Chart eurGOLD   Chart eurSILVER  
 
Food for thought
Debt is the worst poverty
Thomas Fuller  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1359.60-27.44
Silver 22.25-0.41
Platinum 1451.52-31.48
Palladium 735.25-1.25
WORLD MARKETS
DOWJONES 15354120
NASDAQ 349934
NIKKEI 15138101
ASX 516016
CAC 40 400122
DAX 839828
HUI 246-10
XAU 97-3
CURRENCIES (€)
AUS $ 1.3163
CAN $ 1.3179
US $ 1.2818
GBP (£) 0.8448
Sw Fr 1.2480
YEN 132.1700
CURRENCIES ($)
AUS $ 1.0274
CAN $ 1.0275
Euro 0.7801
GBP (£) 0.6594
Sw Fr 0.9733
YEN 103.0740
RATIOS & INDEXES
Gold / Silver61.11
Gold / Oil14.16
Dowjones / Gold11.29
COMMODITIES
Copper 3.320.02
WTI Oil 96.020.86
Nat. Gas 4.060.13
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
In the same category 
( 0 vote, 0/5 ) Print article
     
Tweet

May 21, 2008
No. 08-07

Avalon Ventures Ltd.

 


Initial Assays from Thor Lake Phase 2 drilling confirm north extension of Rare Earth Element enriched zones in Lake Zone deposit

http://images.cmpgnr.com/583043279/Aval1159883348354.gif

 


Avalon Ventures Ltd. TSX: AVL (the "Company") is pleased to announce initial assay results from the Phase 2 drilling program carried out from January 29 to April 29, 2008 on the Lake Zone Rare Earth Element ("REE") deposit, on its 100% owned Thor Lake Rare Metals project, located southeast of Yellowknife, NWT. This phase of drilling was focused on a 1200m by 600m area on the northern part of the deposit, that is covered by Thor Lake itself, plus two holes in a swampy area on the south part of the deposit. A total of 6447 metres were drilled in 34 holes (Table 1, below) and assays results are now available for 9 of these holes, all drilled in the northeast corner of the deposit.

As reported in the Company's news release dated
April 22, 2008, the REE-enriched mineralized zones in the southern part of the deposit do extend into the northern part and the assay results received to date confirm this observation with 8 of the 9 holes containing several very similar several 4-23 metre wide intervals of relatively high grade REE mineralization, within a broad mineralized envelope averaging over 100 metres in thickness. Mineralization in the ninth hole (L08-67) was "dyked-out" by a younger, subvertical diabase intrusion.

Assay highlights include broad sub-intervals of 43.65m of 2.15% TREO ("Total Rare Earth Oxides") in hole L08-65 and 46.9m of 1.74% TREO in hole L08-72, where TREO is defined as the sum of all 14 REE plus Yttrium, expressed in oxide form. Individual intercepts averaged as high as 3.54% TREO over 8.8 metres in hole L08-69 and 4.2% TREO over 1.1m in L08-76. All the widths reported are believed to approximate true thicknesses. The entire mineralized envelope typically averages around 1.0% TREO (Table 2).

Of further significance is the confirmation of a relatively high proportion of the heavy rare earth elements ("HREE", Europium through Lutetium) in all of these intercepts. The content of HREO (Heavy Rare Earth Oxides) as a percentage of TREO ranges from 8.1% to 14.3% over the entire mineralized envelope in these holes and selected sub-intervals average as high as 32.6% HREO over 6.0 metres in hole L08-70. By comparison, most known rare earth deposits are dominated by the light rare earths and typically contain less than 3% HREO. The Lake Zone is a very unusual REE deposit for its relatively high content of some of the more scarce and valuable heavy rare earth elements such as terbium, europium and dysprosium.

Individual HREE values were as high as 143.5 ppm terbium (Tb) oxide, 155.6 ppm europium (Eu) oxide and 818.7 ppm dysprosium (Dy) oxide over widths of 6.0 to 8.8 metres (Table 3). Bid prices for these oxides have all risen sharply since January and are reported for May 15, 2008 by Metal-Pages.com on an FOB China basis as: US$720/kg Tb, US$470/kg Eu and US$115/kg Dy compared to just US$4.05/kg for the more abundant Light REE cerium. These elements are in short supply yet are vital to many current applications in electronics (colour phosphors) and hybrid cars (high strength magnets). In addition to the HREE, these zones also contain high levels of neodymium (Nd), a light rare earth element also in high demand for magnet applications, that is currently quoted at US$32/kg on an FOB China basis. The high grade sub-zones typically contain in excess of 2,000ppm Nd oxide. One 8.8 metre sub-zone produced an exceptional Nd oxide assay of 7,379 ppm (Table 3, below. Note that 1000ppm = 1 kg per tonne).

The main objectives of the Phase 1 and 2 drilling programs on the Lake Zone are to delineate the full extent of the deposit on 100-150 metre hole spacing and define indicated resources within high grade sub-zones. To this end, recent drilling has enabled the recognition of a "layer-cake" horizontal zonation within the deposit consisting of alternating layers of variable grade and mineralogy. A zone containing consistently high relative enrichment in the HREO has been recognized near the base of this mineralized sequence between depths of 100-150 metres and is referred to as the Basal Zone. Several other such sub-zones occur elsewhere within the deposit and it should also be noted that the drilling done to date has not defined any lateral limits to the Lake Zone deposit, which remains open for expansion in all directions

The Basal Zone is anticipated to be the priority for resource definition and future development work on the project. Its thickness, relative shallow depth, and horizontal geometry are believed to make it amenable to low cost underground bulk mining techniques utilizing ramp access. An updated resource estimate for the Lake Zone will be prepared once all the Phase 2 drilling results have been received and are compiled in to a block model. This work will be done by Wardrop Engineering and should be complete by mid summer.

Full analytical details of all intervals for all REE and other rare metals received to date are posted on the Company's website along with a drill hole location plan and related cross-sections at http://www.avalonventures.com/projects/rare/thor_lake. Assays are pending for holes L08-73 to 75 and L08-77 to 98, and will be released as they come available.

On April 29, 2008, a detailed drilling program, consisting of 9 to 15 closely-spaced holes, was initiated in the south-central part of the deposit with 6 of these holes complete as at the date of this news release. The objective of this program is to acquire at least 800 kgs of the Basal Zone mineralization for bench-scale metallurgical tests, which will include flotation and hydrometallurgy to be completed by SGS Lakefield Research before year end. The metallurgical test program has commenced with "QEMSCAN" mineralogical studies of all the ore types present, focusing on the Basal Zone with higher HREO values. This work has already confirmed the presence of fergusonite, (an yttrium-niobium-tantalum oxide mineral enriched in HREE plus neodymium) as a significant component of the Basal Zone.

A rigorous QA/QC program was implemented for all of the program samples to ensure high quality data. Analytical standards were prepared from crushed rejects of historical Lake Zone drill core samples, then analysed at five separate laboratories to determine an averarge value. These standards were then routinely inserted into the sample batches to monitor analytical data. All drill core was split on site, sampled in 2m intervals and shipped to Acme Laboratories facility in Yellowknife for sample preparation. Acme then shipped pulverized splits from all the samples its laboratory in Vancouver, BC. Duplicate samples are being analysed at ALS Laboratories in Vancouver, BC.

All samples are being analysed in both laboratories by lithium metaborate/tetraborate fusion and dilute nitric acid digestion, followed by whole rock and 45 element multielement ICP analysis. Details of the factors used to calculate rare earth oxides are posted on the Company website along with complete analytical data. Further check assays are being conducted by Actlabs Ltd., Ancaster, ON, but are not yet available.

Drilling operations were performed by Peak Drilling Ltd. of Courtenay B.C. under the supervision of J.C. Pedersen, P.Geo., Senior Geologist. The Company's Vice-President, Exploration, Dr. William Mercer, Ph.D., P.Geo. provided overall direction on the project.

About Avalon Ventures Ltd.

Avalon Ventures Ltd. is a Canadian junior mineral exploration and development company, with a primary focus on rare metals and minerals with high technology and environmentally-beneficial applications. Avalon currently holds a portfolio of five such projects, including three that are at, or close to, the feasibility stage. Shares Outstanding: 64,649,748. Cash resources: approximately $14.0 million.

To find out more about Avalon Ventures Ltd., please visit our website at http://www.avalonventures.com. This news release is available on the Company's official on-line investor relations site for investor commentary, feedback and questions. Investors are invited to visit the "Avalon Ventures" IR Hub at http://www.agoracom.com/IR/Avalon. In addition, investors are invited to e-mail their questions and correspondence to AVL@agoracom.com or phone Don Bubar, P.Geo. President, at 416-364-4938. Mr. Bubar and Dr. Mercer are the Qualified Persons responsible for the technical content of this news release.

This news release contains forward-looking information. This forward-looking information includes, or may be based upon, estimates, forecasts, and statements as to management's expectations with respect to, among other things, the size and quality of the Company's mineral resources, progress in development of mineral properties, demand and market outlook for metals and future metal prices. Forward-looking information is based on the opinions and estimates of management at the date the information is given, and is subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. These factors include the inherent risks involved in the exploration and development of mineral properties, uncertainties with respect to the receipt or timing of required permits and regulatory approvals, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project cost overruns or unanticipated costs and expenses, uncertainties relating to the availability and costs of financing needed in the future and other factors. The forward-looking information contained herein is given as of the date hereof and the Company assumes no responsibility to update or revise such information to reflect new events or circumstances, except as required by law.

http://www.agoracom.com/agoraimages/AVLPR052108Table1.jpg

http://www.agoracom.com/agoraimages/AVLPR052108Table2.jpg

http://www.agoracom.com/agoraimages/AVLPR052108Table3.jpg

 

 

 

 

FEATURED LINKS

Avalon Ventures Web Site

Avalon Ventures IR HUB

 

 




http://cmpgnr.com/campaigner_images/Images/powered_by_campaigner.gif

http://cmpgnr.com/app/campaigner/trk/opn.jsp?cid=1234466&rid=1233382&ctd=1090673294&lid=89656364&g=0&f=-1

Tweet

Avalon Rare Metals Inc.

EXPLORATION STAGE
CODE : AVL.TO
ISIN : CA0534701002
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Avalon Rare Metals Inc.
Annual Report 2007
Financings of Avalon Rare Metals Inc.
8/3/2011Announces Closing of Public Offering of Common Shares and Pa...
7/27/2011Prices US$ 43,665,000 Public Offering
7/26/2011Announces Proposed Public Offering of Common Shares
4/25/2011Files Preliminary Base Shelf Prospectus and US Registration ...
10/5/2010Receives Additional $9.6 Million Dollars in Financing from E...
9/30/2010Announces Closing of $30,030,000 Offering
12/15/2008Closing of $1.5 Million Private Placement
11/27/2008Announces $1.5 Million Flow-Through Financing
12/29/2006closes $1,575,000 private placement
12/7/2006Arranges Private Placement of 1,500,000 Flow-through Units
Option Grants of Avalon Rare Metals Inc.
11/27/2007Announces New Board Appointment and Grants of Incentive Stoc...
8/24/2007Announces New Appointments and Grants of Incentive Stock Opt...
Nominations of Avalon Rare Metals Inc.
3/26/2012Announces New Senior Management and Updates on Nechalacho
11/23/2011Appoints Vice-President, Sustainability
6/7/2011Announces New Senior Executive Appointments
1/8/2007Announces new Executive Appointments and Head Office Move
Project news of Avalon Rare Metals Inc.
1/29/2013(Nechalacho)Nechalacho Project Feasibility Study on Track for Completion...
3/26/2012(Nechalacho)Announces New Senior Management and Updates on Nechalacho
12/21/2011(Nechalacho)Retains SNC-Lavalin to Complete Nechalacho Feasibility Study
11/9/2011(Nechalacho)Provides Update for the Nechalacho Heavy Rare Earth Deposit
7/11/2011(Nechalacho)announces progress on product marketing initiatives and prov...
7/8/2011(Nechalacho)updated Prefeasibility Study Confirms Significantly Improved...
4/5/2011(Nechalacho)Provides Progress Report on Metallurgical Testwork, Nechalac...
2/8/2011(Nechalacho)Enters Into Negotiation Agreement With the Deninu K'ue First...
1/27/2011(Nechalacho)Reports Increase in Indicated Resources in the Nechalacho Ra...
11/16/2010(East Kemptville)Provides Progress Report on East Kemptville Tin Indium Proje...
9/9/2010(Thor Lake)Reports 40% Increase in Indicated Resources in the Nechalach...
6/21/2010(Thor Lake)Prefeasibility Study on the Nechalacho REE Deposit, Thor Lak...
3/29/2010(Thor Lake)Hydrometallurgical Process Successfully Developed for its N...
1/15/2010(Thor Lake)Announces Updated Resource Estimate for Nechalacho Rare Eart...
11/20/2009(Thor Lake)Updates Progress on Prefeasibility Study, Nechalacho Rare Ea...
12/24/2008(Thor Lake)Summer drilling program produces best results
10/21/2008(Thor Lake)Progress report on drilling results
6/25/2008(Thor Lake)Further encouraging Rare Earth Element Assays
4/23/2008(Thor Lake)Provides Update on Thor Lake Drilling Program
1/31/2008(Thor Lake)Remaining REE assays from Thor Lake Phase
1/8/2008(Thor Lake)Assays from Thor Lake Phase 1 drilling confirm presence of h...
11/27/2007(Thor Lake)Akaitcho Territory Interim Land Withdrawal and Thor Lake
10/22/2007(Warren Township)Completes Warren Township calcium feldspar bulk sample
10/15/2007(Thor Lake)concludes Phase 1 drilling on Thor Lake Rare Earth Elements ...
1/4/2007(Warren Township)to Proceed with Bulk Sampling Program at Warren Township Ano...
11/21/2006(East Kemptville)acquires rights to part of past-producing East Kemptville ti...
10/31/2006(Red Hill Property)Strong new off-hole conductor detected on Red Hill VMS proje...
10/18/2006(U6 Savant)Phase 1 Drilling Program Commences on U6 Savant Gold Project
Corporate news of Avalon Rare Metals Inc.
3/1/2013, Zenyatta Ventures and Ventripoint Diagnostics Kick-Off Sea...
1/9/2013Annual General Meeting Scheduled for January 29, 2013
11/26/2012(Nechalacho)Reports Increased Measured Resources for the Nechalacho Rare...
11/5/2012(Nechalacho)Reports on Successful Pilot Plant Campaigns for the Nechalac...
10/24/2012(Nechalacho)Appoints HCF as Financial Advisor for Nechalacho
4/18/2012Releases Inaugural Sustainability Annual Report
3/26/2012(Nechalacho)Announces New Senior Management Appointment and Provides Upd...
2/23/2012AVL IB: Avalon Strengthens REE Industry Collaboration
1/3/2012AVL IB: Chinese Ministry Announces REE-Quota Allocations For...
12/28/2011AGM Scheduled for January 26, 2012
12/1/2011Events with Sustainability, CleanTech and Supply Chain Theme...
10/20/2011(Separation Rapids)Resumes Work on its Separation Rapids and Warren Township Ra...
10/20/2011(Warren Township)Resumes Work on its Separation Rapids and Warren Township Ra...
9/30/2011AVL IB: Market Trends and Perspectives on Recent Commentarie...
9/27/2011reports on Yellowknife plane crash survivors
9/23/2011Comments on Yellowknife Plane Crash
9/8/2011Announces Appointment of Mr. Richard Morland to the Board of...
5/9/2011Files Final Base Shelf Prospectus and US Registration Statem...
4/29/2011rings the closing bell at the New York Stock Exchange
2/14/2011Continues Under the Canada Business Corporations Act
12/26/2010Authorized to Trade on NYSE Amex
12/20/2010Added to S&P-TSX Global Mining Index
12/9/2010Enters into Negotiation Agreement with the Yellowknives Dene...
11/30/2010Provides Corporate Update
9/28/2010Industry Bulletin: China Bans REE Exports to Japan?
9/28/2010Receives Positive Report on its Sustainability Performance f...
9/15/2010Announces Filing of Short Form Preliminary Prospectus
8/18/2010Reduces Warrant Exercise Price for 30 day period
7/19/2010Announces Remaining Assay Results from Winter Drilling on Ne...
6/15/2010Rare Earth Minerals' Scarcity Worrisome for Growing Tech Sec...
5/25/2010Documentary about the Rare Earths broadcaston BBC Radio 4 pr...
4/14/2010Actively Participates in Rare Earth Summit and Atlantic Coun...
3/18/2010CEO Don Bubar Interviewed on BNN Commodities Today
2/4/2010 leads supply chain discussions at Magnetics 2010
1/6/2010Notice of Avalon Rare Metals Annual General Meeting - Thursd...
1/4/2010Earth-Friendly Elements, Mined Destructively (NY Times, Dece...
11/12/2009Presenting at the 5th International Rare Earths Conference -...
11/2/2009 Exhibiting at the 2009 Chicago Resource Expo - Friday and S...
10/15/2009Recruits V.P. Operations to Advance the Nechalacho REE Depos...
10/7/2009to Sponsor and Participate in the Critical and Strategic Met...
12/3/2008Files Audited Financial Statements, MDA and Announces Annual...
10/29/2008Don Bubar Goes "Beyond the Press Release" to discuss the rec...
10/17/2008Featured Nationwide on Mining Industry TV
9/22/2008Chevron Mining Agrees to Sell Mountain Pass Rare Earth Minin...
9/2/2008Rare Earth Magnets enable advances in MRI Scanners
8/25/2008Poised To Capitalize On Shift To Green Economy
7/30/2008Remaining assays from Phase 2
7/28/2008Industry Bulletin
7/29/2008Kaiser Bottom Fishing Report
7/22/2008BNN Interview July 22 2008
7/22/2008North American Minor Metals Predicament Obscured by Oil Cris...
7/2/2008(Video) Vancouver Smartstox Interview and Winner
6/2/2008Industry Bulletin - June 2, 2008
5/27/2008Rare Earth Magnets now Playing an Important Role in Wind Ene...
5/26/2008 is Featured "In-Depth" by B-TV
5/21/2008Initial Assays from Thor Lake Phase 2 drilling confirm north...
5/20/2008Industry Bulletin - Tin prices surging
5/5/2008 Industry Bulletin - Rare Metals Help Reduce our Carbon Foot...
4/29/2008Reports On Warren Township Anorthosite Project Furnace Trial
4/28/2008Industry Bulletin
4/11/2008Industry Bulletin - Rare metals key to energy efficient home...
3/25/2008Industry Bulletin - March 25, 2008
2/27/2008to Begin Trading on the Toronto Stock Exchange
1/30/2008Information Bulletin January 30, 2008
1/14/2008Announces Annual General Meeting
10/24/2007Announces $15 Million Equity Financing
9/27/2007Industry Bulletin
9/4/2007Media Bulletin - September 4, 2007
7/16/2007Drilling Set to Commence on Thor Lake Rare Earth Elements Ta...
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (AVL.TO)NYSE (AVL)
1.00-0.99%0.990+0.00%
TORONTO
CA$ 1.00
05/17 16:00 -0.010
-0.99%
Prev close Open
1.01 1.02
Low High
1.00 1.04
Year l/h YTD var.
0.930 -  1.57 -32.89%
52 week l/h 52 week var.
0.930 -  2.35 -31.51%
Volume 1 month var.
56,067 2.04%
24hGold TrendPower© : -17
Produces
Develops
Explores for Cesium - Copper - Gold - Indium - Lithium - Rare earth - Tantalum - Tin - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-50.50%
2012-23.48%3.461.39
2011-42.36%9.652.44
201062.99%4.991.89
2009751.52%4.240.40
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Get Investor Information
High Desert Gold
Select
& click