June 2015 Quarterly Report 31 July 2015


Atlas ramping up production after cutting costs and strengthening balance sheet

Key points

Operations resumed at two Pilbara mines, with third resumed in July

Production ramping up to 14-15Mtpa target by end of CY2015

Implemented an innovative cost-cutting contractor collaboration model

Previously announced benchmark breakeven price of US$50/DMT CFR China;

recent falls in AUD:USD further improve the position

Cash on hand of A$73M at 30 June 2015 (pre capital raising)

Capital raising of A$87M (gross, including A$53M of new cash) completed in July

Overview

Atlas is pleased to report on a pivotal Quarter for the Company, during which it suspended and then resumed production, cut costs by implementing an innovative contractor collaboration model and launched a capital raising which subsequent to Quarter end raised A$87M.
The sharp fall in the iron ore price prompted Atlas to announce on 10 April 2015 that it would suspend operations at its three Pilbara projects. Atlas then completed a detailed review which resulted in a revised operating strategy based around the contractor collaboration model (refer ASX announcement
15 May 2015).
As part of this strategy, Atlas entered into new commercial relationships with key contractors and, with the support of the Western Australian Government, resolved to target a substantially lower cost base. Atlas now aims to be break even at a benchmark 62%Fe price of US$50/DMT CFR* (based on the assumptions set out in the Glossary below, which include an AUD:USD exchange rate of 0.7850).
During the Quarter, production resumed at two of Atlas‟ mines with a third re-started in early July. The business is now on track to return to full production of 14 to 15 million tonnes per annum and achieve its operating costs target by the end of this calendar year.
Due to the suspension of mining operations, export volumes fell compared to the previous Quarter. Product sales included 5½ lump cargoes which attracted a premium price and are now a part of Atlas‟ ongoing iron ore sales strategy.

Atlas also agreed to change timing of payments to key contractors, resulting in a draw-down of cash. Invoices for these key contractors are now predominantly paid in the month incurred as opposed to normal 30 day terms.

Atlas Iron Limited

ABN 63 110 396 168

Raine Square, Level 18

300 Murray Street Perth WA 6000

PO Box 7071

Cloisters Square Perth WA 6850

P: +61 8 6228 8000

F: +61 8 6228 8999

E: [email protected]
W: www.atlasiron.com.au

June 2015 Quarterly Report


Despite the challenges encountered during the Quarter, Atlas is now in a stronger financial and operating position with sharply lower costs, a more robust balance sheet and the support of shareholders, contractors, employees and the WA Government.

Events Subsequent to Quarter Ending

Following the receipt of shareholder approval on 25 June 2015, Atlas completed an A$87M (gross, including A$53M of new cash) capital raising on 24 July 2015. The raising improves the working capital position of the Company and strengthens Atlas‟ balance sheet considerably, providing further protection against future iron ore price volatility.

Atlas shares resumed trading on 27 July 2015, along with the new listed options which were issued as part of the capital raising (ASX:AGOO).

Subsequent to Quarter end there has been a significant fall in the AUD:USD exchange rate from approximately 77 cents to 73 cents which has a favourable impact on the previously announced break-even price target of 62%Fe US$50/DMT CFR*.

Quarterly - Key Metrics

June 15 Mar 15

Quarter Quarter

(WMT) (WMT)

Variance

Quarter

Ore tonnes shipped (WMT)

1.9M

3.4M

(1.5M)

C1 cash costs (A$WMT)

$46

$43

(7%)

All-in cash costs** (A$WMT CFR China)

$61

$60

(2%)

Full cash cost*** (A$WMT CFR China)

$66

$63

(5%)

Capital (A$)

$3M

$3M

-

Net AUD Atlas CFR Sale Price (WMT)

$55

$50

10%

** and *** Please refer to Glossary in this announcement

Atlas continued its strong focus on costs throughout the Quarter which, together with the contractor collaboration model, should significantly reduce costs for future production. However, the interruption to production and shipping volumes caused by the suspension of operations resulted in C1 costs of A$46/WMT (A$43/WMT March 15 Quarter) due to the lower volumes.

