Serengeti Announces Positive PEA Results: $263 Million NPV for Kwanika Copper-Gold Project
Published : February 06, 2013
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Feb. 6, 2013) - Serengeti Resources Inc. (News - Market indicators)(FRANKFURT:34S) is pleased to announce the completion of an independent NI 43-101 compliant Preliminary Economic Assessment ("PEA") for its 100% owned Kwanika copper-gold porphyry project located in the Quesnel Trough of North-Central British Columbia, Canada. The results of the PEA demonstrate the potential technical and economic viability of establishing a new copper-gold mine and mill complex on the property.

PEA Highlights:

  • Pre-tax NPV5% of CDN $263 million, 13.4% IRR, 13.5 year mine life.

  • Life of mine (LOM) payable production of 545 million pounds copper, 489,000 ounces gold, 2.45 million ounces silver and 5.25 million pounds molybdenum.

  • Initial capital cost of CDN $364 million plus LOM sustaining capital of $144 million for a 15,000 tpd (5.5 million tpa) mill and combined open pit, underground mining operation.

"Serengeti is very pleased to have achieved this important milestone for the Kwanika project," commented David W. Moore, President & CEO. "Kwanika represents an opportunity to develop a midsize greenfields copper-gold project in an excellent location and proven jurisdiction. The independent consultant has recommended selected optimization studies to refine certain engineering and costing elements, the results of which could be incorporated into an optimized PEA. We are currently funded to take this next step."

The PEA prepared by Moose Mountain Technical Services ("MMTS") is based on the resource model presented in the March 3, 2011 NI43-101 technical report titled "Technical Report on the Kwanika Project, Fort St. James British Columbia, Canada", authored by David W. Rennie of RPA Inc formerly Roscoe Postle Associates Inc. RPA's Technical Report used a large scale confining pit shell to define contiguous mineralization. The resource therein at US $7.50 and $20.00 / tonne cut-off grades is shown in the following table:

Zone Open Pit
Resource
Category
Tonnes and Grade Total Contained Metal
Tonnes
(Million)
Copper
(%)
Gold
(g/t)
Silver
(g/t)
Moly
(%)
Cu
(M
lbs)
Au
(M
oz)
Ag
(M
oz)
Mo
(M
lbs)
At Cut-Off of $7.50/tonne
Central Indicated 244 0.23 0.21 0.69 - 1,230 1.66 5.439 -
Inferred 55.2 0.14 0.14 0.42 - 168 0.25 0.74 -
South Inferred 240 0.20 0.09 1.49 0.007 1,080 0.66 11.5 37.6
Includes at Cut-Off of $20.00/tonne
Central Indicated 91.0 0.38 0.36 1.08   754 1.06 3.15 -
Inferred 5.13 0.26 0.27 0.65 - 29.0 0.04 0.11 -
South Inferred 74.3 0.33 0.12 2.15 0.012 546 0.29 5.15 19.4
Notes:
1. CIM definitions were followed for Mineral Resources; 2. Mineral Resources are estimated at a cut-off grade of US$7.50/t. The dollar value cut-off was estimated using provisions for metallurgical recovery and off-site costs; 3. Mineral Resources are estimated using an average long-term price of US$1,200/oz Au, US$3.50/lb Cu, US$17.00/lb Mo and US$21.00/oz Ag; 4. A minimum mining width of 5 m was used; 5. Metallurgical recovery factors of 89% Cu, 70% Au, 60% Mo and 75% Ag were used to derive the dollar value cut-off.

The MMTS study focused on a higher grade core of the deposit and delineated pit designs on the Central and South zones as follows:

Zone Category Tonnage
(Mt)
Cu
(%)
Au
(g/t)
Ag
(g/t)
Mo
(%)
Central Indicated 19.90 0.330 0.281 0.859  
  Inferred 0.90 0.332 0.207 0.839  
South Inferred 25.07 0.324 0.120 1.838 0.016*
 Note: NSR cut-off used is Cdn$11.90/tonne with a provision for mining loss of 5% and dilution of 2%

 And an underground Delineated Resource on the Central zone as follows:

Zone Category Tonnage
(Mt)
Cu
(%)
Au
(g/t)
Ag
(g/t)
Mo
UG1 Indicated 19.92 0.456 0.467 1.359 -
  Inferred 0.05 0.332 0.418 1.788 -
UG2 Indicated 7.82 0.472 0.470 1.273 -
Note: Includes all material within the conceptual stope design with a provision for mining loss of 10% and dilution of 15% 

The mine plan generates the following throughput over the project mine life.

Mine Production /
Total tonnes milled (Mt)
Cu (%) Au (g/t) Ag (g/t) Mo (%)
73.66 0.377 0.295 1.378 0.016*
* Note: Mo produced from South pit only.

All mineralized material classified as Indicated (65%) and Inferred (35%) Mineral Resources was considered in the mine plan. The PEA is preliminary in nature and it includes inferred mineral resources that are considered too speculative geologically to have the economic consideration applied to them that would enable them to be characterized as mineral reserves. Mineral resources that are not mineral reserves, do not have demonstrated economic viability and there is no certainty that the results of the PEA will be realized.

Economic Analysis

A Base Case economic evaluation was generated incorporating historical three-year-trailing averages for metal prices as at October 15, 2012 and a reasonable assumption for a US$/CDN$ exchange rate. Results are shown in the following table:

Parameter Unit Base Case
Metal Price    
Copper US$/lb 3.63
Gold US$/oz 1,427.00
Silver US$/oz 27.50
Molybdenum US$/lb 14.45
Exchange Rate US$/CDN$ $0.95
Economic Results(Pre-Tax)    
Undiscounted CDN$ M 567.1
NPV (at 5%) CDN$ M 262.6
NPV (at 8%) CDN$ M 143.3
IRR % 13.4
Payback years 7.3

Project Development Plan

The proposed project is to develop a green-fields copper-gold-silver-molybdenum deposit with a combination of open pit and block cave underground mining for the Central Zone and open pit mining for the South Zone combined with conventional milling and flotation concentration methods. The production rate assumed was 15,000 tonnes per day with a forecast mine life of 13.5 years. Mineral concentrate would be trucked approximately 190 kilometers to a rail load-out facility in Fort St. James and power would be provided by connecting to the existing Kemess mine power line which is connected to the provincial grid. Forecast mine production statistics are summarized in the following table:

Metal LOM Recovery LOM LOM
Grade % Total Production Annual Production
Copper (%) 0.377 89 (000s lbs) 544,892 40,512
Gold (g/t) 0.295 70 (000s oz) 489.0 36.4
Silver (g/t) 1.378 75 (000s oz) 2,448 182.0
Moly (%) 0.016* 60 (000s lbs) 5,251 390.0
* Note: Mo produced from South pit only.

Assumed capital and operating costs for the operation are as follows (in CDN$):

  • Initial capital of $363.6 million including open pit mining equipment and preproduction mining costs, underground equipment and initial development, processing plant, site infrastructure, access and power and a contingency of $58.5 million

  • LOM sustaining capital cost of $143.9 million including open pit sustaining, underground equipment and mine development and reclamation

  • Total weighted operating cost of $21.20 / tonne processed including: open pit mining $2.42 / tonne mined; LOM strip ratio of 3.5:1; underground block cave mining $7.50 / tonne; mill and tailings $10.87 / tonne; G&A $1.20 / tonne.

Opportunities to Enhance Value

Several opportunities exist to increase overall value of the project while simultaneously reducing total costs:

  • Optimization of the current mining plan in the Central Zone to determine most economic recovery method.

  • Additional economic underground resources are possible adjacent to the block cave stope outline used in this report.

  • A large mineralized envelope exists adjacent to the resource used in the current mine plan and offers expansion potential after proposed operation achieves capital payback.

  • Other properties in the local area may have the potential of using the Kwanika facilities on a commercial or joint venture basis.

  • Consideration could be given to reducing capital costs through use of contract mining and / or equipment leasing.

National Instrument 43-101 Disclosure.

The Kwanika PEA was prepared by Moose Mountain Technical Services (MMTS) under the direction of Jim Gray, P.Eng., a Qualified Person (as defined under National Instrument 43-101) who is independent of Serengeti and has reviewed and approved this news release.

Experts contributing to this study include David Rennie, P.Eng., of RPA, who completed the NI 43-101 resource assessment report, AMEC Consulting who produced a Caveability Assessment of the Kwanika Project and SGS Metallurgical Services Ltd. who have conducted a preliminary metallurgical test program on the Central Zone.

An updated national Instrument 43-101 Technical Report on the Kwanika Project describing the results of the PEA will be filed on SEDAR and be available on Serengeti's website at www.serengetiresources.com within 45 days.

David W. Moore, P.Geo., Serengeti Resources Inc. President & CEO is the Company's designated QP for this news release and has reviewed and validated that the information contained in the release is consistent with that provided by the QP's responsible for the PEA.

About Serengeti Resources Inc.

Serengeti is a mineral exploration company managed by an experienced team of professionals with a solid track record of exploration success. The Company is currently advancing its Kwanika copper-gold project and exploring its extensive portfolio of properties in the highly prospective Quesnel Trough of British Columbia. Additional information on Serengeti's projects can be found on the Company's website at www.serengetiresources.com. Serengeti is adequately funded to advance its projects with a current working capital position of approximately $1.7 million. Serengeti has 51.1 million shares issued and outstanding or 56.9 million shares on a fully diluted basis.

ON BEHALF OF THE BOARD

David W. Moore, P. Geo., President, CEO and Director

Cautionary Statement 

This document contains "forward-looking statements" within the meaning of applicable Canadian securities regulations. All statements other than statements of historical fact herein, including, without limitation, statements regarding exploration plans and other future plans and objectives, are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and future events and actual results could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from our expectations are disclosed in the Company's documents filed from time to time via SEDAR with the Canadian regulatory agencies to whose policies we are bound. A comprehensive list of risk factors is provided in the Company's Annual Information Form ("AIF") for the year ended February 29, 2012 and filed on SEDAR on July 11, 2012. Readers are further advised not to place undue reliance on forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

Paradox Public Relations
Investor Relations
514-341-0408 or toll free in North America: 1-866-460-0408
info@paradox-pr.ca
or
Serengeti Resources Inc.
604-605-1300
www.serengetiresources.com
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Serengeti Resources

EXPLORATION STAGE
CODE : SIR.V
ISIN : CA8174991064
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Serengeti Res. is a copper and gold exploration company based in Canada.

Serengeti Res. holds various exploration projects in Canada and in Mexico.

Its main exploration properties are CROY BLOOM, NECHAKO, OMENICA, KWANIKA, GERMANSEN-VALLEAU, QUEST and KEM in Canada.

Serengeti Res. is listed in Canada and in United States of America. Its market capitalisation is CA$ 35.1 millions as of today (US$ 28.1 millions, € 23.5 millions).

Its stock quote reached its highest recent level on December 31, 2007 at CA$ 4.80, and its lowest recent point on January 22, 2016 at CA$ 0.02.

Serengeti Res. has 71 540 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Serengeti Resources
12/7/2009company update featured in Resource Opportunities November p...
Annual reports of Serengeti Resources
2007 Annual Report
Financings of Serengeti Resources
7/22/2016Announces Oversubscription of Financing
10/23/2015Announces Equity Financing
6/16/2011Announces a Non-Brokered Flow-Through Private Placement
1/30/2009Extends Exercise Term of Warrants
5/5/2008 Extends Exercise Term of Warrants
1/29/2008Extends Exercise Term of Warrants
2/17/2007Closes Cdn$5.2 Million Private Placement Financing
Nominations of Serengeti Resources
3/28/2013Announces Appointment of New CFO
2/9/2011Announces Appointment of New Director
9/30/2009Appoints New Auditors
3/17/2008appoints new CFO
Project news of Serengeti Resources
7/27/2016(Kwanika)Begins Drilling at Kwanika Copper-Gold Project
1/22/2014Reports a Significant Expansion to its UDS Property
9/3/2013Summer Field Program Identifies Important Copper-Gold Target...
2/6/2013(Kwanika)Announces Positive PEA Results: $263 Million NPV for Kwanika...
8/29/2012(Tchentlo)Announces Results of Drilling at Choo and Tchentlo Propertie...
8/21/2012(Kwanika)Announces Start of Drill Program at Kwanika, Sampling Result...
7/25/2012(Kwanika)Completes Drill Program and Reports Results from Cuates Prop...
6/14/2012(Tchentlo)Drilling Funded by Freeport-McMoRan of Canada Limited underw...
5/24/2012Reports Recent Drilling Expands Victoria Mineralized Zone
5/8/2012Reports Initial Holes from Victoria, Commences Drilling at C...
3/20/2012Begins Drilling Program on Three Gold-Silver Properties in M...
9/15/2011(Croy Bloom)Identifies IP Anomaly Associated with High Grade Copper-Gold...
5/3/2011(Tchentlo)Phelps Dodge Corporation of Canada Enters into Agreement to...
3/4/2011(Kwanika)Files Kwanika 43-101 Report and Hires Paradox Public Relatio...
2/24/2011(Sutherland Stikine)Acquires Three Properties in the Highly Prospective Stikine ...
2/16/2011(Cristobal)-Mexico Exploration Update: Identifies Mineralized Systems o...
2/7/2011(Kwanika)Groundbreaking Geochemical Study Identifies New Target Adjac...
6/17/2010(Kwanika)Major Drill Campaign Commences at Kwanika Project
4/13/2010(Kwanika)to Drill at Kwanika to Expand South Zone
12/9/2009(Kwanika)initiates Kwanika South Zone Resource Study & Reports result...
10/26/2009(Tchentlo)Encouraged by Regional Exploration Results
8/26/2009(Kwanika)Intersects 0.78% Copper Equivalent over 150 meters in South ...
6/8/2009(Kwanika)Larger Summer Drilling Program on Kwanika and High Priority ...
2/25/2009(Kwanika)Resource Estimate Confirms 1.6 Million Ounce Gold
and 1....
9/11/2008(Kwanika)intersects 482 meters grading 0.51% Copper, 0.90 g/t Gold in...
8/1/2008(Kwanika)Intersects 65 meters grading 1.09% Copper, 1.21 g/t Gold and...
7/17/2008(Croy Bloom)Signs Major Option Agreement with Newcrest on Croy Bloom/Dav...
6/15/2008(Kwanika)Continues to Expand Central Zone at Kwanika
5/21/2008(Kwanika) makes new Copper-Moly discovery at Kwanika & Expands centra...
5/7/2008(Kwanika) Reports on Positive Mineralogical Study at Kwanika
4/23/2008(Kwanika)Continues to expand Copper-Gold zone at Kwanika
3/31/2008(Quest)Expand QUEST Project; Complete Additional Airborne Surveys
3/26/2008(Kwanika) Intersects 610 meters grading 0.74% Copper, 0.78 g/t Gold i...
2/12/2008(Kwanika)Intersects 280 M Grading 0.47 % Copper, 0.63 G/T Gold At Kwa...
1/23/2008(Quest)Large Airborne Magnetometer Survey Completed over QUEST Prop...
1/21/2008(Kwanika) Commences 2008 Drill Program at Kwanika Wins Northern BC Pr...
1/7/2008(Kwanika) Reports Additional Results from Kwanika Including 297 meter...
12/19/2007(Kwanika)Completes 2007 Drill Program at Kwanika
11/26/2007(Kwanika) Kwanika Copper-Gold Project
11/6/2007(Kwanika) Intersects Supergene Copper Zone at Kwanika Grading 0.76% C...
10/2/2007(Kwanika)Continues to Intersect Good Grade at Kwanika Including 159 M...
9/6/2007(Kwanika)Drills 48 meters of 0.75% Copper and 2.5 g/t Gold at Kwanika
8/15/2007(Kwanika)Update Second Drill Rig Mobilized to Kwanika
6/6/2007(Kwanika)Completes Initial Drill Program at Kwanika; Acquires Five Ne...
Corporate news of Serengeti Resources
7/26/2016President's Letter to Shareholders
4/27/2016Announces Grant of Options
10/23/2015Serengeti Announces Equity Financing
10/15/2015Serengeti Reports on Recent Exploration Results and Progress...
3/2/2015Serengeti Provides Update on Major Strategic Investment by S...
12/2/2014Serengeti Announces Terms of a Major Investment by Strategic...
12/1/2014Serengeti Announces Terms of a Major Investment by Strategic...
8/26/2014Serengeti Reports 6.7 Cu%, 5.9 g/t Au, 464 g/t Ag Assays fro...
6/24/2014Serengeti Announces Initiation of Targeted Summer Field Prog...
1/13/2014President's Letter to Shareholders
10/2/2013Reports 6.6% Cu from Rottacker Property
6/20/2013Announces Start of Summer Field Program
5/1/2013(Kwanika)Acquires Property near Colorado Resources' North Rok Copper-...
3/20/2013Announces Engagement of IR Firm and Option Grant
1/16/2013President's Letter to Shareholders
11/13/2012(Croy Bloom)Identifies High Grade Gold in Surface Sampling at Croy Bloom...
11/5/2012(Kwanika)Kwanika Drill Program Shows Copper-Gold System Open at North...
7/26/2012President's Letter to Shareholders
4/17/2012President's Letter
3/5/2012(Tchentlo)Freeport-McMoRan of Canada Limited to Fund 2012 Drill Progra...
2/7/2012Identifies Compelling Gold-Silver Target at Cuates; Plans F...
1/20/2012featured on CEO Clips on The Documentary Channel
1/19/2012Review of 2011 Exploration Programs in British Columbia
1/5/2012Identifies Large Geophysical, Geochemical Target Associated ...
9/21/2011(Quest)Enters into Agreement with Major Mining Company to Explore ...
8/17/2011s British Columbia Exploration Activities
6/30/2011President's Letter to Shareholders
6/30/2011(Kwanika)Completes Financing and Commences Drilling at Kwanika
5/3/2011(Tchentlo)Phelps Dodge Corporation of Canada Enters into Agreement to...
5/3/2011(Tchentlo)Phelps Dodge Corporation of Canada Enters into Agreement to...
7/27/2010Acquires Gold-Silver Properties in Mexico
5/27/2010Completes Airborne Survey at Tchentlo
4/20/2010presenting at Minerals North, Prince George
4/1/2010Announces Investor Relations Contracts
12/1/2009participating in Agoracom Online Gold & Commodities Conferen...
11/30/2009CEO clip featured on The Biography Channel
10/13/2009Commences Drilling on Choo and Mil Gold-Copper Targets near ...
8/6/2009President's Letter to Shareholders
6/1/2009Message to Shareholders
8/11/2008President's Letter to Shareholders
8/30/2007Retains BMK Communications, Grants Options
8/1/2007Fjordland Partner on QUEST Joint Venture
7/27/2007Announces Shareholders Rights Plan
7/10/2007Reports 312 meters of 0.27% Copper and 0.39 g/t Gold from Sp...
6/8/2007Announces Completion of $20 Million Financing
5/16/2007Announces $15 Million Bought-Deal Financing
5/15/2007Drills 328 meters of 0.61% copper and 0.72 g/t gold at its K...
4/24/2007Reports Drilling Progress on Kwanika Property
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (SIR.V)OTHER OTC (SGRNF)
0.490+2.08%0.550-7.56%
TSX-V
CA$ 0.490
03/04 14:49 0.010
2.08%
Prev close Open
0.480 0.490
Low High
0.490 0.500
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.490 -%
Volume 1 month var.
70,621 -%
24hGold TrendPower© : 13
Produces
Develops
Explores for Copper - Gold - Molybdenum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202125.64%0.510.36
202095.00%0.400.15
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.72-0.19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.03+1.47%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48+4.20%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.20-3.74%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.82-2.15%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.58+0.87%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :