Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Foran Mining Corp.

Publié le 03 mars 2018

Foran’s Feasibility Drilling Campaign Continues to Hit High-Grade Zinc

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   9/11 | Canada | Copper | Exploration | Inflation | Mine | Precious Metals | Report | Zinc |

Foran’s Feasibility Drilling Campaign Continues to Hit High-Grade Zinc

VANCOUVER, British Columbia, March 02, 2018 (GLOBE NEWSWIRE) -- Foran Mining Corporation (FOM.V) (“Foran” or the “Company”) is pleased to report additional high-grade zinc intervals from the Phase I resource definition and infill drilling program at its 100% owned McIlvenna Bay zinc-copper property (“McIlvenna Bay” or “Property”) in Saskatchewan.  Drilling has also confirmed the presence of high-grade zinc and elevated precious metals grades in the Hanging Wall (“HWA”) lens, 200 metres (“m”) above the currently defined resource.

Highlights:

Recent assays from six holes contain several high-grade zinc intervals (see Table 1), including the following:

  • 10.33% Zn, 14.83g/t Ag, 0.48% Cu and 0.22 g/t Au over 3.27m in MB-18-186; and,
  • 8.25% Zn, 24.2 g/t Ag, 0.18% Cu and 0.42 g/t Au over 3.42m in MB-18-188

Initial drill holes in the current program targeted the near surface portion of the McIlvenna Bay deposit and are designed to both infill and better define the margins of the known resource.  Drill hole MB-18-183 intersected multiple mineralized horizons across the zinc-rich precious metal bearing HWA lens, above the known resource.  Assays for MB-18-183 included:

  • 22.52% Zn, 37.71 g/t Ag and 0.82 g/t Au over 0.97m which included a narrow elevated precious metals intercept; and
  • 11.99% Zn, 20.62 g/t Ag, and 0.04 g/t Au over 1.47m

Patrick Soares, President & CEO of Foran commented, “Drilling on the McIlvenna Bay deposit continues to support our decision to proceed to feasibility for this project.  These latest results contain intervals at grades higher than the deposit average, which is highly encouraging. With four drills turning, we are moving quickly to complete the drilling necessary to support the upgraded resource estimate and feasibility study.”

Mr. Soares further noted, “Recent assays indicate the presence of high-grade zinc and a narrow horizon of elevated precious metal grades in the HWA zone, above the bulk of the deposit.  The HWA zone represents an exciting exploration target for potential resource growth at McIlvenna Bay and speaks to the opportunities that remain as we continue to drill off the deposit.” 

Technical Information

This release provides the results from six additional holes from the ongoing 2018 winter drill program at McIlvenna Bay. To date, 15 holes of the planned 22-hole (11,000m) Phase I resource definition and infill drilling program have been completed, primarily off frozen low-lying areas. These latest results will be incorporated into an updated resource and reserve estimate and included in the upcoming feasibility study (the “Feasibility Study”).

The McIlvenna Bay deposit consists of several distinct zones of Volcanogenic Massive Sulphide (“VMS”) mineralization, including massive to semi-massive sulphide mineralization in the Main Lens and Lens 3, and underlying stockwork-style copper-rich sulphide mineralization in the Copper Stockwork Zone (“CSZ”). The Main Lens at McIlvenna Bay is comprised of the zinc-rich Zone 2 and the copper and zinc-rich Upper West Zone. Detailed results from the completed drill holes from the Phase I program are provided in Table 1 below.

Table 1: Significant drill intercepts from the Phase I winter drill program1:

Hole Zone From  (m) To  (m) Interval (m) Zn (%) Ag (g/t) Cu (%) Au (g/t)
MR-18-183 HWA 274.53 275.50 0.97 22.52 37.71 0.22 0.82
including   275.03 275.16 0.13 0.47 139.20 0.05 3.36
  HWA 287.66 287.92 0.26 7.30 27.60 0.16 0.19
  HWA 292.03 293.50 1.47 11.99 20.62 0.09 0.04
  Zone 2 601.00 602.00 1.00 2.38 17.40 0.40 0.16
MB-18-184** Zone 2 66.21 75.46 9.25 10.89 20.50 0.07 0.18
Including   70.70 75.18 4.48 14.35 21.12 0.08 0.12
MB-18-185** Zone 2 71.84 80.11 8.27 11.82 10.24 0.11 0.15
Including   71.84 77.10 5.26 13.20 10.71 0.11 0.19
MB-18-186 Zone 2 58.30 61.57 3.27 10.33 14.83 0.48 0.22
  CSZ 61.57 65.05 3.48 0.05 12.92 0.97 0.12
  CSZ 68.05 69.68 1.63 0.13 8.57 1.96 0.09
MB-18-187 Lens 3 48.36 50.48 2.12 5.91 11.50 0.16 0.22
    50.48 51.64 1.16 0.80 21.54 1.50 0.87
MB-18-188 Zone 2 158.00 161.42 3.42 8.25 24.20 0.18 0.42
  CSZ 162.00 169.00 7.00 0.31 6.60 0.82 0.10
MB-18-189 Zone 2 207.00 208.55 1.55 2.51 30.57 0.12 0.30
MB-18-190 Zone 2 294.31 296.27 1.96 6.84 21.44 0.07 0.13
MB-18-191 Lens 3 247.52 252.32 4.80 4.47 21.62 0.54 0.21
  Zone 2 275.30 277.18 1.88 9.54 11.14 0.37 0.13
  CSZ 277.18 281.18 4.00 0.16 7.85 1.19 0.14

1 True thickness is estimated to be approximately 80-85% of drill indicated.
**Previously released. See Foran News release dated February 20, 2018

All reported drill holes target the up plunge, near surface, southeastern limit of the McIlvenna Bay deposit (Figure 1).  Drill holes MB-18-184 to 187 target the near surface projection of the resource and will both expand and provide better definition of that portion of the deposit. MB-18-191 targeted a gap in the previous drill spacing and has provided better delineation of the resource in that area. Holes MB-18-183, 189 and 190 targeted the lower edge of the deposit and will help constrain the lower limit of the resource for future modelling.

There are currently four diamond drills focused on increasing the drill hole density in select areas of the deposit.  The drill program was fast-tracked after the January 2018 decision to advance the McIlvenna Bay deposit to feasibility.  Glencore Canada Corporation (“Glencore”) and Foran signed a Technical Services Agreement in December 2017 which contemplates Glencore contributing its considerable technical expertise towards the preparation of the Feasibility Study. The infill drill program has been designed by Foran and Glencore to upgrade and expand inferred resources to the indicated category and provide additional geotechnical information, all of which will be incorporated into the Feasibility Study. 

A Phase II drill program comprised of approximately 7,500m is scheduled after spring break-up and is intended to target areas of the deposit that can be drill-tested under summer conditions. Additional holes may be added to the winter program if winter conditions persist and are deemed to have potential to expand and/or upgrade the known McIlvenna Bay resource.

Figure 1

A photo accompanying this release is available at http://www.globenewswire.com/NewsRoom/AttachmentNg/665c9a35-efaf-4020-a597-2ca7fe933aff

Exploration Potential

The HWA lens is located approximately 200m above the Main Lens massive sulphide mineralization and consists of zinc-rich massive to semi-massive sulphide in three narrow horizons within a 22-metre-thick rhyolite package. Assays up to 22.52% Zn, 37.71 g/t Ag and 0.82 g/t Au over 0.97m  were obtained from this horizon. The interval also included 13 cm of pyritic massive sulphide assaying 3.36 g/t Au and 139.2 g/t Ag. The HWA lens has an auriferous pyritic component to the mineralization and offers excellent exploration potential. The zone remains open down dip for further expansion. The McIlvenna Bay property contains additional prospective areas such as Target A, Thunder Zone and Bigstone, all of which offer substantial exploration upside to the project.

Quality Assurance and Quality Control

Drilling was completed using NQ size diamond drill core and core was logged by employees of the Company. During the logging process, mineralized intersections were marked for sampling and given unique sample numbers. Sampled intervals were sawn in half using a diamond blade saw. One half of the sawn core was placed in a plastic bag with the sample tag and sealed, while the second half was returned to the core box for storage on site. Sample assays are performed by TSL Laboratories Ltd. (“TSL”) in Saskatoon, Saskatchewan. TSL is a CAN-P-1579, CAN-P-4E (ISO/IEC 17025:2005) accredited laboratory and independent of Foran. Analysis for Ag, Cu, and Zn is performed using atomic absorption spectrometry (“AA”) after multi-acid digestion. Au analysis is completed by fire assay with AA finish. Any samples which return results greater than 3.0 g/t Au are re-run using gravimetric finish. A complete suite of QA/QC reference materials (standards, blanks and pulp duplicates) are included in each batch of samples processed by the laboratory. The results of the assaying of the QA/QC material included in each batch are tracked to ensure the integrity of the assay data.

About Foran Mining

Foran is a zinc-copper exploration and development company with projects in the Flin Flon Greenstone Belt. The McIlvenna Bay Project, Foran’s flagship asset located within the Hanson Lake District, is part of a world class VMS belt that extends from Snow Lake, Manitoba, through Flin Flon to Foran’s ground in eastern Saskatchewan, a distance of over 200 kilometres. McIlvenna Bay is one of the largest undeveloped VMS deposits in Canada.  The Company is currently conducting a resource definition and infill drilling program in preparation for producing a feasibility study on the McIlvenna Bay deposit.

On December 4, 2017, Foran announced the execution of a Technical Services Agreement with Glencore Canada Corporation (“Glencore”).  Glencore has agreed to provide technical expertise and advice in order to advance the McIlvenna Bay deposit to feasibility in exchange for an off-take agreement on the metals and minerals produced from the deposit.

On November 12, 2014, Foran announced a positive preliminary economic assessment (“PEA”) for McIlvenna Bay, with an estimated pre-tax NPV7% of $382M ($263M after-tax) & 22% IRR (19% after-tax) at a Zinc price of US$1.06/lb. Spot Zinc price today is US$1.40/lb.  See below and Foran’s news releases from November 12 and December 22, 2014 for important disclosures with respect to the McIlvenna Bay PEA.

The PEA is considered preliminary in nature and includes mineral resources, including inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves have not yet demonstrated economic viability. Due to the uncertainty that may be attached to mineral resources, it cannot be assumed that all or any part of a mineral resource will be upgraded to mineral reserves. Therefore, there is no certainty that the results concluded in the PEA will be realized.

Roger March, P.Geo., VP Project Exploration for Foran and a Qualified Person within the meaning of National Instrument 43-101, has reviewed and approved the technical information in this release.

Foran trades on the TSX.V under the symbol “FOM”.

For additional information, please contact Foran Mining Corporation:

Patrick Soares
President & CEO
904 – 409 Granville Street
Vancouver, BC, Canada, V6C 1T2
Phone: +1 604-488-0008
Email:  ir@foranmining.com

Neither the TSX-V nor its Regulation Services Provider (as that term is defined in the policies of the TSX-V) accepts responsibility for the adequacy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Forward Looking Statements

This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, Foran’s objectives, goals or future plans, statements regarding the Technical Services Agreement and whether preliminary work will support proceeding with a feasibility study and, if so, whether such study will suggest an economically viable project, estimation of mineral resources, exploration results, potential mineralization, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, preliminary work under the Technical Services Agreement which does not support proceeding with a feasibility study, and assuming the parties agree to proceed with the feasibility study, the failure of such study to suggest an economically viable project, failure to convert estimated mineral resources to reserves, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry, and those risks set out in Foran’s public documents filed on SEDAR. Although Foran believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Foran disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.


Lire la suite de l'article sur https:
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Foran Mining Corp.

CODE : FOM.V
ISIN : CA3449112018
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Foran Mining est une société d’exploration minière de cuivre basée au Canada.

Foran Mining détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont KISSEYNEW, LEO LAKE et MCILVENNA BAY-HANSON LAKE au Canada.

Foran Mining est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 396,9 millions CA$ (317,3 millions US$, 278,0 millions €).

La valeur de son action a atteint son plus haut niveau récent le 13 février 1998 à 9,80 CA$, et son plus bas niveau récent le 20 mars 2009 à 0,04 CA$.

Foran Mining possède 98 970 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Nominations de Foran Mining Corp.
07/02/2013Appoints Technical Consultant
05/05/2011Continues to Build Management Team: Appoints CFO and VP Corp...
Rapports Financiers de Foran Mining Corp.
23/05/2013Announces Results of Annual and Special Meeting of Sharehold...
22/02/2013Reports First Quarter 2013 Results
Communiqués de Presse de Foran Mining Corp.
01/07/2016Foran Announces Closing of Non-Brokered Financing for Procee...
15/06/2016Foran Announces $1,000,000 Non-Brokered Private Placement
30/05/2016Foran Reports First Quarter 2016 Results
30/05/2016Foran Response to Trading Activity
30/03/2016Foran Reports 2015 Annual Financial Results
23/03/2016Foran Announces Expiry of Stock Options
23/03/2016Foran Announces Grant of Stock Options
08/09/2015Foran Bigstone Deposit Update
24/08/2015Foran Reports Second Quarter 2015 Results
18/06/2015Foran to Commence Metallurgy at the Bigstone Copper-Zinc Dep...
20/04/2015Foran Announces Best Hole Drilled To Date in the Bigstone Co...
20/04/2015Foran Reports 2014 Year End Results
20/04/2015Foran Intersects High-Grade Zinc in First Drill Hole at Bigs...
17/04/2015Foran Announces Best Hole Drilled to Date in the Bigstone Co...
16/04/2015Foran Reports 2014 Year End Results
02/04/2015RETRANSMISSION: Foran Intersects High-Grade Zinc in First Dr...
02/04/2015RETRANSMISSION: Foran Intersects High-Grade Zinc in First Dr...
01/04/2015Foran Intersects High-Grade Zinc in First Drill Hole at Bigs...
01/04/2015Intersects High-Grade Zinc in First Drill Hole at Bigstone: ...
25/03/2015Foran Confirms and Expands Thunder Zone Copper-Zinc Discover...
25/03/2015Confirms and Expands Thunder Zone Copper-Zinc Discovery: Bui...
15/01/2015Commences Winter Exploration Program in the Hanson Lake Camp
31/10/2013DEEP-EM Survey Identifies Two High Priority Targets
24/09/2013Presents Traditional Land Use Study
18/09/2013Completes Summer Program at McIlvenna Bay
21/08/2013Forum Increases Financing to $2.25 Million
04/06/2013Completes Successful Infill Drill Program on the McIlvenna B...
16/05/2013Commences Engineering Studies at McIlvenna Bay
19/04/2013Notice of Annual and Special Meeting of Shareholders
08/04/2013Discovers New Zone of High-Grade Copper Mineralization at Ba...
27/03/2013Announces New McIlvenna Bay Resource
19/02/2013Commissions DEEP EM Geophysical Survey
25/01/2013Reports 2012 Year End Results & Granting of Stock Options
14/01/2013Commences Winter Drill Program
09/11/2012Retains Market Maker
01/10/2012Announces $5M Exploration & Development Program for 2013
20/07/2011Commissions Updated Mineral Resource Estimate for McIlvenna ...
19/07/2011Awards Environmental and Engineering Studies for McIlvenna B...
15/06/2011Completes Phase One Program at McIlvenna Bay with High Grade...
07/06/2011Phase One Drilling Continues to Intersect Good Grades & Widt...
06/06/2011Announces Appointment of Corporate Secretary and Grant of St...
10/05/2011Intersects 1.70% Cu and 0.46 g/t Au Over 47.55m at McIlvenna...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (FOM.V)Other OTC (FMCXF)
4,01+24.15%3,02-0.98%
TSX-V
CA$ 4,01
01/08 10:30 0,780
24,15%
Cours préc. Ouverture
3,23 4,06
Bas haut
3,95 4,06
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
3,11 -  4,01 0,754%
Volume var. 1 mois
267 354 -%
24hGold TrendPower© : -4
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20240,00%
202334,11%4,322,79
202215,44%3,251,93
2021346,55%3,080,60
2020123,08%0,700,08
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,87 US$-3,12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX+0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,37 CA$-0,42%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,33 CA$-2,91%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,78 CA$-4,30%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,95 US$-0,35%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :