Abacus Mining and Exploration

Published : December 21st, 2011

announces robust Feasibility Study results for Ajax Copper-Gold Project in B.C.

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Copper | Diamond | Gold | Lead | Market | Recovery | Silver | Storage | Water |

Wednesday, December 21, 2011
Abacus announces robust Feasibility Study results for Ajax Copper-Gold Project in B.C.


Average Annual production estimated at 109 million lbs Cu & 99,000 oz Au over 23 years
Proven & probable reserves estimated at 3 billion lbs Cu and 2.7 million ozs Au

Vancouver, British Columbia - December 21, 2011. Abacus Mining & Exploration Corporation (TSXV: AME "Abacus") is pleased to announce the results of the Feasibility Study ('FS') for the Ajax Copper-Gold Project (the "Ajax Project") located southwest of Kamloops, B.C. The Ajax Project is being developed through KGHM Ajax Mining Inc. ("KGHM Ajax"), owned 49% by Abacus and 51% by KGHM Polska Miedz S.A. ("KGHM"). The NI 43-101 Technical Report will be available on the Company's website (www.amemining.com) and on SEDAR (www.sedar.com).

Base Case Highlights: (all economic figures in US$)
  • Total proven and probable mineral reserves of 3 billion lbs Cu and 2.7 million ozs Au at 0.27% Cu and 0.17 g/t Au based on $2.50 Cu and $1,085 Au
  • 23 year mine life at a processing rate of 60,000 t/d or 21.9 million t/a at a LOM stripping ratio of 2.4:1
  • LOM production of 2.5 billion lbs Cu and 2.28 million ozs Au in concentrate
  • Initial capital costs of $795 million, including contingency of $87 million
  • Cash cost per lb of copper of $1.28 net of gold credits

Economic Analysis:

The base case economic analysis produced by Wardrop, a Tetra Tech Company (Tetra Tech) projects that the Ajax Project will have a pre-tax net present value of $416 million (@ 8% discount rate) and internal rate of return of 14.5% based on pre-tax 100% equity financing. The pre-tax economic results for the base case and additional case scenarios are presented in the following table.

Table 1: Summary of Ajax Project Pre-Tax Economic Results

Base Case
Scenario
Alternate Case
Scenario1
Alternate Case
Scenario2
Cu US$/lb
$2.75
$3.00
$ 3.50
Au US$/oz
$1,085
$1,300
$1,700
Exchange Rate (US$:C$)
0.92
0.94
0.98
Pre-tax Internal Rate of Return
14.5%
19.5%
30.3%
Cash Cost per lb Cu (net of gold credits)
$1.28
$1.11
$0.79
Pre-Tax Net Present Value
(8% discount rate)
$416 million
$818 million
$1,601 million
Payback Years
7.8
3.8
2.2

James D. Excell, President & CEO of Abacus commented, "The FS confirms the economic viability of the Ajax Project at long term copper and gold prices, and demonstrates the leverage to increases in metal prices. At recent market prices the Project is very robust and the NPV nearly quadruples from the base case with an associated 2.2 year payback of initial capital.

The delivery of the FS is a pivotal milestone for Abacus and advances the Ajax Project along the critical path to production start-up targeted for 2015. The Ajax Mine economics compare very favorably to the leading copper projects being developed around the world given its long-life, location, open-pit mining and conventional processing. The mine also represents a small portion of the 8,000 hectare copper-gold camp. We look forward to developing the Ajax Project with our world class partner, KGHM."

Joint Venture Next Steps
Upon deemed delivery of the FS to KGHM, expected on or about December 31, 2011, KGHM will have a maximum of 90 days to acquire a further 29% in the Joint Venture company for a cash consideration equal to 29% of the Proven and Probable copper equivalent reserve in the FS, to a maximum of US$35 million, towards use by Abacus for its share of project capital. Thereafter, KGHM will arrange the financing for its (80%) proportionate interest in the project capital, and Abacus has the option to arrange its own financing for its (20%) proportionate interest or elect to have KGHM do so on commercially reasonable terms.

In the event that KGHM chooses not to increase its interest in the joint venture, Abacus then has 90 days to elect to purchase KGHM's 51% interest for US$37 million, and 90 days thereafter to close on this purchase. Should Abacus choose not to purchase KGHM's interest in its entirety, Abacus' interest in the Joint Venture can be increased to 51% by paying approximately US$1.5 million to KGHM.

Detailed FS Summary
The independent Ajax Project Feasibility Study which was commissioned in May 2010 in accordance with National Instrument 43-101, supports a 60,000 tonne per day conventional milling plant, producing a copper-gold concentrate containing 25% Cu and 18 g/t Au. The Study was led by Tetra Tech as the project's lead consultant, in conjunction with a team of globally recognized consultants:

Tetra Tech - overall management, mineral processing, infrastructure, and financial analysis
AMEC Americas Ltd. - geology, mineral resource estimate, mineral reserve estimate, and mine design
Knight Pi�sold Ltd. - environmental studies, permitting, and social or community impact
Golder Associates Ltd. - tailings handling, thickening and tailings area water management
BGC Engineering Inc. - pit slope designs and site geotechnical investigation
G&T Metallurgical Services Ltd. - metallurgical test work
Krupp Polysius - High Pressure Grinding Rolls (HPGR) pilot test work for the process design

The FS encompasses trade-off studies that were performed to optimize life-of-mine operations since the July 31, 2009 Preliminary Economic Assessment (PEA). Since the PEA level report was issued, further confirmatory metallurgical testing and variability analysis work have been completed. This FS builds on the results and premises of the previous findings, as well as the subsequent test work programs between 2009 and 2011.

Some of the key optimizations from the trade-off studies include crushers and conveyors for in-pit crushing and conveying of both ore and waste, high pressure grinding rolls, and high density tailings deposition. These methods have had the effect of reducing costs and improving recoveries as well as location logistics to reduce the environmental footprint.

1) Mineral Resource Estimates

Mineral Resources take into account geologic, mining, processing and economic constraints, and have been confined within appropriate LG pitshells, and therefore are classified in accordance with the 2010 CIM Definition Standards for Mineral Resources and Mineral Reserves.

Mineral Resources are reported using a copper price of US $2.88/lb and a gold price of US$1,200/oz.
AMEC reported the Mineral Resources at a Base Case CuEq grade of 0.20%.

Mineral Resource Estimate at Selected CuEq Cut-offs
Effective Date May 26, 2011, Timothy O. Kuhl, SME Registered Member

 
 
 
 
 
 
 
Contained Metal
Cutoff
CuEq (%)
Tonnes
CuEq
Cu
Au
NSR
CuEq
('000 lb)
Cu
Au
(Mt)
(%)
(%)
(g/t)
(US$/t)
('000 lb)
(oz)
Measured
0.1
322.5
0.38
0.27
0.17
13.83
2,667,000
1,933,000
1,734,600
0.2
255.8
0.42
0.31
0.19
15.71
2,389,000
1,734,000
1,555,400
Indicated
0.1
336.2
0.36
0.26
0.17
16.7
2,665,000
1,897,000
1,818,100
0.2
256.2
0.42
0.3
0.2
19.98
2,399,000
1,712,000
1,637,400
Measured
0.1
658.7
0.37
0.26
0.17
15.3
5,331,000
3,830,000
3,552,600
+ Indicated
0.2
512
0.42
0.31
0.19
17.85
4,788,000
3,446,000
3,192,800
Inferred
0.1
115.7
0.3
0.21
0.13
13.39
753,000
538,000
499,200
0.2
73.7
0.38
0.27
0.17
17.46
613,000
439,000
405,700
Note 1. Mineral Resources are contained within a conceptual Measured, Indicated and Inferred optimized pitshell using the following assumptions: maximum copper recovery of 91.17% and maximum gold recovery of 86.49% based on the following equations: CuRec = (-74.812 x (Cu%^2))+(85.727xCu%) +66.668 and AuRec = 92.586 x Au(g/t)^0.064; assumed throughput rate of 60,000 t/d; Whittle constraining shell slopes between pit slope angles ranging from 38� to 49�, waste and processed material mining costs of US$1.08/t, fill waste mining costs of US$0.89/t, total processing costs including reclamation of US$3.23/t, general and administrative costs of US$0.52/t, gold price of US$1,200/oz, and copper price of US$2.88/lb. Note 2. Copper equivalency was calculated using the formula CuEq = ([(%Cu) x (CuRec) x (22.0462) x ($lbCu) + (g/t/Au) x (AuRec) x (1/31.1035) x ($ozAu)]) � ((CuRec) x (22.0462) x ($lbCu))). Note 3. Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content. Note 4. Tonnage and grade measurements are in metric units. Contained gold and silver ounces are reported as troy ounces, contained copper pounds as Imperial pounds.

2) Mineral Reserve Estimates

The Proven and Probable Mineral Reserves as of October 31, 2011 consists of 503 million tonnes grading 0.27% Cu and 0.17 g/t Au (0.37% Cu.Eq.) containing approximately 3 billion lbs of copper and 2.7 million ounces of gold.

Mineral Reserve Statement
Effective Date 31 October 2011, R. Mendoza Reyes, P.Eng.

Confidence
Cut-Off
Average
Grades
Copper
Equivalent
Contained Metal
Category
Grade
Tonnes
Cu
Au
Cu.Eq.
Copper
Gold
(US$/t)
(Mt)
(%)
(g/t)
(%)
(M lb)
(k oz)
Proven Mineral Reserve
4.53
279.5
0.27
0.17
0.38
1,680
1,520
Probable Mineral Reserve
4.53
223.5
0.26
0.17
0.37
1,280
1,230
Total Proven & Probable Mineral Reserves
4.53
503.0
0.27
0.17
0.37
2,960
2,750
Note 1. Mineral Reserves are estimated using a cut-off of US$4.53/t NSR, a copper price of US$2.50/lb, and a gold price of US$1,085/oz. The NSR is calculated by adding the NSR attributable to copper to the NSR attributable to gold and then subtracting the freight costs, which include land freight, port charges, ocean freight and miscellaneous costs. The attributable copper is calculated using the metallurgical recovery obtained by the formula: CuRec (%) = -74.812 * Cu(%)2 + 85.727 * Cu(%) + 66.668 with a maximum copper recovery of 91.17%. The attributable gold is calculated using metallurgical recovery obtained by the formula: AuRec (%) = 92.586 * Au(g/t)0.0649 with a maximum gold recovery of 86.49%. Note 2. Mineral Reserves are constrained within a pit shell, optimized using assumptions of a weighted average mining cost of US$1.32/t (ranging from US$0.92/t to US$2.50/t for the different mining benches); a processing cost of US$3.38/t plus US$0.51/t general and administrative costs, and US$0.05/t allocation for closure costs; and pit slope angles that vary from 40� to 49�. Note 3. A 0.5% mining loss factor was applied to account for dilution; diluted grades are estimated at 1.7% lower than the in-situ grades. Note 4. The life of mine, waste to ore strip ratio is 2.40. The assumed life-of-mine throughput rate is 60 kt/d. Note 5. The copper equivalency is calculated using the equation Cu.Eq. = [(%Cu) (CuRec) (22.0462) ($lbCu) + (g/t/Au) (AuRec) (1/31.1035) ($ozAu)] � [(CuRec) (22.0462) ($lbCu)]. Note 6. Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content. Note 7. Tonnage and grade measurements are in metric units. Contained gold ounces are reported as troy ounces; contained copper pounds are Imperial pounds.

The mill copper feed grades generally vary between 0.13% and 0.63% Cu, while the gold grades generally vary between 0.05 g/t and 0.59 g/t Au of the mill feed. The Year 1 to 5 composite plant mill feed estimate was replicated in a sample which was tested during the most recent test program. This sample has a feed grade value of 0.29% Cu and 0.16 g/t Au. These feed values were used as the basis of design for the plant.

3) Life of Mine Plan

The FS supports production of a total of 2.5 billion lbs of copper and 2.28 million ozs of gold in concentrate or an average of approximately 109 million lbs of copper and 99,000 ozs of gold annually. The proposed mine plan envisages a conventional open pit operation extracting 60,000 t/d or 21.9 million t/a of ore. The mine plan is based on the extraction of 503 million tonnes of ore for processing during 23 years of operation at an overall LOM stripping ratio of 2.4:1 waste to ore. Total material movement from the pit during the life of the mine is estimated at 1,701 million tonnes. The average LOM head grade of process feed is 0.27% Cu and 0.170 g/t Au (0.37% Cu.Eq.) which equates to a NSR of $14.68 per tonne.

Mining will be accomplished using a conventional truck and shovel operation, in conjunction with an in-pit crushing and conveying (IPCC) system. IPCC is a system where the mined material is reduced in size by crushing to make it suitable to be transported by belt conveyors out of the pit. After the PEA, IPCC was identified as a potential cost reduction implementation for the Ajax Project when compared with a truck-haul option only.

4) Capital and Operating Costs

The capital and operating cost estimates provided by AMEC, Tetra Tech and Golder indicate an initial estimated capital cost of approximately $795 million, inclusive of contingency of $87 million. The operating cost estimate will be $1.32/t for mining and in-pit crushing and conveying, $3.46/t milled for processing and tailings disposal and $0.53/t G&A cost.

Initial Estimated Capital
US$ '000
Site general and substation
46,280
Mine pre-stripping
34,443
Mining equipment
80,443
Crushing
25,700
Conveying
11,764
Ore storage and HPGR
89,614
Concentrator
144,815
Tailings storage
79,493
Site services & utilities
15,304
Ancillary buildings
18,639
Plant site mobile fleet
4,437
Water supply from Lake
14,805
Total Direct Initial Capital
565,737
Project indirect
107,176
Owners costs
34,500
Contingency
87,570
TOTAL INITIAL ESTIMATED CAPITAL
794,983


Sustaining Capital
US$ '000
Mining equipment
262,714
Crushing
62,400
Conveying
73,058
Stacking
57,987
Plant site
43,214
Tailings
104,642
TOTAL ESTIMATED SUSTAINING CAPITAL
604,015

Approximately $200 million is expected to be incurred in year 5 for in-pit crushing and conveying.

Environmental & Permitting
The Project is currently in the early stages of an environmental assessment process involving both federal and provincial government agencies and will be a state-of-the-art operation designed to meet and exceed health, safety and environmental requirements in Canada.

Knight Pi�sold initiated the environmental studies for the Ajax Project in 2007, including ground and surface water quality and quantity, climatology, fish and fish habitat, wildlife, and vegetation studies. The environmental study suggests that proven mitigation methods will be effective in controlling environmental effects. Acid base accounting was carried out as part of the environmental baseline study, and the results indicate that the waste rock and ore are not acid generating.

Abacus submitted a Project Description to the BC Environmental Assessment Office (EAO) and the federal Canadian Environmental Assessment Agency (CEAA) in early 2011. The project description was accepted by EAO on February 25, 2011 and on March 16, 2011 by CEAA.

The provincial Environmental Assessment Office issued an Order under Section 10 of the Environmental Assessment Act on February 25, 2011 indicating that the Project must proceed through the provincial Environmental Assessment review. The CEAA commenced a comprehensive study on May 25, 2011 and posted a Notice of Commencement on the CEAA Registry on May 31, 2011. A federal project agreement was signed on August 17, 2011. The draft Project Application Information Requirements (dAIR) was provided to the EAO and CEAA on August 12, 2011 for distribution to the Technical Working Group. The Proponent Application/ Environmental Impact Statement (EIS) is expected to be submitted in 2012.

Local Resources/Infrastructure
Local resources necessary for the exploration, development, and operation of the Ajax property are located in Kamloops. Kamloops has a resource-based economy and is a transportation hub for the Canadian National Railway (CNR) and Canadian Pacific Railway (CPR). Numerous service and supply companies which service resource industries are established in Kamloops, including several Diamond drilling companies, light-to heavy equipment contractors and a metallurgical testing laboratory. Highway 1 services Kamloops and Highway 5 is situated within 6 km of the Ajax property. There is also an airport with daily scheduled flights to Vancouver, Calgary, Kelowna and Prince George.

Exploration/History
Abacus acquired the Afton property in 2002 from Teck Ltd. Historic drilling on the Ajax property was concentrated in the areas of the open pit mines that were in production in the 1980s and 1990s. Afton Mines Ltd., controlled by Teck, commenced production at Ajax East and Ajax West in 1989. Production was suspended in 1991 due to low metal prices. A second period of production began in 1994 and was again suspended in 1997. During the periods of production, it is estimated that 17 Mt was mined and 13 Mt milled.

Abacus undertook drilling campaigns from 2005 to 2010 consisting of Diamond drilling, more recently targeting extensions of mineralization along strike and to depth. The approximate drill spacing is 50 x 50 m in the areas of mineralization.

Conference Call Details
A conference call to discuss the results of the Ajax Project Feasibility Study has been scheduled for Wednesday, December 21, 2011 at 4:30pm ET (1:30pm PT). Dial-in numbers for North America are: toll free 1-866-226-1792 or 416-340-2216; for International 1-800-9559-6849. To access the simultaneous webcast, visit Abacus Mining's website at www.amemining.com. A playback version will be available until Friday, January 13, 2012 at 1-800-408-3053 (N.A. toll free) or 905-694-9451 using the pass code 2014266.

Qualified Persons
In May 2010, Abacus commissioned a team of engineering consultants to complete the Ajax Project Feasibility Study in accordance with National Instrument 43-101. Tetra Tech was retained as the lead consultant for the Study.

The mineral resources and reserves for the Ajax Project were estimated by AMEC Americas Ltd. (AMEC) under the direction of Timothy O. Kuhl R.M. and Ramon Mendoza Reyes, P.Eng. Mr. Kuhl as a qualified person for the purposes of National Instrument 43-101, has reviewed and verified the data that pertains to the resources in this press release. Mr. Mendoza Reyes as a qualified person for the purposes of National Instrument 43-101, has reviewed and verified the data that pertains to the reserves in this press release.

The technical information in this news release has been reviewed and approved by Hassan Ghaffari P.Eng., Senior Engineer with Tetra Tech and overall manager for the Feasibility Study, and by Dave Laudrum, P.Geo., Abacus's Chief Geologist and qualified person for the Ajax Project, both of whom are qualified persons within the meaning of National Instrument 43-101.

The NI 43-101 Technical Report will be available on the Company's website (www.amemining.com) and on SEDAR (www.sedar.com).

On Behalf of the Board,
ABACUS MINING AND EXPLORATION CORPORATION

James D. Excell
President & CEO

jexcell@amemining.com

Donna Yoshimatsu
Director, Investor Relations

dyoshimatsu@amemining.com
(647) 345-0826

Forward-Looking Information
This release includes certain statements that are deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that Abacus Mining and Exploration Corp. (the "Company") expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include changes to commodity prices, mine and metallurgical recovery, operating and capital costs ,foreign exchange rate, and ability to obtain required permits on a timely basis including permission from Kinder Morgan to have access to the pipeline right-of-way, exploitation and exploration successes, and continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

You can also view this News Release on our website at:
http://www.amemining.com/s/NewsReleases.asp?ReportID=497905
 


 
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Abacus Mining and Exploration

EXPLORATION STAGE
CODE : AME.V
ISIN : CA0025552096
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Abacus Mining is a copper and gold producing company based in Canada.

Abacus Mining produces copper, gold, palladium and silver in Canada, and holds various exploration projects in Canada.

Its main asset in production is AFTON in Canada and its main exploration properties are THE MONTE CARLO ZONE, DM AUDRA DEPOSIT, AFTON - AJAX CAMP and RAINBOW in Canada.

Abacus Mining is listed in Canada. Its market capitalisation is CA$ 1.4 millions as of today (US$ 1.1 millions, € 1.0 millions).

Its stock quote reached its highest recent level on June 07, 1996 at CA$ 1.66, and its lowest recent point on April 20, 2001 at CA$ 0.01.

Abacus Mining has 39 130 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Abacus Mining and Exploration
2007 Annual report
Annual Report 2006
Option Grants of Abacus Mining and Exploration
10/10/2013Compensation Reductions and Stock Option Grants
Nominations of Abacus Mining and Exploration
5/4/2012announces resignation of Andrew Pooler
4/17/2012appoints Stifel Nicolaus Canada as financial advisor
Project news of Abacus Mining and Exploration
9/15/2015Poland's KGHM says applied for mine permit in Canada
3/19/2013provides update on Ajax Copper-Gold Project in B.C.
8/23/2012KGHM aligned on Ajax Project development KGHM International ...
4/2/2012KGHM exercises option to increase interest in Ajax project t...
1/10/2012Files Ajax Copper-Gold Project Feasibility Study Technical R...
12/21/2011announces robust Feasibility Study results for Ajax Copper-G...
6/23/2011KGHM Ajax participates in open house for Ajax Project Commun...
6/2/2011(Afton - Ajax Camp)KGHM Ajax appoints BNP Paribas as exclusive financial adviso...
1/24/2011(Afton - Ajax Camp)completes major definition and infill drill program at Ajax ...
12/1/2010(Afton - Ajax Camp)Feasibility Study Underway on Ajax Copper-Gold Project, B.C.
6/23/2008(Afton - Ajax Camp)Ajax Joint Venture Area Drilling Continues To Expands The Re...
4/28/2008Intersects 318 metres (1043.3 feet) of 0.43% copper and 0.26...
4/9/2008(Afton - Ajax Camp)Releases Drill Results From Monte Carlo, an Eastern Extensio...
3/25/2008(Afton - Ajax Camp)Sign Definitive Agreements
Corporate news of Abacus Mining and Exploration
4/19/2016Abacus Stock Option Grant
4/1/2016Abacus Board Appointment
2/24/2016Abacus Announces Filing of Updated Feasibility Study for Aja...
1/13/2016Abacus announces positive feasibility study update on Ajax C...
12/29/2015Abacus announces grant of stock options
10/19/2015Abacus Announces Ajax Copper-Gold Project Update
9/14/2015Abacus Announces Submission of Environmental Assessment Appl...
3/24/2015Provides Overview of 2015 Program at Ajax Copper-Gold Projec...
3/24/2015Abacus Provides Overview of 2015 Program at Ajax Copper-Gold...
2/20/2015Abacus Announces Grant of Stock Options
2/12/2015Abacus Provides Review of 2014 Program at Ajax Copper-Gold P...
7/31/2014IIROC Trading Resumption - AME
7/31/2014Abacus Arranges CAD$3 Million Loan and Signs Agreement for t...
7/31/2014IIROC Trading Halt - AME
6/4/2014Abacus Mining Completes Shares for Debt Transaction
5/29/2014KGHM aims to start producing copper at Canadian site at end-...
5/29/2014Abacus Mining Announces New Ajax Project Site Plan
4/25/2014Abacus Mining Announces Issuance of Shares for Debt
8/2/2013& Exploration Corporation: Ajax Project Update
5/17/2013Adopts New Shareholder Rights Plan
3/13/2013Extension of Warrants Approved
4/2/2012initiates strategic review to maximize shareholder value
3/15/2012closes unit offering of C$3.18 million
3/2/2012to close $3.0 million unit offering
2/16/2012announces up to $2.5 million unit offering
9/22/2011' Ajax JV and New Gold sign Asset Exchange Agreement
4/9/2011Completes Asset Purchase Agreement with Teck
9/22/2009Details on the company
4/30/2008 Releases First Drill Results From Ajax Joint Venture Area
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (AME.V)
0.035+0.00%
TSX-V
CA$ 0.035
04/18 11:48 -
0%
Prev close Open
0.035 0.035
Low High
0.035 0.035
Year l/h YTD var.
0.020 -  0.050 16.67%
52 week l/h 52 week var.
0.020 -  0.060 -%
Volume 1 month var.
27,000 16.67%
24hGold TrendPower© : 21
Produces
Develops
Explores for Copper - Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/30/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-22.22%
202380.00%0.060.03
2022-68.75%0.090.03
2021-40.74%0.240.06
202035.00%0.290.06
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :