Amended - Barkerville Intercepts up to 3.4 m (11.0 feet) of 459 g/T (13.393 oz/t) Gold Including 0.8

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Bismuth |

Sep 13, 2011
Amended - Barkerville Intercepts up to 3.4 m (11.0 feet) of 459 g/T (13.393 oz/t) Gold Including 0.8 m (2.6 feet) of 1,942 g/T or 56.635 oz/T Gold -- Discovers Second and Third Gold Zones on Cow Mountain
Vancouver, BC - Barkerville Gold Mines Ltd. (TSXV:BGM) (the "Company") reports the discovery of the second visible gold ("VG")-cosalite-pyrite-quartz mineralized zone returning up to 1,942 g/T or 56.635 oz/t (resplit 2,156 g/T or 62.875 oz/t) gold - the highest gold grade recorded to date in the area. The new zone is parallel/sub-parallel to the first VG-cosalite-quartz-pyrite zone on Cow Mt. reported by the company on June 27 and July 26, and is about 305 meters (1,000 feet) to the mine grid east. Both zones, running mine grid south and north, are outside the perimeter of the proposed Cariboo Gold Quartz ("CGQ") open pit on the northwest and west flanks of Cow Mountain on the company's project in central British Columbia.

A third mineralized zone, located mine grid southeast of the proposed CGQ open pit, returned assays grading up to 102 g/T (2.975 oz/t) gold in drill hole CM11-44, is controlled by drill holes CM11-28B & 29 on Pad G, CM11-43 on Pad H, CM11-44 & 45 on Pad M, and CM11-46, 47 & 48 on Pad J-K. The size of the controlled area of the zone is approximately 15 meters (50 feet) around.

The new VG-cosalite-quartz-pyrite zone is controlled respectively by drill holes CM11-85 & 86 on drill pad W, CM11-83& 84 on pad V, M11-93 on pad X6, and CM11-97 on X2 at present, which is about 244 long meters (800 feet). It is preliminarily interpreted that the zone plunges at depth to the mine grid south. Drilling of CM11-97 is still in progress.

Drill hole intercepts may not represent true widths. Additional holes are being drilled on the second new zone to determine its true width. Results will be published as soon as available

For the first time, it is confirmed that, in addition to pyrite, quartz and cosalite (a bismuth and lead sulphide mineral) are also the dominant minerals to carry gold, especially visible gold. Length of visible gold in a quartz vein in CM11-85 is up to 0.7 centimeter and that in drill hole CM11-93 is 0.25-0.50 cm in size.

Drilling on Cow Mountain continues. The Company currently has five drill rigs in operation and a sixth is en route. Results will be released as they become available. Highlights are as follows (see full Table 1 below) and drill sections will be posted on the company's website at www.barkervillegold.com:

CM11-86
  • 10.2 m (33.6 feet) of 4.37 g/T (0.101 oz/t) gold between 596.4' and 630.0'

CM11-85
  • 2.7 m (8.8 feet) of 23.5 g/T (0.684 oz/t) gold between 934.2' and 943.0'
    • including 0.5 m (1.5 feet) of 130 g/T (3.791 oz/T) gold between 938.5' and 940.0'
  • 3.4 m (11.0 feet) of 459 g/T (13.393 oz/t) gold between 1,007' and 1,018'
    • including 0.8 m (2.6 feet) of 1,942 g/T or 56.635 oz/T (resplit 2,156 g/T or 62.875 oz/t) gold between 1,010.4' and 1,013.0' ..

CM11-84
  • 3.2 m (10.6 feet) of 11.5 g/T (0.336 oz/t) gold between 296.4' and 307.0'
  • 5.5 m (18.0 feet) of 3.48 g/T (0.102 oz/t) gold between 749.0' and 767.0'

CM11-83
  • 10.8 m (35.4 feet) of 7.69 g/T (0.224 oz/t) gold between 731.6' and 767.0'
    • including 1.7 m (5.6 feet) of 30.5 g/T (0.889 oz/t) gold between 751.4' and 757.0'

CM11-46
  • 4.1 m (13.3 feet) of 6.02 g/T (0.175 oz/t) gold between 196.8' and 210.1'

CM11-45
  • 1.2 m (3.9 feet) of 24.2 g/T (0.706 oz/t) gold between 208.0' and 211.9'

CM11-44
  • 9.1 m (29.9 feet) of 7.90 g/T (0.230 oz/t) gold between 147.0' and 176.9'
    • including 2.2 m (7.3 feet) of 29.0 g/T (0.846 oz/t) gold between 166.6' and 173.9'
  • 6.2 m (20.3 feet) of 14.9 g/T (0.434 oz/t) gold between 227.0' and 247.3'
    • including 0.6 m (1.9 feet) of 102 g/T (2.975 oz/t) gold between 233.0' and 234.9'
  • 5.3 m (17.3 feet) of 12.4 g/T (0.360 oz/t) gold between 767.6' and 784.9'
    • including 1.3 m (4.3 feet) of 44.0 g/T (1.283 oz/t) gold between 777.2' and 781.5'

CM11-43
  • 5.5 m (17.9 feet) of 3.38 g/T (0.099 oz/t) gold between 775.9' and 798.3'

CM11-29
  • 3.8 m (12.4 feet) of 5.24 g/T (0.153 oz/t) gold between 146.0' and 158.4'
    • including 0.4 m (1.3 feet) of 46.0 g/T (1.341 oz/t) gold between 156.4' and 157.7'

CM11-28B
  • 3.2 m (10.6 feet) of 5.80 g/T (0.169 oz/t) gold between 446.0' and 456.6'

    TABLE 1
       

    SIGNIFICANT INTERCEPTS OF 2011 DIAMOND DRILL HOLES ON COW MT.

       
                       
    PAD #
    DIP
    DDH#
    FROM
    TO
    WIDTH
     
    Au
     
    Ag
     
     
     
    FEET
     
     
    METER
    g/T
    oz/t
    g/T
    G
    -44.5
    CM11-28
    NO DRILL CORE (hole got stuck & abandoned)
     
    -49.7
    CM11-28B
    75.8
    76.8
    1.0
    0.3
    3.04
    0.089
    N/S
     
     
    171.2
    172.5
    1.3
    0.4
    12.4
    0.362
    2.8
     
     
    284.4
    296.0
    11.6
    3.5
    2.09*
    0.061*
    N/S
     
     
    including
     
     
     
     
     
    284.4
    288.5
    4.1
    1.2
    31.2
    0.910
    1.6
     
     
    446.0
    456.6
    10.6
    3.2
    5.80*
    0.169*
    1.3*
     
     
    496.0
    499.5
    3.5
    1.1
    1.26*
    0.037*
    N/S
     
     
    528.6
    541.6
    13.0
    4.0
    1.26*
    0.037*
    N/S
     
     
    583.9
    584.9
    1.0
    0.3
    2.00
    0.058
    N/S
     
     
    743.3
    747.1
    3.8
    1.2
    2.79
    0.081
    N/S
     
     
    1115.4
    1116.5
    1.1
    0.3
    1.56
    0.045
    1.0
     
     
    1216.4
    1219.6
    3.2
    1.0
    1.19
    0.035
    N/S
     
     
    1291.3
    1292.7
    1.4
    0.4
    2.94
    0.086
    N/S
     
    -62.9
    CM11-29
    146.0
    158.4
    12.4
    3.8
    5.24*
    0.153*
    1.2*
     
     
    including
     
     
     
     
     
    156.4
    157.7
    1.3
    0.4
    46.0
    1.341
    3.2
     
     
    247.4
    253.0
    5.6
    1.7
    8.43
    0.246
    N/S
     
     
    286.3
    293.0
    6.7
    2.0
    1.03*
    0.030*
    N/S
     
     
    including
     
     
     
     
     
    290.9
    292.0
    1.1
    0.3
    7.25
    0.211
    N/S
     
     
    549.6
    552.0
    2.4
    0.7
    3.28
    0.096
    N/S
     
     
    600.5
    605.6
    5.1
    1.6
    2.04
    0.059
    N/S
     
     
    879.0
    880.7
    1.7
    0.5
    3.09
    0.090
    N/S
     
     
    1113.2
    1114.4
    1.2
    0.4
    2.89
    0.084
    N/S
    S
    -44.5
    CM11-41
    252.8
    257.1
    4.3
    1.3
    5.6
    0.163
    N/S
     
     
    (hole got stuck & abandoned)
     
    -59.6
    CM11-42
    NO SIGNIFICANT ASSAY (hole got stuck & abandoned)
    H
    -45.0
    CM11-43
    166.4
    176.1
    9.7
    3.0
    1.38*
    0.040*
    N/S
     
     
    402.9
    407.5
    4.6
    1.4
    1.37
    0.040*
    N/S
     
     
    546.1
    559.8
    13.7
    4.2
    1.54*
    0.045*
    N/S
     
     
    731.8
    740.6
    8.8
    2.7
    1.68*
    0.049*
    N/S
     
     
    775.9
    793.8
    17.9
    5.5
    3.38*
    0.099*
    N/S
    M
    -47.1
    CM11-44
    109.0
    110.7
    1.7
    0.5
    1.78
    0.052
    N/S
     
     
    147.0
    176.9
    29.9
    9.1
    7.90*
    0.230*
    N/S
     
     
    including
     
     
    166.6
    173.9
    7.3
    2.2
    29.0
    0.846
    1.2
     
     
    227.0
    247.3
    20.3
    6.2
    14.9*
    0.434
    1.4*
     
     
    including
     
     
    233.0
    234.9
    1.9
    0.6
    102
    2.975
    9.0
     
     
    236.9
    238.9
    2.0
    0.6
    22.2
    0.647
    1.8
     
     
    241.6
    243.2
    1.6
    0.5
    29.5
    0.860
    1.8
     
     
    657.7
    666.6
    8.9
    2.7
    1.418*
    0.041*
    N/S
     
     
    767.6
    784.9
    17.3
    5.3
    12.4*
    0.360*
    N/S
     
     
    including
     
     
    777.2
    781.5
    4.3
    1.3
    44.0
    1.283
    1.8
     
    -59.5
    CM11-45
    74.8
    76.3
    1.5
    0.5
    24.4
    0.712
     
     
    80.2
    85.1
    4.9
    1.5
    25.6
    0.747
     
     
    208.0
    211.9
    3.9
    1.2
    24.2*
    0.706*
     
     
    230.2
    232.6
    2.4
    0.7
    2.57
    0.075
     
     
    310.4
    313.0
    2.6
    0.8
    2.88
    0.084
     
     
    330.5
    332.9
    2.4
    0.7
    12.0
    0.350
    J-K
    -44.6
    CM11-46
    196.8
    210.1
    13.3
    4.1
    6.02*
    0.175*
    N/S
     
     
    including
     
     
    204.5
    207.4
    2.9
    0.9
    27.3
    0.796
    1.4
     
     
    391.9
    413.8
    21.9
    6.7
    1.03*
    0.030*
    N/S
     
     
    542.5
    543.9
    1.4
    0.4
    1.46
    0.043
    N/S
     
     
    708.7
    725.1
    16.4
    5.0
    1.72*
    0.050*
    N/S
     
     
    766.6
    780.8
    14.2
    4.3
    1.01*
    0.030*
    N/S
     
     
    1108.0
    1121.8
    13.8
    4.2
    2.20*
    0.064*
    N/S
     
    -59.0
    CM11-47
    171.4
    183.9
    12.5
    3.8
    1.60*
    0.047*
    N/S
     
     
    337.3
    342.1
    4.8
    1.5
    1.40*
    0.041*
    N/S
     
    -44.6
    CM11-48
    55.8
    80.4
    24.6
    7.5
    1.80*
    0.052*
    N/S
     
     
    99.0
    114.8
    15.8
    4.8
    1.03*
    0.030*
    N/S
    U
    -43.8
    CM11-81
    234.5
    236.0
    1.5
    0.5
    2.18
    0.064
    N/S
     
    -61.0
    CM11-82
    NO SIGNIFICANT ASSAY
    V
    -44.6
    CM11-83
    205.5
    215.0
    9.5
    2.9
    1.44
    0.042
    N/S
     
     
    235.5
    245.2
    9.7
    3.0
    4.22*
    0.123*
    N/S
     
     
    341.9
    345.9
    4.0
    1.2
    1.74*
    0.051*
    N/S
     
     
    361.8
    362.8
    1.0
    0.3
    25.5
    0.744
    1.0
     
     
    731.6
    767.0
    35.4
    10.8
    7.69*
    0.224*
    N/S
     
     
    including
     
     
    751.4
    757.0
    5.6
    1.7
    30.5
    0.889
    2.0
     
     
    787.0
    799.9
    12.9
    3.9
    4.29*
    0.125*
    N/S
     
     
    including
     
     
    793.4
    795.7
    2.3
    0.7
    23.4
    0.682
    1.2
     
     
    859.7
    867.0
    7.3
    2.2
    34.5
    1.006
    N/S
     
     
    1039.4
    1055.6
    16.2
    4.9
    12.7*
    0.369*
    N/S
     
     
    including
     
     
    1047.9
    1050.0
    2.1
    0.6
    92.0
    2.683
    8.0
     
    -61.0
    CM11-84
    40.0
    71.5
    31.5
    9.6
    1.58*
    0.046*
    N/S
     
     
    105.8
    108.9
    3.1
    0.9
    5.20
    0.152
    1.0
     
     
    197.0
    207.0
    10.0
    3.0
    7.95*
    0.232*
    N/S
     
     
    296.4
    307.0
    10.6
    3.2
    11.5*
    0.336*
    N/S
     
     
    348.6
    352.8
    4.2
    1.3
    3.18
    0.093
    N/S
     
     
    440.8
    460.6
    19.8
    6.0
    1.24*
    0.036*
    N/S
     
     
    584.4
    588.3
    3.9
    1.2
    8.62
    0.251
    N/S
     
     
    597.0
    600.5
    3.5
    1.1
    2.00
    0.058
    N/S
     
     
    724.6
    729.9
    5.3
    1.6
    1.38
    0.040
    N/S
     
     
    729.9
    737.0
    7.1
    2.2
    1.17*
    0.034*
    N/S
     
     
    749.0
    767.0
    18.0
    5.5
    3.48*
    0.102*
    N/S
    W
    -44.9
    CM11-85
    394.8
    395.8
    1.0
    0.3
    1.10
    0.032
    N/S
     
     
    407.8
    409.5
    1.7
    0.5
    7.10
    0.207
    N/S
     
     
    676.6
    687.0
    10.4
    3.2
    4.10*
    0.120*
    N/S
     
     
    including
     
     
    679.2
    681.3
    2.1
    0.6
    20.1
    0.586
    N/S
     
     
    735.2
    747.0
    11.8
    3.6
    4.08*
    0.119*
    N/S
     
     
    934.2
    943.0
    8.8
    2.7
    23.5*
    0.684*
    N/S
     
     
    including
     
     
    938.5
    940.0
    1.5
    0.5
    130.0
    3.791
    1.4
     
     
    1007.0
    1018.0
    11.0
    3.4
    459*
    13.393*
    29.9*
     
     
    including
     
     
    1010.4
    1013.0
    2.6
    0.8
    1,942
    56.635
    126
     
    -60.4
    CM11-86
    197.0
    210.6
    13.6
    4.1
    1.84*
    0.054*
    N/S
     
     
    252.2
    254.2
    2.0
    0.6
    2.05
    0.060
    N/S
     
     
    316.0
    317.0
    1.0
    0.3
    3.80
    0.111
    N/S
     
     
    527.0
    537.0
    10.0
    3.0
    1.86*
    0.054*
    N/S
     
     
    596.4
    630.0
    33.6
    10.2
    4.37*
    0.101*
    N/S

    Note: N/S - no significant assay;
    * weighted

               


    Drill core processing included descriptive logging and sampling for geochemical analyses. The HQ and NQ-size drill core was cut/split in two halves using saws and a splitter at the Company's Lowhee Creek Compound in Wells-Barkerville, central B.C. One-half of the core is put in a sample bag. After all the samples are placed in the rice bags at the mine site, they are transported by BGM's personnel to a shipping company in Quesnel for trans-shipment to Eco Tech Lab in Kamloops, B.C. Sample preparation and geochemical assaying is done at Eco Tech Lab, following their own internal standards for quality control and verification. The gold assaying method uses a standard fire assay with AA finish and a metallic gold assay for those samples with visible gold. ETL is certified under the Assayers Certification Program of B.C.

    About Barkerville Gold Mines Ltd.

    Since the mid 1990s the Company has focused on exploration and development of gold projects in the Cariboo Mining District in central B.C. The Company's mineral tenures now cover over 1,147 square kilometers, encompassing seven past producing hard rock mines and three NI 43-101 gold deposits, including the QR Mine & Mill. The QR Property was acquired in February 2010 and includes a 900 tonne/day gold milling facility and a permitted gold mine located approximately 110 kilometers by highway and all-weather road from the Barkerville Gold Camp. Mining operations commenced at QR in the first quarter of fiscal 2011 and the Company began pouring dor� gold in September 2010. In November 2010, the Company acquired a second permitted mill currently on care and maintenance in Revelstoke, B.C. for relocation to the Barkerville Gold Camp near Wells, B.C. and upgrade to a 3,000-tonne/day facility subject to government approvals. In November 2010 the Company and the Lhtako Dene First Nation also signed a Project Agreement in relation to its Bonanza Ledge and Cariboo Gold Projects. The Company has not hedged any of its future gold production.
    The technical information in this News Release has been reviewed and approved by Chief Geologist Jim Yin, PhD, P.Geo, a qualified person as defined in National Instrument 43-101.

    On behalf of the Board of Directors

    "J. Frank Callaghan"

    J. Frank Callaghan
    President and CEO
    Tel: (604) 669 -- 6463

    This News Release contains forward-looking statements. Forward-looking statements are statements which relate to future events and conditions and therefore involve inherent risks and uncertainties. These statements are only predictions and involve known and unknown risks, uncertainties and other factors that may cause our or our industry's actual results, levels of activity, performance or achievements to be materially different from any future results, levels of activity, performance or achievements expressed or implied by these forward-looking statements. While these forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our industry, actual results will almost always vary, sometimes materially, from any estimates, predictions, projections, assumptions or other future performance suggested herein. Except as required by applicable law, the Company does not intend to update any of the forward-looking statements to conform these statements to actual results. All phases of the Company's operations are subject to environmental regulation and governmental approval and permits and there can be no assurance that the Company will obtain all the requisite permits for future development. Mining is an inherently risky business with large capital expenditures and cyclical metals markets.

    Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
    Home   About   Operations   Investors   News   Media   Contact   Subscribe   

    This email was sent to .com

    Barker Minerals Ltd

    EXPLORATEUR
    CODE : BML.V
    ISIN : CA06762P1099
    Suivi et investissement
    Add to watch list Add to your portfolio Add or edit a note
    Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
    ProfilIndicateurs
    de Marché
    VALEUR :
    Projets & res.
    Communiqués
    de Presse
    Rapport
    annuel
    RISQUE :
    Profile actifs
    Contactez la cie

    Barker est une société d’exploration minière d'or et de cuivre basée au Canada.

    Barker détient divers projets d'exploration au Canada.

    Ses principaux projets en exploration sont KANGAROO, FRANK CREEK, CARIBOO PROPERTIES et ACE PROPERTY au Canada.

    Barker est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 899 288 CA$ (667 623 US$, 587 027 €).

    La valeur de son action a atteint son plus haut niveau récent le 13 avril 2007 à 0,50 CA$, et son plus bas niveau récent le 28 juin 2019 à 0,01 CA$.

    Barker possède 179 857 516 actions en circulation.

    Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
    Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
     
    Dans les médias de Barker Minerals Ltd
    24/01/2019Cow Mountain yields high grades for Barkerville
    Financements de Barker Minerals Ltd
    24/01/2012ville announces closing of $24,351,424 under Equity Financin...
    30/12/2011ville announces closing of first tranche of Equity Financing
    07/12/2011ville announces $20,000,000 Equity Financing
    19/07/2011ville Receives $8,529,375 From Warrant Exercise -- All Warra...
    Projets de Barker Minerals Ltd
    20/01/2014ville Provides Project Update
    16/10/2013ville Provides Project Update
    14/09/2011Amended - Barkerville Intercepts up to 3.4 m (11.0 feet) of ...
    08/09/2011ville Adds 2,975 Hectares To Its Cariboo Mining Project
    27/06/2011ville Intersects 19.9 Meters (65.4 Feet) of 83 g/t (2.429 oz...
    14/02/2011ville Extends New Discovery Zone on Barkerville Mountain to ...
    10/02/2011ville Intercepts 16.7 Meters Grading 15.9 g/T Gold in Replac...
    Communiqués de Presse de Barker Minerals Ltd
    06/03/2015Barker Minerals Lodges a Fraud and Market Manipulation Compl...
    06/03/2015Barker Minerals Ltd. Reports Closing on the Disposition of N...
    27/01/2014ville Announces Results of AGM
    09/12/2013ville Provides Update -- Screen Metallic Fire Assays
    16/07/2012Fully Permitted Barkerville Gold Announces its QR mine to pr...
    30/06/2012ville Announces a NI 43-101 Compliant Indicated Resource of ...
    09/09/2011ville Drilling Updates - Assays Pending
    29/06/2011ville Releases Year End Results
    15/06/2011ville Appoints Ross Hollinger as Mine Manager For Bonanza Le...
    07/04/2011ville Provides Update on the Permitting of the Bonanza Ledge...
    21/03/2011First Diamond Drilling Assay at New Discovery on Barkerville...
    06/11/2007Discovers Gold Mineralization in Initial Exploration Drill P...
    12/10/2007Reports a New Bedrock Discovery of Massive Sulphide Minerali...
    Publication de commentaires terminée
     
    Dernier commentaire publié pour cet article
    Soyez le premier à donner votre avis
    Ajouter votre commentaire
    TSX-V (BML.V)Other OTC (BKMNF)
    0,005+0.00%0,001-50.00%
    TSX-V
    CA$ 0,005
    28/06 17:00 -
    0%
    Cours préc. Ouverture
    0,005 0,005
    Bas haut
    0,005 0,005
    Année b/h Var. YTD
     -  -
    52 sem. b/h var. 52 sem.
    - -  0,005 -%
    Volume var. 1 mois
    40 000 -%
    24hGold TrendPower© : -27
    Produit
    Développe
    Recherche Gold - Palladium - Platinum
     
     
     
    Analyse
    Interactive chart Add to compare
    Graphique
    interactif
    Imprimer Comparer Exporter
    Vous devez être connecté pour accéder au portefeuille (gratuit)
    Top Newsreleases
    LES PLUS LUS
    Variation annuelle
    DateVariationMaxiMini
     
    Graphique 5 ans
     
    Graphique 3 mois
     
    Graphique volume 3 mois
     
     
    Nouvelles des Sociétés Minières
    Plymouth Minerals LTDPLH.AX
    Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
    0,12 AU$-8,00%Trend Power :
    Santos(Ngas-Oil)STO.AX
    announces expected non-cash impairment
    7,54 AU$-2,14%Trend Power :
    OceanaGold(Au)OGC.AX
    RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
    2,20 AU$+0,00%Trend Power :
    Western Areas NL(Au-Ni-Pl)WSA.AX
    Advance Notice - Full Year Results Conference Call
    3,86 AU$+0,00%Trend Power :
    Canadian Zinc(Ag-Au-Cu)CZN.TO
    Reports Financial Results for Q2 and Provides Project Updates
    0,12 CA$+4,55%Trend Power :
    Stornoway Diamond(Gems-Au-Ur)SWY.TO
    Second Quarter Results
    0,02 CA$+100,00%Trend Power :
    McEwen Mining(Cu-Le-Zn)MUX
    TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
    11,86 US$+3,45%Trend Power :
    Rentech(Coal-Ngas)RTK
    Rentech Announces Results for Second Quarter 2017
    0,20 US$-12,28%Trend Power :
    KEFIKEFI.L
    Reduced Funding Requirement
    0,53 GBX-1,12%Trend Power :
    Lupaka Gold Corp.LPK.V
    Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
    0,06 CA$+0,00%Trend Power :
    Imperial(Ag-Au-Cu)III.TO
    Closes Bridge Loan Financing
    2,65 CA$+0,00%Trend Power :
    Guyana Goldfields(Cu-Zn-Pa)GUY.TO
    Reports Second Quarter 2017 Results and Maintains Production Guidance
    1,84 CA$+0,00%Trend Power :
    Lundin Mining(Ag-Au-Cu)LUN.TO
    d Share Capital and Voting Rights for Lundin Mining
    15,29 CA$-2,74%Trend Power :
    Canarc Res.(Au)CCM.TO
    Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
    0,26 CA$+4,08%Trend Power :
    Havilah(Cu-Le-Zn)HAV.AX
    Q A April 2017 Quarterly Report
    0,23 AU$+0,00%Trend Power :
    Uranium Res.(Ur)URRE
    Commences Lithium Exploration Drilling at the Columbus Basin Project
    6,80 US$-2,86%Trend Power :
    Platinum Group Metals(Au-Cu-Gems)PTM.TO
    Platinum Group Metals Ltd. Operational and Strategic Process ...
    1,80 CA$+3,45%Trend Power :
    Devon Energy(Ngas-Oil)DVN
    Announces $340 Million of Non-Core Asset Sales
    50,37 US$-1,58%Trend Power :
    Precision Drilling(Oil)PD-UN.TO
    Announces 2017Second Quarter Financial Results
    8,66 CA$-0,35%Trend Power :
    Terramin(Ag-Au-Cu)TZN.AX
    2nd Quarter Report
    0,04 AU$+0,00%Trend Power :