News Release Issued: Mar 30, 2017 (6:30am EDT)

 

Richmont Mines Provides Exploration and Delineation Drilling Update for the Island Gold Mine; New High Grade Mineralization Identified: 20.6 g/t of gold over 11.3 metres (core length) in the Eastern Lateral Extension

TORONTO, March 30, 2017 /CNW Telbec/ - Richmont Mines Inc. (TSX: RIC) (NYSE: RIC) ("Richmont" or the "Corporation"), is pleased to provide an update from its strategic exploration and delineation drilling program currently underway at the cornerstone Island Gold Mine. Recent exploration drilling has identified new high-grade mineralization located approximately 800 metres east of the main Island Gold deposit with hole GD-640-05 intersecting 20.6 g/t gold over 11.3 metres (core length). All results are reported with estimated true width, unless otherwise indicated, and high-grade assays are capped at 225 g/t gold for the Lower C zone and 70 g/t for the E1E zone, the main mineralized zone east of the second dyke.

"Results from the strategic drilling program at the Island Gold Mine continue to demonstrate the significant near-term potential of this high quality deposit. In the eastern lateral extension, drilling has identified a new mineralized zone in the down plunge extension of a high-grade trend that was identified in 2016. This new area is located only 500 metres east and below the new resource blocks, which indicates that the structure could continue at depth." stated Renaud Adams, CEO. He continued, "The early results from our delineation drilling in the Expansion Case PEA area indicate the significant potential to further expand our reserves at higher than current average grades. In 2017 we will continue to advance our systematic drilling program with an overall focus on positively impacting our near-term mine life and identifying the next million ounces of resources outside the Expansion Case PEA area."

2017 DRILLING PROGRAM � ISLAND GOLD MINE (Figure 1)

The 2016 delineation drilling program contributed to a 34% increase in reserves at an 11% higher grade, while the exploration program delivered more than 450,000 ounces of new inferred resources at a cost of less than $35 per ounce discovered. As of December 31, 2016, the Island Gold Mine increased its reserve base to 752,200 ounces of gold at a higher grade of 9.17 g/t, while inferred resources increased to 995,700 ounces of gold at a higher grade of 10.18 g/t.

The 2017 drilling program currently underway continues to build on positive results achieved in 2016 and is focused on three key priorities: 1) to expand near-mine resources outside the Expansion Case PEA area, both laterally and at depth; 2) to further expand the reserve base, primarily within the Expansion Case PEA area; and 3) continuing to test high priority regional gold targets across the prospective Island Gold Mine property.

Eastern Lateral Exploration and Infill Drilling Program (Figure 2)

The 2016 drilling program successfully added two new inferred resource blocks in the eastern lateral extension, approximately 300 metres east of the Expansion Case PEA area, between the 340 and the 750 metre levels. The largest inferred resource block contains approximately 290,000 tonnes at a grade of 10.35 g/t of gold (approximately 95,000 ounces of gold). These two new blocks are relatively shallow and easily accessible from the existing mine infrastructure. As a result, the 2017 exploration program is following up on the eastern lateral extension area, particularly on a high-grade intersection (Hole GD-630-01) of 25.27 g/t gold over 3.85 metres located approximately 500 metres east of the new resource blocks that was identified in 2016, and continues to target the extension and infill of the new resource blocks.

Recent drilling in the eastern lateral extension has been focused in the down plunge extension of Hole GD-630-01. Highlights include:

  • Hole GD-640-05 intersected 20.57 g/t (26.55 g/t uncut) of gold over a core length of 11.3 metres, at a vertical depth of approximately 1,000 metres;
  • Hole GD-640-04, located approximately 150 metres above hole GD-640-05, intersected 7.38 g/t gold over 3.27 metres.

One directional drill rig has been redeployed to this area to follow-up on the exploration success in this area. The initial 2017 directional drill hole (GD-640-05-1) was completed between holes GD-640-04 and GD-640-05 noted above, and intersected two high-grade intervals at the same elevation, but located 40 to 50 metres north of GD-640-05. The first interval intersected 16.1 g/t gold (28.13 g/t uncut) over a core length of 8.33 metres and the second intersected 10.16 g/t gold (17.32 g/t uncut) over a core length of 5.74 metres. Additional drilling will be required to better understand the geometry and true width of this new area of high-grade mineralization. This new discovery represents significant upside to the potential extension of the eastern lateral corridor. A second directional drill rig will be added to accelerate drilling in this area.

Exploration and infill drilling has continued from the 340 metre level exploration drift that targets a potential extension and infill of the current resource blocks that were identified in 2016. One drill rig is working in the area and another drill rig will be added on the 620 metre level once the 300 metre extension of the exploration drift is completed in the second half of the year.

Recent highlights from Eastern Lateral exploration and infill drilling from the 340 metre level exploration drift (subsequent to the October 12, 2016 exploration press release), include (Table 2):

  • Hole 340-576-02: 8.50 g/t gold over 2.00 metres;
  • Hole 340-588-08: 14.96 g/t gold over 2.00 metres;
  • Hole 340-588-11: 10.10 g/t gold over 3.00 metres;
  • Hole 340-588-12: 10.24 g/t gold over 3.00 metres;
  • Hole 340-588-13: 33.60 g/t gold over 2.00 metres;
  • Hole 340-588-14: 10.60 g/t gold over 2.00 metres;
  • Hole 340-588-15: 11.44 g/t gold over 4.36 metres.

A total of 8,232 metres (33 holes) of exploration and infill drilling of the planned 37,000 metres have been completed to date in the eastern lateral area.

Deep Directional Exploration Drilling Program Highlights: (Figure 3)

The successful 2016 deep drilling program identified a new large inferred resource block of 760,000 tonnes at a grade of 9.53 g/t gold (approximately 230,000 ounces) in the eastern down plunge extension, located between the 1,050 and the 1,300 metre levels.

The deep directional exploration drilling program continues in 2017 and targets the expansion of the new resource block. A total of 16,000 metres of deep directional drilling and 20,000 metres of underground drilling are planned in 2017. The underground drilling will be primarily completed from the 860 metre level exploration drift (400 metre length) that is scheduled to be completed in 2017.

Results to date continue to be encouraging with Hole MH1-10 intersecting 24.5 g/t gold over 3.76 metres. In the eastern portion of this area, Hole MH8 intersected 4.6 g/t gold over 2.24 metres, demonstrating that the mineralization remains open to the east.

In the western area, mineralized zones were intersected and additional drilling is required to better understand the structural geology at depth, however these new zones increase the overall potential of the down plunge extension and provide new high quality targets for follow up drilling.

A total of 5,052 metres (10 holes) have been drilled to date and three surface directional drill rigs are presently working in this area.

Other highlights from the deep directional exploration and infill drilling include (Table 3):

  • Hole MH2A-7: 11.36 g/t gold over a core length of 10.40 metres (Zone X);
  • Hole MH2A-8: 10.37 g/t gold over 9.17 metres;
  • Hole MH2A-10: 6.16 g/t gold over 11.58 metres;
  • Hole MH5-1A: 9.27 g/t gold over 5.93 metres.

EXPANSION CASE PEA DELINEATION DRILLING PROGRAM (Figure 4)

For 2017, a total of 30,000 metres of delineation drilling is planned within the Expansion Case PEA area, primarily in the fourth mining horizon located between the 860 and 1,000 metre levels. Currently, two drill rigs are working in the area and a total of 6,866 metres (40 holes) have been completed to date.

Drilling continues to demonstrate the potential for additional reserve growth, including ounces and grade, primarily through the conversion of the high-grade inferred resources located in the fourth horizon. Results to date also demonstrate the potential to identify additional resources as high-grade mineralization continues to be intersected between the inferred resource blocks.

Recent drilling highlights from delineation and infill drilling completed within the Expansion Case PEA area, which have not been included in the December 2016 Resource and Reserve update include (Table 1):

  • Hole 740-465-08: 43.05 g/t gold over 5.13 metres;
  • Hole 740-465-16: 96.47 g/t gold over 5.08 metres;
  • Hole 740-465-15: 23.29 g/t gold over 3.51 metres;
  • Hole 740-465-20: 24.56 g/t gold over 3.85 metres;
  • Hole 740-483-21: 34.13 g/t gold over 3.53 metres;
  • Hole 820-520-08: 53.64 g/t gold over 6.53 metres;
  • Hole 820-520-13: 30.20 g/t gold over 3.62 metres.

Phase 2 Regional Drilling Program

The Phase 2 regional drilling program is designed to continue to evaluate the potential extension of the mineralization below the Kremzar mine as well as other previously identified high-priority gold targets located elsewhere on the highly prospective 77 km2 Island Gold property. The Phase 2 regional drilling program is expected to begin later in 2017.

Qualified Persons

The scientific and technical content and interpretations contained in this news release have been reviewed, verified and approved by Daniel Adam P. Geo., Ph.D., Richmont's Vice-President, Exploration, a Qualified Person as defined by NI 43-101.

Quality Control

Assays for the exploration drilling were done at LabExpert in Rouyn-Noranda. Mineralized zones samples will be resent for verification to an accredited laboratory. The Corporation inserts at regular intervals quality control (QC) samples (blanks and reference materials) to monitor laboratory performance.

About Richmont Mines Inc.

Richmont Mines currently produces gold from the Island Gold Mine in Ontario, and the Beaufor Mine in Quebec. The Corporation is also advancing development of the significant high-grade resource extension at depth of the Island Gold Mine in Ontario. With 35 years of experience in gold production, exploration and development, and prudent financial management, the Corporation is well-positioned to cost-effectively build its Canadian reserve base and to successfully enter its next phase of growth.

Forward-Looking Statements
This news release contains forward-looking statements that include risks and uncertainties. When used in this news release, the words "estimate", "project", "anticipate", "expect", "intend", "believe", "hope", "may", "objective" and similar expressions, as well as "will", "shall" and other indications of future tense, are intended to identify forward-looking statements.. The forward-looking statements are based on current expectations and apply only as of the date on which they were made. Except as may be required by law or regulation, the Corporation undertakes no obligation and disclaims any responsibility to publicly update or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise.

The factors that could cause actual results to differ materially from those indicated in such forward-looking statements include, without limitation, changes in the prevailing price of gold, the Canadian-United States exchange rate, grade of ore mined and unforeseen difficulties in mining operations that could affect revenue and production costs. Other factors such as uncertainties regarding government regulations and the failure of our exploration drilling programs to identify significant new resources or targets or expand existing resources could also affect the results. Other risks are set out in Richmont's Annual Information Form, Annual Reports and periodic reports. The forward-looking information contained herein is made as of the date of this news release.

Cautionary note to US investors concerning resource estimates
Information in this press release is intended to comply with the requirements of the Toronto Stock Exchange and applicable Canadian securities legislation, which differ in certain respects with the rules and regulations promulgated under the United States Securities Exchange Act of 1934, as amended ("Exchange Act"), as promulgated by the SEC. The requirements of National Instrument 43-101 � Standards of Disclosure for Mineral Projects ("NI 43-101) adopted by the Canadian Securities Administrators differ significantly from the requirements of the United States Securities and Exchange Commission (the "SEC").

U.S. Investors are urged to consider the disclosure in our annual report on Form 20-F, File No. 001-14598, as filed with the SEC under the Exchange Act, which may be obtained from us (without cost) or from the SEC's web site: http://sec.gov/edgar.shtml.

 

Tables of Drill Results

 

TABLE 1

INFILL DELINEATION IN PEA AREA

Hole Number

Length
(metres)

From
(metres)

To
(metres)

True
Width
(metres)

Uncut
Grade
(g/t Au)

Cut

Grade
(g/t Au)

Zone

Vertical depth
of Intersection
(metres)

490-525-01

63

46.45

48.75

2.12

6.18

6.18

C

469

490-525-03

84

61.75

65.50

2.97

6.35

6.35

C

516

740-465-02

220

160.80

166.25

3.96

9.80

9.80

C

858

740-465-03

264

128.90

132.60

3.68

38.66

38.66

C

805

740-465-04

189

129.10

133.10

3.52

161.34

85.33

C

817

including


129.10

131.80

2.37

238.42

125.82



740-465-07

249

131.75

138.00

5.12

16.00

16.00

C

790

740-465-08

186

127.45

133.15

5.13

46.42

43.05

C

801

including


132.10

133.15

0.94

237.78

219.50



740-465-09

210

150.55

157.10

5.21

6.21

6.21

C

839

740-465-15

387

276.29

282.43

3.51

29.78

23.29

C

1,004

including


281.02

281.50

0.27

308.12

225.00



740-465-16

255

192.14

200.00

5.08

114.93

96.97

C

900

740-465-17

345

205.40

210.30

3.44

19.35

19.35

C

919

740-465-20

393

291.05

299.45

4.61

24.56

24.56

C

1,020

740-465-21

546

329.75

347.60

6.46

7.48

7.48

C

1,069

740-465-23

297

223.00

226.65

2.34

61.34

50.84

C

941

including


224.60

225.35

0.48

276.11

225.00



740-471-10

270

193.80

210.00

5.60

34.13

18.84

C

909

including


194.30

195.80

0.52

329.52

164.34



740-471-13

200

146.80

150.33

2.92

6.28

6.28

C

841

740-471-14

354

162.47

166.40

3.04

6.17

6.17

C

863

740-471-16

186

135.84

141.26

4.37

27.47

17.58

C

820

including


136.38

137.20

0.66

167.79

102.38



740-471-22

186

163.08

168.12

4.60

6.14

6.14

C

670

740-471-23

252

159.20

162.60

3.20

6.89

6.89

C

684

740-471-24

351

318.35

333.10

4.10

13.52

11.28

C

1,030

including


318.35

321.55

0.89

56.39

46.08



740-471-31

402

345.06

364.73

8.31

13.26

13.26

C

1,061

740-471-32

441

335.93

348.56

4.95

13.74

13.74

C

1,058

740-471-34

420

218.00

226.00

3.42

9.29

9.29

C

939

740-477-17

270

195.40

203.15

4.14

8.26

8.26

C

892

740-477-19

231

149.80

158.90

7.71

12.84

12.84

C

840

740-477-20

210

141.38

148.81

6.52

6.32

6.32

C

820

740-477-26

225

133.55

142.50

6.60

9.55

9.55

C

741

740-477-29

600

262.10

276.86

6.04

16.07

16.07

C

973

740-477-30

312

236.95

243.00

3.29

83.08

60.15

C

939

including


238.80

241.65

1.55

173.08

124.40



740-477-33

300

218.80

231.10

6.57

32.47

32.47

C

924

740-477-36A

192

156.65

161.52

4.53

8.50

8.50

C

720

740-477-37

405

385.70

399.20

4.95

11.76

11.76

C

1,085

740-477-40

450

382.49

388.07

2.24

38.62

38.62

C

1,083

740-477-42

430

351.45

370.50

8.00

9.92

9.92

C

1,059

740-477-43

383

161.70

169.30

6.20

16.94

16.94

C

847

740-483-19

245

144.65

147.75

2.85

12.81

12.81

C

769

740-483-21

402

295.04

303.08

3.53

34.13

34.13

C

989

740-483-22

381

236.52

242.50

3.46

26.37

26.37

C

930

800-496-01

162

119.00

123.00

2.53

18.21

18.21

C

903

800-511-01

189

67.90

74.80

4.72

23.36

23.36

C

858

800-511-02

87

58.71

68.00

8.60

6.16

6.16

C

823

800-512-01

138

109.00

115.30

4.28

6.90

6.90

C

833

800-512-02

186

145.70

156.00

6.39

21.45

16.17

C

897

800-512-04

170

89.80

105.40

8.79

60.16

60.16

C

859

800-512-05

189

98.00

109.20

5.92

18.37

18.37

C

875

820-520-01

153

138.20

141.50

3.28

59.86

52.67

C

816

including


138.20

139.50

1.29

147.79

129.54



820-520-08

210

194.11

202.35

6.53

61.01

53.64

C

924

including


194.52

197.60

2.44

122.76

103.04



820-520-13

237

213.80

218.80

3.62

34.52

30.20

C

952

including


217.30

217.85

0.40

264.27

225.00



 

TABLE 2

EASTERN LATERAL EXPLORATION AND INFILL DRILLING

Hole Number

Length
(metres)

From
(metres)

To
(metres)

True
Width
(metres)

Uncut
Grade
(g/t Au)

Cut
Grade
(g/t Au)

Zone

Vertical depth
of Intersection
(metres)

340-576-01

402

305.00

314.65

2.00

5.17

5.17

E1E

559

340-576-02

500

435.20

444.13

2.00

9.08

8.50

E1E

663

340-579-01

258

172.30

176.00

2.57

2.69

2.69

E1E

427

340-584-01

126

96.10

99.40

3.03

3.19

3.19

E1E

325

340-584-02

303

110.59

113.96

2.70

1.51

1.51

E1E

353

340-584-03

160

119.50

126.10

4.87

1.98

1.98

E1E

369

340-586-06

201

115.22

118.60

2.68

7.63

7.63

E1E

375

including


118.22

118.60

0.30

59.86

59.86



340-586-07

273

172.30

176.90

2.00

3.16

3.16

E1E

436

340-586-08

420

213.10

218.40

2.00

9.50

8.38

E1E

479

including


214.00

214.50

0.19

81.94

70.00



340-586-09

430

262.00

272.40

2.00

1.73

1.73

E1E

529

340-588-08

453

213.00

218.10

2.00

14.96

14.96

E1E

471

340-588-09

430

302.75

313.45

2.10

3.62

3.62

E1E

554

340-588-10

150

96.60

99.60

2.51

0.81

0.81

E1E

310

340-588-11

315

122.37

126.67

3.00

13.90

10.10

E1E

358

including


125.37

125.87

0.35

102.69

70.00



340-588-12

255

155.60

160.75

3.00

10.24

10.24

E1E

403

340-588-13

399

202.60

207.50

2.00

54.28

33.60

E1E

452

340-588-14

378

264.00

273.70

2.00

17.02

10.60

E1E

516

including


265.80

266.80

0.21

132.27

70.00



340-588-15

222

124.42

130.50

4.36

19.84

11.44

E1E

376

including


125.10

125.90

0.57

133.89

70.00



340-588-16

453

382.80

395.80

2.00

0.93

0.93

E1E

614

340-588-17

498

265.00

278.00

3.00

5.54

4.98

E1E

522

including


272.00

272.50

0.25

84.55

70.00



340-588-18

321

173.50

178.30

2.30

12.44

5.69

E1E

411

including


175.10

175.40

0.14

177.98

70.00



GD-640-01

975

731.60

738.60

4.24

0.08

0.08

E1E

686

GD-640-02

1,029

779.10

789.20

5.34

3.66

3.66

E1E

756

GD-640-04

1,050

888.50

894.50

3.27

8.81

7.38

E1E

852

including


890.20

890.80

0.33

84.31

70.00



GD-640-05

1,264

1,055.20

1,066.50

11.3 c.l.

26.55

20.57

E1E

1,020

including


1,056.00

1,057.50

1.50

115.11

70.00



GD-640-05-1

1,500

1,083.20

1,091.53

8.33 c.l.

28.13

16.10

X

1,029

including


1,086.75

1,090.10

3.35 c.l.

63.25

33.34





1,110.56

1,116.30

5.74 c.l.

17.32

10.16

X

1,042

including


1,110.86

1,111.56

0.7 c.l.

128.71

70.00



 

TABLE 3

DEEP DRILLING PROGRAM, EXPLORATION AND INFILL

Hole Number

Length
(metres)

From
(metres)

To
(metres)

True
Width
(metres)

Uncut
Grade
(g/t Au)

Cut
Grade
(g/t Au)

Zone

Vertical depth
of Intersection
(metres)

MH1-10

1,613

1,350.10

1,356.90

3.76

24.54

24.54

C

1,233

including


1,354.00

1,354.80

0.44

179.67

179.67



MH2A-7

1,607

1,194.20

1,198.70

4.5 c.l.

7.17

6.08

X

1,047

MH2A-7

1,607

1,241.00

1,251.40

10.4 c.l.

11.36

11.36

X

1,085

MH2A-7

1,607

1,312.90

1,319.47

4.80

4.72

4.72

E1E

1,139

MH2A-8

1,433

1,278.82

1,289.47

9.17

11.22

10.37

E1E

1,108

including


1,288.64

1,289.00

0.31

95.21

70.00



MH2A-9B

1,500

1,299.26

1,306.46

5.89

2.66

2.66

E1E

1,134

MH2A-10

1,472

1,300.10

1,316.00

11.58

13.25

6.16

E1E

1,169

including


1,300.50

1,300.80

0.22

383.01

70.00





1,315.70

1,316.00

0.22

133.06

70.00



MH4-4

1,373

1,326.90

1,331.45

3.09

4.10

4.10

C

1,138

MH4-4B

1,505

1,211.15

1,217.10

5.95 c.l.

103.86

5.09

X

1,046

including


1,216.45

1,216.75

0.3 c.l.

2028.91

70.00



MH4-5

1,628

1,346.96

1,351.10

2.51

4.63

4.63

C

1,177

MH5-1

1,523

1,082.60

1,084.55

1.95 c.l.

4.59

4.59

X

948

MH5-1A

1,523

1,321.88

1,329.15

5.93

9.27

9.27

C

1,128

including


1,326.73

1,327.20

0.38

102.07

102.07



MH5-2

1,529

1,323.58

1,329.43

4.40

5.08

5.08

C

1,132

MH5-3

1,517

1,383.40

1,388.55

3.81

0.95

0.95

C

1,215

MH-6

1,857

1,440.50

1,453.05

9.44

0.91

0.91

C

1,261

MH-8

1,576

1,378.50

1,382.10

2.24

4.60

4.60

E1E

1,195

High-grade capping values:
Lower Island C Zone (225 g/t)
Lower X2-E1E Zone, East Lateral E1E Zone and X Zone (70 g/t Au)

 

SOURCE Richmont Mines

For further information: Renaud Adams, President and CEO, Phone: 416 368-0291 ext. 101; Anne Day, Senior Vice-President, Investor Relations, Phone: 416 368-0291 ext. 105

 

To unsubscribe or change your settings click here:

Richmont Mines Inc

PRODUCER
CODE : RIC.TO
ISIN : CA76547T1066
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Richmont Mines is a gold producing company based in Canada.

Richmont Mines holds various exploration projects in Canada.

Its main assets in production are BEAUFOR MINE, ISLAND GOLD and EAST AMPHI MINE in Canada, its main asset in development is FRANCOEUR MINE in Canada and its main exploration properties are WASAMAC, CAMFLO MILL, MONIQUE, RENDELL-JACKMAN (HAMMERDOWN) and CRIPPLE CREEK in Canada.

Richmont Mines is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 741.2 millions as of today (US$ 584.1 millions, € 489.6 millions).

Its stock quote reached its lowest recent point on December 06, 2013 at CA$ 1.00, and its highest recent level on November 24, 2017 at CA$ 11.72.

Richmont Mines has 63 240 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Richmont Mines Inc
1/7/2010Updates its 2010 Investor Presentation
Annual reports of Richmont Mines Inc
2008 annual report
Financings of Richmont Mines Inc
2/11/2015Closes Previously Announced Bought Deal Financing of Common ...
2/1/2012. Completes CAN$ 10 M Private Placement with Mr. Bob Buchan
6/1/2006announces closing of a bought deal of common shares
Nominations of Richmont Mines Inc
5/15/2009Announces Appointments to Board of Directors
Financials of Richmont Mines Inc
8/8/2016Reports Strong Second Quarter Financial Results; On Track to...
5/9/2013Reports First Quarter 2013 Results
2/21/2013Reports Full Year 2012 and Fourth Quarter Results
11/8/2012Reports Results for the Third Quarter of 2012
2/23/2012Reports Record Full Year 2011 and Strong Fourth Quarter Resu...
2/22/2011Reports Strong Fourth Quarter and Full Year 2010 Results
7/30/2009TR: Richmont Mines- News Release - Second Quarter 2009
2/26/2009(Island Gold)Reports Record Sales for the Fourth Quarter and Full Year 20...
1/22/2009(Beaufor Mine)Reports Gold Sales More Than Double in 2008 Fourth Quarter
1/22/2009(Island Gold)Reports Gold Sales More Than Double in 2008 Fourth Quarter
8/19/2008Second Quarter 2008 Fact Sheet
7/31/2008Reports 27.4% Increase in Revenue in the Second Quarter of 2...
5/23/2006announces re-statement and re-filing of first quarter financ...
Project news of Richmont Mines Inc
7/27/2017(Island Gold)Intersects High-Grade, Wide Mineralization in the Down Plung...
1/9/2013(Monique). Receives Mining Permit for Monique Gold Project
7/3/2012(Francoeur Mine)Announces Francoeur Mine Update
5/8/2012(Wasamac)Intercepts 6.40 g/t Au Over 52.8 Metres in Wasamac Main Zone...
3/15/2012(Wasamac).: 2012 Drilling Program at Wasamac Yields Additional Signif...
12/15/2011(Wasamac)Announces Significant Gold Resource Increase at Wasamac
8/30/2011(Wasamac)Intercepts 7.28 g/t Au Over 31.40 Metres at Wasamac; New Dri...
2/17/2011(Wasamac)Announces Resources of Over 1 Million Ounces of Gold at Its ...
1/21/2011(Francoeur Mine)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
1/21/2011(Beaufor Mine)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
1/21/2011(Island Gold)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
4/8/2010(Wasamac)Announces a 10,000 Metre Surface Drilling Program on Its Was...
8/7/2009NI 43-101 report on the Francoeur Gold Project
10/1/2008(Beaufor Mine)EXPLORATION DRILLING CONFIRMS MINERALIZATION AT BEAUFOR MINE...
6/8/2006(Valentine Lake (leprechaun))proceeds with earn-in requirements at Valentine Lake
5/26/2006Island gold project update information concerning East amphi...
Corporate news of Richmont Mines Inc
7/13/2016Richmont Mines Announces Details for the Second Quarter Fina...
7/12/2016Richmont Reports Strong Second Quarter Results from Island G...
7/7/2016Strategic Phase 2 Exploration Program Launched at Island Gol...
6/13/2016Richmont Mines Added to the S&P/TSX Global Mining Index and ...
6/7/2016Richmont Mines Completes CAN$31 Million Bought Deal Financin...
5/16/2016Richmont Mines Announces CAN$27 Million Bought Deal Financin...
5/12/2016Richmont Mines Announces Election of Directors
5/12/2016Richmont Mines Reports Strong First Quarter Financial Result...
5/12/2016Richmont Mines posts 1Q profit
1/12/2016Richmont Annual Production Exceeds Guidance: Island Gold Del...
12/22/2015Richmont Mines Inc.: Chairman Position to Become a Non-Execu...
12/21/2015Richmont Mines Provides Exploration Update for Island Gold
12/18/2015Richmont Mines Announces Filing of NI 43-101 Technical Repor...
12/18/2015Richmont Appoints Christian Bourcier as Vice President, Oper...
12/15/2015Richmont Mines Announces Filing of NI 43-101 Technical Repor...
11/5/2015Richmont Mines Reports Solid Third Quarter Financial Results...
11/5/2015Richmont Mines posts 3Q profit
10/22/2015Richmont Mines Announces Details For Third Quarter Financial...
10/21/2015Richmont Mines to Release Milling and Mining Study for Islan...
10/8/2015Richmont Reports Strong Third Quarter Production Results; Re...
9/16/2015Richmont Mines Provides an Update on the Surface Step-Out Ex...
9/15/2015Richmont Mines Strengthens Executive Team by Appointing Anne...
9/14/2015Richmont Mines Announces Inclusion in the S&P/TSX SmallCap I...
9/10/2015Deep Drilling to Commence at Richmont's Island Gold Mine to ...
8/6/2015Richmont Mines posts 2Q profit
8/6/2015Richmont Mines Reports Record Revenues for the Second Quarte...
7/14/2015Richmont Mines to Extend Beaufor Mine Life With Development ...
7/13/2015Richmont Mines Reports Record Quarterly Gold Production at I...
4/22/2015Richmont Mines Q1 Gold Production Up 23% Over 2014; 2015 Pro...
2/27/2015Richmont Mines President and CEO Mr. Renaud Adams to Oversee...
2/27/2015Richmont Mines President and CEO Mr. Renaud Adams to Oversee...
2/23/2015Richmont Mines Announces the Appointment of Mr. Steve Burlet...
2/23/2015Richmont Mines Announces the Appointment of Mr. Steve Burlet...
2/19/2015Richmont Mines 2014 Revenues Up 47% and Operating Cash Flow ...
2/19/2015Richmont Mines 2014 Revenues Up 47% and Operating Cash Flow ...
2/19/2015annonce les résultats du quatrième trimestre et de l'année 2...
2/11/2015annonce la clôture du financement par actions ordinaires ann...
1/21/2015Richmont Mines Announces CAN$30 Million Bought Deal Financin...
1/21/2015Canada Stocks to Watch: Husky, Eldorado, Celestica, Richmont...
1/21/2015Richmont Mines Announces Increase of Bought Deal Financing t...
1/21/2015IIROC Trade Resumption - RIC; AKG
1/20/2015IIROC Trading Halt - RIC
1/15/2015Richmont Mines Provides Guidance for 2015 and Transformation...
1/15/2015Richmont Mines Provides Guidance for 2015 and Transformation...
1/8/2015Deep Exploration Drilling Extends Mineralisation to a Depth ...
1/8/2015Deep Exploration Drilling Extends Mineralisation to a Depth ...
12/1/2014Ex Barrick Executives Flock to Inca One Gold
11/17/2014Mr. Renaud Adams Officially Commences as President and Chief...
10/16/2013Enters a Land and Mining Rights Agreement with Argonaut Gold
10/4/2013(Monique).: Monique Gold Project Attains Commercial Production; 43-10...
8/23/2013Closes Previously Announced Senior Credit Facility for Up to...
6/17/2013Obtains Letter of Offer for Senior Credit Facility for Up to...
4/12/2013(Island Gold).: Island Gold Deep 43-101 Report Filed on Sedar; New Drill ...
9/24/2012Announces the Immediate Retirement of CAN$10 Million Debentu...
9/10/2012(Island Gold).: New Deep Drill Results Reaffirm Promising Potential at De...
4/12/2012Gold Industry Veteran Ebe Scherkus to Join the Richmont Mine...
3/28/2012(Wasamac)Announces Results From a Preliminary Economic Assessment for...
2/10/2012(Island Gold)Promising Drill Results From Island Gold Mine Confirm Potent...
1/11/2012Gold Industry Veteran Bob Buchan Joins the Board of Director...
12/20/2011(Monique)Announces Open Pit Resources at its Monique Property
11/29/2011(Wasamac)Announces Completion of 2011 Drilling Program at Wasamac; Up...
8/24/2011(Monique)s Final Drilling Results From the Monique Project, Studies U...
8/9/2011Announces a Significant Increase in Earnings and Cash Flow f...
6/22/2011(Monique)More Positive Drill Results From Richmont's Monique Project
5/9/2011(Wasamac)Signs Option Agreement With Globex; Expands Wasamac Explorat...
4/11/2011(Monique).: Monique Work Commitment Completed; Initial Drill Results ...
3/29/2011. Confirms and Amends its Shareholder Rights Plan
4/12/2010hits 73.54 g/t Au over 7 metres on its Cripple Creek Propert...
2/25/2010Q4 and F2009 Results
2/4/2010Shareholders Elect Four New Board Members at Special Shareho...
12/16/2009 Four board nominations at Richmont Mines - Building the nex...
10/29/2009Q3 2009 Release
12/16/2008 Acquires Patricia Mining Corp.
12/3/2008 Announces Acceptance of Normal Course Issuer Bid
9/4/2008AND LKA AGREE TO EXTEND INITIAL COMMITMENT PERIOD TO COMPLET...
7/10/2008TO START DRILLING AT THE GOLDEN WONDER PROJECT
5/18/2006Focus on profitable growth
1/26/2006and Patricia Mining Corp. Announce the purchase of the remai...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (RIC.TO)AMEX (RIC)
11.72+4.27%18,900.00-0.53%
TORONTO
CA$ 11.72
11/24 16:00 0.480
4.27%
Prev close Open
11.24 12.09
Low High
11.66 12.35
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  11.72 -%
Volume 1 month var.
625,800 -%
24hGold TrendPower© : 13
Produces Gold
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 4/20/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.72-0.19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.03+1.47%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48+4.20%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.20-3.70%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.82-2.15%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.64+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :