CENTRAL CATHARINE, 80 FOOT FALL, LINK-CATHARINE and WILD ROSE BC in Canada.

Golden Dawn is listed in Canada and in Germany. Its market capitalisation is CA$ 3.1 millions as of today (US$ 2.4 millions, € 2.5 millions).

Its stock quote reached its highest recent level on May 27, 2011 at CA$ 2.85, and its lowest recent point on October 17, 2014 at CA$ 0.01.

Golden Dawn has 101 870 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Golden Dawn Minerals Inc.
5/8/2013Announcing Proposed Private Placement
4/4/2013Private Placement of $66,810
1/8/2013Private Placement of $ 162,156
11/6/2012Closing of Private Placement of $140,500
Nominations of Golden Dawn Minerals Inc.
12/19/2013Results of AGM - Appointment of New Director
2/15/2011Announces New Appointment to Board
Project news of Golden Dawn Minerals Inc.
1/25/2016Golden Dawn reports final results of 2015 drilling at May-Ma...
12/11/2012Receives Updated Inferred Mineral Resource for Deadwood Gold...
1/25/2012Announces Exploration & Bulk Sampling Intentions on its Gree...
9/1/2011Announces Drilling Program on Boundary Falls
8/19/2011Announces Drilling Program on Wild Rose, Tam O'Shanter
8/4/2011and Nass Valley Gateway Announce NI 43-101
7/13/2011Receives Technical Report for NI 43-101
5/26/2011Receives Initial Mineral Resource Estimate
5/2/2011Renews Mine Evaluation at May Mac Mine
4/21/2011Schedules Resource Calculation
4/4/2011Intersects 127m Grading 0.43 g/t Gold
Corporate news of Golden Dawn Minerals Inc.
6/2/2016Golden Dawn Minerals Inc. Appoints New Executive Director & ...
5/12/2016Golden Dawn Drilling Intersects Gold And Silver Values Below...
4/25/2016Golden Dawn Completes Second Of Three Phases Of Huakan Green...
4/13/2016Golden Dawn Reports Positive Preliminary Economic Assessment...
4/13/2016Golden Dawn Signs Option Agreement With Huakan And Solicits ...
12/18/2015Closing of the Second Tranche of the Company’s Private Place...
12/18/2015Golden Dawn Minerals Inc.: Closing of the Second Tranche of ...
12/17/2015Golden Dawn Confirms Mineralized Zone Extends Below #6 And #...
11/23/2015IIROC Trading Resumption - GOM
11/23/2015Golden Dawn Drilling Intersects Mineralized Zone from #6 to ...
11/23/2015IIROC Trading Halt - GOM
10/22/2015Golden Dawn Minerals Inc. Assays Rock Channel Samples at 529...
10/15/2015GOLDEN DAWN MINERALS INC. STARTS DRILLING AT GREENWOOD PRECI...
10/14/2015Completion of the Financing for $268,147.40
10/13/2015Golden Dawn Minerals Inc.: Completion of the Financing for $...
10/1/2015GOLDEN DAWN MINERALS INC. SAMPLES 12.97 G/T GOLD OVER 0.87 M...
9/24/2015GOLDEN DAWN MINERALS INC. APPOINTS DR MATHEW BALL TO MANAGE ...
9/24/2015Golden Dawn Minerals Inc. Appoints Dr. Mathew Ball to Manage...
9/12/2015Golden Dawn Minerals Inc. Drops Tam O’Shanter Property
9/12/2015Golden Dawn Minerals Inc. Drops Tam O'Shanter Property
9/8/2015Golden Dawn Minerals Inc. Appoints a New German Director
9/2/2015Golden Dawn Minerals Inc. Upgrades Its Current Frankfurt Lis...
8/15/2015Completion of the Financing for $207,600
8/14/2015Golden Dawn Minerals Inc.: Completion of the Financing for $...
7/17/2015Golden Dawn Minerals Inc. Options Tam O'Shanter Property fro...
7/8/2015Golden Dawn Minerals Inc.: Completion of the Financing for $...
6/13/2015Closing of the First Tranche of the Company’s Non-Brokered P...
6/13/2015Golden Dawn Provides Update for Greenwood Exploration and Bu...
4/13/2015Golden Dawn Minerals Inc. Purchases 100% of Amigo Property, ...
4/13/2015Golden Dawn Minerals Inc. Granted Stock Options
4/2/2015Golden Dawn Minerals Inc. Granted Stock Options
3/26/2015Golden Dawn Minerals Inc. Purchases 100% of Amigo Property, ...
3/11/2015Closing of Private Placement
3/6/2015Company Update
2/5/2015Golden Dawn Announces Development Of Greenwood Project, Brit...
1/9/2015Final Tranche Closing of Private Placement
12/30/2014Closing the Private Placement of $ 65,250
10/28/2014Golden Dawn Announces Private Placement to Existing Sharehol...
4/17/2014Golden Dawn Drops Tam O' Shanter Property
4/4/2014Golden Dawn Announces the Resignation of Director
1/7/2014Announces Consolidation
6/12/2013News Release
3/14/2013Purchases the Boundary Falls Property Hosting the May Mac Mi...
1/29/2013Files National Instrument 43-101 Technical Report For Update...
12/11/2012News Release
10/2/2012News Release
10/2/2012s Exploration and Sampling Schedules for Greenwood Project W...
5/30/2012News Release
5/29/2012News Release
5/14/2012News Release
3/22/2012News Release
1/23/2012News Release
10/24/2011News Release
10/24/2011News Release
9/23/2011signs with Lichtfield
5/10/2011Schedules Drilling on Royal Attwood
5/9/2011s from Golden Dawn
5/9/2011SCHEDULES DRILLING OF MULTIPLE PRIORITY TITAN 24 GEOPHYSICAL...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (GOM.V)FRANKFURT (3G8.F)
0.030+0.00%0.029+0.00%
TSX-V
CA$ 0.030
10/14 10:30 -
0%
Prev close Open
0.030 0.030
Low High
0.030 0.030
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.030 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : 25
Produces
Develops
Explores for Copper - Gold - Nickel - Platinum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2022-80.00%0.210.03
20213.45%0.310.11
202026.09%0.200.04
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :