Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Sphinx Resources

Publié le 02 août 2007

6 New Massive Sulphide =?ISO-8859-1?Q?=20Intersections,=20Including=2019=2E75=20

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Zinc |

Marketwire

 
 
Donner Metals Ltd.
TSX VENTURE:DON
FRANKFURT:D4M
Other Recent News

August 2, 2007
Donner Metals Ltd.: 6 New Massive Sulphide Intersections, Including 19.75 Metres of 22.95% Zinc, 21.40 Metres of 12.47% Zinc at Bracemac and 11.42 Metres of 8.91% Zinc at McLeod
VANCOUVER, BRITISH COLUMBIA--(Marketwire - Aug. 2, 2007) - Mr. Harvey Keats, Chief Executive Officer of Donner Metals Ltd. (TSX VENTURE:DON) reports significant results from delineation drilling at both Bracemac and McLeod. At Bracemac, high-grade massive sulphides have been intersected in three drill holes that tested the Key Tuffite Horizon, the horizon that hosts the major deposits of the Matagami mining camp. At McLeod, high-grade massive sulphides have been intersected in three drill holes, also at the Key Tuffite stratigraphic level. McLeod is located approximately 1 kilometre southeast of Bracemac which is located 4 kilometres southeast of Xstrata's Matagami mill.


Bracemac
------------------------------------------------------------
                Core length
DDH                 (metres)   % Zn   % Cu   g/t Ag   g/t Au
------------------------------------------------------------
BRC-07-42              2.00    9.09   0.19    18.22     0.18
------------------------------------------------------------
BRC-07-46             19.75   22.95   0.22    54.40     0.41
------------------------------------------------------------
BRC-07-47             21.40   12.47   2.02    94.85     0.50
------------------------------------------------------------

McLeod
------------------------------------------------------------
                Core length
DDH                 (metres)   % Zn   % Cu   g/t Ag   g/t Au
------------------------------------------------------------
MC-07-25               0.96   35.60   1.82    54.90     2.98
------------------------------------------------------------
MC-05-18W3             9.40    6.48   0.39    21.77     0.44
------------------------------------------------------------
MC-05-18W4            11.42    8.91   1.88    56.40     1.35
------------------------------------------------------------
 
Details of the new drill results are reported in the attached Table 1. A summary of important intersections reported in 2007 at both Bracemac and McLeod are presented in Table 2. Additional geological information, including maps and sections, on both areas is available at www.donnermetals.com. Twelve holes have been completed on the Matagami Project since the Company's news release dated June 14, 2007 for a total of 6310 metres of drilling. Three drills are active on the Matagami Project.

Bracemac

The two new intersections encountered in BRC-07-46 and BRC-07-47 indicate a substantial thickness of high grade massive sulphides at the Key Tuffite level. Encouragement was initially encountered at the Key Tuffite level in previously reported BRC-07-38 (11.41% zinc over 1.3 metres) (see News Release dated June 6, 2007) and in BRC-07-42 which intersected 9.09% zinc over 2.0 metres with an off-hole EM response that lead to the discovery of the thicker sulphide intervals in BRC-07-46 and 47. BRC-07-42 was drilled 100 metres east of BRC-07-38. BRC-07-46 was drilled 25 metres down-dip of BRC-07-42 and BRC-07-47 was drilled 50 metres due east of BRC-07-46. This new mineralization occurs stratigraphically below the massive sulphide mineralization in the Bracemac and Upper Bracemac Zones and confirms both the presence of three vertically stacked mineralized horizons and a robust VMS hydrothermal system in this area.

Drilling also continued to investigate the up-dip extension of the Upper Bracemac Zone with the drilling of BRC-07-41 which intersected unmineralized tuffite underlain by 18 metres of chlorite alteration and sulphide stringers.

The down-plunge and up-dip extension of the Bracemac Zone was investigated by drill holes BRC-07-43 and 44 respectively. Both holes limited the extension of massive sulphides, however very well developed pipe alteration with stringer sulphides over a width of 90 to 100 metres was encountered in both holes and suggests a very robust hydrothermal system can be further investigated for additional massive sulphides down plunge and to the east of the known massive sulphides.

Reconnaissance drilling that targeted magnetic and EM anomalies at the Key Tuffite elsewhere on the Bracemac property was conducted by drilling three widely spaced holes, BRC-07-40, 45 and 48. These holes did not return significant results.

McLeod Zone

One drill hole and two wedge holes were completed at McLeod targeting the well developed mineralization encountered earlier in the program at the Key Tuffite horizon. The two new wedge holes (MC-05-18W3 and W4) were drilled to follow up the results previously reported from diamond drill hole MC-05-18W2 that intersected 27.95 metres of 9.24% zinc, 0.99% copper, 26.1% silver and 0.56g/t gold (see News Release dated June 14, 2007). MC-05-18W3 and MC-05-18W4 intersected the mineralized Key Tuffite 40 metres west and 50 metres up dip of MC-05-18W2 respectively. New drill hole MC-07-25 intersected 0.96 metres grading 35.6% zinc, 1.82% copper, 54.9 g/t silver and 2.98 g/t gold, 100 metres up dip from MC-07-22 that intersected 5.04 metres of 19.30% zinc, 1.32% copper, 28.5 g/t silver and 0.75 g/t gold (see News Release dated June 14, 2007).

Other Activities

The Geological Survey of Canada (GSC) as part of the Abitibi TGI III initiative (http://ess.nrcan.gc.ca/tgi/index_e.php) released in early June an extensive gravity survey covering large portions of the Matagami Camp, the West Camp and the area between the two. A number of encouraging gravity targets have been identified and, combined with whole-rock geochemistry, suggest that the productive Key Tuffite stratigraphic package may be close to surface in areas not previously explored. A Titan 24 ground geophysical survey is underway over selected gravity targets.

About the Matagami Project

The Matagami Project has an area of mutual interest of 4,737 square kilometres and presently includes 2794 mineral claims covering 717 square kilometres. Taking advantage of Xstrata Zinc's extensive historical database, Donner and Xstrata Zinc Canada (Xstrata Zinc) are using a combination of 3D data integration, innovative advanced technologies, new concepts and diamond drilling to explore for new deposits in this prolific mining camp.

The Matagami Mining Camp is a world-class mining district, with 18 known VMS deposits, including 10 past producers of varying sizes, including the giant Mattagami Lake Deposit (25.64 million tonnes of 8.2% Zn, 0.56% Cu, 20.91 g/t Ag and 0.41 g/t Au) discovered in 1957 and mined from 1963 to 1988. The area is host to historical production of 8.6 billion pounds of Zn and 853 million pounds of Cu and has established infrastructure including the town of Matagami, a railway, a paved road, and a 2,600 t/day mill owned by Xstrata Zinc.

Donner has the option to earn a 50% participating joint venture interest in the Matagami Project by incurring a total of $20 to $23 million of expenditures on exploration and related work on or before May 31, 2011. Upon earn-in by Donner, five separate joint ventures will be formed, covering the property and the area of interest. In each of the five joint venture areas, Xstrata Zinc has the option to earn back a 15% interest in each area by incurring up to $20 million on a feasibility study.

The Company's strategy is to explore for and discover zinc - copper deposits in the Matagami Camp and to leverage the general infrastructure and existing processing facilities within a known and well-established cost structure for developing VMS deposits. Donner's exploration objective is to investigate multiple stratigraphic horizons with potential for VMS mineralization including the prolific Key Tuffite horizon throughout the Matagami Camp. Donner has discovered new mineralization on the Bracemac Property in the Upper Bracemac and Bracemac Zones and at the Key Tuffite horizon in both the Bracemac and McLeod areas.

Supplementary Information

The field work on the Matagami Project is being carried out by project operator Xstrata Zinc Canada who is responsible for the sampling, submittal of samples for assay, assay verification and QA/QC. Assaying of samples reported in this news release was carried out and certified by ALS Chemex-Chimitec, of Val D'Or, Quebec (zinc, copper and silver by atomic absorption, and gold by standard fire assay procedures). Sample preparation was done by ALS Chemex of Val D'Or, Quebec. Robin Adair, VP of Exploration for the Company is the Qualified Person responsible for the technical information in this news release.

ON BEHALF OF THE BOARD OF DONNER METALS LTD.

Harvey Keats, Chief Executive Officer


TABLE 1 - New Results 1) BRACEMAC

Key Tuffite Horizon,
---------------------------------------------------------------------------
                            Hor-
                           izon
              UTM   Angle/ name-
         Location   direc- Mine-                 Core
DDH        NAD 83    tion   ral                length     %    %   g/t  g/t
(Depth)   Zone 18 (True N) Type   From     To (metres)   Zn   Cu    Ag   Au
---------------------------------------------------------------------------
BRC-07-42 307509E,    -62 KT-SM  298.3  300.3     2.0  9.09 0.19  18.2 0.18
(427m)   5506197N degrees/
                      027
                  degrees
---------------------------------------------------------------------------
BRC-07-46 307483E,    -63 KT-MS  320.1  327.1     7.0  33.9 0.10  93.1 0.51
(438.7m) 5506162N degrees/
                      027
                  degrees
---------------------------------------------------------------------------
                                 327.1  332.7     5.6  1.98 0.35  26.5 0.36
---------------------------------------------------------------------------
                          KT-MS  332.7 339.85    7.15 28.66 0.25  38.3 0.36
---------------------------------------------------------------------------
                    Total        320.1 339.85   19.75 22.95 0.22  54.4 0.41
                Composite
                 Interval
---------------------------------------------------------------------------
BRC-07-47 307514E,    -63 KT-MS  305.6 327.00    21.4 12.47 2.02 94.85 0.50
(511m)   5506130N degrees/
                      027
                  degrees
---------------------------------------------------------------------------


Bracemac and Upper Bracemac zones

---------------------------------------------------------------------------
                            Hor-
                           izon
              UTM   Angle/ name-
         Location   direc- Mine-                 Core
DDH        NAD 83    tion   ral                length     %    %   g/t  g/t
(Depth)   Zone 18 (True N) Type   From     To (metres)   Zn   Cu    Ag   Au
---------------------------------------------------------------------------
BRC-07-41 307367E,    -45    UB                      No Significant Results
(196m)   5505887N degrees/
                      018
                  degrees
---------------------------------------------------------------------------
BRC-07-43 307227E,    -54   B-S                      100m of strongly
(445m)   5505805N degrees/                           altered basalts with
                     0.17                            sulphide stringers, no
                  degrees                            significant assay
                                                     results
---------------------------------------------------------------------------
BRC-07-44 307227E,    -67   B-S 387.15  394.6        No significant
(574m)   5505805N degrees/                           results - 99.4 metres
                     0.17                            of strongly altered
                  degrees                            basalts
---------------------------------------------------------------------------


Stratigraphic holes drilled elsewhere on Bracemac property

---------------------------------------------------------------------------
                            Hor-
                           izon
              UTM   Angle/ name-
         Location   direc- Mine-                 Core
DDH        NAD 83    tion   ral                length     %    %   g/t  g/t
(Depth)   Zone 18 (True N) Type   From     To (metres)   Zn   Cu    Ag   Au
---------------------------------------------------------------------------
BRC-07-40 307879E,    -58    KT                      No Significant Results
(636m)   5505678N degrees/
                      026
                  degrees
---------------------------------------------------------------------------
BRC-07-45 307587E,    -45    KT                      No Significant Results
(541m)   5505756N degrees/
                      029
                  degrees
---------------------------------------------------------------------------
BRC-07-48 306126E,    -70    KT                      No Significant Results
(598m)   5506729N degrees/
                      027
                  degrees
---------------------------------------------------------------------------

Horizon:      KT equals Key Tuffite, B equals Bracemac Horizon and UB
              equals Upper Bracemac Horizon.
Mineral Type: MS equals massive sulphides, SM equals semi-massive
              sulphides, S equals stringer sulphides
True lengths (true widths) are anticipated to be 80% to 90% of the core
lengths.


2) NEW MCLEOD ZONE

---------------------------------------------------------------------------
                            Hor-
                           izon
              UTM   Angle/ name-
         Location   direc- Mine-                 Core
DDH        NAD 83    tion   ral                length     %    %   g/t  g/t
(Depth)   Zone 18 (True N) Type   From     To (metres)   Zn   Cu    Ag   Au
---------------------------------------------------------------------------
MC-07-25  308266E,     68 KT-MS 700.56 701.52    0.96  35.6 1.82  54.9 2.98
(799m)   5504910N degrees/
                      028
                  degrees 
---------------------------------------------------------------------------
MC-05-    308266E,    -80 KT-SM 836.30 845.70    9.40  6.48 0.39  21.8 0.44
 18W3    5504910N degrees/
(950m)                037
                  degrees 
---------------------------------------------------------------------------
MC-05-    308266E,    -80 KT-MS 796.78 808.20   11.42  8.91 1.88  56.4 1.35
 18W4    5504910N degrees/
(937m)                037
                  degrees 
---------------------------------------------------------------------------

Horizon:      KT equals Key Tuffite.
Mineral Type: MS equals massive sulphides, SM equals semi-massive sulphides
True lengths (true widths) are anticipated to be 80% of the core lengths.
 
Note: Holes MC-05-18W2, 3 and 4 are wedge cuts from a single pilot hole, designed to produce a 50 metre separation at the Key Tuffite. DDH MC-05-18W1 has not been reported as it failed to reach the Key Tuffite due to mechanical problems and subsequently abandoned. The collar information is the same for each wedge cut.


TABLE 2
Summary of Significant Drill Results
Bracemac
---------------------------------------------------------------------------
                                          Core
DDH          Mineral                     length       %      %    g/t   g/t
(Depth)         Type     From       To  (metres)     Zn     Cu     Ag    Au
---------------------------------------------------------------------------
Bracemac - Key Tuffite Zone
---------------------------------------------------------------------------
BRC-07-38(i)      MS    392.4   393.70      1.3   11.41   0.26   27.1  0.02
---------------------------------------------------------------------------
BRC-07-42         MS   298.30   300.30     2.00    9.09   0.18   18.2  0.18
---------------------------------------------------------------------------
BRC-07-46         MS   320.10   339.85    19.75   22.95   0.22   54.4  0.41
---------------------------------------------------------------------------
BRC-07-47         MS    305.6   327.00     21.4   12.47   2.02  94.85  0.50
---------------------------------------------------------------------------
Bracemac - Bracemac Zone
---------------------------------------------------------------------------
BRC-06-26(i)      MS   314.00   330.00    16.00    9.12   1.21   21.6  0.24
---------------------------------------------------------------------------
BRC-06-27(i)      MS   355.00   363.80     8.80   13.98   3.69   38.9  0.48
---------------------------------------------------------------------------
BRC-07-28(i)      MS   335.80   342.70     6.90    9.83   0.90   13.3  0.18
---------------------------------------------------------------------------
BRC-07-30(i)      MS   279.00   288.90     9.90    8.95   1.17   31.5  0.18
---------------------------------------------------------------------------
BRC-07-32(i)      SM   320.70   341.95    21.25    2.99   1.98   22.6  0.51
---------------------------------------------------------------------------
Bracemac-Upper Bracemac Zone
---------------------------------------------------------------------------
BRC-07-30(i)     SMS   192.90   195.20     2.30   10.08   0.49   22.8  0.10
---------------------------------------------------------------------------
BRC-07-31(i)      MS   105.60   114.90     9.30   12.13   0.70   33.4  0.19
---------------------------------------------------------------------------
BRC-07-35(i)      MS    87.70    90.50     2.80   10.70   0.41   37.6  0.28
---------------------------------------------------------------------------
BRC-07-39(i)      MS   119.60   123.10     3.50    9.02   0.56   26.7  0.21
---------------------------------------------------------------------------


New McLeod

---------------------------------------------------------------------------
                                          Core
DDH          Mineral                     length       %      %    g/t   g/t
(Depth)         Type     From       To  (metres)     Zn     Cu     Ag    Au
---------------------------------------------------------------------------
MC-07-22(i)       MS   754.53   759.57     5.04   19.30   1.32   28.5  0.75
---------------------------------------------------------------------------
MC-07-25          MS   700.56   701.52     0.96    35.6   1.82   54.9  2.98
---------------------------------------------------------------------------
MC-05-18W2(i)     MS   828.05   856.00    27.95    9.24   0.99   26.1  0.56
---------------------------------------------------------------------------
MC-05-18W3        MS   836.30   845.70     9.40    6.48   0.39   21.8  0.44
---------------------------------------------------------------------------
MC-05-18W4        MS   796.78   808.20    11.42    8.91   1.88   56.4  1.35
---------------------------------------------------------------------------
(i) denotes results previously released in 2007
 



The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

Donner Metals Ltd.
Harvey Keats
Chief Executive Officer
(604) 683-0564 or Toll Free: 1-800-909-8311
Fax: (604) 602-9311
Email: donner@bed-rock.com
Website: www.donnermetals.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer

Sphinx Resources

EXPLORATEUR
CODE : SFX.V
ISIN : CA8484221012
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Sphinx est une société développant des projet miniers de zinc et de cuivre basée au Canada.

Sphinx est en développement de projets de zinc, de cuivre, d'argent et d'or au Canada.

Son principal projet en développement est PD1 au Canada et ses principaux projets en exploration sont SOUTH VOISEY BAY, WEST RAGLAN et MATAGAMI au Canada.

Sphinx est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 838 700 CA$ (670 585 US$, 587 432 €).

La valeur de son action a atteint son plus haut niveau récent le 26 août 2016 à 0,14 CA$, et son plus bas niveau récent le 06 décembre 2022 à 0,01 CA$.

Sphinx possède 83 870 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Sphinx Resources
08/08/2013Announces Second Closing of Private Placement
08/08/2013=3A Donner Metals announces closing of private placement
09/07/2013=3A Financing Update
24/06/2013Announces Financing
14/11/2012Announces Closing of C$1,439,000 Final Tranche Private Place...
28/02/2012Increases Private Placement Financing
27/02/2012Announces C$10,000,000 Private Placement Financing
27/10/2011Announces C$2,440,000 of Private Placement Financings
27/07/2011$3 Million Private Placement
25/07/2011Funds Received, Private Placement Closed
13/07/2011Financing News
15/02/2010Additional Private Placement Closings
16/11/2009Private Placements close
14/05/2009Non-Brokered Financing
07/01/2008 $3.2 Million Private Placement Closed
17/12/2007 Private Placement Increased to $3.2 Million
07/12/2007 $2.0 Million Private Placement
Projets de Sphinx Resources
10/12/2013Donner Metals Acquires Option on Valmond Gold Property from ...
30/10/2013(Matagami)Matagami Exploration Joint Ventures Update
03/09/2013=3A Donner Forfeits Interest in Bracemac=2DMcLeod
13/08/2013=3A Donner Metals Bracemac=2DMcLeod Interest
13/08/2013Bracemac-McLeod Interest
31/07/2013=3A Donner Metals Mineralization Extended=2C New Copper Zone...
12/07/2013=3A Donner Metals Update on Production at Bracemac=2DMcLeod
12/07/2013Update on Bracemac-McLeod Production
22/05/2013More High-Grade at McLeod Deep
16/05/2013Production has started!
16/05/2013Production Commences at Bracemac-McLeod
01/11/2012Development and Exploration Update
05/09/2012Bracemac-Mcleod Continues on Target
06/07/2012Provides Exploration Drilling Update
06/07/2012=3A Higher Production at Bracemac=2DMcLeod
05/07/2012Higher Production at Bracemac-McLeod
22/02/2012(Matagami)Ltd=2E: New Drilling Continues to Demonstrate Potential of M...
16/01/2012Ltd=2E: Bracemac-McLeod Mine Development Continues to Track ...
25/10/2011Ltd=2E: Bracemac-McLeod Mine Development Tracking On Budget ...
26/04/2011(Matagami)Completes Earn-In on the Matagami Project
06/03/2011(Matagami)Bracemac-McLeod Ramp Moves Past 660 Metres
10/02/2011(Pd1) Matagami Project Advances as the PD1 Deposit Moves to Feasi...
12/07/2010(Matagami)Drilling Extends McLeod Deep Discovery
07/03/2010(Matagami)Bracemac-McLeod Update
16/02/2010(Matagami)McLeod Deep Discovery Expanded-7.50 Metres Grading 10.27% Zi...
23/11/2009(Matagami)Expanded Winter Drill Progam Initiated at Matagami
01/10/2009(Matagami)Bracemac-McLeod Feasibility Advances as Exploration Continue...
15/07/2009(Matagami) BRACEMAC-MCLEOD advances to feasibility
05/06/2009(Matagami)on BNN and Matagami Project Details
25/05/2009(Matagami)Drilling to Resume at Matagami; Scoping Study Nears Completi...
26/02/2009(Matagami)BRACEMAC-MCLEOD NI 43-101 INDICATED RESOURCE: 3,623,000 TONN...
26/02/2009(Matagami)UPDATED BRACEMAC-MCLEOD NI 43-101
11/02/2009(Matagami)featured on Minesite.com
26/01/2009(Matagami)NI43-101 Resource
23/01/2009(Matagami)INITIAL BRACEMAC-MCLEOD NI43-101 INDICATED RESOURCE
12/11/2008(Matagami)Assays Return High-Grade Zincand Copper from the McLeod Disc...
05/09/2008Provides Initial Results From a Single Drill Hole Program on...
27/05/2008(Matagami)Four New High GradeIntersections at Bracemac/McLeod Includin...
09/05/2008(Matagami)13.47% Zinc, 2.33% Copper Over 6.95 Metres Intersected at Br...
11/04/2008High Grade Discovered Between Bracemac and McLeod
03/03/2008New High Grade Intersections Expand Zones at Bracemac and Mc...
09/01/2008 Drilling Intersects 9.48% Zinc and 2.81% Copper Over 6.00
Communiqués de Presse de Sphinx Resources
30/12/2013Announces Completion of Share Consolidation
13/12/2013Announces Results From AnnualGeneral and Special Meeting and...
14/11/2013Annual and Special General Meeting
18/07/2013Announces Closing of C$2,807,010 Placement
08/07/2013=3A Copper Stream with Sandstorm Amended
08/07/2013Donner Metals Copper Stream With Sandstorm Amended
14/03/2013Announces Financial Support from Quebec Institutions
15/01/2013Stock Options Granted
01/11/2012Ltd=2E: Increased Upfront Paymen =?ISO-8859-1?Q?t=20From=20S...
22/10/2012Announces Results from Annual General Meeting, Head Office M...
22/10/2012Announces Results from Annual General Meeting, Head Office M...
04/10/2012Underground photos and video updates from Donner Metals
19/09/2012Ltd=2E: Mcleod Zone Extended Up-Dip: Exploration Drilling In...
28/08/2012=3A President's Message
17/04/2012Normand Champigny Appointed President of Donner Metals
23/02/2012Sandstorm Partners With Donner Metals
22/02/2012Ltd=2E: Development to Reach the McLeod Zone a Year Ahead of...
22/02/2012News Release
20/01/2012Join us at at the Vancouver Resource Show and Exploration Ro...
01/09/2011September Video update from Donner Metals
13/07/2011Sandstorm Provides US$25 Million Senior Financing
14/04/2010Definition Drill Program Completed at Bracemac-McLeod
03/02/2010$2,409,930 Financing Closed
30/01/2010Financing Increased
08/09/2009engineering contract and fast-tracked feasibility
24/08/2009Two Near Term Production Stories
22/06/2009Industrial Alliance Features Report on Donner Metals
19/05/2009A "Green Shoot" Rising
14/05/2009Is At The Starting Gate
26/02/2009Hotsheet
18/02/2009positioned for success
09/02/2009featured in Mining Journal
12/12/2008$1,048,000 Financing Closes
04/12/2008 AND XSTRATA ZINC CANADA WIN INTERNATIONAL EXPLORATION AWARD
25/11/2008$1.0 Million Financing
18/11/2008Donner Metals has fast-track potential says Reinhard
31/07/2008 Drilling Continues toDelineate and Expand Mineralization at...
01/08/2008Hotsheet for 7/31/2008
28/05/2008$3 Million Debenture Offering
27/05/2008Hotsheet for 5/27/2008
11/04/2008Hotsheet for 4/11/2008
20/03/2008March Chairman's Letter
05/03/2008Hotsheet for 3/5/2008
01/02/2008Engages Mau Capital to Provide Investor Relations
08/01/2008Hotsheet for 1/8/2008
07/12/2007Chairman's Letter
28/11/2007Expands Interest in Matagami Camp
08/11/2007Join us at the San Francisco Hard Assets Investment Conferen...
22/10/2007 Hotsheet for 10/21/2007
02/08/20076 New Massive Sulphide =?ISO-8859-1?Q?=20Intersections,=20In...
14/06/2007New Zinc-Copper Discover 9.24% Zinc, 0.99% Copper Over 27.95...
07/06/2007Bracemac Yields Additional Results With New Mineralization I...
11/04/2007Copper-Rich Massive Sulphides Intersected in BRC-07-32 in th...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (SFX.V)
0,010+0.00%
TSX-V
CA$ 0,010
06/12 09:30 -
0%
Cours préc. Ouverture
0,010 0,010
Bas haut
0,010 0,010
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,010 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -9
Produit
Développe
Recherche Copper - Gold - Nickel - Palladium - Platinum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,03 US$+1,47%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$+4,20%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,17 CA$-3,93%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,82 CA$-2,15%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,62 US$+0,93%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :