Chart eurGOLD   Chart eurSILVER  
 
Matière à reflexion
La démocratie c'est deux loups et un mouton à table se demandant ce qu'ils vont manger ce soir. La liberté est un mouton bien armé defendant son choix.
.  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1375,50-1,20
Silver 22,46-0,02
Platinum 1462,202,20
Palladium 743,75-0,45
MARCHES MONDIAUX
DOWJONES 1538853
NASDAQ 35026
NIKKEI 15511130
ASX 5156-29
CAC 40 403613
DAX 847216
HUI 254-7
XAU 97-3
MONNAIES (€)
AUS $ 1,3196
CAN $ 1,3269
US $ 1,2921
GBP (£) 0,8525
Sw Fr 1,2528
YEN 132,5500
MONNAIES (€)
AUS $ 1,3196
CAN $ 1,3269
US $ 1,2921
GBP (£) 0,8525
Sw Fr 1,2528
YEN 132,5500
RATIOS & INDEXES
Gold / Silver61,24
Gold / Oil14,32
Dowjones / Gold11,19
MATIERES PREMIERES
Copper 3,33-0,01
WTI Oil 96,05-0,66
Nat. Gas 4,200,01
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
Aurizon Announces the Completion of the Marban Block Phase Two Drilling; New Zone Discovered Returns 19.21 Grams of Gold Per Tonne Over 5.6 Metres
Published : August 15, 2012
( 0 vote, 0/5 ) Imprimer l'article
     
Tweet
Mots clés associés :   Abitibi | Atomic | Aurizon Mines | Canada | Mineral Resources | Niogold | Reliance | Report | Total |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Aug. 15, 2012) - Aurizon Mines Ltd. (News - Market indicators)(NYSE MKT:AZK)(NYSE Amex:AZK) is pleased to report that the Phase Two exploration program on NioGold's Marban Block property, located in the Malartic gold camp of Quebec's Abitibi region, is now complete. The results from the final 31 drill holes conclude a successful program which identified a new high grade zone approximately 500 metres north of the Marban deposit and 350 metres south of the Norlartic deposit.

The best results from the new zone are:

  • 19.40 g/t Au over 1.2 metres on section 3600 at a vertical depth of 92 metres (MB-12-323)
  • 19.21 g/t Au over 5.6 metres on section 3600 at a vertical depth of 215 metres (MB-12-324)

This discovery occurred in the 13 exploration holes which were drilled outside the Marban deposit limits. Five (5) holes investigating the stratigraphy of the Marban deposit at depth between 400 and 800 metres, have revealed the continuity of the Marban system down to a vertical depth of 780 metres with one hole in particular, MB-12-322 (1.77 gold grams per tonne over 6.5 metres), which is approximately 450 metres from the deepest information on that section of the deposit. North of the Marban deposit, a group of five (5) holes intersected the Norlartic system, of which two (2) intersected high grade mineralization. In addition, a fence of three (3) holes was drilled between 400 and 800 metres south of the Marban deposit.

Results from a further 18 holes of the Phase Two program are distributed on a strike of 1,025 meters and include the Eastern Down Dip Zone ("EDDZ") and Western High Grade Zone ("WHGZ").

Drilling highlights include:

The best results from the EDDZ include:

  • 3.74 grams of gold per tonne over 6.4 metres on section 4700 at a vertical depth of
    245 metres (MB-12-317)
  • 4.51 grams of gold per tonne over 6.0 metres on section 4700 at a vertical depth of
    245 metres (MB-12-317)

In-fill drill holes on the WHGZ include the following highlights:

  • 19.35 grams of gold per tonne over 1.2 metres on section 3725 at a vertical depth of 100 metres (MB-12-309)
  • 20.70 grams of gold per tonne over 0.7 metres and 14.65 grams of gold per tonne over 1.2 metres on section 3675 at a vertical depth of 50 metres and 60 metres respectively (MB-12-312)
  • 1.31 grams of gold per tonne over 19.7 metres on section 3700 at a vertical depth of 35 metres (MB-12-314)
  • 21.40 grams of gold per tonne over 0.9 metres on section 3850 at a vertical depth of 30 metres
    (MB-12-327)

The Phase Two program was completed on May 31, 2012, with a total of 34,658 metres distributed in 90 holes and 9 extensions of previous holes. The main target was the Marban deposit where in-fill drilling was performed mainly in the WHGZ but also along the deposit to increase the quality of the resource at shallow depth. Attempts at extending the deposit to depth and along strike were also successful as indicated by results obtained on the EDDZ. Thirteen holes were drilled of a more exploratory nature geological interpretation is in progress and will be completed shortly.

"The remaining results from the Phase Two program on the Marban Block are encouraging indicating that other structures surrounding Marban may have the potential to deliver high grade results combined with strong metal factors." said George Paspalas, Aurizon's President and CEO. "An important milestone will be achieved in the near future with the completion of a first resource estimate focusing on the Marban surface deposit."

Exploration Hole Results

Hole Easting
(m)
  Northing
(m)
  Azimuth   Dip   Hole
Length
(m)
  From (m)   To (m)   Length (m)   Grade
(g/t Au)
  Zones
Collar coordinates in the Marban grid
MB-12-320 3600   4621   N180°   -56°   813.6   19.3   38.6   19.3   1.03    
                  incl   19.3   27.6   8.3   1.60    
MB-12-321 4000   4635   N178°   -62°   1206.0   144.4   150.3   5.9   2.04    
                      747.0   748.2   1.2   4.44    
MB-12-322 4000   4750   N178°   -67°   1061.0   862.0   868.5   6.5   1.77    
MB-12-323 3600   4867   N178°   -54°   909.0   172.2   173.4   1.2   19.40   New dike
MB-12-324 3600   4867   N178°   -75°   1035.0   215.6   221.2   5.6   19.21   New dike
Collar coordinates in the Norlartic grid
MB-12-330 9+00 E   1+20 S   N210°   -50°   254.0   212.0   217.1   5.1   1.23    
MB-12-331 11+00 E   0+00   N210°   -50°   348.0   169.8   173.4   3.6   1.81   Norlartic
                      307.0   309.4   2.4   1.98    
MB-12-332 11+00 E   1+50 S   N210°   -50°   240.0   59.3   61.9   2.6   2.24   Norlartic

Holes MB-12-333, 334, 335, 336, 337 do not contain intersections ≥ 1 g/t.

Marban Deposit Results:

Hole Easting
(m)
  Northing
(m)
  Azimuth   Dip   Hole
Length
(m)
  From
(m)
  To
(m)
  Length
(m)
  Grade
(g/t Au)
  Zones
MB-12-307 3800   3975   N180°   -47°   228.0   143.7   146.0   2.3   3.08   D3
MB-12-308 3800   3915   N180°   -46°   186.0   118.0   123.0   5.0   1.43   D3
MB-12-309 3725   4050   N180°   -47°   281.0   128.8   130.0   1.2   5.89    
                      134.2   135.4   1.2   19.35    
MB-12-310 3750   4028   N180°   -46°   251.0   131.4   132.6   1.2   8.06   2
                      190.6   193.0   2.4   4.24   D3
MB-12-311 3750   3905   N180°   -46°   167.0   119.3   121.5   2.2   0.87    
MB-12-312 3675   3950   N180°   -47°   209.0   61.9   62.6   0.7   20.70   2
                      75.2   76.4   1.2   14.65    
MB-12-313 3700   3925   N180°   -45°   182.0   93.6   106.8   13.2   1.07   E
MB-12-314 3700   3860   N180°   -45°   120.0   35.8   55.5   19.7   1.31   E
MB-12-315 3725   3910   N180°   -47°   170.0   88.6   93.3   4.7   1.19   E
MB-12-316 3900   3955   N180°   -46°   234.0   145.4   149.0   3.6   1.37    
MB-12-317 4700   3983   N180°   -55°   522.0   297.6   304.0   6.4   3.74    
                      455.8   457.0   1.2   4.11    
MB-12-318 3850   3870   N180°   -45°   164.0   70.2   73.1   2.9   5.57    
MB-12-319 4600   4000   N180°   -57°   557.0   349.0   353.8   4.8   2.08   V
                      383.1   384.0   0.9   9.22   W
                      446.8   465.4   18.6   2.36    
                  incl   446.8   452.8   6.0   4.51    
MB-12-325 4050   3820   N180°   -46°   140.0   40.2   41.4   1.2   8.32    
                      87.4   88.2   0.8   7.32    
MB-12-326 4450   4127   N180°   -78°   693.0   193.5   196.3   2.8   3.47    
                      226.6   227.2   0.6   5.52    
                      532.7   533.8   1.1   9.77    
MB-12-327 3850   4005   N180°   -45°   279.0   42.7   43.6   0.9   21.40    
                      180.5   181.3   0.8   7.75    
                      190.3   194.6   4.3   2.13    
MB-12-328 4650   3925   N180°   -55°   480.0   278.0   280.1   2.1   4.07   M
MB-12-329 3900   4035   N180°   -47°   287.0   58.0   59.2   1.2   12.85    
                      96.5   97.3   0.8   10.55    

Overview of Marban property drilling

The 2010-2012 drill programs (Phase 1 and 2) totalled 84,911 metres (260 holes and 17 extensions). The Marban deposit received the bulk of the drilling with 68,861 metres (208 holes), among which 19,575 metres (74 holes) were in-filling at a 25x25 metres spacing pattern. The other holes were completing a 50x50 metres spacing pattern or making steps of 100 metres. The Norlartic deposit received 4,319 metres (21 holes) of in-fill drilling and 11,731 metres (31 holes) were drilled for exploring the Marban Block property mainly between the Norlartic and Marban deposits, as well as some other targets on the property.

Aurizon Option

Aurizon can earn up to a 65% interest the Marban Block property under the terms of an option and joint venture agreement dated July 5, 2010, between NioGold and Aurizon. The initial 50% interest can be earned by incurring expenditures of $20 million over three years, completing an updated NI 43-101 compliant mineral resource estimate, and by making a resource payment for 50% of the total gold ounces defined by the mineral resource estimate. NioGold remains the project operator during the initial earn-in period (see news release dated July 6, 2010).

Technical Info, QA/QC and Qualified Persons

Reported intervals are in core lengths but are anticipated to approximate true width, except where structural complexities occur, as the holes were drilled near perpendicular to the principal local structural orientation.

Diamond drill holes were drilled with NQ-size core in order to obtain larger sample volumes of the mineralised zones, except for holes that traversed underground workings which were completed using BQ-size core. The core was sealed delivered by the drilling contractor to NioGold's facilities located at the Norlartic mine site. The core was photographed for reference, logged and mineralised sections were sawed in half. Sample lengths vary between 0.5 to 1.5 metres. Half core samples were bagged, sealed and delivered to ALS Chemex in Val-d'Or, Quebec, an accredited laboratory. The remaining core is stored on site for reference. Samples were assayed by the fire-assay method using an atomic absorption finish on a 50-gram pulp split. A quality assurance and quality control program (QA/QC) was implemented by NioGold and the laboratory to insure the precision and reproducibility of the analytical method and results. The QA/QC program includes the insertion of standards, blanks and field duplicates in the sample batches sent to the laboratory and a systematic re-assaying of samples returning values above 2 g/t Au by the fire-assay method using a gravimetric finish. As well, pulps grading above 0.5 g/t Au are sent to Bourlamaque Assay Laboratories Ltd. in Val-d'Or for check assaying.

The drilling program is conducted under the supervision of Yan Ducharme, M.Sc., P. Geo. (OGQ), the NioGold Vice President of Exploration and a Qualified Person as defined by National Instrument 43-101. The news released was prepared under the supervision of Martin Demers, P.Geo., Aurizon's General Manager, Exploration and a Qualified Person under National Instrument 43-101, based on information made available by Niogold and verified by personnel of Aurizon.

Additional information

There is one sketch attached to this news release showing the Marban deposit drill hole locations and the longitudinal figures. To view the sketch, please click on the following link: http://media3.marketwire.com/docs/arz815.pdf.

About Aurizon

Aurizon is a gold producer with a growth strategy focused on developing its existing projects in the Abitibi region of north-western Quebec, one of the world's most favourable mining jurisdictions and prolific gold and base metal regions, and by increasing its asset base through accretive transactions. Aurizon shares trade on the Toronto Stock Exchange under the symbol "ARZ" and on the NYSE MKT under the symbol "AZK". Additional information on Aurizon and its properties is available on Aurizon's website at www.aurizon.com.

FORWARD LOOKING STATEMENTS AND INFORMATION

This news release contains "forward-looking statements" and "forward-looking information" within the meaning of applicable securities regulations in Canada and the United States (collectively, "forward-looking information"). The forward-looking information contained in this news release is made as of the date of this news release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information.

Specifically, this news release contains forward-looking information with respect to future exploration work and the expected timing of an updated resource estimate on the Marban property. Forward-looking information contained in this news release is based on certain assumptions that the Company believes are reasonable, including the assumption that the current price of and demand for gold will be sustained or will improve. However, forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others, the risk that actual results of exploration activities will be different than anticipated, that required supplies, equipment or personnel will not be available or will not be available on a timely basis or that the cost of labour, equipment or supplies will increase more than expected, that the future price of gold will decline, that the Canadian dollar will strengthen against the U.S. dollar, that mineral resources are not as estimated, that actual costs or actual results of reclamation activities are greater than expected; that changes in project parameters as plans continue to be refined may result in increased costs, of accidents, labour disputes and other risks generally associated with exploration, unanticipated delays in obtaining governmental approvals or financing or in the completion of exploration activities, as well as those factors and other risks more fully described in Aurizon's Annual Information Form filed with the securities commission of all of the provinces and territories of Canada and in Aurizon's Annual Report on Form 40-F filed with the United States Securities and Exchange Commission, which are available on Sedar at www.sedar.com and on Edgar at www.sec.gov/. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Readers are cautioned not to place undue reliance on forward-looking information due to the inherent uncertainty thereof.



Aurizon Mines Ltd.
George Paspalas
President & CEO
604-687-6600 or Toll Free: 1-800-411-GOLD (4653)
or
Aurizon Mines Ltd.
Ian S. Walton
Executive Vice President & CFO
604-687-6600 or Toll Free: 1-800-411-GOLD (4653)
or
Aurizon Mines Ltd.
Investor Relations
604-687-6600 or Toll Free: 1-800-411-GOLD (4653)
jennifer.north@aurizon.com
or
Aurizon Mines Ltd.
604-687-6600 or Toll Free: 1-800-411-GOLD (4653)
604-687-3932
info@aurizon.com
www.aurizon.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous
Tweet

Aurizon Mines Ltd

PRODUCTEUR
CODE : ARZ.TO
ISIN : CA05155P1062
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Aurizon Mines Ltd
13/03/2013B.C. Securities Commission to referee in Aurizon Mines’ ‘poi...
17/09/2010Aurizon Mines buying into Quebec gold properties
14/06/2010Confirms ‘Principal Area’ and discovers new gold mineralizat...
11/01/2010Aurizon Mines expects lower output this year, but increasing...
13/05/2009Aurizon Mines posts first-quarter profit
Rapports annuels de Aurizon Mines Ltd
2009 Annual Report
2008 Annual Report
2007 Annual Report
2005 Annual report
Financements de Aurizon Mines Ltd
02/02/2011AURIZON ANNOUNCES US$50 MILLION REVOLVING CREDIT FACILITY
Attributions d'options de Aurizon Mines Ltd
15/08/2011Grant of 600,000 options at 6,38
Nominations de Aurizon Mines Ltd
26/08/2011Announces Vice President, Corporate Development Resignation
15/08/2011George Paspalas Joins Aurizon as Chief Executive Officer; Da...
27/06/2011Aurizon Announces Appointment of George Paspalas as Chief Ex...
27/03/2009Appoints Roger Walsh As Vice President, Corporate Developmen...
Rapports Financiers de Aurizon Mines Ltd
08/11/2012Aurizon Reports Third Quarter 2012 Financial Results
09/08/2012Aurizon Reports Second Quarter 2012 Financial Results
10/05/2012Aurizon Reports First Quarter 2012 Financial Results
15/03/2012Aurizon Reports 2011 Financial Results
10/11/2011Aurizon Reports Third Quarter 2011 Results
11/08/2011Aurizon Reports Second Quarter 2011 Results
16/05/2011AURIZON REPORTS FIRST QUARTER 2011 RESULTS
12/04/2011AURIZON ANNOUNCES FIRST QUARTER 2011 OPERATING RESULTS
17/03/2011AURIZON REPORTS 2010 FINANCIAL RESULTS
14/08/2009reports record revenues and cash flow in second quarter 2009
13/05/2009Reports Highlights Of First Quarter 2009 Results
11/03/2009Reports 2008 Financial Results
06/11/2008Third Quarter 2008 Results
06/11/2008Reports Highlights Of Third Quarter 2008 Results
08/08/2008Reports Highlights Of Second Quarter 2008 Results
07/05/2008Reports Highlights Of First Quarter 2008 Results
19/03/2008 Reports 2007 Financial Results
Projets de Aurizon Mines Ltd
16/08/2012(Marban Mine)Aurizon Announces the Completion of the Marban Block Phase T...
30/07/2012(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Confirm Continuity and...
20/07/2012(Joanna)Aurizon Files Feasibility Study of the Hosco Deposit
09/07/2012(Joanna)Aurizon Mines Ltd.: New Drill Results Expand the Heva Area a...
06/06/2012(Joanna)Aurizon Receives Results of Feasibility Study for Joanna's H...
15/05/2012(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Highlight the Potentia...
26/04/2012(Marban Mine)Aurizon Mines Ltd.: New Results at Marban Highlight Potentia...
20/04/2012(Joanna).: Higher Grade Mineralization Discovered on the Heva and Ho...
04/04/2012(Rex South)Aurizon Announces Results from the 2011 Exploration Program ...
01/03/2012(Casa Berardi)Reports Mineral Reserve Replenishment and Mineral Resource U...
01/03/2012(Marban Mine)Aurizon Mines Ltd.: Marban Eastern Down Dip Zone Returns 6.4...
17/11/2011(Marban Mine)Aurizon Mines Ltd.: Marban High Grade Western Zone Returns 9...
22/09/2011(Marban Mine) Two New High Grade Gold Zones Discovered at Marban
09/09/2011(Casa Berardi)Aurizon Mines Ltd.: Drilling Confirms the Continuity and the...
31/08/2011(Fayolle)Aurizon Reports New High Grade Values at Fayolle
11/08/2011(Joanna)Aurizon Reports Joanna Feasibility Study Delayed, However Dr...
09/08/2011(Fayolle)Aurizon Reports Discovery of New Gold Bearing Trends Outside...
22/06/2011(Marban Mine) Deeper Drilling at Marban Reveals Added Upside With 5
13/06/2011(Joanna)Aurizon Increases the Hosco In-Pit Measured and Indicated Mi...
25/05/2011(Marban Mine)AURIZON REPORTS FURTHER RESULTS FROM MARBAN BLOCK
14/04/2011(Marban Mine)AURIZON REPORTS FURTHER DRILL RESULTS FROM MARBAN
13/03/2011(Casa Berardi)AURIZON REPORTS A 44% INCREASE IN MINERAL RESERVES FOR THE C...
15/02/2011(Rex South)AURIZON AND AZIMUT RE-EVALUATE TUNGSTEN VALUES ON THE COPPER...
21/01/2011(Marban Mine)AURIZON ANNOUNCES 9=2E06 GRAMS OF GOLD PER TONNE OVER 7=2E3 ...
11/01/2011AURIZON ANNOUNCES 2010 PRODUCTION RESULTS AND 2011 PLANS
11/01/2011(Casa Berardi)AURIZON ANNOUNCES 2010 PRODUCTION RESULTS AND 2011 PLANS
21/12/2010(Casa Berardi)Latest Drilling Outlines High Grade Gold Mineralized Corrido...
16/12/2010(Patris)Options Midland Exploration's Patris Gold Property
16/12/2010(Fayolle)Announces Further Drill Results From The Fayolle Project
04/11/2010(Marban Mine)Reports 80.8 Meters at 1.21 Grams of Gold Per Tonne, Includi...
02/11/2010(Fayolle)Typhoon and Aurizon Drill 8.8 Grams Per Tonne of Gold Over 1...
30/09/2010(Fayolle) and Typhoon drill 112.5 g/t of gold over 6 metres on the Fa...
27/09/2010(Casa Berardi)INFILL DRILLING CONFIRMS CONTINUITY OF THE
16/09/2010(Opinaca)Aurizon Acquires Option On Azimut And Everton Opinaca Proper...
01/09/2009Aurizon Intersects 18.9 Grams of Gold per Tonne Over 4.0 Met...
11/03/2009(Joanna) Infill Drilling Increases Mineral Resources at Joanna
20/02/2009(Casa Berardi)Reports Mineral Reserve Renewal And Mineral Resource Update ...
26/01/2009(Joanna): Grade and Thickness Confirmed Along the North Zone at Joan...
11/12/2008(Joanna)Infill Drilling Program Completed At Joanna 116 Grams Of Gol...
27/10/2008(Joanna)Infill Drilling Confirms Thickness Of 20 To 60 Metres At Joa...
24/10/2008(Casa Berardi)New Gold Zone Discovered 7.5 Kilometres East Of Casa Berardi...
13/06/2008(Kipawa)Reports Additional Rare Earth And Uranium Results At Kipawa ...
12/05/2008(Joanna) Commissions Pre-Feasibility Study At Joanna
23/04/2008(Joanna) Reports Further Results From Its Joanna Property Including ...
02/04/2008(Casa Berardi)Provides Mineral Reserves And Resources Update
Communiqués de Presse de Aurizon Mines Ltd
01/05/2013Reminds Shareholders of Important Vote Deadline of May 7, 20...
24/04/2013Announces That Leading Independent Proxy Advisory Firm Insti...
30/10/2012. Announces Third Quarter 2012 Conference Call & Webcast
01/05/2012. Announces First Quarter 2012 Conference Call & Webcast
31/03/2012Aurizon Releases Annual Disclosure Documents
09/03/2012. Announces 2011 Financial Results Conference Call & Webcast
11/01/2012Aurizon Announces Record 2011 Gold Production and 2012 Plans
01/11/2011(Marban Mine)Announces Commencement of a $5 Million Phase 2 Program on th...
02/08/2011. Announces Second Quarter 2011 Conference Call & Webcast
30/11/2010Receives Award From Aemq
03/11/2010GEORGE BRACK JOINS AURIZON'S BOARD OF DIRECTORS
26/05/2010Options Azimut's Rex South Property
23/03/2009To Be Included In S&P/TSX Composite Index
22/10/2008: President & CEO Interview
13/06/2008defines Gold Targets and Commences Exploration Program at Ki...
15/05/2008Andre Falzon Joins Aurizon's Board
15/03/2008deeply regrets
07/01/2006(Casa Berardi)Advances Casa Berardi Gold Mine to Production
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (ARZ.TO)FRANKFURT (AUE.F)
4,32+5.88%2,62-11.73%
TORONTO
CA$ 4,32
21/05 16:00 0,240
5,88%
Cours préc. Ouverture
4,08 4,06
Bas haut
4,06 4,37
Année b/h Var. YTD
3,30 -  4,76 23,43%
52 sem. b/h var. 52 sem.
3,15 -  5,49 -2,48%
Volume var. 1 mois
704 789 3,85%
24hGold TrendPower© : 2
Produit Gold
Développe Gold
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
2013-14,96%
20120,59%5,753,80
2011-30,92%7,584,87
201056,53%8,413,81
200927,95%6,243,33
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois