Chart eurGOLD   Chart eurSILVER  
 
Matière à reflexion
C'est ce que nous croyons déjà savoir qui nous empeche le plus souvent d'apprendre
Claude Bernard  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1375,97-0,73
Silver 22,580,11
Platinum 1461,751,75
Palladium 747,203,00
MARCHES MONDIAUX
DOWJONES 1547689
NASDAQ 351614
NIKKEI 15627246
ASX 5142-14
CAC 40 404610
DAX 852149
HUI 2584
XAU 97-3
MONNAIES (€)
AUS $ 1,3286
CAN $ 1,3301
US $ 1,2884
GBP (£) 0,8556
Sw Fr 1,2608
YEN 133,0730
RATIOS & INDEXES
Gold / Silver60,94
Gold / Oil14,33
Dowjones / Gold11,25
MATIERES PREMIERES
Copper 3,400,07
WTI Oil 96,05-0,66
Nat. Gas 4,17-0,03
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
( 0 vote, 0/5 ) Imprimer l'article
     
Tweet

 

Richmont Mines .: updated cripple creek drill results confirm presence of gold mineralization 3 500 metre

 

 

 

 

 

- Richmont Mines Inc. (TSX:RIC - News; NYSE Amex:RIC)("Richmont" or the "Company") is pleased to announce complete results from the second phase of its 2010 surface drilling campaign at its Cripple Creek property, located west of the Timmins Gold Camp in Ontario.

Highlights:




--  New results from Zone 16 include: 3.79 g/t Au over 16.35 metres, 4.55
    g/t Au over 7.1 metres, 3.57 g/t Au over 5.6 metres, 26.34 g/t Au over
    0.55 metres, and 15.81 g/t Au over 0.4 metres;
--  Extensions of Zone 16 to the west and at depth reveal promising
    potential;
--  An additional campaign of 3,500 metres planned for winter 2011.

As detailed in the table below, the second phase of drilling yielded several interesting intercepts, including 3.79 g/t Au over 16.35 metres in hole CC-10-57. Notably, this result confirmed that the alteration zone containing the intercept of 73.53 g/t Au over 7 metres in hole CC-10-45 previously-released with results from the first phase of drilling (please see the release entitled "Richmont Mines Announces Start of a 3,500 Metre Drilling Campaign on Its Cripple Creek Property" published on June 10, 2010 for full details), broadens near surface.

New drilling results from Cripple Creek (1)




                                                                  Length of
                Length of hole                                    intercept
Hole Number           (metres)  From (metres)    To (metres)       (metres)
---------------------------------------------------------------------------
CC-10-56                   173     Abandoned due to technical difficulties.
---------------------------------------------------------------------------
CC-10-57                   467         267.35          267.9           0.55
                                        285.2          286.2           1.00
                                       289.25            290           0.75
                                          322            323           1.00
                                       325.65            342          16.35
                                          344            345           1.00
                                          346            347           1.00
                                        357.7         358.75           1.05
                                        371.3          378.4           7.10
                                          380         380.65           0.65
                                          393            394           1.00
                                          413            414           1.00
---------------------------------------------------------------------------
CC-10-58                   512           .301            303           2.00
                                        307.5          309.5           2.00
                                       315.75          316.4           0.65
                                          332            333           1.00
                                          337            338           1.00
                                       339.65          340.5           0.85
                                        361.5          362.5           1.00
                                          430            431           1.00
                                          434            435           1.00
                                          487            489           2.00
---------------------------------------------------------------------------

                                                              Vertical depth
                    True Width       Grade           Type of of intersection
Hole Number        (metres)(2)    (g/t Au) mineralization(3)        (metres)
----------------------------------------------------------------------------
CC-10-56                                                                   
----------------------------------------------------------------------------
CC-10-57                   0.4       26.34                VN           205 m
                           0.9        1.41                VN               
                           0.5        6.10               DIS               
                                      1.85                VN               
                                       3.8            DIS+VN           255 m
                           0.7        1.37            DIS+VN               
                           0.7        1.34            DIS+VN               
                           0.7        2.19               DIS               
                                      4.55            DIS+VN           285 m
                           0.5        6.21               DIS               
                           0.7        5.07               DIS           300 m
                           0.7        1.44            DIS+VN               
----------------------------------------------------------------------------
CC-10-58                   1.3        2.38               DIS           230 m
                                      2.73            DIS+VN           235 m
                                      1.51            DIS+VN               
                           0.5        4.49               DIS           252 m
                           0.5        2.78               DIS           260 m
                                      1.85            DIS+VN               
                                      1.47            DIS+VN               
                           0.8        3.15               DIS           325 m
                           0.8        5.18               DIS           330 m
                                      3.77                VN           368 m
----------------------------------------------------------------------------
                    Length                                  Length of
                    of hole          From         To        intercept
Hole Number        (metres)       (metres)  (metres)         (metres)
---------------------------------------------------------------------
CC-10-59                521          333.9     334.5             0.60
                                       393     393.4             0.40
                                       455    455.85             0.85
                                     468.9       470             1.10
                                    498.05       499             0.95
---------------------------------------------------------------------
CC-10-60                542         371.35     371.8             0.45
                                       444     449.6             5.60
                                     462.5     463.5             1.00
                                     468.5       470             1.50
                                     471.1     472.2             1.10
                                       474       475             1.00
                                     514.5     516.4             1.90
                                     522.8     523.4             0.60
---------------------------------------------------------------------
CC-10-61                776          109.1     109.5             0.40
                                    151.15       152             0.85
                                     198.5       200             1.50
                                     694.6     695.6             1.00
                                    700.55     701.6             1.05
                                    731.95     732.8             0.85
---------------------------------------------------------------------
Metres                                                              
 drilled:             2,991                                         
---------------------------------------------------------------------

                                                                   Vertical
                                                                    depth of
                 True Width                          Type of    intersection
Hole Number     (metres)(2) Grade (g/t Au) mineralization(3)        (metres)
----------------------------------------------------------------------------
CC-10-59                              3.57                VN           270 m
                                     15.81            DIS+VN           315 m
                        0.8           1.03               DIS           365 m
                        1.0           1.65               DIS           375 m
                        0.7           1.10                VN           400 m
----------------------------------------------------------------------------
CC-10-60                              1.54                VN           330 m
                                      3.57            DIS+VN           395 m
                        0.9           1.23                VN               
                        1.1           1.92               DIS               
                                      1.10                VN                
                                      5.59            DIS+VN           420 m
                        1.7           1.39                VN           455 m
                        0.5           1.92                VN           460 m
----------------------------------------------------------------------------
CC-10-61                              1.13                VN               
                                      2.06                VN               
                                      4.70            DIS+VN               
                                      1.92               DIS               
                                      2.19            DIS+VN           620 m
                        0.6           2.16                VN           650 m
----------------------------------------------------------------------------
Metres                                                                     
 drilled:                                                                  
----------------------------------------------------------------------------

1.  Please see the Regulation 43-101 at the end of this release for full
    analysis details.
2.  True width available when determinable, rounded to the nearest decimal.
3.  DIS : Disseminated sulphides, VN : Veins, DIS+VN : Disseminated
    sulphides and veins

While much exploration work remains to be done on this property, the Company obtained additional geological insight from the second phase of the 2010 drilling campaign, which encompassed 6 holes over 2,991 metres. Most importantly, drilling reaffirmed the gold potential of the sector, and also enabled for better understanding of the mineralization. Results from the campaign also confirmed the continuity of the main mineralized zone to a vertical depth of 650 metres and that the alteration pipe of Zone 16 extends at depth. Furthermore, drilling revealed that two types of mineralized zones are present. The first, containing disseminated pyrite, has a northern dip of approximately 65 degrees and is found at the contact points of silicified mafic volcanics and ultramafic volcanics. The second system, formed by milky quartz veins containing iron carbonate and mineralized with gold, appears to be sub-horizontal, and cross-cuts other geological formations. Interpretation of this new information makes establishing true width of the mineralized gold zones difficult when they consist of the two types of mineralization.

Richmont is planning to drill an additional 3,500 metres in the winter 2011. The goal of this upcoming exploration program is to confirm the new interpretation of Zone 16 provided by results obtained to date, to better target mineralized zones, and to test the extension of the Mahoney Zone at depth.

About Richmont Mines Inc.

Richmont Mines has produced over 1,000,000 ounces of gold from its operations in Quebec, Ontario and Newfoundland since beginning production in 1991. With extensive experience in gold exploration, development and mining, the Company is well positioned to cost-effectively build its North American reserve base through a combination of organic growth, strategic acquisitions and partnerships. Richmont routinely posts news and other important information on its website (www.richmont-mines.com).

Forward-Looking Statements

This news release contains forward-looking statements that include risks and uncertainties. When used in this news release, the words "estimate", "project", "anticipate", "expect", "intend", "believe", "hope", "may" and similar expressions, as well as "will", "shall" and other indications of future tense, are intended to identify forward-looking statements. The forward-looking statements are based on current expectations and apply only as of the date on which they were made.

The factors that could cause actual results to differ materially from those indicated in such forward-looking statements include changes in the prevailing price of gold, the Canadian-United States exchange rate, grade of ore mined and unforeseen difficulties in mining operations that could affect revenue and production costs. Other factors such as uncertainties regarding government regulations could also affect the results. Other risks may be set out in Richmont Mines' Annual Information Form, Annual Reports and periodic reports.

Regulation 43-101

The exploration program was conducted by qualified persons as defined by Regulation 43-101. Specifically, the program was overseen by Mr. Gregoire Bastien, Geo., B. Sc. A, a qualified person as defined by Regulation 43-101, and an employee of Richmont Mines Inc., under the supervision of Mr. Daniel Adam, Geo., Ph.D., Exploration Manager, a qualified person as defined by Regulation 43-101, and an employee of Richmont Mines Inc.

The analyses were conducted at the Lab-Expert laboratory in Rouyn-Noranda, Quebec, by means of fire assay fusion with atomic absorption (AA) and gravimetric finish.

 

 

Tweet

Richmont Mines Inc

PRODUCTEUR
CODE : RIC.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Richmont Mines Inc
07/01/2010Updates its 2010 Investor Presentation
Dans les médias de Richmont Mines Inc
30/11/2012Richmont Mines to shut Quebec gold mine
29/04/2011Richmont Mines Stock Hits New 52-Week High (RIC)
22/02/2011Strong gold sales boost Richmont Mines Q4 profit
10/02/2011Richmont Mines Shows Why Gold and Silver Bars Don't Cut It
Rapports annuels de Richmont Mines Inc
Form 20-F / Annual Report For Foreign Private Issuers
2008 annual report
Annual Report 2006
Financements de Richmont Mines Inc
01/02/2012. Completes CAN$ 10 M Private Placement with Mr. Bob Buchan
01/06/2006announces closing of a bought deal of common shares
Nominations de Richmont Mines Inc
15/05/2009Announces Appointments to Board of Directors
Rapports Financiers de Richmont Mines Inc
09/05/2013Reports First Quarter 2013 Results
21/02/2013Reports Full Year 2012 and Fourth Quarter Results
08/11/2012Reports Results for the Third Quarter of 2012
03/08/2012Announces Second Quarter 2012 Results
23/02/2012Reports Record Full Year 2011 and Strong Fourth Quarter Resu...
07/11/2011Reports Solid Revenue and Earnings Growth in the Third Quart...
22/02/2011Reports Strong Fourth Quarter and Full Year 2010 Results
22/02/2011annonce d'excellents résultats pour le quatrième trimestre e...
30/07/2009TR: Richmont Mines- News Release - Second Quarter 2009
07/05/2009Reports Strong Revenue and Net Income in the First Quarter o...
26/02/2009(Island Gold)Reports Record Sales for the Fourth Quarter and Full Year 20...
22/01/2009(Beaufor Mine)Reports Gold Sales More Than Double in 2008 Fourth Quarter
22/01/2009(Island Gold)Reports Gold Sales More Than Double in 2008 Fourth Quarter
19/08/2008Second Quarter 2008 Fact Sheet
31/07/2008Reports 27.4% Increase in Revenue in the Second Quarter of 2...
23/05/2006announces re-statement and re-filing of first quarter financ...
Projets de Richmont Mines Inc
09/01/2013(Monique). Receives Mining Permit for Monique Gold Project
17/02/2011(Wasamac)annonce des ressources de plus d'un million d'onces d'or à l...
17/02/2011(Wasamac)Announces Resources of Over 1 Million Ounces of Gold at Its ...
21/01/2011(Francoeur Mine)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
21/01/2011(Beaufor Mine)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
21/01/2011(Island Gold)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
16/12/2010(Cripple Creek).: Updated Cripple Creek Drill Results Confirm Presence of G...
08/12/2010(Wasamac).: Additional Drilling Results Reaffirm Potential of Wasamac...
28/09/2010(Monique)Begins a 5,500 Metre Surface Drilling Program on its Monique...
21/09/2010(Beaufor Mine)Announces Updated Surface Drilling Results at the Beaufor Mi...
31/08/2010(Wasamac)Obtains Favourable Preliminary Drilling Results on its Wasam...
08/04/2010(Wasamac)Announces a 10,000 Metre Surface Drilling Program on Its Was...
07/08/2009NI 43-101 report on the Francoeur Gold Project
27/04/2009(Francoeur Mine)Begins Dewatering at its Francoeur Project
01/10/2008(Beaufor Mine)EXPLORATION DRILLING CONFIRMS MINERALIZATION AT BEAUFOR MINE...
16/08/2007(Valentine Lake (leprechaun))Today's Mountain Lake News
09/06/2006(Valentine Lake (leprechaun))satisfera les exigences d'acquisition de 2006 pour le projet...
08/06/2006(Valentine Lake (leprechaun))proceeds with earn-in requirements at Valentine Lake
26/05/2006Mise à jour du projet Island Gold renseignements concernant ...
26/05/2006Island gold project update information concerning East amphi...
24/02/2006annonce ses résultats pour 2005 et une dévaluation d'élément...
Communiqués de Presse de Richmont Mines Inc
12/04/2013(Island Gold).: Island Gold Deep 43-101 Report Filed on Sedar; New Drill ...
22/11/2012(Island Gold).: Latest Drill Results at Island Gold Mine Continue to Conf...
24/09/2012Announces the Immediate Retirement of CAN$10 Million Debentu...
12/04/2012Gold Industry Veteran Ebe Scherkus to Join the Richmont Mine...
11/01/2012Gold Industry Veteran Bob Buchan Joins the Board of Director...
31/10/2011. Completes Can$10.3 Million Private Placement
09/08/2011Announces a Significant Increase in Earnings and Cash Flow f...
09/05/2011(Wasamac)Signs Option Agreement With Globex; Expands Wasamac Explorat...
29/03/2011. Confirms and Amends its Shareholder Rights Plan
17/06/2010Completes Equity Financing
02/06/2010Announces Terms of Equity Financing
01/06/2010Announces Equity Financing
12/04/2010hits 73.54 g/t Au over 7 metres on its Cripple Creek Propert...
25/02/2010Q4 and F2009 Results
04/02/2010Shareholders Elect Four New Board Members at Special Shareho...
16/12/2009 Four board nominations at Richmont Mines - Building the nex...
29/10/2009Q3 2009 Release
30/03/2009Announces Death of Chairman
16/12/2008 Acquires Patricia Mining Corp.
03/12/2008 Announces Acceptance of Normal Course Issuer Bid
04/09/2008AND LKA AGREE TO EXTEND INITIAL COMMITMENT PERIOD TO COMPLET...
10/07/2008TO START DRILLING AT THE GOLDEN WONDER PROJECT
22/02/2007MINES RICHMONT ANNONCE UNE AUGMENTATION DE 21 % DES VENTES D...
01/06/2006Annonce la cloture de la prise ferme d'actions ordinnaires
23/05/2006Révise te redépose ses résultats du 1er trimestre 2006
18/05/2006Focus on profitable growth
18/05/2006Orienté vers une croissance rentable
05/04/2006Orienté vers la croissance
26/01/2006and Patricia Mining Corp. Announce the purchase of the remai...
23/01/2006Annonce la mise en production du projet Est Amphi
07/12/2005Réalise un placement privé d'actions ordinaires accréditives
04/10/2005mise à jour des travaux à la mine Beaufor, à la propriété Ea...
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (RIC.TO)AMEX (RIC)
1,75+2.94%1,70+1.19%
TORONTO
CA$ 1,75
22/05 11:02 0,050
2,94%
Cours préc. Ouverture
1,70 1,73
Bas haut
1,71 1,83
Année b/h Var. YTD
1,70 -  3,40 -41,08%
52 sem. b/h var. 52 sem.
1,70 -  6,77 -68,69%
Volume var. 1 mois
17 450 -11,17%
24hGold TrendPower© : -44
Produit Gold
Développe Gold
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
2013-67,17%
2012-51,81%9,3210,74
2011116,86%9,9810,15
201036,00%5,713,78
200990,36%4,932,04
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois