The project involves the extraction of a shaft pillar and mining of previously abandoned areas. It is planned to mine the shaft pillars concurrently with the remaining reserve blocks. Mill tonnage is placed at 51 600 tonnes at a recovered grade of appoximately 5.0g/t per month. A total 15 950 kg will be recovered over a seven-year period.
|
|
|
|
|
|
|
|