Chart gbpGOLD   Chart gbpSILVER  
 
Food for thought
Debt is the slavery of the free
Publilius Syrus  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1345.20-23.50
Silver 21.23-0.48
Platinum 1408.00-28.00
Palladium 690.10-19.70
WORLD MARKETS
DOWJONES 15112-203
NASDAQ 3443-39
NIKKEI 13245238
ASX 484247
CAC 40 3839-21
DAX 8197-32
HUI 246-8
XAU 1030
CURRENCIES (€)
AUS $ 1.4304
CAN $ 1.3652
US $ 1.3276
GBP (£) 0.8581
Sw Fr 1.2346
YEN 128.3090
CURRENCIES ($)
AUS $ 1.0775
CAN $ 1.0282
Euro 0.7532
GBP (£) 0.6464
Sw Fr 0.9298
YEN 96.6300
RATIOS & INDEXES
Gold / Silver63.36
Gold / Oil13.75
Dowjones / Gold11.23
COMMODITIES
Copper 3.12-0.02
WTI Oil 97.84-0.40
Nat. Gas 3.96-0.01
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
( 0 vote, 0/5 ) Print article
     
Tweet

Marketwire

 
 
Lake Shore Gold Corp.
TSX: LSG
Other Recent News

November 1, 2010
Lake Shore Gold Continues to Confirm and Expand Thunder Creek Rusk Horizon, Initial Drilling on 650 Level Intersects Rusk Zone and 100 Metres of Porphyry
TORONTO, ONTARIO--(Marketwire - Nov. 1, 2010) - Lake Shore Gold Corp. (TSX:LSG)

--  Cross cut on 315 Level exposes additional high-grade mineralization in
    down dip extension from 300 Level 
--  High-grade intercepts from ongoing underground drilling confirm Rusk
    Zone to minimum 150 metres below 300 Level cross cut 
    --  Intersections include 12.11 gpt over 7.20m, 9.44 gpt over 7.90m,
        8.16gpt over 6.20m, 4.17 gpt over 6.20m and 5.18 gpt over 3.80m 
--  Drilling up plunge extends mineralization at least 30 metres above 300
    Level, area above 300 Level remains open 
    --  Results include 11.25 gpt over 7.60m, 20.20 gpt over 1.00m and 23.70
        gpt over 1.00m  
--  Potential for further expansion of Rusk Zone considered excellent 
--  First drill on 650 Level intersects Rusk Zone and approximately 100
    metres of Porphyry in vicinity of previously reported TC09-68B (12.75
    gpt over 83.40m).
 
Lake Shore Gold Corp. (TSX:LSG) ("Lake Shore Gold" or the "Company") today announced that the 300 Level access ramp at Thunder Creek has now been extended by 15 metres to depth with development commencing on the high-grade Rusk Zone mineralization on the 315 Level. The Company also reported high-grade intercepts from an additional 19 holes (2,694.8 metres) drilled near the 300 Level as well as initial observations from the first underground drill hole to test the Thunder Creek 650 Level, which intersected the Rusk Zone in addition to a wide interval of Hematite altered Syenite Porphyry measuring approximately 100 metres in width.

The new development on the 315 Level is an important step as the Company continues to expose mineralization and gain information about the continuity and characteristics of the Rusk Zone that will assist in establishing an initial National Instrument ("NI") 43-101 resource for Thunder Creek. Work on the 315 Level has progressed along the zone approximately 15 metres to the east and 12 metres west of the access crosscut and has encountered strong, high-grade mineralization similar in appearance to that found on the 300 Level.

Tony Makuch, President and CEO of Lake Shore Gold, commented: "The recent results from development and drilling around the 300 Level at Thunder Creek continue to be very encouraging and highlight the potential to further expand what we are confident is already a large gold system. Based on the limited tonnes extracted from the 300 Level to date, we are encouraged by the grades we have encountered, which have averaged over 7.50 grams per tonne in the primary mineralized area targeted by the cross cut and covered by recent drilling. The substantial grade and width plus the presence of multiple zones in the 300 Level drilling is a positive indication for the first NI 43-101 resource for the Thunder Creek Deposit, which we are working to complete in the second half of 2011. We are also pleased with our first underground drill hole from the 650 Level which has intersected the Rusk Zone as well as substantial mineralization in the Porphyry Zone and we look forward to reaching the mineralization with our access drift over the next couple of weeks."

Underground drilling near the 300 Level was conducted from cutouts located 50 to 100 metres north of the Rusk Zone and targeted areas up and down plunge of previous drilling as well as near the previous east and west limits of the zone.

Holes drilled down plunge from the 300 Level tested up to 150 metres below the Level and indicated excellent grades and continuity of mineralization with several holes encountering multiple zones of mineralization. Significant results include: 12.11 gpt over 7.20m in TC280-019A, 9.44 gpt over 7.90m in TC280-007A, 8.16 gpt over 6.20m in TC280-005A and 5.18 gpt over 3.80m and 4.17 gpt over 6.20m in TC280-018A. Mineralization in the zones shows a well defined set of characteristics including locally intense carbonate, hematite and potassic alteration, 1-5 % sulphide mineralization and occasional visible gold ("VG"). Based on the more detailed drilling it appears that the best mineralization occurs within a series of higher-grade lenses which trend sub parallel to a northeast trending pyroxenite-sediment contact that has been intruded by Syenite Porphyry. The substantial widths and grades plus the local presence of multiple zones are considered very positive developments for defining potential resources.

Holes drilled up plunge of mineralization on the 300 Level tested up to 30 metres above the Level. Significant results from the drilling included 11.25 gpt over 7.60m in TC200-019A (in addition to previous reported intercepts of 9.04 gpt over 2.20m and 21.60 gpt over 0.60m), 20.20 gpt over 1.00m in TC200-017 and 23.70 gpt over 1.00m in TC280-013A. These intersections are considered significant as they occur considerably above the previously interpreted upper limit for mineralization, with the area above and towards surface remaining open.

TC320-013 tested the area near the east limit of previous drilling on the 300 Level and intersected 11.43 gpt over 7.30m, 20 metres east of previously reported hole TC200-014 (See press release August 30, 2010) which had intersected 14.09 gpt over 3.00m. The area to the east of the new hole is still considered open for expansion of the zone.

In addition, the new underground access cross cut from the Timmins Mine to Thunder Creek is now approaching the Porphyry Zone as indicated by previous surface drilling, including TC08-068B which intersected 12.75 gpt over 83.40m. Underground drilling has also now commenced on the 650 Level and is being carried out from a cutout on the west side of the new 650 Level access crosscut and north of the Porphyry Zone. The drilling is being done to test the location of the zone originally indicated from surface drilling and to obtain a preliminary indication of shape and grade of mineralization for mine planning purposes. TC650-001 is targeting an area 20 metres below TC08-068B and has now reached 514 metres from the collar of the hole. Assay results from TC650-001 are still unknown as the hole is still in process of being sampled and assayed, but initial observations indicate that the hole has intersected the Rusk Zone in addition to a wide interval of Hematite altered Syenite Porphyry measuring approximately 100 metres in width and lining up well with the Porphyry observed in TC08-068B. The hole also includes local quartz veining, increased sulphides and several occurrences of VG.

Underground drilling at Thunder Creek is continuing with two drills active near the 300 Level and one drill operating from a cut out on the 650 Level access drift.

Quality Control

The Company's Qualified Person ("QP") for the underground drilling being completed on the Thunder Creek property is Dean Crick, P. Geo. As QP, he has prepared or supervised the preparation of the scientific or technical information and has verified the data disclosed in this press release. Mr. Crick is an employee of Lake Shore Gold.

Lake Shore Gold has a quality control program to ensure best practices in the sampling and analysis of all drill core. Assays have been completed at both ALS Chemex (TC200 series holes) and LSG - Bell Creek lab (TC300 series holes); both labs use a standard fire assay with a 30-gram aliquot. For samples that return a value greater than 10 grams (ALS Chemex) and 20 grams (Bell Creek) per tonne gold, another pulp is taken and fire assayed with a gravimetric finish. Mineralized sections of the Porphyry Zone are analyzed using the "metallics" or screen fire assay technique. BQTK size drill core is saw cut and half the drill core is sampled in standard intervals. The remaining half of the core is stored in a secure location. The drill core is transported in security-sealed bags to either the Bell Creek lab for preparation and analysis or to the ALS Chemex Prep Lab located in Timmins, Ontario. The pulps from core that is sent to the ALS Chemex Prep Lab are then shipped to ALS Chemex Assay Laboratory in Vancouver, BC. ALS Chemex is an ISO 9001-2000 registered laboratory preparing for ISO 17025 certification. The LSG - Bell Creek lab conducts in-house analysis of mill, underground and drill core samples and is not an ISO 9001-2000 registered laboratory.

