Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

UEX Corp

Publié le 27 janvier 2010

2010 Western Athabasca Basin Drilling Programs Underway with Three Drills at Shea Creek and O

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | K Street | Uranium |

UEX/AREVA 2010 Western Athabasca Basin Drilling Programs Underway with Three Drills at Shea Creek and One Drill at Beatty River

Trading Symbol: UEX-TSX

VANCOUVER, Jan. 27 /CNW/ - AREVA Resources Canada Inc. ("AREVA") has informed UEX Corporation ("UEX") that it has commenced the 2010 drilling programs at the Shea Creek Project ("Shea Creek") and the Beatty River Project ("Beatty River") which were announced on November 24, 2009.

Shea Creek Project

Shea Creek hosts the Kianna, Anne and Colette Deposits, and is the most advanced of the ten 49%-owned Western Athabasca Uranium Projects joint-ventured with AREVA, the operator. The 2010 exploration expenditures are budgeted at approximately $8.0 million of which UEX's 49% share is approximately $3.9 million. The drilling program will focus on the Kianna, Anne and Colette Deposits as well as the 58B Area, which is located between the Kianna and Colette Deposits.

The drilling of a new pilot hole (SHE-134) has commenced in the northeast area of the Kianna Deposit ("Kianna"). Concurrently, the drilling of another new pilot hole (SHE-135) has started in the northwest area of Kianna. Several directional cuts will be made in a southerly direction from each of these pilot holes and will further test the down dip and lateral extensions of open basement mineralization in the northern part of Kianna.

The third drill on the Shea Creek property has begun directional drilling utilizing existing pilot hole SHE-133 in order to further explore the 58B Area where, in 2009, hole SHE-133-2 intersected basement-hosted mineralization grading 1.21% U(3)O(8) over 3.1 metres. In 1997, hole SHE-58B encountered multiple mineralized intervals in the basement, including 2.21% U(3)O(8) over 2.6 metres that also included 6.73% U(3)O(8) over 0.7 metres.

A fourth drill, currently drilling at Beatty River, will be moved to Shea Creek once the Beatty River exploration program is completed.

The Shea Creek deposits form part of a world-class uranium system in which mineralization is being defined over a strike length exceeding three kilometres along the Saskatoon Lake graphitic conductor in northern parts of Shea Creek. Most areas of mineralization continue to be open and have high potential for both expansion of known areas of mineralization and discovery of new zones (see UEX's news release of November 19, 2009).

Beatty River Project

A 2010 diamond drilling program consisting of four holes totaling 1,500 metres is currently underway at Beatty River. The drilling program will test prospective locations along conductive, graphitic basement units. The Beatty River Project is 50.70% owned by AREVA and 49.30% by JCU (Canada) Exploration Company, Limited ("JCU"). UEX is earning a 25% interest in the project from JCU by funding $864,500 of exploration expenditures by December 31, 2011.

To view maps and other information regarding UEX's exploration projects, please access UEX's website at www.uex-corporation.com under "Projects".

Technical information in this news release has been reviewed and approved by R. Sierd Eriks, P.Geo., UEX's Vice President of Exploration, who is a Qualified Person as defined by National Instrument 43-101.

About AREVA Resources Canada Inc.

AREVA, a uranium exploration, mining and milling company, is a subsidiary of AREVA Group, a worldwide expert in the energy field with manufacturing facilities in 43 countries and a sales network in more than 100 countries. AREVA Group, through its Canadian subsidiary, has significant interests in several uranium deposits in the Athabasca Basin, including the producing McClean Lake Deposits operated by AREVA, the producing McArthur River Deposit operated by Cameco Corporation, the Midwest Deposit, the Millennium Deposit, and the Cigar Lake Deposit.

About UEX

UEX is a Canadian uranium exploration and development company actively involved in 19 uranium projects, including seven that are 100% owned and operated by UEX, one joint venture with AREVA that is operated by UEX, ten joint-ventured with AREVA and one under option from JCU (Canada) Exploration Company, Limited, which are operated by AREVA. The 19 projects, totaling 353,134 hectares (872,613 acres), are located in the eastern, western and northern perimeters of the Athabasca Basin, the world's richest uranium belt, which accounts for approximately 21% of the global primary uranium production. UEX is currently developing several uranium deposits in the Athabasca Basin which include the Kianna, Anne and Colette Deposits at its 49%-owned Shea Creek Uranium Project, a joint venture with AREVA in the western Athabasca Basin, and the Horseshoe, Raven and West Bear Deposits located at its 100%-owned Hidden Bay Project in the eastern Athabasca Basin.

           ON BEHALF OF THE BOARD OF DIRECTORS OF UEX CORPORATION
    
                               Graham C. Thody,
                             President & C.E.O.

Forward-Looking Statements

This news release contains "forward-looking statements" that are based on UEX's current expectations, estimates, forecasts and projections. These forward-looking statements include statements regarding UEX's outlook for our future operations, plans and timing for the commencement or advancement of exploration activities on our properties, and other expectations, intention and plans that are not historical fact. The words "estimates", "projects", "expects", "intends", "believes", "plans", or their negatives or other comparable words and phrases are intended to identify forward-looking statements. Such forward-looking statements are based on certain factors and assumptions and are subject to risks, uncertainties and other factors that could cause actual results to differ materially from future results expressed or implied by such forward-looking statements. Important factors that could cause actual results to differ materially from UEX's expectations include uncertainties relating to interpretation of drill results and geology, continuity and grade of deposits, fluctuations in uranium prices and currency exchange rates, and other risks and uncertainties disclosed in UEX's Annual Information Form and other filings with the securities commission on SEDAR. Many of these factors are beyond the control of UEX. Consequently, all forward-looking statements made in this news release are qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking statements. Except as required by applicable law, UEX disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.

%SEDAR: 00017609E For further information: UEX CORPORATION, SUITE 1007 - 808 NELSON STREET, VANCOUVER, B.C., CANADA, V6Z 2H2, PH: (604) 669-2349, FAX (604) 669-1240, Website: www.uex-corporation.com, email: uex@uex-corporation.com

.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

UEX Corp

EXPLORATEUR
CODE : UEX.TO
ISIN : CA9026661061
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

UEX est une société d’exploration minière d'or et de cuivre basée au Canada.

UEX détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont BLACK LAKE, RIOU LAKE, BEATTY RIVER, DOUGLAS, NORTHERN ATHABASCA PROJECTS, WESTERN ATHABASCA PROJECTS, FOND DU LAC, SHEA CREEK, HIDDEN BAY, ALEXANDRA, BRANDER LAKE PROJECTS et JAMES CREEK PROJECTS au Canada.

UEX est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 158,0 millions CA$ (126,3 millions US$, 110,7 millions €).

La valeur de son action a atteint son plus bas niveau récent le 15 août 2003 à 0,05 CA$, et son plus haut niveau récent le 09 novembre 2007 à 9,30 CA$.

UEX possède 319 240 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de UEX Corp
18/05/2016Closes $7.25 Million Combined Flow-Through and Hard Dollar P...
05/06/2013Announces Closing of Private Placement
25/05/2013Announces $3.175 Million Private Placement
23/02/2012Announces $3 Million Private Placement
Nominations de UEX Corp
19/12/2013Announces the Appointment of Roger Lemaitre as President and...
29/04/2011appoints Ed Boney as Chief Financial Officer
27/05/2010Appoints Walter Segsworth and David Rhys to its Management A...
Rapports Financiers de UEX Corp
06/11/2013Third Quarter 2013 Financial Results and MD&A
Projets de UEX Corp
07/01/20142014 Joint Venture Exploration Programs Commence
04/06/2013(Shea Creek)Announces Additional $2.0 Million Drilling Budget for Shea C...
10/04/2013(Shea Creek)Secures Right to Fund $18 Million in Additional Drilling at ...
20/03/2013(Shea Creek)/AREVA Announce $3.1 Million Budget for Shea Creek Spring/Su...
13/02/2013(Black Lake)Regarding Uracan's Option for Black Lake Project in the Atha...
26/04/2012(Shea Creek)/AREVA 2012 Shea Creek Drilling Program Underway
16/02/2012(Hidden Bay)Commences Winter 2012 Hidden Bay Drilling Program
30/11/2011(Shea Creek)Announces Shea Creek Drilling Budget of $6 Million for 2012
09/08/2011(Hidden Bay)Commences 18,000 Metre Summer Drilling Program at Hidden Bay
24/02/2011(Western Athabasca Projects)/AREVA 2011 Western Athabasca Basin Drilling Programs Underw...
18/02/2010(Hidden Bay)Receives West Bear Preliminary Feasibility Study Reporting P...
27/01/2010(Shea Creek)2010 Western Athabasca Basin Drilling Programs Underway with...
06/01/2010(Hidden Bay)Reports Results of Summer 2009 Exploration on the Hidden Bay...
23/07/2009(Hidden Bay)Reports Significantly Expanded Resource Estimates for the Ho...
25/02/2009(Shea Creek)2009 Drill Program Underway at Shea Creek with Three Drills
12/01/2009(Shea Creek)/AREVA Drilling in the Prospective Corridor at Shea Creek Co...
05/01/2009Reports N.I. 43-101 Compliant Mineral Resource Estimate for ...
29/09/2008(Hidden Bay)reports N.I. 43-101 compliant mineral resource for Horseshoe...
18/06/2008/AREVA Drilling Outlines New Zone of High-grade Mineralizati...
17/01/2008(Hidden Bay) Launches Largest Winter Drilling Program at Hidden Bay with...
15/01/2008(Shea Creek)UEX/AREVA Launch Largest Drill Program to Date at Shea Creek...
05/12/2007(Shea Creek)/AREVA Plan $20.3 Million Program at Shea Creek for 2008 Whi...
04/12/2007(Shea Creek)/AREVA Report Additional High-Grade Basement-Hosted Minerali...
14/11/2007/AREVA Report High-Grade Basement-Hosted Mineralization in t...
18/10/2007Report Second-Best Hole Ever at the Anne Deposit Intersectin...
04/09/2007(Shea Creek)/AREVA to Commence Shea Creek Drilling Program with Three Dr...
21/08/2007(Black Lake)Extends Uranium Mineralization at Black Lake Hole BL-140 Int...
23/07/2007Reports Best Hole Ever from West Bear Deposit: Hole UEX-206 ...
12/07/2007Drilling Extends Mineralization at Kianna Deposit: SHE-115-1...
14/06/2007 Plans to Initiate Final Feasibility Study at Raven and Hors...
08/02/2006(Beatty River)2006 winter exploration commences at Beatty River Uranium pr...
Communiqués de Presse de UEX Corp
18/08/2016Research Reports Initiated on Uranium Miners Stocks U3O8, UE...
11/07/2016Paul Bay Continuity Confirmed and Down-Dip Drilling Underway
24/06/2016High Grade Zone Extended at Christie Lake
13/06/2016Drill Turning at Christie Lake
08/06/2016UEX Corporation Reports Results of Annual General Shareholde...
25/05/2016Highest Grade Hole at Christie Lake Project – 9.3% U3O8 over...
17/05/2016UEX Closes $7.25 Million Combined Flow-Through and Hard Doll...
02/05/2016UEX Places “Flow-Through” Shares and Overallotment Option; A...
28/04/2016UEX Announces $4.0 Million “Flow-Through” Private Placement
13/04/2016UEX intersects 4.27% eU3O8 over 10.2 m at Christie Lake
22/01/2016UEX Closes $2.0 Million Private Placement
19/01/2016Final Option Agreement Signed - Drill Program to Commence Im...
19/01/2016UEX Corporation: Final Option Agreement Signed-Drill Program...
22/12/2015UEX Announces $2.0 Million Private Placement
26/10/2015UEX Signs LOI on Advanced Stage Athabasca Uranium Project
21/09/2015Uranium companies could take the cake
21/04/2015UEX Announces $2.5 Million Private Placement
10/04/2015New Radioactive Fault at Wolf Lake Returns Probe Peak of 12,...
27/02/2015Promising Hydrothermal Clay Alteration Expanded at Dwyer Lak...
05/06/2014UEX/AREVA Report Drilling Results from Laurie and Mirror Riv...
02/04/2014(Black Lake)Uracan/UEX report uranium mineralization on the Black Lake P...
28/11/2013(Shea Creek)Reports 31.5 Metres Grading 0.80% eU3O8, Including 4.05% eU3...
06/08/2013(Shea Creek)Reports 22.3 Metres Grading 0.85% eU3O8, including 5.93% eU3...
04/06/2013(Shea Creek)Announces Completion and Filing of Shea Creek Technical Repo...
21/03/2013(Beatty River)Announces Completion of Beatty River Earn-in
08/08/2012/AREVA Drilling Continues to Outline Thick Mineralization at...
08/06/2012Board Re-elected and Mark Eaton Re-Appointed Chairman
31/05/2012/AREVA Drilling Continues to Outline Thick Unconformity Mine...
07/05/2012Terminates Shareholder Rights Plan
01/05/2012(Hidden Bay)Reports Summer-Fall 2011 Drilling Results for the Raven and ...
17/02/2012Announces $8 Million Bought Deal
16/12/2011Comments by David Talbot on UEX Corporation in the Energy Re...
07/12/2011Adopts Shareholder Rights Plan
06/12/2011(Shea Creek)/AREVA Drilling Expands Mineralization Northward from the Ki...
24/06/2011Board Re-elected
28/04/2011appoints Nan Lee as Vice-President of Project Development
17/03/2010Significant Unconformity Intersections at Shea Creek's 58B A...
23/09/2009CEO Stephen Sorensen to Retire; Board Names Current Chairman...
10/06/2009Stepout Drilling Expands Mineralization at Raven and Horsesh...
26/11/2008Announces Minimum $16.5 Million Budget for 2009
09/04/2008 reports final results of 2007 Horseshoe and Raven drilling,...
26/03/2008Eaton Joins UEX Board
22/01/2008UEX Commences 2008 Winter Exploration Program at Black Lake ...
14/01/2008UEX Earns Full 49% Interest in AREVA's Western Athabasca Ura...
14/12/2007Interim Resource Estimate for the West Bear Deposit Adds 223...
11/07/2007Commences Summer/Fall 2007 Drilling Programs at the Raven an...
23/04/2007on Riou Lake and Northern Athabasca Uranium Projects 2007 Ge...
28/02/2007Commences 2007 Winter Exploration Program at Black Lake Uran...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (UEX.TO)FRANKFURT (UXO.F)
0,495+16.47%0,385+2.67%
TORONTO
CA$ 0,495
24/08 16:59 0,070
16,47%
Cours préc. Ouverture
0,425 0,400
Bas haut
0,440 0,500
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,495 -%
Volume var. 1 mois
9 418 620 -%
24hGold TrendPower© : 44
Produit
Développe
Recherche Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 07/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202230,26%0,510,24
202146,15%0,600,25
2020108,00%0,280,07
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :