Chart gbpGOLD   Chart gbpSILVER  
 
Food for thought
Markets Clear
J.B. Say  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1377.000.30
Silver 22.480.00
Platinum 1459.50-0.50
Palladium 744.500.30
WORLD MARKETS
DOWJONES 1538853
NASDAQ 35026
NIKKEI 15553172
ASX 5156-29
CAC 40 403613
DAX 847216
HUI 254-7
XAU 97-3
CURRENCIES (€)
AUS $ 1.3193
CAN $ 1.3272
US $ 1.2925
GBP (£) 0.8526
Sw Fr 1.2527
YEN 132.5350
CURRENCIES ($)
AUS $ 1.0209
CAN $ 1.0267
Euro 0.7737
GBP (£) 0.6597
Sw Fr 0.9690
YEN 102.5270
RATIOS & INDEXES
Gold / Silver61.25
Gold / Oil14.34
Dowjones / Gold11.17
COMMODITIES
Copper 3.33-0.01
WTI Oil 96.05-0.66
Nat. Gas 4.200.01
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
In the same category 
( 0 vote, 0/5 ) Print article
     
Tweet

 

August 19, 2008                                                                                                                                                                                                                                                              TSX:BAJ 

 

PRESS RELEASE

 

BAJA MINING TO TAKE FIRST DELIVERY OF MINING EQUIPMENT

 

 

Baja Mining Corp. (the ?Company? or ?Baja?) is pleased to announce that the first shipment of major mining equipment for use at its Boleo project is expected to arrive at site in Baja California Sur in August or early September 2008.  The equipment will immediately be put into service in development of stockpile benches, access roads to the planned underground portals, and stripping of the open-cut mines and within the tailings impoundment facility.  It will also be available for preparation of the process plant site and tailings facility. Subsequent deliveries of the remaining surface mining equipment will be occurring over the balance of 2008; and the first arrival of underground production mining equipment is expected in late December 2008 for startup in first quarter 2009.  These initial deliveries are focused on primary mining equipment and include the continuous mining machines, roof bolters and other production machines.

 

Baja continues to make progress on the construction schedule, targeting start of commissioning of the process plant in the first quarter of 2010.  All testwork on the process technology was completed in 2006 as part of the Company?s Definitive Feasibility Study. The process and metallurgical testing took place at two continuous pilot plant campaigns at a research facility in Ontario, Canada.  The pilot plants finalized the design criteria for recovery of metals and consumption of key consumables and demonstrated the high clay content of the Boleo deposit does not present a problem for the counter current decantation circuit, as well confirmed the viability and efficiency of the recovery process. It is planned that mining will commence approximately one year in advance of start-up of the process plant to ensure that a sufficient stockpile of ore is available to the plant at that time.  Development of the underground mines will provide access to the first, high-grade orebodies that are scheduled for production and will also ensure that all mining personnel are fully trained prior to startup of the process plant.

 

At the plant site, work is well advanced on installation of the construction camp and associated infrastructure, construction offices and warehouses/lay down areas, improvements to project wide site access and the desalination plant.  Between the Company and its construction contractors, there are now over 200 workers on site. Contracts have been let for camp catering and administration. The Company is now well underway in the hiring of the workforce for the project. The Company has its own internal project management team and has continued to add additional seasoned veterans from the industry.  Work continues with the potential earthworks and dock contractors have been issued bid drawings and specifications.

 

 

The Boleo Project will produce copper cathode, cobalt cathode and zinc sulphate at site.  After the ramp up period it is expected that annual production will be approximately 125 million pounds of copper cathode and 3.7 million pounds of cobalt cathode for the first several years.  Using conservative price estimates for cobalt and zinc sulphate ($15./lb Co and $1250/t zinc sulphate), the net cash cost of copper production is expected to be close to zero, providing healthy cash flows to survive any drop in the price of copper.

 

ON BEHALF OF THE BOARD OF DIRECTORS OF

BAJA MINING CORP.

 

?John W. Greenslade?

 

JOHN W. GREENSLADE, PRESIDENT

 

For further information please contact John Greenslade, President, at (604) 685-2323

 

Some of the statements contained in this release are forward-looking statements, such as statements that describe the Company?s expectation and timing of arrival of mining equipment , projected metal prices, projected production rates, estimated start up of mining operations, estimated start up of operations and other statements.  Since forward-looking statements are not statements of historical fact and address future events, conditions and expectations, forward-looking statements by their nature inherently involve unknown risks, uncertainties, assumptions and other factors well beyond the Company?s ability to control or predict.  Actual results and developments may differ materially from those contemplated by such forward-looking statements. Material factors that could cause actual revenues to differ materially from those contained in such forwarding-looking statements include (i) fluctuations on the prices of copper, cobalt, zinc and manganese, (ii) interpretation of contract terms, (iii) accuracy of the Company?s and consultants? projections, (iv)  the Company?s ability to finance, receive permits for, obtain equipment, construct and develop the El Boleo Project, (v) the effects of weather; operating hazards; adverse geological conditions and global warming, (vi) impact of availability of labor, materials and equipment; and (vii) changes in governmental laws, regulations, economic conditions or shifts in political attitudes or stability.

 

These forward-looking statements represent the Company?s views as of the date of this release. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.  Readers should not place undue reliance on any forward-looking statements.

--------------------------------------------------

 

 

 

Tweet

Baja Mining Corp

DEVELOPMENT STAGE
CODE : BAJ.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Baja Mining Corp
5/5/2012Is this Baja Mining's ‘Et tu, Brute?' moment?
4/25/2012Baja Mining suffers massive sell-off as analysts cut targets
4/23/2012Rising project costs hit Baja Mining's Mexico project
1/4/2012Baja Mining eyes $1bn manganese upside at Boleo
7/27/2009Baja Mining develops manganese recovery process for its Bole...
5/15/2009Baja Mining Selects ICA Fluor as EPCM Contractor & Restarts ...
10/19/2007Baja Mining: Tin Foil Hats Have Their Uses
12/19/2006New Analysis
Annual reports of Baja Mining Corp
2008 Annual report
2007 Annual Report
Financings of Baja Mining Corp
8/21/2012Reports on Status of Stage I Financing and Provides Corporat...
11/23/2010Closes C$184 Million Bought Deal Financing
11/1/2010Announces C$160 Million Cross-Border Bought Deal Financing
8/13/2010Closes $17.5 Million Bought Deal Offering
9/13/2007Announces CDN$45+ Million Private Placement
Nominations of Baja Mining Corp
11/14/2012[Baja Mining Corp.] Appoints Interim CFO
5/23/2012Announces Appointment of New Director
5/16/2012[Baja Mining Corp.] Announces Resignation of Greenslade, App...
4/18/2012[Baja Mining Corp.] Announces Resignation of Gerald Prosalen...
4/17/2012Announces Resignation of Gerald Prosalendis From Board
12/15/2011Hires New Officers; Completes Second Draw on Senior Debt
2/3/2011Appoints Wolf Seidler to Board
6/3/2009Appoints Michael Shaw as COO
9/6/2007Welcomes New Vice President - Engineering & Construction
Financials of Baja Mining Corp
11/15/2012[Baja Mining Corp.] Files Third Quarter 2012 Financial Resul...
Project news of Baja Mining Corp
5/13/2013(Boleo)Boleo Project Receives Further Funding and Baja Mining Inter...
5/13/2013(Boleo)Boleo Project Receives Further Funding and Baja Mining Inter...
10/15/2012(Boleo)Announces Further Funding for Boleo Project
12/20/2010(Boleo)Closes Copper Hedging For Boleo Project
11/23/2010(Boleo)[Baja Mining Corp.]Fully Funded for Boleo Construction - Pro...
9/29/2010(Boleo)[Baja Mining Corp.] Signs US$ 858 Million of Financing Facil...
3/9/2010Files Updated Technical Report & Amended Financial Statement...
10/28/2009(Boleo)Provides Project Update
6/17/2009(Boleo)Achieves Key Milestone in Development of Manganese Metal Pro...
5/14/2009(Boleo)Selects ICA Fluor as EPCM Contractor & Restarts Boleo Engine...
2/3/2009(Boleo)Provides Project and Company Update
4/18/2008(Boleo)Welcomes Kores as Development Partner at El Boleo
8/21/2007(Boleo)Receives Essential Land Use Permits
Corporate news of Baja Mining Corp
4/18/2013Provides Annual Meeting Information
2/12/2013Korean Consortium Provides Phase 2 Funding Commitment, Baja ...
1/24/2013(Boleo)Provides Boleo Project Financing Update
4/23/2012(Boleo)Provides Update For Costs of the Boleo Project; Announces Di...
4/22/2011Adopts Shareholder Rights Plan
1/18/2011Finalizes Fixed Interest Rate on US EXIM Loans at 3.02% and ...
12/13/2010[Baja Mining Corp.] Announces S&P/TSX Global Mining Index an...
12/2/2010Wins Exploration and Development Funding Award
3/9/2010Files Base Shelf Prospectus
9/14/2009Commences Trading on US OTCQX
3/16/2009Sees Potential Capital Cost Savings At Boleo
10/16/2008(Video) Focus on Manganese
8/20/2008To Take First Delivery of Mining Equipment
7/4/2008 Releases Video Presentation on Korean Financing Closing
7/2/2008Completes Unprecedented Financing and Provides Transaction D...
6/25/2008Provides Financing Update
6/3/2008[Baja Mining Corp.] Closes Transaction with Korean Consortiu...
5/9/2008 Welcomes Tom Ogryzlo as Chairman of the Board
4/23/2008Launches New Multimedia Presentations - Now Online!
3/27/2008 Presents at AMEX Precious and Base Metals Conference
1/14/2008Project Update and Ordering of Long Lead Items
11/13/2007 Secures US$64 Million Equipment Lease with Caterpillar Fina...
10/16/2007Closes Brokered Tranche of $45 Million Placement; Receives S...
10/11/2007 Notifies 2005 Warrant Holders of Near Term Expiry Date
9/4/2007Signs Bridge Loan Facility with Endeavour Mining Capital
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (BAJ.TO)FRANKFURT (B1Y.F)
0.040-20.00%0.030-41.18%
TORONTO
CA$ 0.040
05/21 11:40 -0.010
-20%
Prev close Open
0.050 0.040
Low High
0.040 0.050
Year l/h YTD var.
0.040 -  0.130 -63.64%
52 week l/h 52 week var.
0.040 -  0.270 -85.19%
Volume 1 month var.
48,050 -20.00%
24hGold TrendPower© : -17
Produces
Develops Cobalt - Copper - Manganese - Zinc
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-69.23%
2012-84.34%1.100.04
2011-23.15%1.290.63
201063.64%1.390.54
2009200.00%0.970.18
 
5 years chart
 
3 months chart
 
3 months volume chart