2

June 2015 Quarterly Report

Operations

Mine Production and Shipping

Table 1 - Production

Note 1: Please see Appendix 1 for further details of production outputs by mine.

Table 2 - Inventory and Shipping

Atlas shipped 1.9M WMT for the June Quarter, 1.4M WMT of which was Standard Fines and 0.5M WMT of which was Lump. Atlas shipped 12.2M WMT for FY15. The 44% reduction in shipped tonnes for the Quarter resulted from the suspension of operations in April.

3

June 2015 Quarterly Report

Marketing

The benchmark Platts 62% Fe IODEX averaged US$58/DMT in the June Quarter compared with US$62/DMT in the March 2015 Quarter. The Australian dollar was relatively stable in the June Quarter, averaging US77.75c compared with US77.36c in the March 2015 Quarter.1
The June Quarter was marked by significant iron ore price volatility, with the price reaching a low in April of US$47.50/DMT (Platts 62% CFR basis) followed by a strong recovery over May and June to a high of US$65.75/DMT.
The iron ore price volatility reflected the significant global economic challenges over the Quarter, including uncertainties with respect to Greece and the Eurozone, the robustness of the Chinese economy and expectations of continued production increases from major producers.
Over the Quarter, discounts being offered in the market by major suppliers were more favourable to
Atlas compared to the prior Quarter and has led to improved discounts being achieved for Atlas‟ product.
Atlas‟ average realised headline sale price for tonnes delivered during the June 2015 Quarter was US$44.07/DMT CFR (March 2015 Quarter US$49.85/DMT CFR). The June figure increased to US$44.86/DMT after adjusting for the impact of positive provisional pricing movements, up from US$41.68/DMT in the March Quarter. This means Atlas‟ ultimate realised sale price was up Quarter on Quarter.
The June Quarteraverage realised sale price was negatively impacted by timing of sales, with more than half of the tonnes sold in April, the lowest priced month of the Quarter. May and June sales volumes were impacted by mine suspensions.
Atlas is now hedging a greater proportion of its cargoes and with final pricing of cargoes generally being closer to their sailing date, the effects of provisional pricing are expected to continue to be less material to the business going forward than has historically been the case.
Atlas‟ new Lump product is being successfully sold to a range of customers and achieved an average premium of US$9/DMT over fines during the Quarter.
Freight costs for the Quarter decreased to A$7.95/WMT (March Quarter A$10.57/WMT), largely due to lower oil prices reducing fuel costs.
At the end of the Quarter, Atlas had approximately 2 million WMT subject to some form of forward price fixing via the use of forwards, collars or puts. Further detail on these arrangements is contained in the Company‟s ASX announcement dated 8 July 2015.

1 Average FX rates quoted for the Quarter are simple average of the three monthly average FX rates as published by RBA.

4

June 2015 Quarterly Report

Corporate

On 7 April 2015 the Company requested a voluntary suspension in the trading of its shares pending the outcome of an extensive review of the Company‟s operations, financial outlook, asset sale opportunities and capital structure. Following this review, Atlas suspended production (see ASX announcement dated
10 April 2015) while it looked to restructure its business. The Company‟s shares remained suspended
from trading on ASX for the remainder of the Quarter and were reinstated to trading on 27 July 2015.
On 15 May 2015, the Company announced an innovative new "Contractor Collaboration" business model, allowing the resumption of operations with materially lower costs. The Contractor Collaboration model applies to the Wodgina and Abydos sites, with a separate agreement struck with BGC at the Mt Webber site (see ASX announcement dated 2 June 2015) to realise lower mining costs. Site operations have been sequentially restarted and are ramping up with targeted break-even price of approximately US$50/DMT CFR* (62% CFR basis) once a production run rate of 14-15Mtpa is achieved (see Glossary for further details).
Following the receipt of shareholder approval on 25 June 2015, Atlas completed an A$87M capital raising on 24 July 2015.
Atlas continued to work with the State Government with respect to the previously announced royalty relief package, which provides a 50% cash rebate (repayable by late 2017) on State Government royalties paid to eligible producers. The Company has now signed formal documentation and has submitted its application for the December 2014 and March 2015 Quarters. This draw-down is expected to occur in early August and is estimated to be approximately A$13M.

Financial Position Summary

Cash as at 30 June 2015 was A$73M (31 March 2015: A$125M). This does not include the A$53M cash component of the $87M capital raising (gross), which flowed through subsequent to the end of the Quarter. The reduction during the Quarter is attributable to the accelerated timing of payments made to key contractors as part of the Contractor Collaboration model, as well as lower quarterly production levels which contributed to a A$15M fall in working capital. In addition, A$8M in restructuring costs were incurred, including those associated with suspending mining operations. Quarterly cash flow was further impacted by A$9M of debt principal and interest payments, the investment of A$3M in capital and stamp duty costs and the payment of A$2M of capital raising costs.

5

June 2015 Quarterly Report

Glossary

* The key assumptions underlying the estimated Break Even Prices above, as set out in the Company‟s
prospectus, are summarised below:

AUD/USD $0.7850.

"Break Even Price Estimate" based on nominal production run-rate and Full Cash Costs at

15Mtpa (i.e. 320kt/mth, 480kt/mth and 450kt/mth from Abydos, Wodgina and Mt Webber respectively)

Sea freight of US$6.25/WMT.

No Contractor Collaboration Deed cost assumed for Mt Webber, however estimated 10-12%

mining cost savings (via the BGC Agreement).

Private and State Royalties of 10.5% at Wodgina and 8.0% at Mt Webber and Abydos.

Interest of 8.75% p.a. applied to secured debt of US$269M (i.e. A$343M at AUD/USD $0.785).

Payment of Contractor Collaboration Margin included for Wodgina and Abydos.

Moisture of 5.7%, 3.8% and 4.5% at Wodgina, Abydos and Mt Webber respectively (i.e. average expected moisture over next 24 months).

Average assumed lump premium of A$10/DMT with Lump contributing 66% and 50% of Abydos

and Mt Webber product respectively. No Lump product assumed to be produced at Wodgina.

Initial Lump production at Mt Webber from November 2015, growing during December 2015 to stated 50% of product tonnes.

Average "Other‟ contractual penalties of US$0.50/DMT assumed to provide for impurities not specified in contracts.

Quality / Value in Use discount of 12.5%, relating to discounts for ore impurities.

Average assumed grade of Atlas ore of 57.0% Fe, compared with benchmark grade of 62.0% Fe.

WA State Government Royalty Relief not included in Break Even Price analysis.

** All-in cash costs‟ includes C1 Cash Costs, royalties, freight, corporate and administration, expensed exploration and evaluation but excludes interest expense, capital expenditure, one-off restructuring costs, suspension and ramp up costs of operating mine sites, Contractor Collaboration Margin and other non-cash expenses. C1 Cash Costs are inclusive of contractors and Atlas‟ costs including Contractor Rate Uplift. All-in cash costs are derived from unaudited management accounts.
*** Full cash costs includes All-in cash costs‟, capitalised exploration and evaluation, interest expense and sustaining capital expenditure, but excludes depreciation and amortisation, one-off restructuring costs, suspension and ramp up costs of operating mine sites, Contractor Collaboration Margin and other non-cash expenses. Full cash costs are derived from unaudited management accounts.

6

June 2015 Quarterly Report

Corporate Profile

Directors

The Hon. Cheryl Edwardes Non-Executive Chairman
David Flanagan Managing Director
Ken Brinsden Executive Director
Sook Yee Tai Non-Executive Director
Jeff Dowling Non-Executive Director

General Counsel & Company Secretary

Yasmin Broughton

Executive Management

Mark Hancock Chief Commercial Officer Brian Lynn Chief Financial Officer Jeremy Sinclair Chief Operating Officer

Registered Office and Head Office

Level 18, 300 Murray Street, Perth WA 6000
Website: www.atlasiron.com.au
Twitter: @Atlas_Iron

7

June 2015 Quarterly Report

Appendix 1: Mine Production by Location and Inventory

Table A - Mine Production Wodgina

June 15 Mar15 Variance Variance Quarter Quarter Quarter Quarter (t) (t) (t) (%)

Ore Mined1

905,353

1,541,583

(636,230)

(41%)

Ore Processed

1,023,884

1,461,938

(438,054)

(30%)

Haulage to Port

894,981

1,497,460

(602,479)

(40%)

Table B - Mine Production Abydos

June 15 Mar15 Variance Variance

Quarter Quarter Quarter Quarter

(t) (t) (t) (%)

Ore Mined1

730,727

1,053,240

(322,513)

(31%)

Ore Processed

872,180

965,098

(92,918)

(10%)

Haulage to Port

792,459

942,212

(149,753)

(16%)

Note 1: Ore Tonnes Mined represents ore tonnes delivered to Run-of-Mine (ROM) stockpiles at the processing plant.

Table C - Mine Production Mt Webber

June 15 Mar15 Variance Variance

Quarter Quarter Quarter Quarter

(t) (t) (t) (%)

Ore Mined

145,792

423,108

(277,316)

(66%)

Ore Processed

183,829

996,981

(813,152)

(82%)

Haulage to Port

273,869

934,002

(660,133)

(71%)

Table D - Inventory

June 15 Mar15 Variance Variance Quarter Quarter Quarter Quarter (t) (t) (t) (%)

Run-of-Mine Ore at site

393,294

641,191

(247,897)

(39%)

Final Product Stock at site

313,369

161,621

151,748

94%

Final Product Stocks - Port

104,498

57,027

47,471

83%

Note: Percentages are rounded

8

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : China | Greece | All
Gold and Silver Prices for these countries : China | Greece | All

Atlas Iron Limited

PRODUCER
CODE : AGO.AX
ISIN : AU000000AGO1
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Atlas Iron is a iron exploration company based in .

Atlas Iron holds various exploration projects in Australia.

Its main asset in production is PARDOO in Australia, its main assets in development are WODGINA and RIDLEY MAGNETITE PROJECT in Australia and its main exploration properties are ABYDOS, MT WEBBER and MID WEST IRON in Australia.

Atlas Iron is listed in Australia and in Germany. Its market capitalisation is AU$ 416.8 millions as of today (US$ 302.7 millions, € 265.6 millions).

Its stock quote reached its highest recent level on July 29, 2011 at AU$ 3.96, and its lowest recent point on June 24, 2016 at AU$ 0.01.

Atlas Iron has 9 261 129 728 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Atlas Iron Limited
10/16/2018Australia's Atlas Iron names ex-Hancock executive CEO in boa...
6/8/2018Australia's Fortescue takes stake in Atlas Iron, may block b...
2/28/2018Atlas Iron reveals strategy to weather storm of discounts
12/24/2014Atlas Iron to take a $900 million write-down
Nominations of Atlas Iron Limited
5/25/2011Retirement of Chairman and Appointment of Interim Chairman
12/2/2008Appoints Geoff Clifford as Chairman
Financials of Atlas Iron Limited
10/19/2016September 2016 Quarterly Activities Report
Project news of Atlas Iron Limited
9/22/2016Mineral Resources and Ore Reserves at 30 June 2016
5/9/2011(Wodgina)Increases production capacity at Wodgina by 75% to 7Mtpa
6/21/2010(Wodgina)Mining Commences at Wodgina
6/16/2010(Wodgina)New DSO Discovery at Wodgina
4/7/2010(Wodgina)Key DSO Growth Projects on Track
10/13/2009(Pardoo)Progress Update - North Pilbara DSO Projects
8/4/2009(Mt Webber)Maiden Resource for Mt Webber DSO Project
7/31/2009(Wodgina)Wodgina DSO Project Feasibility Study Compete
6/19/2009(Mt Webber)Continued North Pilbara Exploration Success
5/26/2009(Wodgina)Wodgina DSO Project - Interim Feasibility Study Outcomes
5/21/2009(Mt Webber)New DSO Discovery at Mt Webber
5/19/2009(Wodgina)500% Increase in Wodgina DSO Resource
3/9/2009Drilling Results Add to Wodgina Infrastructure Potential
1/29/2009(Pardoo)Atlas Increases Pilbara DSO Resources By 45 per cent to 56.7...
1/7/2009(Pardoo)Intersects High Grade at Pardoo DSO Project
12/31/2008(Abydos)New Hematite Discoveries at the Abydos DSO Project
12/11/2008(Abydos)New DSO Discovery at Wodgina
12/8/2008(Abydos)Signs Native Title Mining Agreement for Abydos
11/26/2008(Pardoo)Ridley Magnetite Resource Upgrade to 2 Billion Tonnes
11/24/2008(Pardoo)Pilbara DSO Projects - Operations Update
11/10/2008(Pardoo)Delivers First Iron Ore to Port
10/2/2008(Pardoo)Ridley Magnetite Resource Upgrade
8/6/2008(Abydos)Abydos Magnetite Joint Venture with FMG
7/30/2008(Abydos)Abydos Direct Shipping Ore Project - Pre Feasibility Study U...
6/17/2008Ridley Magnetite Pre Feasibility Study Technical Update
4/7/2008(Abydos)Abydos Drilling Continues To Impress
Corporate news of Atlas Iron Limited
11/16/2016Change in substantial holding for Centaurus
11/16/2016Change in substantial holding (Marathon)
7/27/2016June 2016 Quarterly Report
6/28/2016Atlas welcomes WA Government announcement
6/28/2016David Flanagan resigns as Managing Director
6/23/2016Change in substantial holding for CTM
6/6/2016Appointment of Chairman
5/23/2016May 2016 Investor Presentation
5/10/2016Ceasing to be a substantial holder
5/6/2016Implementation of Creditors' Scheme
4/29/2016Creditors' Scheme
4/27/2016Chairman's Address to Shareholders at General Meeting
4/27/2016Presentation at General Meeting
4/21/2016Atlas March 2016 Quarterly Activities Report
4/18/2016Letter to Shareholders
4/4/2016Update on Debt Restructure
3/24/2016Notice of General Meeting/Proxy Form
12/23/2015Atlas signs debt restructure agreement
12/22/2015Trading Halt
12/15/2015Change in substantial holding for CTM
12/2/2015Change in substantial holding for CTM
10/28/2015Managing Director's AGM Presentation
10/28/2015Chairman's Address to Shareholders
10/22/2015Atlas Iron September 2015 Quarterly Report
10/22/2015Pre-feasibility Study Underway for Corunna Downs
10/6/2015Company Secretary Appointment/Resignation
9/29/2015Notice of Annual General Meeting/Proxy Form
9/29/2015Annual Report
9/24/2015New Iron Ore Sales Agreement and Marketing Update
9/9/2015Atlas Production Figures
9/1/2015Executive Changes as Part of Cost Reduction Programme
8/28/2015Production Update
8/17/201513 August 2015 Sale of Pilbara Iron Tenements
8/14/20152015 Annual Results
8/14/20152015 Annual Financial Report
8/14/2015Appendix 4E - 30 June 2015
8/13/20152015 Annual Financial Report and Appendix 4E
8/13/2015Full Year Results Presentation FY2015
8/13/2015SFX: Sale of Pilbara Iron Tenements
7/31/2015Quarterly Report
7/30/2015Ceasing to be a substantial holder
7/29/2015Becoming a substantial holder
7/29/2015MCS: Business Update and FY15 Result
7/27/2015Shares in Australia's Atlas Iron sink 70%
7/24/2015Reinstatement to Official Quotation
7/24/2015Request to Lift Suspension
7/22/2015Australia shares fall on profit taking, NZ stocks up
7/20/2015Atlas set for stronger future after raising $86m
7/15/2015Extension of the Closing Date - SPO and General Placement
7/8/2015Update on Forward Price Strategies
7/6/2015Supplementary Prospectus
7/2/2015Letter to Shareholders
6/17/2015Prospectus
6/11/2015Capital Raising to Strengthen Balance Sheet
6/11/2015Change of Date for General Meeting
6/11/2015David Flanagan Appointed as Managing Director
4/21/2015Voluntary Suspension Extension Request
4/14/2015Update Regarding Operational and Financial Review
4/13/2015Atlas Iron Suspends Production
4/12/2015Abydos Contract Update (1 pages)
4/10/2015Atlas Suspends Production in Response to Low Iron
4/6/2015Voluntary Suspension
3/9/2015Resignation of Director
3/6/2015S&P DJ Indices Announces March Quarterly Review
2/13/2015AGO: Investment Update - Mt Webber Project and Shaw River
2/13/2015Investment Update - Mt Webber Project and Shaw River
4/21/2011Quarterly Report for the Period Ending 31 March 2011
4/7/2011Media Alert - Atlas Iron MD to shed his locks this Friday......
4/4/2011Atlas posts shipping record in March
2/24/2011Reports $30M maiden half year profit
2/14/2011Declares Giralia takeover offer unconditional and accelerate...
7/6/2010More DSO Success at Hercules
5/28/2010Broker Report from Credit Suisse
5/5/2010to Ship Additional Tonnes Through Port Hedland Port Ahead of...
4/29/2010To Raise $63.5 Million To Capitalise On Strong Iron Ore Pric...
2/22/2010Atlas And Aurox Enter Into Utah Point Port Cooperation Agree...
11/6/2009Dr David Smith Joins The Atlas Board
10/20/2009Merger Moves Ahead
9/8/2009and Warwick Resources Agree to Merge
7/31/2009June 2009 Quarterly Report
6/15/2009to raise $116.7 Million to fund development of Pilbara Iron ...
2/17/2009and Talison Complete Infrastructure Sharing Agreement
1/19/2009 Ships Second Commercial Iron Ore to China
1/15/2009Maiden Inferred Resource At Wodgina
12/19/2008Completes Sale of Second Shipment of Connie Deposit Ore
12/15/2008Additional Excellent Results Enhance Wodgina DSO Project
12/5/2008Ships First Commercial Iron Ore to China
11/21/2008Managing Director's Address
9/25/2008Pardoo DSO Project - Mining Team Mobilised to Site
8/6/2008Signs Port Access Agreement with FMG
8/4/2008North West Iron Ore Alliance Maintains Pressure for Fair and...
8/1/2008June 2008 Quarterly Activities Report
7/28/20081.3 Billion Tonne Ridley Magnetite Resource
7/25/2008 DSO Resource and Reserve Update Summary
7/22/2008Pardoo Project Development Update
7/17/2008New Hematite Mineralisation Discovered at Pardoo
6/23/2008Welcomes NCC Recommendation to Declare Goldsworthy Railway
6/16/2008EPA Recommends Pardoo DSO Project for Ministerial Approval
5/19/2008Pardoo Mining Contract Awarded to CDE Capital
5/1/2008Supports Goldsworthy Railway Declaration
4/23/2008to Raise $100 Million to Accelerate Growth of Pilbara Iron O...
3/25/2008 Targets 120-180Mt of Pilbara Iron Ore
2/25/2008Open BriefingR. Production and Export of DSO
1/31/2008December 2007 Quarterly Activities Report
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (AGO.AX)Berlin (ATU.BE)
0.045+0.00%0.0000
AUSTRALIA
AU$ 0.045
11/21 10:00 -
0%
Prev close Open
0.045 0.045
Low High
0.045 0.045
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.045 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : 19
Produces Iron
Develops Iron
Explores for Iron
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.73-1.90%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.26-0.53%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.58-0.35%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.49-0.40%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.41-1.34%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-2.38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.72-0.86%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.68-1.39%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+3.03%Trend Power :