Scorpio Mining Announces Cosalá District Project Development
Published : June 19, 2014
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Copper | G Mexico | Gold | Growth | Lead | Mexico | Report | Silver | Silver Producer | Zinc |

Scorpio Mining Announces Cosalá District Project Development

TORONTO, June 19 , 2014 /CNW/ - Scorpio Mining Corporation (TSX: SPM) ("Scorpio Mining" or the "Company") today announced its development plans for the Cosalá District projects with NI 43-101 compliant resources, namely the El Cajón and San Rafael deposits, both located within trucking distance from its Nuestra Señora processing plant.

El Cajón Mine Development Update

Underground development work is proceeding as scheduled.  As of the end of May, the portal had been secured; 167 m of ramp had been driven, along with 42 m of lateral cross-cut to establish the powder magazine.  Pictures of the on-going work at El Cajón are regularly posted on the Company's website (http://www.scorpiomining.com/s/elcajon.asp).

The field visit by the Dirección General de Minería ("DGM"), to provide surveying evidence of where the boundaries of the Company's concessions lie relative to those of a neighbour, has now been scheduled for June 25, 2014.  Considering the time lapse since our request was issued, in late March, and the probable duration of the following cabinet work by the DGM, before issuing their final assessment, the publication of a prefeasibility study covering the El Cajón project may be postponed into Q1 2015.  This is not affecting the underground development schedule though.

Prospective Cosalá Norte Project Development Sequence

With the ramp being driven into El Cajón and the subsequent production ramp-up expected to follow later this year, the Company is considering alternatives for bringing forward the development of the San Rafael Project as an additional source of ore.  As indicated in the NI 43-101 technical report prepared for the San Rafael Project, (per Mine Development Associate's report dated September 7, 2012, filed on SEDAR) comprising both the Zn-Pb-Ag Main Zone and the Ag-Cu 120 Zone, both deposits hold a total of over 90 million silver equivalent ("Ag eq.") ounces1 in the Measured & Indicated ("M&I") resource categories.  It is envisioned that the potential development of the San Rafael Project through production would be coupled with the finalization of the plant expansion, from a nameplate capacity of 1,600 tonnes per day ("tpd") to 2,750 tpd.

(Note 1. Conversion to silver equivalent (Ag eq.) ounces based on 2014 budget metal pricing of $19/oz Ag, $0.99/lb Pb, $0.95/lb Zn, $2.97/lb Cu, $1,294/oz Au).

Towards this goal, specific tasks are planned, such as:

  • Permitting for Exploration Drilling at San Rafael – Since 2012, Mexican regulations require a full permitting process for enabling surface exploration; similar to what is required for exploitation.  The Company has filed the relevant application in Q1 2014 and received a request for additional information early in June 2014.

  • Infill Drilling at San Rafael – Upon receipt of the above-mentioned exploration permit, the Company will embark on an infill program that will target the tabular, near-surface, Main Zone and the upper portion of the near-vertical 120 Zone.  This 2,300 m program should be carried through H2 2014, with compilation and a revised resource estimate prepared in Q2 2015.

  • Preliminary Engineering for Development at San Rafael – A Preliminary Economic Assessment ("PEA") published on May 22, 2013, (per Mine Development Associate's, filed on SEDAR) envisioned the establishment of an open pit at San Rafael, targeting production from the Main Zone, with a later development of an underground operation to mine the 120 Zone.  The PEA gave consideration to the residual M&I resources at Nuestra Señora, along with the placement in operation of the El Cajón deposit in early 2014 and completion of a plant expansion during 2014, from its current nameplate capacity of 1,600 tpd to 2,750 tpd.

With last year's permitting delays related to the development of El Cajón, coupled with the uncertain long-term steady-state mining rate achievable from the remaining resources at Nuestra Señora, the Company elected not to proceed with the plant expansion which was slated to start early in 2014, per the PEA timeline.  Nevertheless, the eventual availability of high-quality resources at San Rafael, as enhanced through the definition drilling of H2 2014, concurrent with mining at El Cajón, could create a set of conditions under which such an expansion would be justified, subject to metal pricing and financing.

The Company is reviewing the economics associated with the development of an underground operation at San Rafael, instead of an open pit, as suggested in the PEA.  This approach provides multiple advantages:

  • A faster realization timeline: the permitting process and pre-stripping requirements to establish an open pit would take more time than the residual permitting needed for the underground mine, the development of the initial access ramp, and the lateral development needed to commence mining in either the upper portion of the 120 Zone, or in the Main Zone.  The Company already holds the approved environmental impact statement (MIA) to proceed with an underground operation, lacking only the change of use of land (ETJ) permit.  The Company intends to file this application in Q4 2014, once the requirements for surface infrastructures and access have been finalized.

  • Mining costs for an open pit operation are not expected to provide a competitive advantage over underground mining costs, due to a high strip ratio.

  • Similar upfront capital for completing open pit pre-stripping as requirements for underground mobile equipment and initial ramp and lateral development workings for underground mine.

  • Flexibility in having access, with minimal additional development cost, to either the 120 Zone or the Main Zone, depending on metal prices.

  • Possibility of mining in both the Main and 120 Zones simultaneously in the future, after the higher value ore from the El Cajón orebody is mined out.

A decision towards development of an underground mine at San Rafael, in parallel with completion of the plant expansion, could be taken in the first half of 2015, with an estimated delay before expanded production, for completion of additional engineering, development and construction work, estimated at 12 months.  This would allow for an increased annual production rate, towards 3.0 million Ag eq ounces (using the PEA's mined grades and cost basis assigned to the 120 Zone material) and reduced cash and total production costs, to be realized during the first half of 2016.

  • Financing – The Company is relying on its existing cash balance of $17.2M at end of Q1 2014 (working capital of $35.7M), and the generation of cash flow from on-going operations, albeit limited by the current low metal pricing environment, to cover this year's sustaining capital requirements, the initial development costs at El Cajón and to realize the steps indicated above relating to San Rafael.

    If a decision to go ahead with the development of the San Rafael underground mine and the associated plant expansion was to be taken, it is envisioned that external funds will be required to realize these tasks.  The Company has been in informal discussions with third-parties that would be interested in extending such financing, likely including an off-take agreement covering the purchase of concentrate production from the Cosalá District operations.  An upper range on a preliminary estimate for the San Rafael initial underground development and plant expansion cost is put at $25-30 millions, considering the expansion's detailed engineering data available, the sunk costs for civil works and purchase of a used ball mill, as well as an estimate of the meterage of underground ramp and development required to access the 120 Zone.  This estimate will be refined through the preliminary engineering expected in the second half of 2014.

About Us

Scorpio Mining Corporation is a silver producer operating in Mexico with significant base metal by-product credits.  The 100% owned Nuestra Señora Mine located in the Cosalá District of the state of Sinaloa, has flexible mining methods and diversified metal production.  It has a fully mechanized underground operation and a 1,600 tpd processing facility with permitted capacity for expansion to 4,000 tpd.  The plant produces zinc, copper and lead concentrates, with a significant payable silver component in the copper and lead concentrates.

In addition, the Company has numerous exploration targets in the vicinity of its current operations as well as the advanced El Cajón and San Rafael development projects.  The Company's strategy for near-term growth is currently focused on mine development of the fully-permitted El Cajón deposit.

Scorpio Mining's President and CEO, Mr. Pierre Lacombe, Eng. (OIQ, PEO), is a Qualified Person as defined under National Instrument 43-101 and has reviewed and approved the content of this release.

ON BEHALF OF SCORPIO MINING CORPORATION

Pierre Lacombe, Eng.
President & CEO

This news release includes certain statements that may be deemed "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with respect to the Company's operations, exploration and development plans, expansion plans, estimates, expectations, forecasts, objectives, predictions and projections of the future. Generally, these forward-looking statements can be identified by the forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "projects", "intends", "anticipates", or "does not anticipate", or "believes", or "variations of such words and phrases or state that certain actions, events or results "may", "can", "could", "would", "might", or "will" be taken", "occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Scorpio Mining Corporation to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the exploration and development and operation of the Company's projects in Mexico, risks related to international operations, construction delays and cost overruns, the actual results of current exploration, development and construction activities, conclusions of economic evaluations, changes in project parameters as plans continue to be refined, future prices of silver, zinc, copper, lead and gold, risks relating to completing acquisition transactions as well as those factors discussed in the sections relating to risk factors of our business filed in Scorpio Mining Corporation's required securities filings on SEDAR, including its Annual Information Form dated March 14, 2013. Although Scorpio Mining Corporation has attempted to identify important factors that could cause results to differ materially from those contained in forward-looking statements, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended.

There can be no assurance that any forward-looking statements will prove accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Scorpio Mining Corporation does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws.

SOURCE Scorpio Mining Corporation

For further information: Victoria Vargas, Vice President Investor Relations and Corporate Communications, +1 416-585-2200, Email: vvargas@scorpiomining.com, Website: www.scorpiomining.com
Data and Statistics for these countries : Mexico | All
Gold and Silver Prices for these countries : Mexico | All

Scorpio Mining Corporation

PRODUCER
CODE : SPM.TO
ISIN : CA80917V1058
CUSIP : 80917V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Scorpio Mining is a silver and zinc development stage company based in Canada.

Scorpio Mining produces silver, zinc, copper, gold and lead in Mexico, and holds various exploration projects in Mexico.

Its main asset in production is NUESTRA SENORA in Mexico and its main exploration properties are SAN RAFAEL - MAIN & UPPER ZONE, SAN RAFAEL - 120 ZONE, EL CAJON DEPOSIT, LA VERDE SINALOA, COSALA DISTRICT and LA REVANCHA in Mexico.

Scorpio Mining is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 27.8 millions as of today (US$ 20.0 millions, € 17.9 millions).

Its stock quote reached its highest recent level on April 16, 2004 at CA$ 4.00, and its lowest recent point on February 05, 2016 at CA$ 0.06.

Scorpio Mining has 347 230 016 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Scorpio Mining Corporation
2007 Annual Report
Financings of Scorpio Mining Corporation
5/5/2011Debt Free with Repayment of Debentures
5/6/2008Closes Bought Deal Financing
Option Grants of Scorpio Mining Corporation
3/6/2007Announces Grant of Incentive Stock Options
Nominations of Scorpio Mining Corporation
10/25/2013Announces Resignation of COO Tom McGrail and Subsequent Appo...
6/14/2013Reports Voting Results of Election of Directors
3/13/2013Appoints Chief Executive Officer
4/18/2011Appoints New CFO
1/22/2011Scorpio Mining Announces Appointment of Jonathan Berg Resig...
7/22/2010Appoints New Chairman
3/2/2010Appoints Pierre Lacombe, Eng., to the Board
2/17/2010Appoints Mexico Country Manager
1/5/2010Appoints New Director to the Board
1/30/2008Appoints New Director To The Board
Financials of Scorpio Mining Corporation
11/6/2014Reports Third Quarter 2014
5/13/2014Reports First Quarter 2014
11/11/2013Reports Financial Results for its Third Quarter 2013
8/14/2013Reports Financial Results for its Second Quarter 2013
5/10/2013Reports Financial Results for First Quarter 2013
3/18/2013Reports Fourth Quarter and Year-End Financial Results for 20...
11/8/2012Reports Third Quarter Results - Cost reduction programs are ...
5/19/2011Reports Record Silver Production in Q1 2011 and Increases Mi...
4/1/2011Announces Fourth Quarter and Year-End Financial Results for ...
4/1/20102009 Year-end and Fourth Quarter Financial Results
8/15/2009Announces Second Quarter 2009 Results
Project news of Scorpio Mining Corporation
4/30/2013Announces Granting of Environmental Permitfor El Caj=F3n an...
4/4/2013Announces 2013 Exploration Program
1/18/2013Reports Q4 Operating Results and 2012 Production for Nuestra...
10/9/2012Deepens Hole EC-109 at New El Caj=F3n La Emma Zone and Inter...
10/1/2012Announces Increased Mineral Resources and Contained Metals a...
9/24/2012Announces Increase in Resource Estimate for El Caj=F3n
1/30/2012(Nuestra Senora)Advances Expansion Planning to Increase Production Capacity ...
1/27/2012Reports Record 2011 Production Results and2012 Guidance for ...
6/27/2011(Nuestra Senora)to Advance Feasibility Study of an Additional Plant and Plan...
3/17/2011(Cosala District)Acquires Additional Mineral Concessions inCosal=E1 District ...
3/13/2011(Nuestra Senora)Reports Nuestra Senora Mineral Reserve of 2.764 Mt @287 AgEq...
5/6/2010(Nuestra Senora)Drilling Reports 42.4 metres grading 198.03 g/t Silver, 1.37...
11/5/2009(San Rafael - Main & Upper Zone)Reports Drill Highlights of Platte River Gold=E2??s La Verde...
2/26/2009(Nuestra Senora)Reports on Drilling of the Main Zone from the 9th Level
11/6/2008 Drilling of the North West Main Zone from the 10th Level Co...
11/4/2008(Nuestra Senora)Provides October Operations Update on Nuestra Senora Mine, M...
9/6/2008(Nuestra Senora)?s Drilling of the North West Main Zone Intersects 13,671 g/...
9/3/2008(Nuestra Senora)Provides Operations Update on Nuestra Senora Project, Mexico
7/3/2008(Nuestra Senora)Drilling on 9th Level of the Main Zone Reports 5.80 metres g...
6/16/2008(Nuestra Senora)Mexican Subsidiary Enters Into Agency Agreement for Marketin...
5/13/2008(Nuestra Senora)Receives New Resource Estimate
5/5/2008(Nuestra Senora)Drilling of the Main Zone from the 8th Level of the Nuestra ...
4/24/2008(Nuestra Senora) Commences Production Mining at the Nuestra Senora Project, ...
4/11/2008(Nuestra Senora)Discovers Another New Zone Reporting 11.50 metres grading 16...
3/31/2008(Nuestra Senora)Receives Mill Facility Construction Completion Certificate A...
3/18/2008(Nuestra Senora)Santa Teresa Extension Continues to Produce High-Grade Resul...
3/12/2008(Nuestra Senora)Nuestra Senora Main Zone Increases In Size With Underground ...
2/28/2008(Nuestra Senora)Santa Teresa Deposit Continues to Deliver with Underground D...
2/26/2008(Nuestra Senora) Reports on Mineralized Stockpile for Initial Mill Throughpu...
2/14/2008(Nuestra Senora) Provides Nuestra Senora Project Update, Sinaloa State, Mexi...
1/16/2008(Nuestra Senora)Underground Drilling of Santa Teresa Deposit Reports 32.8 me...
11/2/2007(Nuestra Senora)Deep Drilling of Nuestra Senora Deposit From 11th level Hits...
10/2/2007Reports High-Grade Intercept of 1,158 g/t Ag, 29.95% Zn, 4.2...
9/25/2007(Nuestra Senora)Scorpio's Underground Drilling of Sept 9 Zone Hits 1,483 g/t...
9/19/2007(Nuestra Senora)Underground Drilling of Nuestra Señora Deposit Hits 21 metr...
8/30/2007(Nuestra Senora)Mexico Team Fully Staffed and Ready for Production
8/20/2007(Nuestra Senora)Scorpio's Underground Drilling from the 9th Level of Nuestra...
8/13/2007(Nuestra Senora)Scorpio's Underground Drilling of Nuestra Senora Deposit Hi...
8/8/2007(Nuestra Senora) Provides Nuestra Senora Project Update, Sinaloa State, Mexi...
7/30/2007(Nuestra Senora)First Ever Surface Drilling of Santo Domingo Satellite Depos...
7/10/2007(Nuestra Senora)8 Level Underground Drilling of Nuestra Señora Deposit Repor...
6/14/2007AMENDED: Scorpio Receives Positive Results from the Pre-Feas...
6/13/2007(Nuestra Senora)Receives Positive Results from the Pre-Feasibility Study on ...
6/8/2007(Nuestra Senora)2007 Technical report
4/23/2007(Nuestra Senora)Drilling of Nuestra Señora Main Zone Reports 4.4 metres grad...
3/26/2007(Nuestra Senora)Drilling of Nuestra Senora Zone Hits 11 Mineralized Intercep...
3/19/2007(Nuestra Senora)Drilling of Nuestra Senora Zone Hits 8 Mineralized Intercept...
2/21/2007(Nuestra Senora)Receives Metallurgical Test Work and Moves Forward
Corporate news of Scorpio Mining Corporation
8/28/2015Americas Silver Corporation. Announces Completed Private Pla...
8/14/2015Americas Silver Reports Second Quarter 2015 Financial Result...
7/23/2015Americas Silver Corporation Provides Second Quarter Producti...
4/20/2015Scorpio Mining Provides First Quarter Production Update
4/15/2015Scorpio Mining Adopts Shareholder Rights Plan
4/15/2015Adopts Shareholder Rights Plan
3/30/2015Scorpio Mining Reports Fourth Quarter and Year-End 2014 Fina...
12/4/2014Announces Purchase Option Agreement for Concession near Curr...
11/6/2014Scorpio Mining Reports Third Quarter 2014
10/29/2014Scorpio Mining Provides Update on El Cajón Project and Provi...
10/16/2014Scorpio Mining Reports Third Quarter 2014 Production Results
9/5/2014Scorpio Mining's Board Determines Not to Accept Director Res...
8/11/2014Scorpio Mining Reports Second Quarter 2014 and Resignation o...
8/11/2014Reports Second Quarter 2014 and Resignation of Vice Presiden...
8/2/2014Scorpio Mining Reports Contractor Fatality at its Nuestra Se...
8/2/2014Reports Contractor Fatality at its Nuestra Señora Mine
7/14/2014Scorpio Mining Reports Second Quarter 2014 Production Result...
4/14/2014Development Projects Update and New AGM Date
12/16/2013Receives Final Permit to Proceed with Development of the Und...
10/16/2013Reports Third Quarter 2013 Production Results
6/3/2013s El Cajón Project Status and Signs Letter of Intent for Con...
5/22/2013Reports New Mineral Reserve Estimate for Nuestra Señora and ...
4/25/2013Reports First Quarter 2013 Production Results
10/15/2012Reports Third Quarter Production Results
10/9/2012Deepens Hole EC-109 at New El Cajón La Emma Zone and Int...
9/17/2012Announces 2012 Corporate Update, Action Plan
8/22/2012Intercepts 1.64 Meters of 3.23 g/t gold, 2,510 g/t Silver, 1...
8/13/2012Reports Second Quarter Results=2C Signs Land Agreement on Co...
7/20/2012Names Peter Hawley President and CEO
3/28/2012Reports Record Revenues=2C Mine Operating Earnings and Cash ...
7/18/2011Provides Exploration Update on its Projects in Mexico
7/13/2011Maintains Strong Production Levels in Second Quarter 2011
5/26/2009Provides April 2009 Update
12/22/2008Provides November-December Update and January 2009 Forecast
8/5/2008Begins Shipments Of Concentrates From Its 100% Owned Nuestra...
8/6/2008GOLD CORPORATION SIGNS LETTER OF INTENT WITH CINCORO CAPITAL...
7/7/2008Drilling of Santa Teresa Zone reports 1.60 metres grading 1,...
4/18/2008Granted Increase on Mill Processing Permit and Connects Nues...
3/25/2008Defines the "Jewel Box" Trend within the Northwest Sector of...
3/19/2008Announces Termination of Merger Between Scorpio Gold and Bac...
12/6/2007and BacTech Mining Corporation Seek Shareholder Approval to ...
11/19/2007NEWS OUT(GOLD): RSM.TSXV-ROYAL STANDARD MINERIALS-PRODUCTION
11/8/2007Additional Deep Drilling of Sept 9 Zone from 11th level of t...
10/30/2007 Signs Definitive Agreement for Merger with BacTech and Move...
9/7/2007Sign Letter of Intent with Bactech Mining Corporation for Sa...
6/27/2007Surface Drilling of Satellite Santa Teresa Deposit Reports 1...
6/25/2007Makes Production Decision on its 100% Owned Nuestra Senora P...
5/28/2007Pre-Feasibility Update
5/16/2007Creates Gold Subsidiary
4/30/2007Announces Change of Officer
4/10/2007Construction of a 33-Kv Line to Connect the Comederos Hydro ...
4/4/2007Infill Drilling of the Hoag Zone Continues to Demonstrate Co...
3/13/2007Receives Positive Metallurgical Test Work on the Hoag Zone, ...
2/26/2007Hits 5.2 metres of 171.96 g/t Ag, 11.36% Zn, 2.27% Cu, 4.81%...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (SPM.TO)FRANKFURT (SZ7.F)
0.080+0.00%0.184-5.64%
TORONTO
CA$ 0.080
02/05 15:54 -
0%
Prev close Open
0.080 0.080
Low High
0.060 0.080
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.080 -%
Volume 1 month var.
972,393 -%
24hGold TrendPower© : -7
Produces Copper - Gold - Lead - Silver - Zinc
Develops
Explores for Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/9/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.14+2.01%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-2.91%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48+4.20%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.54+1.44%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.89+6.78%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.68-0.80%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :