Chart usGOLD   Chart usSILVER  
 
Food for thought
Nobody grows old merely by living a number of years. We grow old by deserting our ideals
Samuel Ullman  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1359.60-27.44
Silver 22.25-0.41
Platinum 1451.52-31.48
Palladium 735.25-1.25
WORLD MARKETS
DOWJONES 15354120
NASDAQ 349934
NIKKEI 15138101
ASX 516016
CAC 40 400122
DAX 839828
HUI 246-10
XAU 97-3
CURRENCIES (€)
AUS $ 1.3162
CAN $ 1.3193
US $ 1.2825
GBP (£) 0.8461
Sw Fr 1.2477
YEN 132.4600
CURRENCIES ($)
AUS $ 1.0268
CAN $ 1.0279
Euro 0.7797
GBP (£) 0.6593
Sw Fr 0.9725
YEN 103.1300
RATIOS & INDEXES
Gold / Silver61.11
Gold / Oil14.16
Dowjones / Gold11.29
COMMODITIES
Copper 3.300.01
WTI Oil 96.020.86
Nat. Gas 4.060.13
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
( 0 vote, 0/5 ) Print article
     
Tweet

 

Lake Shore Gold confirms and expands large gold system in thunder creek porphyry intersects 99.60 metres grading 4.91 gpt

 

 

 

 

 

Lake Shore Gold Corp.




--  Wide, high-grade intercepts near Thunder Creek 730 Level confirm results
    from surface drilling, including multiple occurrences of visible gold
    ("VG")
    --  6.92 gpt over 61.40m, including 13.90 gpt over 18.56m, intersected
        within broad mineralized envelope covering entire width of syenite
        porphyry stock grading 4.91 gpt over 99.60m, with additional 5.16
        gpt over 2.30m in Rusk Zone for combined width of 101.90m grading
        4.92gpt
    --  650-001, in combination with previous surface holes, identifies
        thick, large-scale mineralized core (minimum 300m x 125m) to deposit
        which remains open in all directions
--  Surface drilling expands both Porphyry and Rusk zones near east and west
    limits near 730 Level, zones remain open for further expansion
    --  Key intercepts include: 13.30 gpt over 13.20m, including 82.27 gpt
        over 1.60m, 6.54 gpt over 23.70m, 4.00 gpt over 27.30m, including
        11.30 gpt over 7.13m, and 4.24 gpt over 22.30m
--  Surface drilling southwest of Thunder Creek extends deformation and
    alteration zone by 350 metres towards 144 property, suggests potential
    for additional deposits
    --  Up to 100 metres of hematite and carbonate alteration intersected,
        containing multiple porphyry intrusions, several strong shear zones
        and elevated gold values.

Lake Shore Gold Corp. (TSX:LSG - News; "Lake Shore Gold" or the "Company") today announced results from an additional 15 holes (9,755m) of drilling at the Company's Thunder Creek Project, including from the first underground hole drilled (561m) from the 650 Level Access Drift and 14 holes (9194m) drilled from surface. Results from the underground hole confirmed the existence of a broad mineralized envelope, including multiple occurrence of VG, encompassing the entire width of a syenite porphyry stock located at the core of the Thunder Creek deposit. Surface drilling continued to expand both the Porphyry and Rusk zones near the 730 Level and also extended the deformation and alteration zone of the Thunder Creek deposit by 350 metres toward the Company's 100% owned 144 property.

Tony Makuch, President and CEO commented: "Drilling results from Thunder Creek continue to demonstrate that the property hosts a very large gold system with considerable potential to support a long-life, low-cost bulk mining operation. The core of porphyry mineralization that we have identified near the 730 Level is similar to those found in world class mines in the Timmins Camp such as the Hollinger and McIntyre deposits. The excellent widths and grades intersected both in the drill holes and the current mine development strongly confirm previous results obtained from surface drilling and provide us with even greater confidence as we continue development along mineralization on the 730 Level at Thunder Creek.

"In addition, the excellent results in our early stage testing to the southwest of Thunder Creek towards our 144 property are exciting and highlight the fact that our current areas of focus at Thunder Creek represent just a small part of the highly prospective land package we have along the Timmins Mine, Thunder Creek and 144 property corridor with abundant opportunities for major new discoveries."

Hole TC650-001 represents the first underground hole to be drilled towards the Thunder Creek deposit, collared from the Thunder Creek decline. The decline was initiated from the 650 metre Level station at Timmins Mine to access the Thunder Creek Rusk and Porphyry zones at roughly the 730 metre level. Hole TC650-001 intersected mineralization approximately 25 metres below the 730 metre level and 15 metres below previously reported surface hole TC09-068b, which intersected 12.75 gpt over 83.40m (see press release dated June 24, 2009).

Among significant results from TC650-001 was 6.92 gpt over 61.40m, including 13.90 gpt over 18.56m, within a broad mineralized envelope encompassing the entire width of a syenite porphyry stock located at the core of the Thunder Creek deposit, and grading 4.91 gpt over 99.60m. In addition, 650-001 also intersected 5.16 gpt over 2.30m in the Rusk Zone for a total combined width of 110.90m grading 4.92 gpt. The results strongly confirm the presence of a significant mineralizing system within the area, with the bulk of mineralization being associated with the Porphyry Zone and some also being from the Rusk Zone. Observations from the drill core of 650-001 indicate that the Porphyry Zone intersected has geological characteristics similar to TC09-68b, including widespread hematite, carbonate and potassic alteration, local quartz veining, pyrite, galena, sphalerite, scheelite and multiple occurrences of VG.

Additional significant results were from surface holes drilled near the east and west margins of the deposit which continued to confirm and expand mineralization beyond limits defined by previous drilling. Among significant intercepts near the west margin of the deposit were 13.30 gpt over 13.20m, including 82.27 gpt over1.60m and 7.89 gpt over 3.20m in TC09-69g and 6.97 gpt over 9.75m, 12.74 gpt over 5.60m, 2.24 gpt over 27.10m, 9.40 gpt over 1.50m and 4.88 gpt over 2.90m in TC09-69f. TC09-69g intersected mineralization approximately 25 metres west of TC09-69, which intersected 8.86 gpt over 24.85m (see press release dated May 5, 2009). TC09-69f intersected mineralization approximately 45 metres below TC09-69g. A substantial area up plunge and to the southwest of these two new holes remains untested suggesting excellent potential for further expansions to the mineralized zones.

Significant intersections near the east margin of the deposit include 6.54 gpt over 23.70m in TC09-68f, 4.00 gpt over 27.30m, including 7.13 gpt over 11.30m, and 14.09 gpt over 2.00m in TC09-80c and 4.24 gpt over 22.30m in TC09-68e. These holes were part of a five hole series testing on a cross section approximately 50 metres east of TC09-68b. TC09-68f was the uppermost hole in the series and intersected mineralization approximately 120 metres above hole TC09-68b. TC09-68e intersected mineralization 40 metres below TC09-68f, with TC09-80c intersecting mineralization 60 metres below TC09-68e. TC09-80a and TC09-80b tested up to 100 metres below TC09-80c and intersected significant widths of porphyry but decreased widths and grades. Potential to expand the zones further to the east are considered excellent.

Favourable drill results were also intersected by two early stage exploration holes testing to the southwest of the Thunder Creek Deposit. Holes TC10-83a and TC10-84 were designed to test the potential extension of the Thunder Creek Alteration and Deformation zone at Thunder Creek at distances of 150 and 350 metres from the previous west limit of the deposit near the 950-1000 metre level and were successful. Both holes intersected up to 100 metres of hematite and carbonate alteration containing several strong shear zones, multiple porphyry intrusions and locally elevated gold values which appear to line up well with the Thunder Creek deposit. Of significance, the trend of the zone appears to have shifted slightly to a more southerly direction than originally thought which places it on a path to intersect both a major Porphyry body and the 144 Zone, which is known to host very similar alteration and rock types to Thunder Creek near surface. The total distance between Thunder Creek and the 144 area is approximately 1.6 km and has had little to no previous diamond drilling along the Thunder Creek Alteration and Deformation zone.

Drilling is continuing at the Thunder Creek project with two underground drills on the 650 Level and two on the 300 Level as well as one surface drill. The company also has nine other drills active in the area, including four underground at Timmins Mine and five surface drills (two at the 144 property, two at the Thorne property (Gold River Trend), and one at the AGE/RT Joint Venture property).

Quality Control

The Company's Qualified Person ("QP") for the underground drilling being completed on the Thunder Creek property is Dean Crick, P. Geo. and for surface drilling at Thunder Creek is Jacques Samson, P. Geo. As QPs, they have prepared or supervised the preparation of the scientific or technical information related to drilling at Thunder Creek and have verified the data disclosed in this press release. Mr. Crick and Mr. Samson are employees of Lake Shore Gold.

Lake Shore Gold has a quality control program to ensure best practices in the sampling and analysis of drill core. Assays have been completed using a standard fire assay with a 30-gram aliquot. For samples that return a value greater than three grams per tonne gold, another pulp is taken and fire assayed with a gravimetric finish. Zones with visible gold are generally tested by pulp metallic analysis. NQ size drill core is saw cut and half the drill core is sampled in standard intervals. The remaining half of the core is stored in a secure location. The drill core is transported in security-sealed bags for preparation at ALS Chemex Prep Lab located in Timmins, Ontario, and the pulps shipped to ALS Chemex Assay Laboratory in Vancouver, B.C. ALS Chemex is an ISO 9001-2000 registered laboratory preparing for ISO 17025 certification.

Assays from underground hole 650-001 have been completed at ALS Chemex using a standard fire assay with a 50-gram aliquot. For samples that return a value greater than 10 grams per tonne another pulp is taken and fire assayed with a gravimetric finish. BQTK size drill core is saw cut and half the drill core is sampled in standard intervals. The remaining half of the core is stored in a secure location. The drill core is transported in security-sealed bags to the ALS Chemex Prep Lab located in Timmins, Ontario. The pulps from core that is sent to the ALS Chemex Prep Lab are then shipped to ALS Chemex Assay Laboratory in Vancouver, B.C.

About Lake Shore Gold Corp.

Lake Shore Gold is a rapidly growing mining company with a vision is to become a mid-tier gold producer through the successful exploration, development and operation of its properties in the Abitibi Greenstone belt in Northern Ontario and Quebec, starting with its strong base in Timmins, Ontario. In Timmins, the Company is currently carrying out pre-production development at the Timmins Mine, where it is using both a shaft and ramp to mine the Timmins deposit, and has intersected mineralization underground at the adjacent Thunder Creek deposit, which is being developed using the same infrastructure and as part of the Timmins Mine project. Progress is also being made with an underground advanced exploration program at its Bell Creek Mine, located on the east side of the City of Timmins, which is moving forward to become the Company's second mining operation in the Timmins Gold Camp. The Company's wholly owned mill (located on the Bell Creek property) has been refurbished and is currently operating at 2,000 tonnes per day. The Company continues to invest aggressively in exploration primarily in the Timmins Gold Camp and in its other properties in Northern Ontario and Quebec, and owns a large land position in Mexico. The Company's common shares trade on the TSX under the symbol LSG.

Forward-looking Statements

Certain statements in this press release relating to the Company's exploration activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" within the meaning of securities legislation. The Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward-looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects according to schedule, and that actual mineralization on properties will not be less than identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements. More information about risks and uncertainties affecting the Company and its business is available in Lake Shore Gold's most recent Annual Information Form and other regulatory filings which are posted on sedar at www.sedar.com.

There is no guarantee that drill results reported in this news release will lead to the identification of a deposit that can be mined economically, and further work is required to identify resources and reserves.




                                                                           
----------------------------------------------------------------------------
Thunder Creek Property-Significant New Assay Results to Nov 19 2010        
----------------------------------------------------------------------------
                            Interval   Grade                               
Hole Number From (m)  To (m)     (m)   (gpt) Section                Comments
----------------------------------------------------------------------------
TC650-001     335.80  338.10    2.30    5.16                    Rusk Horizon
              347.30  446.90   99.60    4.91                        Porphyry
   including  361.50  422.90   61.40    6.92                               
   including  386.20  400.10   13.90   18.56                               
                                                      Rusk & Porphyry; incl.
TC09-68e      844.50  866.80   22.30    4.24   9600N                      VG
   including  844.50  849.30    4.80    8.14                               
   including  864.90  865.40    0.50   49.30                        incl. VG
TC09-68f      825.50  849.20   23.70    6.54   9600N                Porphyry
   including  825.50  832.50    7.00    8.37                               
   including  836.50  839.90    3.40   19.06                        incl. VG
              843.50  849.20    5.70    3.39                        incl. VG
TC09-69f      819.35  829.10    9.75    6.97   9500N            Rusk Horizon
   including  823.90  829.10    5.20   10.78                               
         and  851.55  851.90    0.35   12.20                               
              863.00  865.90    2.90    4.88                        Porphyry
              899.20  899.70    0.50    5.43                               
              905.70  932.80   27.10    2.24                               
              926.30  926.80    0.50   17.10                               
              932.30  932.80    0.50   33.50                               
         and  952.70  954.20    1.50    9.40                                
              969.90  975.50    5.60   12.74               Footwall porphyry
   including  969.90  970.40    0.50  125.50                               
TC09-69g      791.10  804.30   13.20   13.30   9475N            Rusk Horizon
   including  797.50  799.10    1.60   82.27                               
              818.20  821.40    3.20    7.89                        Porphyry
              877.80  879.80    2.00    3.61                               
                                                            Altd volc in the
TC09-79a      993.80  994.60    0.80   31.90   9450N                footwall
TC09-80a      914.00  934.90   20.90    1.67   9600N            Rusk Horizon
   including  914.00  915.00    1.00   10.97                                
              932.90  933.40    0.50    9.91                        Porphyry
              946.70  947.20    0.50    4.19                               
              965.70  966.20    0.50    9.76                               
             1025.15 1025.70    0.55    4.11                               
TC09-80b      886.00  888.70    2.70    3.16   9600N            Rusk Horizon
              914.40  923.50    9.10    2.40                        Porphyry
              942.40  942.90    0.50    8.00                               
              950.20  963.90   13.70    1.70                               
              970.70  971.20    0.50    4.31                               
              974.70  975.20    0.50    5.38                                
TC09-80c      876.00  903.30   27.30    4.00   9600N      Porphyry; incl. VG
   including  892.40  903.70   11.30    7.13                        incl. VG
   including  902.90  903.30    0.40  156.00                               
              908.20  908.50    0.30    7.00                               
              918.60  921.80    3.20    2.56               Footwall porphyry
              928.50  930.50    2.00   14.09               Footwall porphyry
TC09-81       304.60  305.30    0.70    3.52   9420N                       
              385.90  386.40    0.50    3.93                        Porphyry
TC09-83a     1099.80 1100.40    0.60    4.22   9380N        Porphyry dykelet
----------------------------------------------------------------------------
Notes:                                                                     
- TC09-69f is a bypass hole to TC09-69e (previously released) due to an    
 obstruction in the hole below the Rusk Horizon.                           
- TC10-82,-83 were abandoned; no significant assays. TC10-84 (9200N) and   
 TC09-79b (9430N) had no significant results.                              
- Due to uncertainties in zone orientations, true widths are not known at  
 this time.                                                                 
- Assays reported are uncut.                                               
- Approximately 1.5m of core was missing from TC650-001 between 363.0 and  
 364.1.                                                                     

 

 

Tweet

Lake Shore Gold Corporation

PRODUCER
CODE : LSG.TO
ISIN : CA5107281084
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Lake Shore Gold Corporation
1/12/2013Haywood paints rosier picture for Lake Shore Gold in 2013
4/12/2012Lake Shore Gold underpins mill expansion with Sprott debt
4/3/2012Employee killed at Lake Shore Gold's Ontario mine
7/19/2011Lake Shore Gold hammered on lacklustre quarterly production
1/7/2010BRIEF-Lake Shore Gold says acquires interest in RT Minerals
3/27/2009UPDATE 1-Lake Shore Gold starts ore processing at Timmins Mi...
3/26/2009Lake Shore Gold starts processing ore from Timmins mine
Financings of Lake Shore Gold Corporation
2/28/2011Completes US$50 Million Corporate Revolving Credit Facility
10/26/2010Exercises Warrants in Northern Superior Resources
7/28/2010Secures US$50m credit facility
7/28/2010Signs Term Sheet for Corporate Revolving Credit Facility of ...
2/16/2010Closing of Second Tranche of Flow-Through Financing
12/31/2009Announces Closing of First Tranche of Flow-Through Financing
12/4/2009Announces Closing of Private Placement Financing
2/19/2008 Announces Private Placement of $64.5 Million at 30% Premium...
Nominations of Lake Shore Gold Corporation
3/13/2009Announces Appointment of Ignacio Bustamante to Board of Dire...
5/30/2008Announces Management Appointments
2/27/2007Appoints Hannu Virtanen as VP, Project Development
Financials of Lake Shore Gold Corporation
8/9/2012Lake Shore Gold Reports Strong Second Quarter Results
1/12/2012Reports 2011 Operating Results, Pours 26,550 Ounces in Fourt...
11/10/2011Announces Third Quarter 2011 =?ISO-8859-1?Q?=20Financial=20R...
8/10/2011Announces Second Quarter 201 =?ISO-8859-1?Q?1=20Financial=20...
5/26/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Results,=20In...
5/4/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Production=20...
8/11/2010Continued Progress During Second Quarter 2010
5/15/2008Announces First Quarter 2008 Results
Project news of Lake Shore Gold Corporation
10/14/2011(Timmins Mine)Reports Higher Commercial Production from Timmins Mine in Th...
8/16/2011(Bell Creek)Reports 400 Metre Extension of Gold Mineralization at Bell C...
3/29/2011(Band Ore)to Acquire 19% of Golden Share Through Sale of 100% Interest
3/4/2011(Thunder Creek)Reports Wide Intersections With High-Grade Sections Within P...
2/28/2011(Timmins Mine)Lake Shore Gold Discovers Significant New Gold Zone at 144 P...
2/24/2011(Timmins Mine)Intersects Wide, High-Grade Mineralization at Timmins Mine, ...
1/25/2011(Timmins Mine)Lake Shore Gold to Nearly Triple Gold Production in 2011
1/25/2011(Thunder Creek)Confirms Broad Mineralized Envelope With High-Grade Sections...
1/11/2011(Thorne)Demonstrates Near Surface Resource Potential and Extends Min...
1/6/2011(Timmins Mine)Declares Commercial Production =?ISO-8859-1?Q?=20at=20Timmin...
12/1/2010(Bell Creek)Announces Initial Resource a Bell Creek Mine, Large Deposit ...
11/24/2010(Thunder Creek)Confirms and Expands Large Gold System in Thunder Creek Por...
11/24/2010(Thunder Creek)Confirms and Expands Large Gold System in Thunder Creek Porp...
11/11/2010(West Timmins)Announces New High-Grade Intercepts, Major Extension of Main...
11/3/2010(Bell Creek)Extends High-Grade Core to Depth at Bell Creek
11/3/2010(Bell Creek)=?ISO-8859-1?Q?Lake=20Shore=20Gold=20Reaches=202,000=20Tonne...
11/1/2010(Thunder Creek)Continues to Confirm and Expand Thunder Creek Rusk Horizon
8/30/2010Expands Thunder Creek Rusk =?ISO-8859-1?Q?=20Zone,=20Announc...
8/30/2010Lake Shore Gold Expands Thunder Creek Rusk Zone, Announces A...
6/29/2010(Thunder Creek)Ramp Reaches & Intersects High-Grade Gold Mineralization
6/29/2010Ramp Reaches Thunder Creek Deposit, Intersects High-Grade Go...
6/23/2010Intersects High-Grade Mineralization at Thorne...
5/4/2010(West Timmins)Advances Third Major Gold Target
4/1/2010(Ti-pa-haa-kaa-ning (tpk))Agrees to Sell 50% Interest in Ti-pa-haa-kaa-ning Gold Prope...
2/18/2010(Timmins Mine)Major Extensions to Timmins Mine Mineralization, Thunder Cre...
2/17/2010(Timmins Mine)Reports Results of Underground Exploration at 650-Level Test...
2/17/2010(Casa Berardi)Extends Casa Berardi "G Zone"
1/26/2010(Thunder Creek)Extends Thunder Creek to Depth, Confirms High-Grade Core and...
1/18/2010(Bell Creek)Continues to Define and Extend Large New Gold System at Bell...
11/6/2009(Bell Creek)Confirms Presence of Large New Gold System
10/29/2009(Timmins Mine)Results of Underground Drilling and Development at Timmins M...
10/7/2009Releases Updated National Instrument 43-101 Report for Timmi...
10/1/2009(Bell Creek)Reports Extension to High grade mineralization at Bell Creek
8/25/2009(Thunder Creek)Continues to Establish Large Gold System at Thunder Creek
8/24/2009Reports High-Grade Intercepts From Underground Drilling at T...
7/21/2009(Bell Creek)Discovers Substantial New High-Grade Extension at Bell Creek
7/21/2009Lake Shore Gold discovers substantial new high-grade extensi...
7/7/2009(Bell Creek)Confirms Deep Extensions of Gold Mineralization at Bell Cree...
5/5/2009(Thunder Creek) Reports Additional High-Grade intercepts at Thunder Creek
4/28/2009(Bell Creek)Commences Advanced Underground Exploration Program at the Be...
3/31/2009(Thunder Creek)Discovery of Second Mineralized Horizon in Porphyry
3/26/2009(Bell Creek)Commences Processing at Bell Creek Mill
12/16/2008Significantly Extends Rusk Zone and Announces New High-Grade...
12/10/2008(Bell Creek)Significantly Extends Bell Creek Mineralization
7/10/2008(Bell Creek)Intersects New Gold Zone and Extends Mineralization at Bell ...
3/31/2008(Thunder Creek)Intersects 8.57 Grams Gold Per Tonne Over 9.00 Metres at the...
Corporate news of Lake Shore Gold Corporation
5/7/2013Announces Details of First Quarter 2013 Conference Call and ...
3/12/2013Announces Details of Full Year and Fourth Quarter 2012 Confe...
1/10/2013Achieves 2012 Production Target, Company Poised for Sharply ...
12/11/2012on Track for Strong Finish to 2012, Processing Capacity Incr...
10/25/2012Announces Details of Third Quarter 2012 Conference Call and ...
9/18/2012Announces Exercise of Underwriters' Over-Allotment Option fo...
9/7/2012Completes C$90 Million Convertible Senior Unsecured Debentur...
8/16/2012Announces C$75 Million Convertible Senior Unsecured Debentur...
7/13/2012Announces Details of Second Quarter 2012 Conference Call and...
7/4/2012Reports Strong Second Quarter Production of 24,426 Ounces of...
5/10/2012Exceeds Targets and Achieves Continued Operating Improvement...
3/23/2012Announces Details of Fourth Quarter and Full-Year 2011 Confe...
11/2/2011Announces Details of Third Quarter 2011 Conference Call and ...
8/5/2011Announces Details of Second Quarter 2011 Conference Call and...
7/19/2011Releases Production Resultsfor Second Quarter and First Six-...
4/1/2011Announces Adoption of Shareholder Rights Plan
3/14/2011Lake Shore Gold Achieves Major Milestones in 2010, on Track ...
2/1/2011Increases Interest in Northern Superior Resources Inc.
12/3/2010Disposal of remaining 6% stake in Lake Shore Gold by Hoschil...
10/14/2010Hochschild reduces stake in Lake Shore Gold to 6%
7/22/2010Confirms & Expands Mineral
5/27/2010Completes Sale of 50% Interest in Ti-pa-haa-kaa-ning JV
5/12/2010Changes to Board of Directors
5/5/2010Announces Continued Progress
4/27/2010Expands Resource Potential at Timmins Mine
3/11/20102009 Year End Results
12/17/2009Completes Acquisition of "Bell Creek West" Properties
12/15/2009Announces Management Changes
12/15/2009Added to S&P/TSX Composite Index
11/24/2009Announces Changes to Board of Directors
11/6/2009and West Timmins Mining Complete Business Combination
8/27/2009and West Timmins Agree to Business Combination
8/6/2009Advances Projects on Schedule and Budget and Achieves Explor...
6/24/2009Reports 12.75 Grams Per Tonne Over 83.40 Metres at Thunder C...
5/5/2009Continues to Expand Mineralion at Bell Creek
5/5/2009Continues to Advance Projects on Schedule and Budget and to ...
3/12/2009Completes 2008 on Schedule and Under Budget
5/20/2008Provides 2008/2009 Budget Plan
5/16/2008Announces Approval of Special Resolutions at Annual and Spec...
5/5/2008Comments on May 15, 2008 Shareholder Vote
4/16/2008Announces Revised Agreement With Hochschild Mining; Second P...
4/16/2008 Announces Management Changes
3/28/2008Announces 2007 Year End Results and Provides 2008 Outlook
3/24/2008Announces Management Changes
3/18/2008Announces Annual Meeting and Revised Date for Special Meetin...
2/25/2008 Completes Financing and Enters Into Strategic Alliance With...
7/17/2007Commences Drilling at Blakelock and Expands its Property Pos...
4/23/2007Completes Due Diligence on Bell Creek Acquisition
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (LSG.TO)Other OTC (LSGGF.PK)
0.290-6.45%2.29-0.87%
TORONTO
CA$ 0.290
05/17 16:00 -0.020
-6.45%
Prev close Open
0.310 0.310
Low High
0.280 0.310
Year l/h YTD var.
0.290 -  0.910 -62.34%
52 week l/h 52 week var.
0.290 -  1.15 -67.78%
Volume 1 month var.
1,139,129 -36.96%
24hGold TrendPower© : -34
Produces Gold
Develops
Explores for Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-68.82%
2012-23.77%1.730.74
2011-70.46%4.421.10
2010-1.20%4.322.48
2009266.67%4.371.10
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Get Investor Information
High Desert Gold
Select
& click