Risk and valuation analysis of the Bingo Project |
Status Risk : Advanced discovery |
|
|
|
|
|
|
|
|
|
|
|
|
Location of the Bingo Project |
Plans call for a minimum of 4,000 metres of drilling at the Bingo deposit, 55 km south of Golden Band's Jolu mill.
|
|
History of the Bingo Project |
Exploration on the historic Bingo East Showing, located approximately 300 m to the northeast of the Bingo Deposit decline, was carried out using a mix of surface grab and channel samples as well as two short diamond-drill holes completed with a bazooka drill.
|
|
|
|