Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Platinum Group metals Ltd

Publié le 15 juin 2017

Platinum Group Metals Reports on Waterberg Definitive Feasibility Work

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   9/11 | Bushveld | Canada | Cash | Exploration | Mine | Palladium | Record | Report |



Platinum Group Metals has added a new press release to its web site. For full details please visit the Platinum Group Metals web site at:



Platinum Group Metals Reports on Waterberg Definitive Feasibility Work

VANCOUVER, BRITISH COLUMBIA and JOHANNESBURG, SOUTH AFRICA -- (Marketwired) -- 06/15/17 -- Platinum Group Metals Ltd. (TSX:PTM)(NYSE MKT:PLG) ("Platinum Group" or the "Company") reports that planned Definitive Feasibility Study ("DFS") engineering work on the Waterberg Project is underway, including infill drilling, resource modelling, mine plan optimization and infrastructure engineering. Engineering and design work to reduce and improve underground development and optimize the project scale and return will be part of the DFS.

The Waterberg Project represents one of the few significant undeveloped primary palladium assets globally. The palladium market has been in a fundamental deficit for a number of years and based on strong auto demand, limited mine supply and shrinking stockpiles this deficit is expected to continue.

Detailed drilling targeting the higher grade, thicker portions of the deposit is in progress. The objective of the drilling is to move portions of the deposit into the measured resource category and to investigate the best grade portions for inclusion in early mine planning. License and permitting application work is also underway. Work at Waterberg is wholly funded at present by 28.35% JV partner JOGMEC (the Japan Oil, Gas and Metals National Corporation) through an exploration earn-in commitment.

Details

During May 2017 infill drilling re-commenced at Waterberg with the objective of increasing the confidence level of defined areas of T and F Reef from the inferred to the indicated or measured level of confidence. A total of eight machines have been deployed and approximately 11,230 meters have been drilled in this program to date. Assays for the current drilling program are in process. Several holes drilled in late 2016 have recently returned assays. Highlights include the following intercepts:

  • North Super F Zone Borehole WE097D3 returning 45.1 meters of 4.64 g/t 3PGE, including 16.6 meters of 7.28 g/t 3PGE;

  • North Super F Zone Borehole WE096D0 returning 25.81 meters of 3.62 g/t 3PGE, including 6.15 meters of 4.89 3PGE; and

  • T Zone Borehole WB211D2 returning 6.55 meters of 5.81 g/t 3PGE.

The true width of the shallow dipping (30° to 35°) mineralized zones that were sampled are approximately 82% to 87% of the reported interval from the vertical intercept. For the efficient application of bulk mining methods and for mine planning, vertical intercepts of 3 meters or more are desirable. Increased grade thickness zones associated with minor footwall troughs or bays along the 13 km long layered complex have recently been identified. Infill drilling is confirming and adding definition to these zones, which will allow them to be prioritized in an updated mine plan for the DFS.

As a result of its shallow depth, good grade and a fully mechanized mining approach, the Waterberg Project has the opportunity to be a safe mine within the lowest quartile of the Southern Africa PGE industry cost curve. The project resources consist of 60% palladium (refer to "Independent Technical Report on the Waterberg Project Including Mineral Resource Update and Pre-Feasibility Study - Project Areas located on the Northern Limb of the Bushveld Igneous Complex, South Africa" dated effective October 17, 2016 and filed on October 19, 2016 at www.sedar.com).

A table of results for the 2016 boreholes recently assayed, including the highlight holes referred to above, follows:

BHID DEFLECTION WGS 84 LO 29 FROM TO ZONE LENGTH Est. True
Width
2PGE+Au PT PD AU CU NI
X Y m m m g/t g/t g/t g/t % %
WB211 D0 2 587 819 11 767 233.00 239.00 TZ 6.00 5.10 1.41 0.38 0.82 0.21 0.05 0.05
D1 232.17 237.50 TZ 5.33 4.53 2.42 0.65 1.50 0.27 0.09 0.07
D2 233.45 240.00 TZ 6.55 5.57 5.81 1.69 3.47 0.65 0.15 0.12
D3 231.43 237.71 TZ 6.28 5.34 3.99 0.95 2.47 0.58 0.14 0.09
WB212 D0 2 587 692 11 643 208.50 211.90 TZ 3.40 2.89 2.74 0.88 0.91 0.96 0.17 0.08
D1 208.00 211.26 TZ 3.26 2.77 3.83 1.20 1.22 1.42 0.14 0.06
WB213 D0 2 587 691 11 765 284.00 288.57 TZ 4.57 3.88 4.34 1.65 0.94 1.75 0.29 0.16
D1 285.00 290.00 TZ 5.00 4.25 1.40 0.50 0.26 0.65 0.13 0.08
D2 282.50 287.86 TZ 5.36 4.56 4.32 1.64 0.90 1.78 0.32 0.15
WB214 D0 2 587 942 11 891 252.00 260.50 TZ 8.50 7.23 0.36 0.13 0.13 0.10 0.02 0.02
D1 253.00 261.50 TZ 8.50 7.23 2.47 0.68 1.14 0.65 0.10 0.05
D2 251.62 260.50 TZ 8.88 7.55 1.78 0.65 0.89 0.24 0.05 0.04
WB215 D0 2 587 565 11 641 239.00 245.00 TZ 6.00 5.10 2.44 0.73 1.06 0.65 0.08 0.03
D1 239.00 245.00 TZ 6.00 5.10 3.71 1.32 1.78 0.61 0.10 0.03
WB216 D0 2 588 192 12 015 231.00 235.50 TZ 4.50 3.83 2.08 0.53 0.50 1.06 0.25 0.11
D1 231.00 235.50 TZ 4.50 3.83 2.49 0.59 0.49 1.41 0.31 0.12
D2 231.00 235.50 TZ 4.50 3.83 2.51 0.59 0.46 1.45 0.30 0.12
WB217 D0 2 588 311 12 235 224.50 227.50 TZ 3.00 2.55 4.74 1.62 0.46 2.67 0.73 0.24
D1 223.50 226.50 TZ 3.00 2.55 3.05 1.01 0.31 1.73 0.41 0.17
D2 223.00 225.97 TZ 2.97 2.52 2.42 0.82 0.24 1.36 0.36 0.14
WB218 D0 2 588 318 12 154 Replaced by dyke
WB219 D0 2 588 182 12 128 267.97 270.94 TZ 2.97 2.52 3.36 0.86 0.47 2.04 0.43 0.17
D1 267.95 271.00 TZ 3.05 2.59 2.84 0.73 0.57 1.53 0.32 0.13
D2 268.00 271.15 TZ 3.15 2.68 3.69 0.89 0.99 1.80 0.46 0.20
WB221 D0 2 587 755 11 830 297.00 298.50 TZ 1.50 1.28 2.24 0.67 1.15 0.42 0.08 0.06
WB222 D0 2 587 817 11 892 295.33 305.50 TZ 10.17 8.64 4.27 1.08 2.42 0.76 0.24 0.13
D1 295.00 303.50 TZ 8.50 7.23 4.42 1.14 2.66 0.61 o/s o/s
D2 298.38 308.00 TZ 9.62 8.18 4.70 1.15 2.82 0.72 o/s o/s
WB224 D0 2 587 832 12 019 370.50 385.50 TZ 15.00 12.75 3.48 1.07 1.69 0.72
WB225 D0 2 588 248 12 243 284.11 285.50 TZ 1.39 1.18 0.54 0.14 0.27 0.12 o/s o/s
D1 284.00 285.50 TZ 1.50 1.28 2.75 0.88 1.51 0.36 o/s o/s
D2 284.00 285.50 TZ 1.50 1.28 0.41 0.12 0.25 0.04 o/s o/s
WB226 D0 2 587 564 11 769 322.50 329.76 TZ 7.26 6.17 3.15 0.82 2.07 0.26
WE096 D0 2 582 883 7 705 245.15 270.96 NSF 25.81 21.94 3.62 0.78 2.67 0.17 0.12 0.21
D1 245 270.96 NSF 25.96 22.07 2.59 0.72 1.74 0.14 0.11 0.18
D2 245 269 NSF 24.00 20.40 2.60 0.71 1.76 0.14 0.11 0.20
WE097 D0 2 582 945 7 699 208 253.9 NSF 45.90 39.02 4.48 1.08 3.16 0.23 0.14 0.29
D1 207.5 253.4 NSF 45.90 39.02 4.32 1.15 2.94 0.22 0.14 0.28
D2 208 253.5 NSF 45.50 38.68 4.20 1.06 2.93 0.21 o/s o/s
D3 208 253.1 NSF 45.10 38.34 4.64 1.21 3.20 0.23 0.15 0.29
WE098 D0 2 583 066 7 755 183 205.5 NSF 22.50 19.13 0.51 0.18 0.32 0.02 0.03 0.09
WE096 D0 2 582 883 7 705 245.15 251.3 NSF_IN 6.15 5.23 4.89 1.29 3.32 0.28 0.17 0.30
D1 245 250.48 NSF_IN 5.48 4.66 3.65 1.00 2.46 0.19 0.13 0.24
D2 246.14 252 NSF_IN 5.86 4.98 1.55 0.41 1.04 0.09 0.08 0.19
WE097 D0 2 582 945 7 699 208 224.2 NSF_IN 16.20 13.77 7.30 1.88 5.01 0.41 0.23 0.41
D1 207.5 223.6 NSF_IN 16.10 13.69 6.31 1.67 4.30 0.34 0.20 0.38
D2 208 223.7 NSF_IN 15.70 13.35 6.31 1.56 4.43 0.32 o/s o/s
D3 208 224.6 NSF_IN 16.60 14.11 7.28 1.87 5.07 0.35 0.21 0.40

In the table above "NSF" refers to North Super F Zone, "NSF_IN" refers to a higher-grade North Super Zone intercept within a borehole reported above and "TZ" refers to T Zone. All of the above holes were drilled vertical or near vertical.

Base metals and other major elements were determined by multi acid digestion with Inductively Coupled Plasma ("ICP") finish and PGEs were determined by conventional fire assay and ICP finish. Setpoint Laboratories is an experienced ISO 17025 SANAS accredited laboratory in assaying and have utilized a standard quality control system including the use of standards. Platinum Group utilized a well-documented system of inserting blanks and standards into the assay stream and has a strict chain of custody and independent lab re-check system for quality control.

Important detailed infrastructure planning has commenced for the Waterberg Project, including power line environmental and servitude work by Eskom and detailed hydrogeological work to source ground water. Eskom has progressed electrical power connection planning for a 65 km, 140MW line to the project.

Hydrological work so far has also identified several large-scale water basins that are likely able to provide potable and mine process water for the Waterberg Project and local communities. The Waterberg Project team is examining the possibility of assisting with regional infrastructure to source potable water for municipal use while also sourcing and providing mine process water. Meetings with local municipalities have been positive and co-operative in tone and are encouraging for future development.

Outlook

Waterberg continues to advance with infill drilling and engineering work. Further results are expected in the weeks ahead. Preparations are in progress for the filing of a mining right. JOGMEC continues to fund 100% of the current costs at Waterberg.

General Corporate Update

As reported in a news release dated June 9, 2017, the technical team at the Company's Maseve Mine is focussed on improving performance during production ramp up, which is behind schedule.

To accommodate the Company for delayed production ramp-up at the Maseve Mine, a syndicate of lenders led by Sprott Resource Lending Partnership (collectively, "Sprott") and Liberty Metals & Mining Holdings, LLC ("LMM") have agreed to amend their existing loan facilities to the Company and provide waivers, in each case, until October 31, 2017, with regard to minimum cash and working capital requirements, achievement of production targets, certain events of default and the requirement to pay the lenders 50% of the proceeds of equity and debt financings. Sprott and LMM are each to be paid a fee of US $200,000 and US $400,000 respectively in consideration of the above amendments, both at the same time upon the maturity or repayment of the Sprott facility. The Liberty facility is in second secured position and is scheduled for repayment subsequent to the Sprott facility. The Company highlights that additional working capital will be required to continue its operations. Financing methods in consideration by the Company include but are not limited to sale of assets, debt or equity. While the Company believes that further funding will be achieved, there is no assurance that such will be concluded on terms acceptable to the Company, or at all.

The Company continues to work with BMO Capital Markets and Macquarie Capital to review and assess corporate and asset level strategic alternatives as well as potential further financing opportunities.

About Platinum Group Metals Ltd.

Platinum Group, based in Johannesburg, South Africa and Vancouver, Canada, has a successful track record with more than 20 years of experience in exploration, mine discovery, mine construction and mine operations.

Formed in 2002, Platinum Group holds significant mineral rights and large-scale reserves of platinum and palladium in the Bushveld Igneous Complex of South Africa, which is host to over 70% of the world's primary platinum production. The Company is currently focused on ramping up the Maseve Mine, its first near-surface platinum mine, to commercial production.

Platinum Group has delineated new low cost, near surface reserves on the North Limb of the Bushveld Complex on the Waterberg Project. Waterberg represents a new bulk type of large scale, shallow low-cost platinum, palladium and gold deposit. Waterberg is one of the only large scale dominantly palladium deposits in the world.

Qualified Person

R. Michael Jones, P.Eng., the Company's President, Chief Executive Officer and a significant shareholder of the Company, is a non-independent qualified person as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and is responsible for preparing the technical information contained in this news release. He has verified the data by reviewing the detailed information of the geological and engineering staff and the Independent Qualified Person reports as well as visiting the site regularly.

On behalf of the Board of Platinum Group Metals Ltd.

Frank R. Hallam, CFO and Director

Disclosure

The Toronto Stock Exchange and the NYSE MKT LLC have not reviewed and do not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management.

This press release contains forward-looking information within the meaning of Canadian securities laws and forward-looking statements within the meaning of U.S. securities laws (collectively "forward-looking statements"). Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, plans, postulate and similar expressions, or are those, which, by their nature, refer to future events. All statements that are not statements of historical fact are forward-looking statements. Forward-looking statements in this press release include, without limitation, statements regarding anticipated or potential developments at the Waterberg Project including drilling and the potential results thereof, the potential for increasing confidence in mineral resources and upgrading categories of mineral resources, mine planning, potential water sources, work on the DFS including engineering and design work to reduce and improve underground development at Waterberg and to optimize the project scale and return, and the filing of a mining right; working capital requirements; potential sales of assets, debt or equity; the Company's ability to obtain further funding; corporate and asset level strategic alternatives; the potential economics of the Waterberg Project, if developed; ramp-up and potential achievement of commercial production at the Maseve Mine; the Company's key objectives; and the Company's plans and estimates regarding exploration, studies, development, construction, production, cash flows and other activities and developments. Statements of mineral resources and mineral reserves also constitute forward-looking statements to the extent they represent estimates of mineralization that will be encountered on a property and/or estimates regarding future costs, revenues and other matters.
Although the Company believes the forward-looking statements in this press release are reasonable, it can give no assurance that the expectations and assumptions in such statements will prove to be correct. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward-looking statements as a result of various factors, including risks related to indebtedness; the Company's capital requirements may exceed its current expectations; the uncertainty of cost, operational and economic projections; the ability of the Company to negotiate and complete future funding transactions; variations in market conditions; the nature, quality and quantity of any mineral deposits that may be located; metal prices; other prices and costs; currency exchange rates; the Company's ability to obtain any necessary permits, consents or authorizations required for its activities; the Company's ability to produce minerals from its properties successfully or profitably, to continue its projected growth, or to be fully able to implement its business strategies; risks related to contractor performance and labour disruptions; and other risk factors described in the Company's Form 40-F annual report, annual information form and other filings with the Securities and Exchange Commission and Canadian securities regulators, which may be viewed at www.sec.gov and www.sedar.com, respectively.

Cautionary Note to U.S. and other Investors

Estimates of mineralization and other technical information included or referenced in this press release have been prepared in accordance with NI 43-101. The definitions of proven and probable reserves used in NI 43-101 differ from the definitions in SEC Industry Guide 7. Under SEC Industry Guide 7 standards, a "final" or "bankable" feasibility study is required to report reserves, the three-year historical average price is used in any reserve or cash flow analysis to designate reserves and the primary environmental analysis or report must be filed with the appropriate governmental authority. As a result, the reserves reported by the Company in accordance with NI 43-101 may not qualify as "reserves" under SEC standards. In addition, the terms "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are defined in and required to be disclosed by NI 43-101; however, these terms are not defined terms under SEC Industry Guide 7 and normally are not permitted to be used in reports and registration statements filed with the SEC. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into reserves. "inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian securities laws, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Additionally, disclosure of "contained ounces" in a resource is permitted disclosure under Canadian securities laws; however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in place tonnage and grade without reference to unit measurements. Accordingly, information contained or referenced in this press release containing descriptions of the Company's mineral deposits may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements of United States federal securities laws and the rules and regulations thereunder.

R. Michael Jones, President
or Kris Begic, VP, Corporate Development
Platinum Group Metals Ltd., Vancouver
(604) 899-5450 / Toll Free: (866) 899-5450
www.platinumgroupmetals.net

Source: Platinum Group Metals Ltd.



Click Here for a complete listing of Platinum Group Metals press releases.

-------------------
To unsubscribe from this list please visit the email alert section of the Platinum Group Metals site.


Date Sent: 6/15/2017 8:06:46 AM Powered by Q4 Inc.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Platinum Group metals Ltd

EN DÉVELOPPEMENT
CODE : PTM.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Platinum Group Metals est une société développant des projet miniers de platine basée au Canada.

Platinum Group Metals détient divers projets d'exploration aux Philippines.

Son principal projet en développement est WESTERN BUSHVELD JV en Afrique Du Sud et ses principaux projets en exploration sont AGNEW LAKE et LAC DES ILES au Canada, WAR SPRINGS et TWEESPALK en Afrique Du Sud et ACT (ADLAY CAGDIANAO TANDAWA NICKEL) aux Philippines.

Platinum Group Metals est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 246,2 millions CA$ (179,1 millions US$, 168,2 millions €).

La valeur de son action a atteint son plus haut niveau récent le 30 novembre 2012 à 9,90 CA$, et son plus bas niveau récent le 15 juin 2018 à 0,12 CA$.

Platinum Group Metals possède 133 070 008 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Platinum Group metals Ltd
06/11/2018Group ten metals – On the search for platinum group metals i...
30/09/2013Media Coverage - A different animal! Long term South African...
10/07/2013Mining Weekly - New-Breed Platinum Operator Hits Jackpot In ...
15/08/2012(PLG:NYSE MKT, PTM:TSX) – Media Coverage – Mining Weekly
09/03/2011- Media Coverage - Mining Weekly
Financements de Platinum Group metals Ltd
05/05/2016Platinum Group Metals Announces US$33 Million Bought Deal Fi...
03/11/2015Platinum Group Metals to Drawdown US $40 million Sprott Faci...
09/12/2014Platinum Group Metals Announces US$110 Million Bought Deal F...
09/12/2013Announces C$175 Million Bought Deal Financing
12/12/2012Announces Public Offering of Common Shares
26/09/2008Announces Non-Brokered Private Placement
Nominations de Platinum Group metals Ltd
16/07/2013Adds to Board of Directors
Rapports Financiers de Platinum Group metals Ltd
14/07/2016Platinum Group Metals Third Quarter Results and Update
12/04/2016Platinum Group Metals Second Quarter Results and Update
10/04/2015and Second Quarter Results
14/01/2013Reports Q1 2013 Financial Results
13/07/2012Reports Q3 2012 Financial Results
16/04/2012Reports Q2 2012 Financial Results
25/01/2012Reports Q1 2012 Financial Results
13/07/2011Reports Q3 2011 Financial Results
Projets de Platinum Group metals Ltd
31/08/20151:57 am Platinum Group Metals files WBJV Project 1 technical...
20/04/20151:09 pm Platinum Group Metals announces a new intercept WE 0...
14/11/2013Extension of the Super F Zone of the Waterberg Platinum Depo...
11/11/2013WBJV Project 1 Project Finance Update and Waterberg Update
21/10/2013Reports on Initial Drilling on the Waterberg Extension Permi...
18/10/2013Announces that 26% WBJV Project 1 Shareholder Africa Wide Ha...
02/10/2013Announces the Start of New Exploration on the Waterberg Exte...
03/09/2013Announces Updated Waterberg Resource of 17.5 million ounces
10/06/2013Announces an 800 meter step out on the T2 Platinum Layer int...
24/04/2013WBJV Project 1 Platinum Mine Signs Life of Mine Concentrate ...
23/04/2013Continues to Significantly Expand Waterberg Platinum Discove...
14/02/2013WBJV Project 1 (Maseve) Section 54 Notice
14/02/2013WBJV Project 1 (Maseve) Surface Worker Fatality
05/02/2013Prophecy Platinum Announces Drill Results Demonstrating Broa...
01/02/201310 Million Ounce Platinum, Palladium and Gold Inferred Updat...
16/01/2013INVITATION: Platinum Group Metals Cocktail Reception, Core S...
05/11/2012Strike Length Doubles at Waterberg Platinum Discovery
12/10/2012WBJV Project 1 Banking Advances
11/09/2012Anglo American Exercises First Right of Refusal for Platinum...
05/09/2012Initial 6.6 Million Ounce Platinum, Palladium and Gold Infer...
20/07/2012Sable Project Update Western Bushveld South Africa
08/10/2009Feasibility Study Project 1 Platinum Mine
09/10/2009(Western Bushveld Jv)Exploration Projects Update New Large Funded Joint Venture w...
05/03/2009(War Springs)PTM Signs US$10M Option Funding Agreement for War Springs Pr...
02/09/2008(Western Bushveld Jv)Increase its Interest in Project 1 Platinum Mine from 37% to...
01/07/2008Project 1 Bankable Feasibility Study to be Published July 7,...
25/04/2008(Western Bushveld Jv)First Project 3 Resource adds 1.9 million ounces to Western ...
23/04/2008(Western Bushveld Jv)Project 2 Resources Increase Western Bushveld Joint Venture
17/03/2008(War Springs)War Springs Resource Increased to 1.7 Million Ounces
22/01/2008(Western Bushveld Jv)Western Bushveld Joint Venture Update
Communiqués de Presse de Platinum Group metals Ltd
31/07/2017Platinum Group Metals Ltd. Operational and Strategic Process...
19/09/2016Corporate Update
14/07/2016Platinum Group posts 3Q profit
14/07/2016Platinum Group posts 3Q profit
14/07/2016Platinum Group Metals Third Quarter Results and Update
31/05/2016Platinum Group Metals Ltd. Announces More High Grade, Thick ...
31/05/2016Platinum Group Metals Ltd. Announces More High Grade, Thick ...
26/05/2016Platinum Group Metals Closes Public Offering of Common Share...
26/05/2016Platinum Group Metals Closes Public Offering of Common Share...
05/05/2016Platinum Group Metals Announces US$33 Million Bought Deal Fi...
05/05/2016Platinum Group Metals Maseve Update and Amendment to Working...
05/05/2016Platinum Group Metals Maseve Update and Amendment to Working...
29/04/2016Platinum Group Metals Files Waterberg Project Technical Repo...
19/04/2016Platinum Group Metals Reports 13% Increase in F Zone Grade a...
19/04/2016Platinum Group Metals Reports 13% Increase in F Zone Grade a...
12/04/2016Platinum Group reports 2Q loss
26/01/20163:43 am Platinum Group Metals consolidates common shares on ...
26/01/2016Platinum Group Metals Announces Share Consolidation
26/01/2016Platinum Group Metals Announces Share Consolidation
19/01/2016Insiders Are Loading Up on Platinum Mining Company
19/01/2016Insiders Are Loading Up on Platinum Mining Company
14/01/2016Platinum Group Metals First Quarter Results and Update
14/01/2016Platinum Group Metals First Quarter Results and Update
14/01/2016Platinum Group posts 1Q loss
14/01/2016Platinum Group posts 1Q loss
25/11/2015Platinum Group Metals 2015 Annual Results and Update
25/11/2015Platinum Group Metals 2015 Annual Results and Update
03/11/2015Summary of Terms
02/11/2015Platinum Group Metals to Drawdown US $40 million Sprott Faci...
02/11/2015Platinum Group Metals to Drawdown US $40 million Sprott Faci...
15/10/2015Platinum Group Metals (PLG) in Focus: Stock Up 6.3%
15/10/2015Platinum Group Metals (PLG) in Focus: Stock Up 6.3%
05/09/2015Platinum Group Metals Files Waterberg Project Technical Repo...
29/08/2015Platinum Group Metals Files WBJV Project 1 Technical Report
29/08/2015Platinum Group Metals Files WBJV Project 1 Technical Report
22/07/2015Platinum Group Metals Increases Waterberg Mineral Resource t...
15/07/2015Platinum Group Metals Update and Third Quarter Results
15/07/2015Platinum Group Metals Update and Third Quarter Results
15/07/2015Platinum Group Metals Ltd.: WBJV Project 1 Platinum Mine Upd...
15/07/2015Platinum Group Metals Ltd.: WBJV Project 1 Platinum Mine Upd...
20/04/2015Platinum Group Metals Reports Second Waterberg Extension Int...
20/04/2015Platinum Group Metals Reports Second Waterberg Extension Int...
10/04/2015Platinum Group Metals Update and Second Quarter Results
10/04/2015Platinum Group Metals Update and Second Quarter Results
09/12/2014Platinum Group Discontinues 150,000 Unit Offering of Senior ...
26/11/2014Platinum Group Metals Reports 2014 Annual Results
25/02/2014BMO Global Metals and Mining Conference Webcast Presentation...
14/02/2014Announces a Positive Preliminary Economic Assessment for a 6...
10/01/2014Reports Q1 2014 Financial and Operating Results
09/12/2013Waterberg Extension Project Drilling Intersects 53.22 Metres...
27/11/2013Reports 2013 Annual Results
17/10/2013Files Report on Updated Mineral Resource Estimate for the Wa...
23/09/2013’ CEO Addresses Denver Gold Forum
25/07/2013Bushveld Complex: A Mining Battle Ground – Financial Mail – ...
25/07/2013Announces 52 New Platinum Intercepts at Waterberg
12/07/2013Reports Q3 2013 Financial and Operating Results
12/06/2013Announces an 800 meter step out on the T2 Platinum Layer (RE...
15/05/2013Reports Positive Metallurgical Test Results for Waterberg
12/04/2013Resumes Work on North Declines, WBJV Project 1 Platinum Mine
09/04/2013Reports Q2 2013 Financial and Operating Results
18/03/2013Waterberg Technical Report Filed
15/03/2013Added to S&P/TSX Global Mining Index
04/02/2013Announces New Intercepts at Waterberg
30/01/2013Visit Platinum Group Metals Ltd. at Mining Indaba
14/11/2012Leading PGM Forecaster Calls for Significant Platinum and Pa...
26/10/2012(PLG:NYSE MKT, PTM:TSX) – Media Coverage: The Northern Miner
10/10/2012Technical Report Filed
25/09/2012(PLG:NYSE MKT, PTM:TSX) – Media Coverage Business News Netwo...
19/09/2012(PLG:NYSE MKT, PTM:TSX) – Media Coverage - Bloomberg TV – Lu...
17/09/2012.: Significant New Intercepts Expand the Waterberg Platinum ...
11/09/2012(PLG:NYSE MKT, PTM:TSX) – Media Coverage – Kitco News from D...
10/07/2012Adopts Shareholder Rights Plan
19/06/2012Confirms Plans
23/05/2012New Waterberg Results
08/05/2012Announces Waterberg Discovery Expands
02/05/2012– Media Coverage – Business Day
04/04/2012.: Mining Right Granted for WBJV Project 1 Platinum Mine
29/02/2012CEO Addresses BMO Global Metals and Mining Conference
27/02/2012Reminder: Join PLATINUM GROUP METALS for cocktails at PDAC!
06/02/2012.: Waterberg Discovery of Thick High Grade Reefs Expanded
06/09/2011President and CEO Interviewed on Business News Network (BNN)
29/08/2011North Limb Platinum Exploration Update
02/08/2011.: Mandate for $260 Million WBJV Project Loan Completed
11/07/2011Adds to its Board
05/07/2011Construction Update
16/05/2011. Announces Acceptance of Western Bushveld Joint Venture (WB...
05/05/2011' Partner Completes Transaction with Chinese Consortium
13/04/2011Global Exploration Update Platinum Group Metals Ltd.
04/04/2011Project 1 Mine Advances Underground and Mining Right Applica...
21/02/2011– Media Coverage – The Globe and Mail
21/02/2011Appoints Gordon Chunnett to Advisory Board
17/02/2011Eskom Agreement Completed for Delivery of 40MVA Electricity ...
09/02/2011Media Coverage
22/12/2009Platinum For A New World
08/10/2009Hosts Webcast for WBJV Update
26/06/2009Company Update
17/06/2009Announces Closing for C$35 Million
29/05/2009Announces Pricing of Offering
28/05/2009Announces C$35 Million Offering
09/12/2008Definitive Agreements For 74% Deal Executed
15/09/2008Creates New Funded Platinum Joint Venture
06/09/2008Platinum Group in Loan Talks for $506 Million Mine
25/06/2008We Are Building on Platinum
01/04/2008Platinum Group Metals Ltd - Project 2 Update Western Bushvel...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (PTM.TO)AMEX (PLG)
1,85-2.63%1,34-3.60%
TORONTO
CA$ 1,85
19/04 16:58 -0,050
-2,63%
Cours préc. Ouverture
1,90 1,90
Bas haut
1,82 1,90
Année b/h Var. YTD
1,32 -  2,02 24,16%
52 sem. b/h var. 52 sem.
1,30 -  2,40 -18,50%
Volume var. 1 mois
8 800 20,13%
24hGold TrendPower© : -11
Produit
Développe Platinum
Recherche Cobalt - Copper - Gold - Iron - Nickel - Palladium - Platinum - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/10/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20248,82%
2023-28,27%2,511,62
2022-4,82%3,661,58
2021-57,58%7,592,14
2020192,04%8,001,25
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,22 US$+1,63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$-1,59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-2,63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,83 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :