Risk and valuation analysis of the Tennant Creek Project |
Status Risk : Advanced discovery |
|
|
|
|
|
|
|
|
|
|
|
|
Location of the Tennant Creek Project |
Tennant Creek is located in central Northern Territory, approximately 980 km south of Darwin along the Stuart Highway. See Figure 1. All the tenements are accessible by car along either bitumen or well maintained dirt tracks.
|
|
History of the Tennant Creek Project |
Until 2000, approximately 5.14 million ounces of gold (M oz Au) had been produced from the Tennant Creek goldfield. Although approximately 130 deposits have recorded production, most of gold to that time was produced from twelve, typically low-tonna more...
|
|
Geology of the Tennant Creek Project |
|
The Excalibur tenements are all located within the Tennant Creek Inlier, a series of deformed and metamorphosed Palaeoproterozoic orogenlc sedimentary rocks (mainly flysh sediments), and volcaniclastic and volcanic rocks that have been intruded by gr more...
|
|
|
|