About Lake Shore Gold Corp.

Lake Shore Gold is a rapidly growing mining company with a goal to become a North American mid-tier gold producer through the successful exploration, development and operation of three wholly owned mines in Timmins, Ontario: Timmins Mine, Thunder Creek and Bell Creek Complex. The Company is currently in pre-production development at the Timmins Mine project, where it has both a shaft and a ramp, and has accessed mineralization at the adjacent Thunder Creek property as part of an underground advanced exploration program. Progress is also being made with an underground advanced exploration program at its Bell Creek Complex, located on the east side of Timmins. The Bell Creek Mill has been refurbished and is being expanded incrementally to a total capacity of 3,000 tonnes per day by late 2011. The Company continues to invest aggressively in exploration primarily in Timmins and in select other areas of Northern Ontario and Quebec, and owns a large land position in Mexico. The Company's common shares trade on the TSX under the symbol LSG.

Forward-looking Statements

Certain statements in this press release relating to the Company's exploration activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" within the meaning of securities legislation. The Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward-looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects according to schedule, and that actual mineralization on properties will not be less than identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements. More information about risks and uncertainties affecting the Company and its business is available in Lake Shore Gold's most recent Annual Information Form and other regulatory filings which are posted on sedar at www.sedar.com.

There is no guarantee that drill results reported in this news release will lead to the identification of a deposit that can be mined economically, and further work is required to identify resources and reserves.

-------------------------------------------------------------            
 Table 1 - Thunder Creek - Significant New Underground Drill             
                            Results                                      
-------------------------------------------------------------            
Hole           From      To  Assay Length  Comments                      
-------------------------------------------------------------            
Number          (m)     (m)  (gpt)    (m)                                
-------------------------------------------------------------            
TC200-017    188.70  189.70  20.20   1.00  Ultramafic Zone               
-------------------------------------------------------------------------
TC200-019A   107.10  107.70  21.60   0.60  ct W Pyroxenite   previously  
             111.00  113.20   9.04   2.20  Rusk Zone         reported    
  includes   112.50  113.20  12.55   0.70                                
-------------------------------------------------------------------------
             126.70  134.30  11.25   7.60  Porphyry ct/Sed               
  includes   127.00  130.40  19.97   3.40                                
  includes   128.70  129.50  44.70   0.80                                
                                           Rusk, Sed,flt                 
TC280-002     89.00   95.70   2.45   6.70  Zones                         
  includes    95.10   95.70   8.86   0.60                                
TC280-004     77.10   81.20   5.53   4.10  Ultramafic                    
  includes    77.10   77.70  12.25   0.60                                
                                           Ultramafic/                   
TC280-007A    84.30   92.20   9.44   7.90  Porphyry ct                   
  includes    86.00   90.00  14.15   4.00                                
  includes    87.10   88.30  23.15   1.20                                
TC280-003     83.10   86.70   2.80   3.60  Ultramafic/Sed ct             
  includes    84.60   85.10   5.27   0.50                                
TC320-001     24.20   26.70   2.59   2.50  Rusk                          
  includes    24.20   24.80   6.46   0.60                                
TC280-008     92.70   97.80   6.01   5.10  Porphyry                      
  includes    92.70   94.40  14.11   1.70                                
  includes    93.20   93.80  36.80   0.60                                
TC09-80C      902.6   903.3  92.32    0.7                                
             928.50  930.50  14.09   2.00                                
TC280-005A    85.30   91.50   8.16   6.20  Rusk                          
TC280-011B    91.60   93.50   5.71   1.90  Ultramafic ct                 
             117.60  129.50   7.59   2.90  Porphyry                      
TC280-014B   146.10  147.00  20.40   0.90  Porphyry                      
TC280-018A    84.50   90.70   4.17   6.20  Rusk                          
              99.00  102.80   5.18   3.80  Sed Xenoliths                 
TC280-016     76.50   85.60   3.95   9.10  Rusk                          
TC320-013     41.70   49.00  11.43   7.30  Porphyry                      
  includes    44.20   46.60  31.13   2.40                                
TC280-13A    104.70  105.70  23.70   1.00  Rusk                          
TC280-015A   130.50  133.40   2.99   2.90  Rusk                          
             160.40  163.70   9.56   3.30                                
  includes   160.40  160.70  75.20   0.30                                
TC280-017     81.00   85.80   9.61   4.80  Rusk-Sediment                 
  includes    82.10   82.60  19.75   0.50                                
TC320-005     19.60   20.10  34.40   0.50  Ultramafic/Sed ct.            
TC280-019A    99.50  106.70  12.11   7.20  Rusk Zone                     
  includes    99.50  101.35  33.02   1.85                                
-------------------------------------------------------------            
                                                                            
Notes:                                                                      
1) Assays are reported uncut.                                               
2) True widths are not reported at this time.
 
To view Figure 1 - Level Plan, please visit the following link: http://media3.marketwire.com/docs/lsg111a.pdf

To view Figure 2 - Long Section, please visit the following link: http://media3.marketwire.com/docs/lsg111b.pdf

CONTACT INFORMATION:

Lake Shore Gold
Tony Makuch
President & CEO
(416) 703-6298
info@lsgold.com

or

Lake Shore Gold
Mark Utting
Vice-President, Investor Relations
(416) 703-6298
info@lsgold.com
www.lsgold.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer


If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click here. .
Tweet

Lake Shore Gold Corporation

PRODUCER
CODE : LSG.TO
ISIN : CA5107281084
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Lake Shore Gold Corporation
1/12/2013Haywood paints rosier picture for Lake Shore Gold in 2013
4/12/2012Lake Shore Gold underpins mill expansion with Sprott debt
4/3/2012Employee killed at Lake Shore Gold's Ontario mine
7/19/2011Lake Shore Gold hammered on lacklustre quarterly production
1/7/2010BRIEF-Lake Shore Gold says acquires interest in RT Minerals
3/27/2009UPDATE 1-Lake Shore Gold starts ore processing at Timmins Mi...
3/26/2009Lake Shore Gold starts processing ore from Timmins mine
Financings of Lake Shore Gold Corporation
2/28/2011Completes US$50 Million Corporate Revolving Credit Facility
10/26/2010Exercises Warrants in Northern Superior Resources
7/28/2010Secures US$50m credit facility
7/28/2010Signs Term Sheet for Corporate Revolving Credit Facility of ...
2/16/2010Closing of Second Tranche of Flow-Through Financing
12/31/2009Announces Closing of First Tranche of Flow-Through Financing
12/4/2009Announces Closing of Private Placement Financing
2/19/2008 Announces Private Placement of $64.5 Million at 30% Premium...
Nominations of Lake Shore Gold Corporation
3/13/2009Announces Appointment of Ignacio Bustamante to Board of Dire...
5/30/2008Announces Management Appointments
2/27/2007Appoints Hannu Virtanen as VP, Project Development
Financials of Lake Shore Gold Corporation
8/9/2012Lake Shore Gold Reports Strong Second Quarter Results
1/12/2012Reports 2011 Operating Results, Pours 26,550 Ounces in Fourt...
11/10/2011Announces Third Quarter 2011 =?ISO-8859-1?Q?=20Financial=20R...
8/10/2011Announces Second Quarter 201 =?ISO-8859-1?Q?1=20Financial=20...
5/26/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Results,=20In...
5/4/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Production=20...
8/11/2010Continued Progress During Second Quarter 2010
5/15/2008Announces First Quarter 2008 Results
Project news of Lake Shore Gold Corporation
10/14/2011(Timmins Mine)Reports Higher Commercial Production from Timmins Mine in Th...
8/16/2011(Bell Creek)Reports 400 Metre Extension of Gold Mineralization at Bell C...
3/29/2011(Band Ore)to Acquire 19% of Golden Share Through Sale of 100% Interest
3/4/2011(Thunder Creek)Reports Wide Intersections With High-Grade Sections Within P...
2/28/2011(Timmins Mine)Lake Shore Gold Discovers Significant New Gold Zone at 144 P...
2/24/2011(Timmins Mine)Intersects Wide, High-Grade Mineralization at Timmins Mine, ...
1/25/2011(Timmins Mine)Lake Shore Gold to Nearly Triple Gold Production in 2011
1/25/2011(Thunder Creek)Confirms Broad Mineralized Envelope With High-Grade Sections...
1/11/2011(Thorne)Demonstrates Near Surface Resource Potential and Extends Min...
1/6/2011(Timmins Mine)Declares Commercial Production =?ISO-8859-1?Q?=20at=20Timmin...
12/1/2010(Bell Creek)Announces Initial Resource a Bell Creek Mine, Large Deposit ...
11/24/2010(Thunder Creek)Confirms and Expands Large Gold System in Thunder Creek Por...
11/24/2010(Thunder Creek)Confirms and Expands Large Gold System in Thunder Creek Porp...
11/11/2010(West Timmins)Announces New High-Grade Intercepts, Major Extension of Main...
11/3/2010(Bell Creek)Extends High-Grade Core to Depth at Bell Creek
11/3/2010(Bell Creek)=?ISO-8859-1?Q?Lake=20Shore=20Gold=20Reaches=202,000=20Tonne...
11/1/2010(Thunder Creek)Continues to Confirm and Expand Thunder Creek Rusk Horizon
8/30/2010Expands Thunder Creek Rusk =?ISO-8859-1?Q?=20Zone,=20Announc...
8/30/2010Lake Shore Gold Expands Thunder Creek Rusk Zone, Announces A...
6/29/2010(Thunder Creek)Ramp Reaches & Intersects High-Grade Gold Mineralization
6/29/2010Ramp Reaches Thunder Creek Deposit, Intersects High-Grade Go...
6/23/2010Intersects High-Grade Mineralization at Thorne...
5/4/2010(West Timmins)Advances Third Major Gold Target
4/1/2010(Ti-pa-haa-kaa-ning (tpk))Agrees to Sell 50% Interest in Ti-pa-haa-kaa-ning Gold Prope...
2/18/2010(Timmins Mine)Major Extensions to Timmins Mine Mineralization, Thunder Cre...
2/17/2010(Timmins Mine)Reports Results of Underground Exploration at 650-Level Test...
2/17/2010(Casa Berardi)Extends Casa Berardi "G Zone"
1/26/2010(Thunder Creek)Extends Thunder Creek to Depth, Confirms High-Grade Core and...
1/18/2010(Bell Creek)Continues to Define and Extend Large New Gold System at Bell...
11/6/2009(Bell Creek)Confirms Presence of Large New Gold System
10/29/2009(Timmins Mine)Results of Underground Drilling and Development at Timmins M...
10/7/2009Releases Updated National Instrument 43-101 Report for Timmi...
10/1/2009(Bell Creek)Reports Extension to High grade mineralization at Bell Creek
8/25/2009(Thunder Creek)Continues to Establish Large Gold System at Thunder Creek
8/24/2009Reports High-Grade Intercepts From Underground Drilling at T...
7/21/2009(Bell Creek)Discovers Substantial New High-Grade Extension at Bell Creek
7/21/2009Lake Shore Gold discovers substantial new high-grade extensi...
7/7/2009(Bell Creek)Confirms Deep Extensions of Gold Mineralization at Bell Cree...
5/5/2009(Thunder Creek) Reports Additional High-Grade intercepts at Thunder Creek
4/28/2009(Bell Creek)Commences Advanced Underground Exploration Program at the Be...
3/31/2009(Thunder Creek)Discovery of Second Mineralized Horizon in Porphyry
3/26/2009(Bell Creek)Commences Processing at Bell Creek Mill
12/16/2008Significantly Extends Rusk Zone and Announces New High-Grade...
12/10/2008(Bell Creek)Significantly Extends Bell Creek Mineralization
7/10/2008(Bell Creek)Intersects New Gold Zone and Extends Mineralization at Bell ...
3/31/2008(Thunder Creek)Intersects 8.57 Grams Gold Per Tonne Over 9.00 Metres at the...
Corporate news of Lake Shore Gold Corporation
5/7/2013Announces Details of First Quarter 2013 Conference Call and ...
3/12/2013Announces Details of Full Year and Fourth Quarter 2012 Confe...
1/10/2013Achieves 2012 Production Target, Company Poised for Sharply ...
12/11/2012on Track for Strong Finish to 2012, Processing Capacity Incr...
10/25/2012Announces Details of Third Quarter 2012 Conference Call and ...
9/18/2012Announces Exercise of Underwriters' Over-Allotment Option fo...
9/7/2012Completes C$90 Million Convertible Senior Unsecured Debentur...
8/16/2012Announces C$75 Million Convertible Senior Unsecured Debentur...
7/13/2012Announces Details of Second Quarter 2012 Conference Call and...
7/4/2012Reports Strong Second Quarter Production of 24,426 Ounces of...
5/10/2012Exceeds Targets and Achieves Continued Operating Improvement...
3/23/2012Announces Details of Fourth Quarter and Full-Year 2011 Confe...
11/2/2011Announces Details of Third Quarter 2011 Conference Call and ...
8/5/2011Announces Details of Second Quarter 2011 Conference Call and...
7/19/2011Releases Production Resultsfor Second Quarter and First Six-...
4/1/2011Announces Adoption of Shareholder Rights Plan
3/14/2011Lake Shore Gold Achieves Major Milestones in 2010, on Track ...
2/1/2011Increases Interest in Northern Superior Resources Inc.
12/3/2010Disposal of remaining 6% stake in Lake Shore Gold by Hoschil...
10/14/2010Hochschild reduces stake in Lake Shore Gold to 6%
7/22/2010Confirms & Expands Mineral
5/27/2010Completes Sale of 50% Interest in Ti-pa-haa-kaa-ning JV
5/12/2010Changes to Board of Directors
5/5/2010Announces Continued Progress
4/27/2010Expands Resource Potential at Timmins Mine
3/11/20102009 Year End Results
12/17/2009Completes Acquisition of "Bell Creek West" Properties
12/15/2009Announces Management Changes
12/15/2009Added to S&P/TSX Composite Index
11/24/2009Announces Changes to Board of Directors
11/6/2009and West Timmins Mining Complete Business Combination
8/27/2009and West Timmins Agree to Business Combination
8/6/2009Advances Projects on Schedule and Budget and Achieves Explor...
6/24/2009Reports 12.75 Grams Per Tonne Over 83.40 Metres at Thunder C...
5/5/2009Continues to Expand Mineralion at Bell Creek
5/5/2009Continues to Advance Projects on Schedule and Budget and to ...
3/12/2009Completes 2008 on Schedule and Under Budget
5/20/2008Provides 2008/2009 Budget Plan
5/16/2008Announces Approval of Special Resolutions at Annual and Spec...
5/5/2008Comments on May 15, 2008 Shareholder Vote
4/16/2008Announces Revised Agreement With Hochschild Mining; Second P...
4/16/2008 Announces Management Changes
3/28/2008Announces 2007 Year End Results and Provides 2008 Outlook
3/24/2008Announces Management Changes
3/18/2008Announces Annual Meeting and Revised Date for Special Meetin...
2/25/2008 Completes Financing and Enters Into Strategic Alliance With...
7/17/2007Commences Drilling at Blakelock and Expands its Property Pos...
4/23/2007Completes Due Diligence on Bell Creek Acquisition
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (LSG.TO)Other OTC (LSGGF.PK)
0.285+0.00%2.29-0.87%
TORONTO
CA$ 0.285
06/19 16:00 -
0%
Prev close Open
0.290 0.285
Low High
0.285 0.300
Year l/h YTD var.
0.285 -  0.910 -62.99%
52 week l/h 52 week var.
0.285 -  1.15 -70.00%
Volume 1 month var.
571,284 -1.72%
24hGold TrendPower© : -37
Produces Gold
Develops
Explores for Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-69.35%
2012-23.77%1.730.74
2011-70.46%4.421.10
2010-1.20%4.322.48
2009266.67%4.371.10
 
5 years chart
 
3 months chart
 
3 months volume chart