Stornoway Reports Optimized Renard Mine Design and Cost Estimates
Published : January 28, 2013

Initial Capital Cost Reduced; High Operating Margin Maintained

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Jan. 28, 2013) - Stornoway Diamond Corporation (News - Market indicators) is pleased to report the completion of a mine design and cost optimization exercise (the "Optimization Study") for the Renard Diamond Project, Stornoway's 100% owned mining development project located in north-central Québec. The Optimization Study incorporates certain design refinements undertaken since the release of the project's Feasibility Study in November 2011 (the "Feasibility Study"), including the deferral of shaft access for the underground mine and a modified underground mining sequence and draw point design. As a result of these design changes, project operating and capital cost estimates have been restated, and a revised production schedule established. The Optimization Study also contains an updated project development schedule and financial model incorporating, amongst other things, the terms of the March 2012 Mecheshoo Agreement with the Cree Nation of Mistissini, the Grand Council of the Crees (Eeyou Istchee), and the Cree Regional Authority, and the November 2012 Renard Mine Road financing agreement with the Government of Québec. Highlights of the Optimization Study are as follows:

  • A revised initial capital cost of C$752 million, including contingencies, in October 2012 terms, a reduction of C$50 million from the previous estimate which was expressed in June 2011 terms.
  • A revised operating cost averaging C$57.63/tonne (C$76.63/carat) life of mine in October 2012 terms, an increase of C$2.92/tonne from the previous estimate.
  • Base case estimates of Net Present Value ("NPV") of C$683 million at a 7% discount rate and Internal Rate of Return ("IRR") of 20.3% before taxes and mining duties, and C$391 million and 16.3% after taxes and mining duties, all improvements from the previous estimates.
  • 11 years reserve-based mine life with Diamond production averaging 1.6 million carats/annum life of mine, real terms net revenue of C$4,046 million, and a cash operating margin of C$2,693 million (67% compared to 68% in the previous estimate).

Matt Manson, President and CEO, commented: "The Optimization Study reported today confirms a robust project with strong cash flows. Since the release of the project's Feasibility Study, we have been able to bring down our initial capital cost estimate with only a modest impact on the project's operating costs. We are particularly pleased that the project has so successfully absorbed the kind of post-feasibility design adjustments and operating agreements that can negatively impact a project's value. The deferral of the shaft has been achieved without compromising the future development of the project's substantial resource upside, and the refinements made to the underground mining sequence provide greater confidence in the operating parameters for this critical part of the overall mine plan. With our Mining Lease and Québec Certificate of Authorization in hand, and the Renard Mine Road under development, we can now move towards finalizing our project financing arrangements, and initiating project construction in the third quarter of this year."

The Optimization Study restates the project's Probable Mineral Reserves at 17.9 million carats (23.8 Mtonnes at 75 carats per hundred tonnes, or "cpht"), a reduction of 0.1 million carats after allowance for revised mining dilution and ore recovery estimates. The new study does not incorporate any changes to the project's underlying National Instrument ("NI") 43-101 compliant Mineral Resources, and does not include the results of the ongoing bulk sampling program at the Renard 65 kimberlite. Including Renard 65, the project contains 17.5 million carats (31.1 Mtonnes at 56 cpht) of Inferred Mineral Resources, much of which lies within the envelope of the planned mine infrastructure. Since mineral resources that are not mineral reserves do not have demonstrated economic viability, these have not been incorporated into the Optimization Study mine plan, in compliance with Canadian reporting standards. However, the project's design, processed kimberlite storage capacity, permits and Mining Lease contemplates the eventual mining of all NI 43-101 Mineral Resources over an extended mine life. In addition to the Mineral Resources, 23.5 to 48.5 million carats of non-resource exploration upside (55.1 to 75.5 Mtonnes at grades ranging from 23 to 188 cpht) has been estimated to 775 meters depth, below which each kimberlite remains open. Readers are cautioned that the potential quantity and grade of any such exploration target is conceptual in nature, there has been insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the target being delineated as a mineral resource (an Optimization Study Support Material presentation is available at http://stornowaydiamonds.com/_resources/feasibility_support_materials_20130128.pdf).

Significant Changes to the November 2011 Feasibility Study

The Feasibility Study included both ramp and shaft access to the Renard underground mine. Shaft sinking will now be deferred until later in the mine life and access to the underground mine will be by way of a ramp only. This will be developed to a depth of 610 meters, sufficient to extract all Mineral Reserves and the Inferred Mineral Resources, and enlarged to accommodate the planned production rate of 6,000 tonnes of ore daily. Ore will be hauled to surface by 60 tonne trucks, with ramp ventilation capacity and surface maintenance facilities expanded to accommodate the increased fleet. Plant capacity remains at 6,000 tonnes per day (2.2 Mtonnes/year) expandable to 7,000 tonnes per day (2.6 Mtonnes/year). Power requirements are expected to total 12.2 MW during operations and be provided by on-site diesel power generation.

Diamond production in Years 1 and 2 remains predominantly derived from the Renard 2/3 open pit. Diamond production from the underground mine will commence during Year 2. As with the Feasibility Study, underground ore will be mined with blast-hole shrinkage on 250 meter, 430 meter and 610 meter development levels, with waste back fill from surface. The Optimization Study contains a refined draw point design and a mining sequence incorporating a panel-retreat method to better assure geomechanical stability and militate against the unexpected onset of natural caving. Numerical analysis of blast fragmentation, and modeling of ore flow during the draw, has been conducted using REBOP™ software. This has resulted in a modest increase in the overall estimate for ore dilution and a modest decrease in the estimate for ore recovery.

No changes have been made to assumptions contained within the Feasibility Study for Diamond price, exchange rate, or marketing costs. The cost of diesel fuel is based on an assumed oil price of US$95/barrel compared to US$90/barrel previously.

The Optimization Study incorporates the impact of a Framework Agreement between Stornoway and the Québec Ministère des Transports, the Ministère des Ressources Naturelles, and the Ministère des Finances et de l'Économie ("MFE") for the completion of the Route 167 Extension and the Renard Mine Road, and a revised financing agreement between Stornoway and the MFE (Stornoway press releases dated November 15 and 30, 2012). The Optimization Study assumes a cost to Stornoway of $78 million (after escalation) to complete the road. The MFE loan to Stornoway funding the Renard Mine Road is in two tranches, $77 million at 3.35% and, to the extent required, an additional $7.7 million at 6.3%, both with a term of 15 years, with interest accruing from January 2016 and interest and principal payments beginning in December 2016. As a result of these agreements, the new project development schedule assumes first road access to the project site by the fourth quarter of 2013 rather than July 2013 previously. Plant commissioning is now scheduled to begin in December 2015 with commercial production achieved by June 2016, compared to July 2015 and January 2016 previously.

The Optimization Study also incorporates certain financial terms of the Mecheshoo Agreement, the Impacts and Benefits Agreement between Stornoway, the Cree Nation of Mistissini, the Grand Council of the Crees (Eeyou Istchee) and the Cree Regional Authority (Stornoway press release dated March 27, 2012). The Mecheshoo Agreement includes a mechanism by which the Cree parties will benefit financially from the success of the project on a long term basis, consistent with mining industry best practices for social engagement.

The results of the Optimization Study are outlined in Table 1 below.

Table 1: Results and Key Assumptions
November 2011 Feasibility Study January 2013 Optimization
Mining Parameters Reserve Carats (M) 18.0 17.9
  Tonnes Processed (M) 23.1 23.8
  Recovered Grade (cpht) 78 75
  Average Ore Recovery (%) 83.5% 82.9%
  Average Mining Dilution (%) 13.5% 17.9%
  Dilution Grade (cpht) 0 0
  Processing Rate (Mtonnes/annum) 2.2 2.2
  Mine Life (years) 11 11
Cost Parameters Initial Cap-ex (C$M)1 $802 $752
  LOM Cap-ex (C$M)3 $994 $1,013
  Oil Price (US$/barrel)1 $90 $95
  LOM Op-ex (C$/tonne)1 $54.71 $57.63
  LOM Op-ex (C$/carat)1 $70.27 $76.63
Revenue Parameters Gross Revenue (C$M)1 $4,112 $4,268
  Marketing Costs 2.7% 2.7%
  DIAQUEM Royalty 2.0% 2.0%
  Cash Operating Margin (C$M)1 $2,677 $2,693
  % Operating Margin 68% 67%
  Income Tax, Mining Duties and IBA payments (C$M)1 $571 $625
  After Tax Net Cash Flow (C$M) $1,151 $1,084
Diamond Price Parameters2 Renard 2 and Renard 3 (US$/carat) $182 $182
  Renard 4 (US$/carat) $164 $164
  Diamond Price Escalation 2.5% 2.5%
  Exchange rate 1C$=1US$ 1C$=1US$
Schedule Parameters Effective Date for NPV Calculation January 1 2012 January 1 2013
  Construction Mobilization (Early Works) July 1 2013 August 1 2013
  Plant Commissioning Commences July 1 2015 December 1 2015
  Commercial Production Declared January 1 2016 June 1 2016
Valuation Parameters4 Pre-Tax NPV7% (C$M) $672 $683
  Pre-Tax IRR 18.7% 20.3%
  After-Tax NPV7% (C$M) $376 $391
  After-Tax IRR 14.9% 16.3%
  1. November 2011 Feasibility Study expressed in June 2011 terms. January 2013 Optimization expressed in October 2012 terms.
  2. Prices are expressed in May 2011 terms.
  3. Expressed in nominal terms.
  4. De-escalated nominal terms.

Capital and Operating Costs

Capital and operating costs in the Optimization Study were adjusted on the basis of modified deliverables and material take offs arising from the mine design scope changes. No changes were made to quantity estimates where no design changes had been made. Capital cost is estimated at an accuracy of -11% and +19%. All estimated costs were escalated to October 2012 terms from June 2011 terms previously by applying market inflation indices. Indirect, owners and EPCM costs were re-assessed on the basis of the revised project schedule including early works and infrastructure availability. Contingencies, risk and escalation factors were all re-assessed.

Initial capital costs are now estimated at C$752.1 million, including a contingency of C$64.7 million, expressed in October 2012 terms. Life of Mine capital cost, including escalation commencing in Q4 2012, the Renard Mining Road, sustaining and deferred capital, less credits for pre-production revenue and salvage value, are estimated at C$1,012.9 million.

Table 2: Estimate of Capital Costs1
November 2011 Feasibility Study January 2013 Optimization
Site Preparation & General $ 22.9 $ 32.7
Mining $ 236.9 $ 151.2
Mineral processing plant $ 168.4 $ 175.4
Onsite utilities and infrastructures $ 102.4 $ 114.8
Owner's Cost $ 86.2 $ 94.7
Spares, fills, tools $ 10.2 $ 7.1
EPCM services $ 45.0 $ 47.9
Field indirect costs, vendor representatives $ 22.5 $ 33.9
Construction camp & Catering $ 25.0 $ 24.5
Freight and duties $ 8.1 $ 5.5
Contingency $ 74.3 $ 64.7
Total Initial Capital $ 801.8 $ 752.1
Escalation Allowance on Initial Capital $ 57.3 $ 45.1
Pre-Production Revenue $ (24.6) $ (25.0)
Deferred & Sustaining Capital2 $ 138.8 $ 175.9
Deferred Capital (Route 167 Extension) $ 44.0 $ 0.0
Renard Mine Road2 $ 0.0 $ 78.0
Salvage Value2 $ (22.9) $ (13.3)
Total Life of Mine Capital, After Contingency, Escalation, Deferred and Sustaining Capital $ 994.4 $ 1,012.9
All figures in C$ million.
1. Totals may not add due to rounding.  
2. After Escalation

Life of mine operating cost is estimated at C$57.63/tonne (C$76.63 per carat; Table 3). The majority of open pit costs at Renard 2 and 3 occur before June 2016 and are contained within the capital cost estimates.

Table 3: Estimate of Operating Costs1,2    
  November 2011
Feasibility Study
January 2013
Optimization
  C$ millions Unit Cost $/Tonne C$ millions Unit Cost $/Tonne
Open Pit Mine $ 6 $ 0.27 $ 10 $ 0.43
Underground Mine3 $ 556 $ 24.45 $ 555 $ 23.64
Processing $ 344 $ 15.13 $ 359 $ 15.29
G&A $ 338 $ 14.86 $ 429 $ 18.27
Total Life of Mine Operating Costs $ 1,244 $ 54.71
($70.27/ct)
$ 1,352 $ 57.63
($76.63/ct)
  1. Totals may not add due to rounding. November 2011 Feasibility Study costs are expressed in Q3 2011 terms. January 2013 Optimization costs are expressed in Q3 2012 terms.
  2. Excludes capitalized preproduction costs.
  3. Unit cost per processed tonnes. Unit cost per mined tonnes were $26.13 in the November 2011 Feasibility Study and are $25.53 in the 2013 Optimization Study.

Qualified Persons

Jean-François St-Onge, Eng. of SNC Lavalin Inc. is the independent Qualified Person responsible for infrastructure design, the operating and capital cost estimate, and risk management.

Dr. Lynton Gormely, P.Eng. of AMEC Americas Limited is the independent Qualified Person responsible for process plant design.

Mr. William Bagnell, P.Eng. of AMEC Americas Limited is the independent Qualified Person responsible for underground mine design and mineral reserves.

Mr. Louis-Pierre Gignac, Eng. of G Mining Services Inc. is the independent Qualified Person responsible for open pit design and mineral reserves, and financial analysis.

Mr. Martin Magnan, Eng. of Roche Lte. is the independent Qualified Person responsible for permitting and environmental and social considerations.

Mr. Paul Bedell, P.Eng. of Golder Associates Ltd. is the independent Qualified Person responsible for geotechnical, water management and processed kimberlite containment facility design.

Ms. Valérie Bertrand, Géo. of Golder Associates Ltd. is the independent Qualified Person responsible for geochemical classification.

Dr. Richard Brummer, P.Eng. of Itasca Consulting Canada Inc. is the independent Qualified Person responsible for geomechanical and hydrogeological considerations.

Mr. Charles Gagnon, Eng. of Roscoe Postle Associates Inc. is the independent Qualified Person responsible for underground ventilation design.

Mr. David Farrow, P.Geo. (BC) of GeoStrat Consulting Inc. is the independent Qualified Person responsible for the preparation of the mineral resource estimate for the Renard Diamond Project.

All of these Qualified Persons have reviewed and approved the contents of this press release for which they are responsible.

Stornoway will file a NI 43-101 compliant technical report on the Optimization Study, representing an amended Feasibility Study, within 45 days.

About the Renard Diamond Project

The Renard Diamond Project is located approximately 250 km north of the Cree community of Mistissini and 350 km north of Chibougamau in the James Bay region of north-central Québec. In November 2011, Stornoway released the Renard results in the November 2011 Feasibility Study followed with the January 2013 Feasibility Study Optimization which highlighted the potential of the project to become a significant producer of high value rough diamonds over a long mine life. NI 43-101 compliant Probable Mineral Reserves stand at 17.9 million carats, with a further 17.5 million carats classified as Inferred Mineral Resources, and 23.5 to 48.5 million carats classified as non-resource exploration upside. All kimberlites remain open at depth. Pre-production capital cost stands at an estimated C$752 million, with a life of mine operating cost of C$57.63/tonne giving a 67% operating margin over an initial 11 year mine life. Readers are referred to the technical report dated December 29, 2011 in respect of the November 2011 Feasibility Study for the Renard Diamond Project for further details and assumptions relating to the project.

About Stornoway Diamond Corporation

Stornoway is a leading Canadian Diamond exploration and development company listed on the Toronto Stock Exchange under the symbol SWY and headquartered in Montreal. Our flagship asset is the 100% owned Renard Diamond Project, on track to becoming Québec's first Diamond mine. Stornoway also maintains an active Diamond exploration program with both advanced and grassroots programs in the most prospective regions of Canada. Stornoway is a growth oriented company with a world class asset, in one of the world's best mining jurisdictions, in one of the world's great mining businesses.

On behalf of the Board

STORNOWAY Diamond CORPORATION

Matt Manson, President and Chief Executive Officer

This press release contains "forward-looking information" within the meaning of Canadian securities legislation and "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995. This information and these statements, referred to herein as "forward-looking statements", are made as of the date of this press release and the Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by law.

Forward-looking statements relate to future events or future performance and reflect current expectations or beliefs regarding future events and include, but are not limited to, statements with respect to: (i) the amount of mineral resources and exploration targets; (ii) the amount of future production over any period; (iii) net present value and internal rates of return of the mining operation; (iv) assumptions relating to capital costs, operating costs and other cost metrics set out in the Feasibility Study or the Optimization Study; (v) assumptions relating to gross revenues, operating cash flow and other revenue metrics set out in the Feasibility Study or the Optimization Study; (vi) assumptions relating to recovered grade, average ore recovery and other mining parameters set out in the Feasibility Study or the Optimization Study; (vii) mine expansion potential and expected mine life; (viii) expected time frames for completion of permitting and regulatory approvals and making a production decision; (ix) the expected time frames for delivery of a winter road by the Québec Ministère des Transports, construction of a mining grade road by Stornoway and completion generally of the Route 167 extension and the financial obligations or costs incurred by Stornoway in connection with such road extension; (x) future exploration plans; (xi) future market prices for rough diamonds; and (xii) sources of and anticipated financing requirements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "plans", "projects", "estimates", "assumes", "intends", "strategy", "goals", "objectives" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements are made based upon certain assumptions by Stornoway or its consultants and other important factors that, if untrue, could cause the actual results, performances or achievements of Stornoway to be materially different from future results, performances or achievements expressed or implied by such statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which Stornoway will operate in the future, including the price of diamonds, anticipated costs and ability to achieve goals. Certain important factors that could cause actual results, performances or achievements to differ materially from those in the forward-looking statements include, but are not limited to: (i) estimated approval date of the Environmental and Social Impact Assessment; (ii) required capital investment and estimated workforce requirements; (iii) estimates of net present value and internal rates of return; (iv) receipt of regulatory approvals on acceptable terms within commonly experienced time frames; (v) the assumption that a production decision will be made, and that decision will be positive; (vi) anticipated timelines for the commencement of mine production; (vii) anticipated timelines related to the delivery of a winter road by the Québec Ministère des Transports, construction of a mining grade road by Stornoway and completion generally of the Route 167 extension and the impact on the development schedule at Renard; (viii) anticipated timelines for community consultations and the impact of those consultations on the regulatory approval process; (ix) market prices for rough diamonds and the potential impact on the Renard Project's value; and (x) future exploration plans and objectives.

By their very nature, forward-looking statements involve inherent risks and uncertainties, both general and specific, and risks exist that estimates, forecasts, projections and other forward-looking statements will not be achieved or that assumptions do not reflect future experience. We caution readers not to place undue reliance on these forward-looking statements as a number of important risk factors could cause the actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates, assumptions and intentions expressed in such forward-looking statements. These risk factors may be generally stated as the risk that the assumptions and estimates expressed above do not occur, including the assumption in many forward-looking statements that other forward-looking statements will be correct, but specifically include, without limitation, (i) risks relating to variations in the grade, kimberlite lithologies and country rock content within the material identified as mineral resources from that predicted; (ii) variations in rates of recovery and breakage; (iii) the greater uncertainty of exploration targets; (iv) developments in world Diamond markets; (v) slower increases in Diamond valuations than assumed; (vi) risks relating to fluctuations in the Canadian dollar and other currencies relative to the US dollar; (vii) increases in the costs of proposed capital and operating expenditures; (viii) increases in financing costs or adverse changes to the terms of available financing if any; (ix) tax rates or royalties being greater than assumed; (x) results of exploration in areas of potential expansion of resources; (xi) changes in development or mining plans due to changes in other factors or exploration results of Stornoway; (xii) changes in project parameters as plans continue to be refined; (xiii) risks relating to receipt of regulatory approvals or the implementation of the existing Impact and Benefits Agreement with aboriginal communities; (xiv) the effects of competition in the markets in which Stornoway operates; (xv) operational and infrastructure risks; (xvi) technical, environmental, permitting and execution risk relating to the construction by Stornoway of a mining grade road forming part of the Route 167 extension, (xvii) weather conditions or other unpredictable events which may impact the construction or planned availability of a winter road by March 2013; and (xviii) the additional risks described in Stornoway's most recently filed Annual Information Form, annual and interim MD&A, and Stornoway's anticipation of and success in managing the foregoing risks. Stornoway cautions that the foregoing list of factors that may affect future results is not exhaustive.

When relying on our forward-looking statements to make decisions with respect to Stornoway, investors and others should carefully consider the foregoing factors and other uncertainties and potential events. Stornoway does not undertake to update any forward-looking statement, whether written or oral, that may be made from time to time by Stornoway or on our behalf, except as required by law.



Stornoway Diamond Corporation
Matt Manson
President and CEO
416-304-1026
or
Stornoway Diamond Corporation
Nick Thomas
Manager Investor Relations
604-983-7754 or Toll Free: 1-877-331-2232
info@stornowaydiamonds.com
www.stornowaydiamonds.com
or
Stornoway Diamond Corporation
M. Ghislain Poirier
Vice-president Affaires publiques
418-780-3938
gpoirier@stornowaydiamonds.com
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Stornoway Diamond Corporation

DEVELOPMENT STAGE
CODE : SWY.TO
ISIN : CA86222Q8065
CUSIP : 86222Q806
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Stornoway Diamond is a gold and copper exploration company based in Canada.

Stornoway Diamond develops gold, copper, diamonds and nickel in Canada, and holds various exploration projects in Botswana and in Canada.

Its main asset in development is RENARD (FOXTROT) in Canada and its main exploration properties are RAVEN, CHURCHILL, KINGORA, LDG, DARING LAKE, JEWEL, STARFISH, WALES ISLAND, SCEPTRE AND TIARA, HAMMER, QILALUGAQ, PORTAGE MINE, MELVILLE PENIN. and MELVILLE PENINSULA (AVIAT PROJECT) in Canada.

Stornoway Diamond is listed in Canada. Its market capitalisation is CA$ 16.6 millions as of today (US$ 12.6 millions, € 11.4 millions).

Its stock quote reached its highest recent level on May 14, 2004 at CA$ 9.80, and its lowest recent point on September 06, 2019 at CA$ 0.01.

Stornoway Diamond has 828 659 968 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Stornoway Diamond Corporation
4/10/2019Stornoway Diamond halts open pit operations at Quebec mine
11/15/2018Stornoway Diamond shares down on $37 million loss, departure...
Annual reports of Stornoway Diamond Corporation
LAUNCHES 2008 ONLINE ANNUAL REPORT: Posts Presentation from ...
Financings of Stornoway Diamond Corporation
7/11/2016Stornoway Receives C$82.72 Million from Warrant Exercise
3/31/2016Stornoway Announces Funding Of Third Tranche Of Stream Finan...
10/1/2015Stornoway Announces Funding of Second Tranche of Stream Fina...
11/13/2013Announces Increase To Bought Flow-Through Financing
4/19/2012Closes Private Placement of Units
3/8/2012Announces Bought Deal Equity Financing
8/1/2011Announces Financing Agreements With Québec For the Route 167...
5/29/2009Announces Closing of Flow-Through Financing
11/14/2008Announces Closing of Financings
11/5/2008Increases Previously Announced Private Placement
11/4/2008Announces Flow-Through Financing
8/1/2008Closes $22 Million Private Placement and Redeems Convertible...
7/28/2008Announces $22 Million Private Placement To Close Within 21 D...
7/16/2008ARRANGES $22 MILLION PRIVATE PLACEMENT Proceeds To Redeem Co...
Nominations of Stornoway Diamond Corporation
8/15/2013Announces Appointment to Board of Directors
6/25/2013Announcement of Appointment
8/3/2011Announces Changes To The Board Of Directors
7/20/2011Announces New Appointments to the Board of Directors
5/3/2010Announces Appointment Of Chief Operating Officer
3/1/2010Announces Management Appointments
Financials of Stornoway Diamond Corporation
8/10/2017Second Quarter Results
7/27/2017Stornoway Announces Second Quarter Release Date
5/17/2016Stornoway Announces Results From Annual General Meeting
5/10/2016Stornoway Announces FY2016 First Quarter Results
5/5/2016Annual General Meeting
9/15/2009First Quarter Financial Results Posted, Matt Manson’s AGM Pr...
Project news of Stornoway Diamond Corporation
7/15/2016(Renard (foxtrot))Stornoway Commences Ore Processing At Renard Diamond Project
1/28/2014Provides Update On Exploration Joint Ventures
10/10/2013To Commence Early Construction Of Renard Mine Airport
9/3/2013First Vehicle Arrives At Renard Project Site Via New Permane...
8/7/2013Provides Update On Exploration Joint Ventures
7/23/2013Announces Updated Renard Mineral Resource Estimate
7/16/2013Receives Federal Government Authorisation For Renard Project
6/3/2013Provides Renard Project Update
3/14/2013Options Non-Core Exploration Projects
2/14/2013Reports Arrival Of Winter Road At Renard Project Site
1/28/2013Reports Optimized Renard Mine Design And Cost Estimates
6/1/2012Exhibiting at the World Resource Investment Conference: Vanc...
3/27/2012Signs Impacts And Benefits Agreement For The Renard Diamond ...
2/17/2012Renard Diamond Project Digital Fly-Through Video
1/4/2012Files NI 43-101 Technical Report For The Renard Feasibility ...
12/10/2011Renard Diamond Project Community Relations Video
10/3/2011Provides Update On Pipeline Projects
5/25/2011(Hammer)Announces Exploration Drill Program at Hammer Property, Nuna...
4/28/2011(Renard (foxtrot))Provides Renard Project Update Feasibility Study on Track fo...
4/1/2011(Renard (foxtrot))Announces Closing Of Agreement To Acquire Remaining 50% Of R...
3/7/2011(Aviat)Announces New Microdiamond Results From the Aviat Project, N...
2/23/2011(Renard (foxtrot))Announces Positive Microdiamond Results from Renard 1
2/10/2011(Renard (foxtrot))Shareholders Overwhelmingly Approve Acquisition Of Remaining...
2/7/2011(Renard (foxtrot))Files NI 43-101 Technical Report On The Recently Revised Res...
1/24/2011(Renard (foxtrot))Announces Increased Ni 43-101 Mineral Resource Estimate For ...
12/14/2010(Renard (foxtrot))Stornoway Announces Acquisition Of Remaining 50% Of Renard P...
3/22/2010(Renard (foxtrot))Renard Updated Economic Assessment Teleconference Archive No...
12/8/2009Announces Revised Ni 43-101 Mineral Resource Estimate For Re...
3/9/2009(Renard (foxtrot))Provides Renard Drilling Update: Renard 2 Kimberlite Greatly...
2/19/2009(Aviat)Reports Initial Diamond Results From Aviat 200 Tonne Bulk Sa...
12/15/2008Reports Filing of NI 43-101 Technical Report for Renard Prel...
11/28/2008(Churchill)Reports Diamond Counts From Two Kimberlites At Churchill
9/24/2008(Churchill)And Shear Announce 9 New Kimberlites At Churchill Diamond Pr...
9/15/2008(Churchill)and Shear Announce New Killiq Kimberlite at Churchill Diamon...
9/8/2008(Aviat)Doubles Size of Aviat’s Highly Diamondiferous AV267 Sheet
9/4/2008(Qilalugaq)Discovers New Kimberlite at Qilalugaq
7/2/2008(Churchill)and Shear Announce 2008 Program Underway at the Churchill Di...
6/27/2008(Churchill)And Shear Report Additional High Interest Mineral Dispersion...
5/15/2008(Aviat) Provides Aviat Project Spring Update Increases Project Inte...
4/28/2008(Renard (foxtrot))New Renard Diamond Valuation Results and Pre-Feasibility Upd...
3/13/2008(Aviat)Improves On Diamond Content of Aviat Kimberlites AV1 and AV2...
2/20/2008(Churchill)and Shear Report Additional Diamonds from Kahuna Drilling
1/31/2008(Churchill) and Shear Report High Diamond Counts from Four Kimberlites ...
1/29/2008(Aviat)Reports Diamond Content of 162 Cpht from 20.6 Tonne Aviat Sa...
1/28/2008(Renard (foxtrot))HIGH DIAMOND CONTENT CONFIRMED AT HIBOU DYKE 126 Cpht from 3...
12/12/2007(Melville Peninsula Aviat 1)Third Kimberlite Pipe At Aviat Proves Diamondiferous
11/14/2007(Churchill Project) and Shear Recover a 5.43 Carat Diamond fromChurchill?sKahun...
9/25/2007(Sua Pan (stornoway/motapa Jv))and Motapa Commence Drilling at Sua Pan Project, Botswana
7/25/2007 Commences Pre-Feasibility Study on Renard Diamond Deposit
Corporate news of Stornoway Diamond Corporation
6/29/2016Stornoway Reminds Warrantholders Of Upcoming Exercise Deadli...
6/22/2016Stornoway commences plant commissioning at Renard Diamond Pr...
6/6/2016Stornoway Provides Renard Operational Readiness Update
5/5/2016Stornoway Intersects Kimberlite At Adamantin Project
3/30/2016Stornoway Announces Updated Renard Mine Plan and Mineral Res...
10/14/2015Stornoway Files Renard NI 43-101 Technical Report
9/8/2015North Arrow Confirms High Diamond Counts From Pk150 Kimberli...
3/30/2015North Arrow Discovers Three New Kimberlites at the Pikoo Dia...
3/24/2015Stornoway Announces Third Quarter 2015 Results
3/24/2015Stornoway Commences Pre-Stripping at Renard 2-Renard 3 Open ...
3/11/2015Stornoway Announces Third Quarter 2015 Results
2/26/2015North Arrow Reports Initial Diamond Recoveries From First 60...
2/12/2015Stornoway to Attend Upcoming Investor Conferences
2/11/2015North Arrow Drilling Program Underway at Pikoo, Saskatchewan
1/21/2015North Arrow Updates Qilalugaq Project Bulk Sample Processing
12/16/2014Stornoway Announces Second Quarter 2015 Results
12/15/2014Stornoway Announces Second Quarter 2015 Results
11/17/2014Stornoway Completes Field Portion Of 2014 Renard Drill Progr...
11/17/2014Stornoway Completes Field Portion of 2014 Renard Drill Progr...
11/10/2014Stornoway Lists Convertible Debentures
11/10/2014Stornoway Lists Convertible Debentures
10/22/2014Stornoway Announces Results From Annual General Meeting
10/22/2014Stornoway Announces Results From Annual General Meeting
10/20/2014Stornoway Adds Large Diamond Recovery Capacity To Renard Dia...
10/20/2014Stornoway Adds Large Diamond Recovery Capacity to Renard Dia...
9/23/2014North Arrow Identifies New Targets at the Pikoo Diamond Proj...
9/22/2014Stornoway Announces Notice of 2014 Annual Meeting of Shareho...
9/15/2014Stornoway Announces First Quarter 2015 Results
8/25/2014Stornoway Provides Renard Project Update
7/21/2014Stornoway Awards EPCM Contract to SNC-Lavalin Inc.
7/16/2014Stornoway Announces Appointment of Douglas Silver to Board o...
7/10/2014Stornoway Announces Formal Production Decision at Renard
7/8/2014Announces Closing Of Comprehensive Financing Package To Fund...
7/8/2014Stornoway Announces Closing of Comprehensive Financing Packa...
6/27/2014Shareholders Overwhelmingly Approve Resolutions Relating To ...
6/26/2014Stornoway Shareholders Overwhelmingly Approve Resolutions Re...
3/27/2014Stornoway Confirms Negotiations For Project Financing
11/13/2013Announces Flow-Through Financing For Renard Resource Expansi...
11/5/2013Hosts Québec Minister of Natural Resources at Montreal Press...
10/24/2013Announces Results From Annual General Meeting
10/21/2013to Proceed With Liquefied Natural Gas (LNG) Power Plant for ...
10/2/2013Arranges $20M Bridge Facility for Renard Diamond Project
6/25/2013Reports Quebec Strike Action Settled
6/19/2013Provides Renard Mine Road Update
5/7/2013Welcomes Clarity On Future Quebec Mining Taxation
4/11/2013Reports Positive Renard 65 Diamond Valuation Result
3/27/2013Provides Construction Update on the Renard Mine Road
3/12/2013Reports Fatality In Accident On The Winter Road
2/25/2013Completes Renard 65 Diamond Recovery
12/11/2012Recovers High Value 9.78 Carat Stone From Renard 65 Bulk Sam...
10/29/2012Provides Update on the Route 167 Extension
10/18/2012Receives Renard Mining Lease
9/25/2012Annual Summary
9/11/2012Announces Results From Annual General Meeting
9/6/2012Executes Mandate Letter With Lead Arrangers For Renard Proje...
8/30/2012Announces The Successful Completion Of The Final Public Hear...
7/23/2012to Commence Bulk Sampling of Renard 65 Kimberlite
7/5/2012Signs Partnership Accord With Chibougamau And Chapais
7/4/2012Provides Update On Renard Powerline Study
7/4/2012Presentation from the RBC Diamond Conference in London, June...
6/12/2012(Qilalugaq)Reports Initial 26.1 Million Carat Mineral Resource Estimate...
6/8/2012Announces the Successful Completion of Federal Public Consul...
5/31/2012Announces Establishment Of Head Office In Montreal
5/24/2012Video of the Mecheshoo Agreement Signing Ceremony
5/23/2012Announces $28.4m Renard Pre-Development Capital Program
5/4/2012Arranges a $20 Million Unsecured Debt Facility for Renard Di...
3/22/2012Conducts Successful Open Houses in Chibougamau and Mistissin...
2/3/2012Announces Commencement Of Construction Of Route 167 Extensio...
1/12/2012Corporate Video, Social Media, and Upcoming Events
12/28/2011Announces Filing of the Renard Environmental and Social Impa...
12/7/2011Québec Releases Certificate Of Authorization For The Constr
12/5/2011Video Presentation from the 2011 Scotia Capital Mining Confe...
10/26/2011Annual Summary
9/20/2011Provides Renard Project Update
9/12/2011Announces Addition to S&P/TSX SmallCap Index
8/6/2011English Language Media Attention Regarding Route 167 Road Ag...
8/1/2011Announces FinancingAgreements With Québec For Th
7/11/2011Announces Acquisition of "Aeon" Claims in Northern Quebec
6/13/2011Announces 56% Increase in Renard Diamond Price Estimate
4/27/2011Announces 2011 Exploration Program And Budget
3/20/2011Welcomes Quebec Budget Announcement of Financing for the Rou...
2/18/2011to Commence Trading on Consolidated Basis at Market Opening ...
4/7/2010Matt Manson on CBC's the Lang and O'Leary Exchange
3/22/2010Reports Updated Renard Preliminary Assessment Pre-Tax NPV In...
3/8/2010Reports Overall Diamond Recovery Of 86.2 CPHT From Notch Sam...
2/12/2010Files Renard “Notice Of Intent”
1/15/2010Upcoming Conferences in Vancouver
11/28/2009Presentation from the Quebec Exploration Conference: the 200...
10/6/2009s Announces Fourfold Tonnage Increase In Renard 2 Following ...
8/10/2009And Shear Option Chesterfield Inlet Claims, Nunavut
7/30/2009(Hammer)Reports Discovery Of Hammer Kimberlite
7/8/2009is now on Twitter
6/8/2009Renard Summer Drill Program Commences
1/24/2009Upcoming Events
1/15/2009Reports 144 Cpht In Large Tonnage Hibou Dyke Sampling
1/7/2009Provides 2009 Exploration Outlook
12/17/2008Provides Corporate Update
7/14/2008Related News
5/1/2008 is Attending the CIM Conference in Edmonton, May 4-6
3/4/2008Additional Diamond Results From Renard 65 and North Anomaly ...
1/21/20083.64 Carat Diamond Recovered from AV2 Kimberlite at Aviat
12/14/2007 Announces Additional Renard Diamond Recovery Results
12/3/2007 And Shear Recover 337 Carats From 356 Tonne Kahuna Bulk Sam...
10/22/2007 Announces Positive Valuation Results From Renard Bulk Sampl...
9/19/2007Yves Harvey Appointed Member of Stornoway Board of Directors
9/18/2007And Shear Confirm High Commercial Diamond Content AtChurchil...
9/11/2007Qilalugaq Diamond Exploration Program Update
9/6/2007Aviat's Eastern Sheet Complex Points To Significant Tonnage
8/23/2007New Kimberlite Pipe Discovered At Aviat
8/14/2007 Reports 2,213 Carats Recovered From Renard 4
8/1/2007Reports an Additional 31 Diamonds Weighing 1.74 Carats from ...
7/31/2007Reports 1,642 Carats Recovered from Renard 2 Including a 15....
7/17/2007and Shear Announce Closing of BHP Billiton Diamond Inc's Int...
7/10/2007Enters Into Agreement with Bayswater to Explore Diamond Targ...
6/20/2007Reports 2,681 Carats Recovered From Renard 3 Including A 10....
5/17/2007Reports an Initial Diamond Content of 150 cpht from Renard 3...
5/14/2007Provides Exploration Update - On Schedule For First Renard D...
5/14/2007Provides Exploration Update
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (SWY.TO)
0.020+100.00%
TORONTO
CA$ 0.020
09/06 17:15 0.010
100%
Prev close Open
0.010 0.010
Low High
0.010 0.020
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.020 -%
Volume 1 month var.
15,947,741 -%
24hGold TrendPower© : -33
Produces
Develops Diamonds
Explores for Diamonds - Gold - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.69-0.39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+7.89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :