Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Sphinx Resources

Publié le 31 juillet 2013

=3A Donner Metals Mineralization Extended=2C New Copper Zone Discovered

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Facebook | Zinc |
Donner Metals Exploration News Update
View this email in your browser

News: Mineralization Extended at McLeod Deep and Bracemac KT Zones - New Copper Zone Discovered Northwest of Bracemac-McLeod


JULY 31, 2013, Montreal, Qu�bec: Mr. Harvey Keats, Chief Executive Officer of Donner Metals Ltd. (�Donner� or the �Company�) (TSXV-DON), provides an update on drilling at McLeod Deep, Bracemac-McLeod as well as on regional exploration targets. Results include the extension of massive and semi-massive sulphide mineralization, associated with extensive alteration, down plunge of McLeod Deep and a new intercept of zinc-rich sulphides immediately northwest of the Bracemac KT zone, which is currently being mined. Additionally, a new sulphide discovery has been made on the North Flank JV property that grades 2.06% copper over 4.9 metres, located 13 kilometres northwest of the Bracemac-McLeod Mine and 7 kilometres northwest of Matagami mill.
 
McLeod Deep (Bracemac-McLeod JV)
 
Nine new intersections of massive and semi-massive sulphides are reported from the McLeod Deep Zone (Table 1). In addition to mineralized intersections within this zone, mineralization has been extended down-plunge of the Inferred Mineral Resource envelope (Figure 1) in diamond drill holes MC-13-30WA and MC-13-30WB. Both holes intersected well-developed pipe alteration below the sulphide mineralization suggesting the hydrothermal system is robust in the area. Drilling is on-going with four drills.
 
Bracemac-McLeod Mine Area (Bracemac-McLeod JV)
 
Exploration drilling is in progress between the Bracemac and McLeod zones. Six widely-spaced holes have been completed to date targeting the Key Tuffite horizon. Anomalous base metal values were encountered to the east of the Bracemac-KT zone. Results are reported in Table 2 and Figure 2. One drill is active in this area.
 
Three underground exploration holes were drilled immediately northwest of the Bracemac KT zone in the upper structural plate of the Key Tuffite Horizon (Figure 2). UBRC-EXP-001 intersected 6.8 metres of approximately 20% sphalerite, 50 metres from the main ramp in an area not previously known to be mineralized. Two additional holes intersected weak mineralization.
 
Regional Exploration (North Flank JV)
 
Six drill holes were completed in the DJV area located 7 kilometres northwest of the Matagami mill. Drilling returned the first discovery of semi-massive copper-rich sulphides within a 1.2 kilometre wide zone of chlorite-silica-pyrite alteration. Exploration in this area is targeting a newly identified trend of the favourable Key Tuffite Horizon that was first identified in 2012 (see news release dated February 21, 2012). DJV-13-105 intersected 2.06% copper over 4.9 metres (3.58 metres estimated true width) at the Key Tuffite Horizon underlain by extensive chlorite and silica alteration. DJV-13-103 returned an intercept of 3.44% copper over 0.90 metres in pipe alteration approximately 1 kilometre east of DJV-13-105. One drill is active in this area.
 
SUPPLEMENTARY INFORMATION
 
The Bracemac-McLeod deposit contains Proven and Probable Mineral Reserves of 3.7 million tonnes grading 9.60% zinc, 1.26% copper, 28.25 g/t silver and 0.43 g/t gold and commenced production on May 15, 2013. Inferred Mineral Resources of 2.6 million tonnes grading 8.79% zinc, 1.31% copper, 38.84 g/t silver and 1.06 g/t gold are located in proximity to the Mineral Reserves. The Company is a partner with Glencore in six separate joint venture properties in the Matagami base metal camp located in the Abitibi region of Qu�bec. This joint venture partnership covers claims, mining licences and other direct mineral interests (collectively the �Matagami Project�) at either 50%/50% or 65%/35% Glencore / Donner joint venture interests (see property map posted at www.donnermetals.com). The Matagami Project covers prime volcanic stratigraphy in which high-grade zinc and copper massive sulphide deposits have been discovered and mined since 1963.
 
The Bracemac-McLeod Mine and area as well as the McLeod Deep exploration program are governed under the Bracemac-McLeod joint venture (65% Glencore � 35% Donner). The DJV area program is governed under the North Flank joint venture (50% Glencore � 50% Donner).
 
Additional information is available at www.donnermetals.com.
 
Glencore is the project operator for the Matagami Project and all of the respective joint ventures. As operator, Glencore is responsible for the execution of all development, production, processing smelting and refining activities related to the Bracemac-McLeod Mine as well as with respect to the exploration programs conducted on the Matagami Project. This includes resource evaluation, sampling, submittal of samples for assay, assay verification, metallurgical evaluation and QA/QC.  Sample preparation and assaying are conducted by AGAT Laboratories in Sudbury, Ontario (zinc, copper and silver by atomic absorption, and gold by standard fire assay procedures).
 
Robin Adair (VP of Exploration) is a Qualified Person for Donner Metals Ltd and is responsible for the technical information reported in this news release.
 
ON BEHALF OF THE BOARD OF
DONNER METALS LTD
 
�Harvey Keats�
Chief Executive Officer
 
Certain phrases and or descriptions in this news release are �forward-looking statements�. Forward-looking statements contain wording such as �are expected� in reference to descriptions of mineralized core in the absence of assays which may be pending at the time of this news release. Such statements and or descriptions are applicable specifically to a visual review of drill core. Such descriptions are visual in nature and describe minerals present. Such descriptions do not imply a specific grade of zinc, copper, silver or gold to the interval described in the absence of accredited analytical data. Estimations of grades by the reader based on these descriptions involve uncertainties and other factors which may result in significant differences (either positive or negative) between descriptions and future assay results. The reader is cautioned not to place any undue reliance on descriptions in lieu of actual assay results. Further discussion of �forward looking statements� and the risks inherent to mineral exploration and development, in relation to Donner�s activities, can be found on the Company�s website at www.donnermetals.com.

Table 1 view at www.donnermetals.com/news/2013View table 2  www.donnermetals.com/news/2013
View at www.donnermetals.com/news/2013
View www.donnermetals.com/news/2013
View this news release and more here http://donnermetals.com/news/2013
Website
Twitter
LinkedIn
Facebook
Copyright � 2013 Donner Metals Ltd, All rights reserved.

    

Sphinx Resources

EXPLORATEUR
CODE : SFX.V
ISIN : CA8484221012
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Sphinx est une société développant des projet miniers de zinc et de cuivre basée au Canada.

Sphinx est en développement de projets de zinc, de cuivre, d'argent et d'or au Canada.

Son principal projet en développement est PD1 au Canada et ses principaux projets en exploration sont SOUTH VOISEY BAY, WEST RAGLAN et MATAGAMI au Canada.

Sphinx est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 838 700 CA$ (670 585 US$, 587 432 €).

La valeur de son action a atteint son plus haut niveau récent le 26 août 2016 à 0,14 CA$, et son plus bas niveau récent le 06 décembre 2022 à 0,01 CA$.

Sphinx possède 83 870 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Sphinx Resources
08/08/2013Announces Second Closing of Private Placement
08/08/2013=3A Donner Metals announces closing of private placement
09/07/2013=3A Financing Update
24/06/2013Announces Financing
14/11/2012Announces Closing of C$1,439,000 Final Tranche Private Place...
28/02/2012Increases Private Placement Financing
27/02/2012Announces C$10,000,000 Private Placement Financing
27/10/2011Announces C$2,440,000 of Private Placement Financings
27/07/2011$3 Million Private Placement
25/07/2011Funds Received, Private Placement Closed
13/07/2011Financing News
15/02/2010Additional Private Placement Closings
16/11/2009Private Placements close
14/05/2009Non-Brokered Financing
07/01/2008 $3.2 Million Private Placement Closed
17/12/2007 Private Placement Increased to $3.2 Million
07/12/2007 $2.0 Million Private Placement
Projets de Sphinx Resources
10/12/2013Donner Metals Acquires Option on Valmond Gold Property from ...
30/10/2013(Matagami)Matagami Exploration Joint Ventures Update
03/09/2013=3A Donner Forfeits Interest in Bracemac=2DMcLeod
13/08/2013=3A Donner Metals Bracemac=2DMcLeod Interest
13/08/2013Bracemac-McLeod Interest
31/07/2013=3A Donner Metals Mineralization Extended=2C New Copper Zone...
12/07/2013=3A Donner Metals Update on Production at Bracemac=2DMcLeod
12/07/2013Update on Bracemac-McLeod Production
22/05/2013More High-Grade at McLeod Deep
16/05/2013Production has started!
16/05/2013Production Commences at Bracemac-McLeod
01/11/2012Development and Exploration Update
05/09/2012Bracemac-Mcleod Continues on Target
06/07/2012Provides Exploration Drilling Update
06/07/2012=3A Higher Production at Bracemac=2DMcLeod
05/07/2012Higher Production at Bracemac-McLeod
22/02/2012(Matagami)Ltd=2E: New Drilling Continues to Demonstrate Potential of M...
16/01/2012Ltd=2E: Bracemac-McLeod Mine Development Continues to Track ...
25/10/2011Ltd=2E: Bracemac-McLeod Mine Development Tracking On Budget ...
26/04/2011(Matagami)Completes Earn-In on the Matagami Project
06/03/2011(Matagami)Bracemac-McLeod Ramp Moves Past 660 Metres
10/02/2011(Pd1) Matagami Project Advances as the PD1 Deposit Moves to Feasi...
12/07/2010(Matagami)Drilling Extends McLeod Deep Discovery
07/03/2010(Matagami)Bracemac-McLeod Update
16/02/2010(Matagami)McLeod Deep Discovery Expanded-7.50 Metres Grading 10.27% Zi...
23/11/2009(Matagami)Expanded Winter Drill Progam Initiated at Matagami
01/10/2009(Matagami)Bracemac-McLeod Feasibility Advances as Exploration Continue...
15/07/2009(Matagami) BRACEMAC-MCLEOD advances to feasibility
05/06/2009(Matagami)on BNN and Matagami Project Details
25/05/2009(Matagami)Drilling to Resume at Matagami; Scoping Study Nears Completi...
26/02/2009(Matagami)BRACEMAC-MCLEOD NI 43-101 INDICATED RESOURCE: 3,623,000 TONN...
26/02/2009(Matagami)UPDATED BRACEMAC-MCLEOD NI 43-101
11/02/2009(Matagami)featured on Minesite.com
26/01/2009(Matagami)NI43-101 Resource
23/01/2009(Matagami)INITIAL BRACEMAC-MCLEOD NI43-101 INDICATED RESOURCE
12/11/2008(Matagami)Assays Return High-Grade Zincand Copper from the McLeod Disc...
05/09/2008Provides Initial Results From a Single Drill Hole Program on...
27/05/2008(Matagami)Four New High GradeIntersections at Bracemac/McLeod Includin...
09/05/2008(Matagami)13.47% Zinc, 2.33% Copper Over 6.95 Metres Intersected at Br...
11/04/2008High Grade Discovered Between Bracemac and McLeod
03/03/2008New High Grade Intersections Expand Zones at Bracemac and Mc...
09/01/2008 Drilling Intersects 9.48% Zinc and 2.81% Copper Over 6.00
Communiqués de Presse de Sphinx Resources
30/12/2013Announces Completion of Share Consolidation
13/12/2013Announces Results From AnnualGeneral and Special Meeting and...
14/11/2013Annual and Special General Meeting
18/07/2013Announces Closing of C$2,807,010 Placement
08/07/2013=3A Copper Stream with Sandstorm Amended
08/07/2013Donner Metals Copper Stream With Sandstorm Amended
14/03/2013Announces Financial Support from Quebec Institutions
15/01/2013Stock Options Granted
01/11/2012Ltd=2E: Increased Upfront Paymen =?ISO-8859-1?Q?t=20From=20S...
22/10/2012Announces Results from Annual General Meeting, Head Office M...
22/10/2012Announces Results from Annual General Meeting, Head Office M...
04/10/2012Underground photos and video updates from Donner Metals
19/09/2012Ltd=2E: Mcleod Zone Extended Up-Dip: Exploration Drilling In...
28/08/2012=3A President's Message
17/04/2012Normand Champigny Appointed President of Donner Metals
23/02/2012Sandstorm Partners With Donner Metals
22/02/2012Ltd=2E: Development to Reach the McLeod Zone a Year Ahead of...
22/02/2012News Release
20/01/2012Join us at at the Vancouver Resource Show and Exploration Ro...
01/09/2011September Video update from Donner Metals
13/07/2011Sandstorm Provides US$25 Million Senior Financing
14/04/2010Definition Drill Program Completed at Bracemac-McLeod
03/02/2010$2,409,930 Financing Closed
30/01/2010Financing Increased
08/09/2009engineering contract and fast-tracked feasibility
24/08/2009Two Near Term Production Stories
22/06/2009Industrial Alliance Features Report on Donner Metals
19/05/2009A "Green Shoot" Rising
14/05/2009Is At The Starting Gate
26/02/2009Hotsheet
18/02/2009positioned for success
09/02/2009featured in Mining Journal
12/12/2008$1,048,000 Financing Closes
04/12/2008 AND XSTRATA ZINC CANADA WIN INTERNATIONAL EXPLORATION AWARD
25/11/2008$1.0 Million Financing
18/11/2008Donner Metals has fast-track potential says Reinhard
31/07/2008 Drilling Continues toDelineate and Expand Mineralization at...
01/08/2008Hotsheet for 7/31/2008
28/05/2008$3 Million Debenture Offering
27/05/2008Hotsheet for 5/27/2008
11/04/2008Hotsheet for 4/11/2008
20/03/2008March Chairman's Letter
05/03/2008Hotsheet for 3/5/2008
01/02/2008Engages Mau Capital to Provide Investor Relations
08/01/2008Hotsheet for 1/8/2008
07/12/2007Chairman's Letter
28/11/2007Expands Interest in Matagami Camp
08/11/2007Join us at the San Francisco Hard Assets Investment Conferen...
22/10/2007 Hotsheet for 10/21/2007
02/08/20076 New Massive Sulphide =?ISO-8859-1?Q?=20Intersections,=20In...
14/06/2007New Zinc-Copper Discover 9.24% Zinc, 0.99% Copper Over 27.95...
07/06/2007Bracemac Yields Additional Results With New Mineralization I...
11/04/2007Copper-Rich Massive Sulphides Intersected in BRC-07-32 in th...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (SFX.V)
0,010+0.00%
TSX-V
CA$ 0,010
06/12 09:30 -
0%
Cours préc. Ouverture
0,010 0,010
Bas haut
0,010 0,010
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,010 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -9
Produit
Développe
Recherche Copper - Gold - Nickel - Palladium - Platinum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,11 US$+2,21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,47 CA$+3,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,25 CA$-3,42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-3,76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :