Risk and valuation analysis of the CENTRAL YILGARN Project |
Status Risk : Early discovery |
|
|
|
|
|
|
|
|
|
|
|
Title(s) of the CENTRAL YILGARN Project |
| Jupiter Mines Ltd Owner: 100% |
| | | | |
Title | Company Profile | All Projects | Company website | Company project page |
|
|
|
|
|
Location of the CENTRAL YILGARN Project |
The CYIP is located west of Menzies, with the Mt Mason inferred resource being approximately 100km North West of Menzies. The project area covers 275 km2 .(Figure 3) The banded iron formations (BIFs) trend North West in sub parallel multiply sets ranging from 1 to 6 in a set. The Mt Mason mineralisation is hosted within the BIFs.
|
|
History of the CENTRAL YILGARN Project |
In 1969, BHP surveyed Mt Mason. This was approximately 60 years after it was initially discovered by Geological Survey of Western Australia (GSWA). Even though high iron assays from the survey returned 62.8% iron with 0.042% phosphorus, BHP did not proceed with the project. Infrastructure in the area was limited at the time.
|
|
Geology of the CENTRAL YILGARN Project |
|
The Mt Mason-Mt Hope tenement areas cover part of the western edge of the Mt Ida greenstone belt, which lies along the eastern boundary of the Southern Cross Granite-Greenstone Terrain (SCGGT). A large scale regional structure, the Ida Fault, marks t more...
|
|
|
|