Drazhnje Project |
|
|
|
Province |
Kosovo |
|
|
|
|
Status |
ADVANCED DISCOVERY
|
|
|
|
|
|
|
|
|
|
|
|
|
Legends
|
|
|
|
|
|
|
Explores for
|
Lead - Zinc -
|
|
|
|
Risk and valuation analysis of the Drazhnje Project |
Status Risk : Advanced discovery |
|
|
|
|
|
|
|
|
|
|
|
Title(s) of the Drazhnje Project |
| Private Company Owner: 100% |
| | | | |
Title | Company Profile | All Projects | Company website | Company project page |
|
|
| Lydian International Ltd Net Smelter Return: 3% |
| | | | |
Title | Company Profile | All Projects | Company website | Company project page |
|
|
|
|
|
Location of the Drazhnje Project |
The Drazhnje project is located in Kosovo.
|
|
History of the Drazhnje Project |
Historic exploration activities identified a number of variably exposed northwest trending massive sulphide bodies. This was not a producing mine, it is an abandoned exploration project. Previous exploration work comprised some 80 drill holes, collared both from surface and from two levels of exploratory drives.
|
|
Geology of the Drazhnje Project |
|
The Drazhnje Zn-Pb-Ag project is located along the Vardar Zone which is a major basin-controlling fault structure that was active during the Cretaceous and then inverted during the Tertiary. The main body of massive sulphide mineralisation at Drazhnj more...
|
|
|
|
|
|
|
|
|
Data last updated on : 9/22/2009
|
Disclaimer
|
All information on this page comes from internal and external sources deemed reliable. This information might not be up to date, so please perform due diligence before making any conclusion or making any action. Do contact us should any information be missing or incorrect.
|
|
|
|