Report: OEPA Reviewed Environmental Scoping Document

EXTENSION TO THE WILUNA URANIUM PROJECT (CMS 14025)

ASSESSMENT NO: 2002

ENVIRONMENTAL SCOPING DOCUMENT

FEBRUARY 2015

ENVIRONMENTAL SCOPING DOCUMENT

PROPOSAL NAME: EXTENSION TO THE WILUNA URANIUM PROJECT

ASSESSMENT NUMBER: 2002 (CMS 14025)

LOCATION: MINING AT TWO LOCATIONS, 30 KILOMETRES AND 105 KILOMETRES SOUTH OF WILUNA

LOCAL GOVERNMENT

AREA:

SHIRE OF WILUNA

PROPONENT: TORO ENERGY LIMITED

PUBLIC REVIEW PERIOD: 2 WEEKS (ESD); 12 WEEKS (PER) EPBC REFERENCE NO.: EPBC 2014/7138

1. Introduction

The above proposal is being assessed by the Environmental Protection Authority (EPA) under Part IV of the Environmental Protection Act 1986 (EP Act) at the level of Public Environmental Review (PER). This Environmental Scoping Document (ESD) sets out the requirements for the environmental review of the proposal. The purpose of an ESD is to:

· provide proposal-specific guidelines to direct the proponent on the preliminary key environmental factors or issues that are to be addressed during the environmental review and preparation of the environmental review report; and

· identify the required work that needs to be carried out.

Toro Energy Limited (Toro), the proponent, will conduct the environmental review in accordance with this ESD and then report to the EPA in an environmental review report (PER document). As well as the proposal-specific requirements for the environmental review identified in this ESD, the PER document must also address the generic information requirements listed in section 10.2.4 of the EPA's Environmental Impact Assessment (Part IV Divisions 1 and 2) Administrative Procedures 2012 (Administrative Procedures). When the EPA is satisfied that the PER document adequately addresses both of these requirements, Toro will release the document for a public review period of 12 weeks.
This ESD has been prepared by Toro in consultation with the Office of the EPA, decision- making authorities and interested agencies and released for a two week public review period  consistent with EPA Environmental Assessment Guideline (EAG) 10 - Scoping a proposal
. The ESD will be available on the EPA website (www.epa.wa.gov.au) upon endorsement and must be appended to the PER document.

Assessment under Bilateral Agreement

The proposal has been referred and determined to be a controlled action under the Environment Protection and Biodiversity Conservation Act 1999 and is being assessed under the Bilateral Agreement between the Commonwealth of Australia and the State of Western Australia made under section 45 of that Act. The relevant matters of national environmental significance (MNES) for this proposal are:

· Listed threatened species and communities; and

· Nuclear actions.

This ESD is inclusive of work required to be carried out and reported on in the PER document in relation to MNES.

2. The proposal

The subject of this ESD is Toro's proposed Extension to the Wiluna Uranium Project which involves the mining of two deposits, Millipede and Lake Maitland, as well as the construction of a haul road and associated infrastructure. The regional location of the proposal is shown in Figure 2 of Attachment 1.
The Wiluna Uranium Project was the subject of EPA Assessment 1819 (EPA Report 1437). Following this assessment, the Western Australian Minister for Environment gave Toro approval in October 2012 (Ministerial Statement No. 913) to construct and operate a uranium mine consisting of two deposits, Centipede and Lake Way, respectively located approximately 30 kilometres (km) south and 15 km south-east of Wiluna. The Federal Minister for Sustainability, Environment, Water, Population and Communities also approved that proposal (EPBC 2009/5174) in April 2013.
Since initiating assessment of the Wiluna Uranium Project, Toro acquired two additional deposits, Millipede, also approximately 30 km south of Wiluna, and Lake Maitland, 105 km south-east of Wiluna, and proposes to integrate those deposits into an extended Wiluna Uranium Project.
Ore from Millipede and Lake Maitland would be processed at the same plant as ore from Centipede and Lake Way. The capacity of the processing plant already approved following EPA Assessment 1819 and EPBC 2009/5174 would not increase under this proposal to extend the Wiluna Uranium Project. However, the plant's operating life would double to beyond 20 years, the period during which sequential mining would be undertaken from the Centipede, Millipede, Lake Maitland and Lake Way deposits. During that period, the operation would produce up to 1200 tonnes per annum (tpa) of uranium oxi de concentrate (UOC). Construction and pre-mining are scheduled to begin at Centipede by late 2016 and at Millipede at the same time, subject to government approval and market conditions.

To continue reading this noodl, please get the original version here.

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | All
Gold and Silver Prices for these countries : Australia | All

Toro Energy Limited

DEVELOPMENT STAGE
CODE : TOE.AX
ISIN : AU000000TOE6
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Toro Energy is a gold producing company based in Australia.

Toro Energy develops gold, aluminum, phosphate, silica and uranium in Australia, and holds various exploration projects in Australia and in Morocco.

Its main asset in production is LAKE WAY in Australia, its main asset in development is WILUNA in Australia and its main exploration properties are RADIUM HILL, LAKE MACKAY PROJECT, MT WOODS, COOBER PEDY, NONNING, ROXBY–ACROPOLIS, LAKE FROME, AMADEUS PROJECT, REYNOLDS RANGE, TANAMI, NAPPERBY and CENTIPEDE in Australia, GAWIB WEST, TUMAS NORTH and CHUNGOCHOAB in Namibia and HAUTE MOULOUYA in Morocco.

Toro Energy is listed in Australia, in Germany and in United States of America. Its market capitalisation is AU$ 863.5 millions as of today (US$ 561.3 millions, € 524.3 millions).

Its stock quote reached its lowest recent point on April 03, 2020 at AU$ 0.00, and its highest recent level on March 12, 2021 at AU$ 2.40.

Toro Energy has 2 008 069 888 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Project news of Toro Energy Limited
7/23/2015Toro Energy accelerating uranium exploration
2/13/2012Oz Minerals' offer of $3.75m for terminated SA uranium proje...
5/5/2010(Lake Mackay Project)In survey start on 4th WA uranium project
1/7/2010(Wiluna) WA Govt Approval for resource test pit
9/24/2009(Lake Mackay Project)Drilling at Lake Mackay Commences
9/1/2009(Wiluna)Major boost for new WA uranium project
5/22/2009(Lake Mackay Project)launches first survey at WA uranium project
9/30/2008(Napperby)Drilling complete for 2008 at the Napperby Project
9/23/2008Wiluna Uranium Project - Prefeasibility Study
7/30/2008(Napperby)SIGNIFICANT MINERALISATION EXTENSIONS FROM 2008 DRILLING OF ...
7/28/2008(Napperby)DOUBLING OF RESOURCE FOR TORO’S NT URANIUM PROJECT
5/16/2008(Napperby)2008 Napperby Uranium Resource Drilling Underway
4/29/2008(Napperby)Napperby Uranium Deposit Drilling Resluts
1/23/2008(Napperby)Success at Napperby Uranium Project
Corporate news of Toro Energy Limited
2/2/2016High Grade Resources Expanded at Wiluna Uranium Project
1/28/2016Quarterly Activities and Cashflow Reports
1/18/2016Wiluna Uranium Project Public Information Sessions
12/3/2015Uranium: Critical to a clean energy future
12/1/2015Operations Update
12/1/2015Report: RealFin-Operations Update
10/30/2015September 2015 Quarterly Activities and Cashflow Report
10/30/2015Report: RealFin Research report 2015
10/27/2015Uranium: Critical to a clean energy future
10/27/2015Annual General Meeting Resolution Amendments
10/19/2015Director Appointment / Resignation
10/16/2015Notice of Annual General Meeting and Proxy Form
10/16/2015Annual Report to Shareholders
10/16/2015Report: Dundee Capital Markets Research report
10/15/2015Managing Director elected as a Fellow of Australian Academy
10/15/201520% Increase in Mineral Resources at Centipede / Millipede
10/12/2015Toro Energy on improving Uranium outlook
10/6/2015Australian Uranium and Clean Energy: Toro’s Opportunity
10/5/2015Updated Presentation to Sydney Mining club
10/2/2015Updated presentation to Sydney Mining Club
10/2/2015Report: WNA Investor briefing London
10/2/2015Interview with MD
9/25/2015Report: Proactive Investors research report
9/15/2015Report: TOE Financial report 2015
9/8/2015Full Year Statutory Accounts
9/8/2015Appendix 4G
9/8/2015Corporate Governance Statement
9/4/2015Toro pushes forward with Wiluna as Japan Reactors Restart
8/26/2015Report: RealCap Uranium Research August Report
8/25/2015Report: ATSE Eminent Speaker Series – Murdoch
8/25/2015Community Consultation begins for extension for Wiluna Urani...
8/25/2015Japan Signals Uranium market rejig
8/18/2015Wiluna Uranium Project Technical Studies
8/17/2015Women on the board leads to profitability
7/23/2015Report: Ready for the next Uranium price cycle
7/21/2015Report: Ready for the next Uranium price cycle
7/16/2015Report: Ready for the next upward uranium price cycle
7/15/2015Report: Quarterly Cashflow report – June 2015
7/14/2015Report: Quarterly Activities Report – June 2015
7/8/2015Report: RealCap Uranium Research June Report
7/2/2015Appendix 3B
6/25/2015Section 708A Notice – Sentient Placement
4/13/2015Report: SAREIC Presentation
4/8/2015Appendix 3Z – Final Director’s Interest Notice
4/8/2015Clarification Statement – 2015 PDAC Presentation
3/31/2015MD presentation at ASX Spotlight Series in New York
3/13/2015Report: Half Yearly Report and Accounts
2/23/2015Report: OEPA Reviewed Environmental Scoping Document
2/11/2015Australian Uranium Industry
1/30/2015Report: Quarterly Activities and Cashflow Reports – December...
1/16/2015Australia Business Week in India
1/12/2015Confirmation of Release – TOE – Appointment of Toro Energy M...
1/7/2015Confirmation of Release – TOE – Director Appointment
12/22/2014Confirmation of Release – TOE – $17.5M Received from The Sen...
12/12/2014Toro Welcomes Foreign Investment Review Board Approval of Th...
12/8/2014Toro’s SPP wins strong shareholder backing with A$3.9 millio...
11/12/2014ASX Announcement – Toro Announces Share Purchase Plan and Up...
11/7/2014Toro Completes Unitisation Agreement with Sentient – Confirm...
11/3/2014Media Release – Toro Secures Funding and Uranium Assets from...
10/30/2014Report: Quarterly Activities and Cashflow Reports – Septembe...
10/25/2012Derek Carter to retire from Toro Energy Board
5/4/2010not to procceed with $57m purchase option
9/17/2009 Share purchase plan offer for shareholders to subscribe for...
9/15/2009Release - OZ Minerals' CFO joins Toro Energy board
8/18/2009US fund in A$20m backing of Toro's uranium ambitions
7/29/2009China and Japan investors court Toro's Australian uranium as...
6/23/2009OZ Minerals - Toro Energy ASX release
6/15/2009Board changes as result of Oz Minerals vote
6/9/2009 withdraws from SA uranium project
1/7/2009director appointed to leading nuclear body
10/1/2008Announces $26m raising to fast-track key Australian uranium ...
9/23/2008WA Uranium Project Economically Viable at Long Term Prices
9/15/2008Toro welcomes WA o.k. for uranium mining
4/28/2008to Update NT Uranium Resource - Napperby
11/23/2007 Exploration and Drilling Update
10/26/2007 success in $275 million acquistion of Nova Energy
4/30/2007Signficant U results for Toro from Warrior first drilling
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
Australia (TOE.AX)FRANKFURT (T4W.F)
0.430+0.00%0.234-6.40%
Australia
AU$ 0.430
04/24 11:00 -
0%
Prev close Open
0.430 0.440
Low High
0.425 0.445
Year l/h YTD var.
0.370 -  0.600 -10.42%
52 week l/h 52 week var.
0.009 -  0.800 3,809.09%
Volume 1 month var.
232,128 -%
24hGold TrendPower© : 24
Produces
Develops Gold
Explores for Copper - Gold - Iron - Platinum - Ree - Scandium - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/17/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
20244200.00%
202311.11%0.010.01
2022-59.09%0.030.01
202146.67%2.400.01
2020114.29%0.020.00
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :