Risk and valuation analysis of the Poundmaker Project |
Status Risk : Past producer |
|
|
|
|
|
|
|
|
|
|
|
Title(s) of the Poundmaker Project |
| Wildcat Exploration Ltd Owner: 100% |
| | | | |
Title | Company Profile | All Projects | Company website | Company project page |
|
|
|
|
|
Location of the Poundmaker Project |
The Poundmaker Project area is composed of two blocks. The Poundmaker Main Block consists of 72 claims that cover 11,980ha. The Poundmaker North Block consists of 2 claims that cover 415 ha. The total Poundmaker Project Area covers of 74 claims that total 12,431 ha.
|
|
History of the Poundmaker Project |
Total historical production is estimated at 645 oz, and samples from the muck pile have been reported at 0.9-20.2 g/t Au and in 1923, and the average grade was reported as 33 g/t Au in the upper two levels.
|
|
Geology of the Poundmaker Project |
|
The Poundmaker occurrence is underlain by foliated hornblende-quartz diorite which has been sheared along a structure trending 310° along which quartz veins have been mapped underground and on surface over a strike length of 600m and up to 15m wide.
|
|
|
|