Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Cornerstone Capital Resources Inc

Publié le 29 juillet 2010

and Thundermin intersect 2.3% Cu over 18.0 m, including 4.2% Cu over 5.5 m, in d

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper |


=======================================================================
Re:   News - Thursday, July 29, 2010
      10-16 - Cornerstone and Thundermin intersect 2.3% Cu over 18.0 m,
      including 4.2% Cu over 5.5 m, in deepest intersection to date at
      Little Deer
=======================================================================

Mount Pearl, NL, Canada:   Cornerstone Capital Resources Inc.
(TSXV-CGP) (F-GWN) (B-GWN) (OTC-CTNXF) and 50% joint venture partner
Thundermin Resources Inc. ("Thundermin") (THR:TSX) announce that they
have intersected 2.3% Cu over a core length of 18.0 m, including 4.2%
Cu over 5.5 m, approximately 992 m below surface on the Little Deer
Copper Deposit ("Deposit") located approximately 10 km north of
Springdale in north-central Newfoundland (see Table 1 and Figure 1).
This intersection, which is the deepest significant copper
mineralization intersected to date in the Deposit, suggests that there
is good potential to increase tonnages at depth at Little Deer. The
potential to increase tonnes at depth, however, is conjectural in
nature and additional drilling will be required to define the true
tonnage potential of the Deposit.

Table 1: Little Deer Drill Results
 
Hole No.  East (m)  North (m)  Dip (o)  Az (o)  From (m)   To (m)  Interval (m)*  Cu (%)
LD-10-37   13,141     4,635     -73.3    312.6     742.1    743.9     1.8 uz       5.8
                                                 1,055.0  1,073.0    18.0          2.3
incl                                             1,066.2  1,071.7     5.5          4.2
                                                 1,096.2  1,097.2     1.0          2.8
                                                 1,104.7  1,117.7    13.0          1.1
                                                 1,125.6  1,135.5     9.9          1.3
LD-10-38   13,141     4,635     -72.8    328.0     679.1    679.4     0.3 uz       7.9
                                                   900.0    906.8     6.8          1.7
                                                   925.7    938.2    12.5          1.0
incl                                               934.1    938.2     4.1          1.6
                                                   945.1    945.9     0.8          2.9
                                                   950.9    969.4    18.5          1.4
incl                                               956.6    963.0     6.4          1.9
                                                   989.8    996.1     6.3          2.2
LD-10-36   13,320     4,502     -64.1    317.7     662.6    667.8     5.2 uz       2.4
                                                   781.7    784.2     2.5          3.2
LD-10-35   13,141     4,635     -70.5    324.0     635.6    640.2     4.6 uz       1.9
                                                   661.5    662.0     0.5          2.5
                                                   762.0    780.6    18.6          1.3
incl                                               764.0    771.8     7.8          1.7

Notes:
*  Reported intervals are core lengths. The true thicknesses of the
various copper intersections are highly variable due to the stringer
nature of the mineralization. Management, however, believes that the
true thicknesses of the drill intercepts average approximately 70% -
75% of core lengths.

uz  Relatively narrow but generally high grade upper zone also
intersected in previously reported holes LD-10-32, LD-10-32A, and
LD-08-09B.

Hole LD-10-34 -- no significant values.

The current $1,500,000 diamond drilling program, which commenced on
February 3, 2010 and finished on June 29, 2010, consisted of 10,649 m
of NQ drilling in eight surface holes, three hole deepenings and four
wedge holes. Assay results for ten of these holes were presented in
Cornerstone and Thundermin news releases dated April 13 and April 29.
The results for the final five holes of the program are set out in
Table 1 and on Figure 1:
http://www.cornerstoneresources.com/i/maps/properties_nfld_littledeerlongsec.jpg. The primary goals of this drill program were to increase
the mineral resources outlined to date in the Deposit (see Mineral
Resource Estimate below) by an additional two to three million tonnes
at generally comparable copper grades, and to obtain fresh core samples
for metallurgical testing at SGS Lakefield Research ("Lakefield"). A
potential increase in the current mineral resource is conceptual in
nature and it is uncertain whether further exploration will result in
an expansion of this mineral resource.

Holes LD-10-35, LD-10-36, LD-10-37 and LD-10-38 were drilled to confirm
and expand the resource potential in the western portion of the Deposit
where previously announced, wide-spaced holes LD-08-16, LD-08-16A,
LD-08-16B, LD-08-09B and LD-10-32A intersected substantial thicknesses
of copper mineralization within wide zones of intense chlorite
alteration (see Table 1 and Figure 1). In addition, previously
announced hole LD-10-32 intersected an extensive, locally copper
bearing, chlorite alteration zone from approximately 922 to 1,142 m
below surface before the hole was abandoned due to drilling
difficulties.

The most significant of the new drill holes, LD-10-37, intersected 2.3%
Cu over a core length of 18.0 m, including 4.2% Cu over 5.5 m,
approximately 992 m below surface (see Figure 1). This intersection is
approximately 50 m below and 115 m west of hole LD-10-32A, which
intersected 2.1% Cu over 19.6 m, including 4.6% Cu over 5.9 m and 14.5%
Cu over 1.5 m, and approximately 60 m east and 145 m below hole
LD-08-16A, which intersected 1.2% Cu over 9.4 m and 1.5% Cu over 23.3
m, including 3.1% Cu over 6.2 m and 1.9% Cu over 15.8 m. Hole LD-10-37
also intersected wide zones of lower grade copper mineralization near
the bottom of the hole that assayed 1.1% Cu over 13.0 m and 1.3% Cu
over 9.9 m. The presence of substantial thicknesses of copper
mineralization within wide zones of intense chlorite alteration
suggests that there is a good possibility that the Deposit may extend
to depth in this area.

An upper, relatively narrow, but generally high grade copper zone has
been intersected in the western portion of the Deposit over a strike
length of approximately 200 m and over a vertical depth of
approximately 150 m. Intersections in this zone include 5.8% Cu over
1.8 m, 7.9% Cu over 0.3 m, 2.4% Cu over 5.2 m and 1.9% Cu over 4.6 m in
new holes LD-10-37, LD-10-38, LD-10-36 and LD-10-35, respectively (see
Table 1), and 8.8% Cu over 1.8 m, 5.5% Cu over 0.8 m and 0.8% Cu over
8.8 m in previously announced holes LD-10-32A, LD-08-09B and LD-10-32,
respectively. The total extent and significance of this zone is unknown
at the present time.

Hole LD-10-34 failed to intersect any significant sulphide
mineralization approximately 933 m below surface in the central portion
of the Deposit. A borehole Pulse EM survey is planned for this hole to
determine if there are any nearby sulphides that were missed by the
drilling.

Further diamond drilling to expand the mineral resources within the
Deposit and to upgrade known resources from the Inferred to the
Indicated mineral resource category will await the receipt of final
results from the updated mineral resource estimate and the
metallurgical test work.

Cornerstone and Thundermin would like to acknowledge the financial
support received from the Junior Exploration Assistance ("JEA") program
of the Province of Newfoundland and Labrador in carrying out a portion
of their work on the Little Deer property.

Mineral Resource Estimate

On July 7, 2009, Cornerstone and Thundermin reported a National
Instrument 43-101 ("NI 43-101") mineral resource estimate for the
Deposit comprising Indicated Resources of 1,087,000 tonnes at an
average grade of 2.9% Cu and Inferred Resources of 1,950,000 tonnes at
an average grade of 2.3% Cu. The mineral resource estimate was prepared
by Mr. Reno Pressacco, M.Sc.(A), P.Geo., then Senior Geologist for
Micon International Limited of Toronto, Ontario, an independent
Qualified Person ("Q.P.") in accordance with NI 43-101. A NI 43-101
Technical Report supporting the mineral resource estimate was filed on
SEDAR on August 20, 2009.

An updated NI 43-101 compliant mineral resource estimate, to include
results from 26 holes drilled subsequent to May 2009, will commence
shortly and take approximately three weeks to complete.

Metallurgy

Metallurgical test work is on-going at Lakefield on fresh core samples
collected during the recent diamond drilling campaign. This work is
focusing on determining copper recoveries, copper concentrate grades,
reagent consumption, power usage for grinding and the environmental
characteristics of any tailings products. Initial results suggest that
a very simple metallurgical process will be required to recover the
majority of the copper from the Little Deer sulphides. Final results
from the metallurgical test work are expected near the end of August
and will be reported when received. 

Little Deer Joint Venture

Thundermin, the operator, and Cornerstone have the option, on a 50/50
basis to earn a 100% interest in the Little Deer Copper Deposit and
adjacent property from Weyburn Investments Ltd. Thundermin, under its
joint venture agreement with Cornerstone, has the right to increase its
interest in the Little Deer property to 75% by completing a feasibility
study and by arranging 100% of the necessary bank financing required to
place the property into commercial production. Details on the Deposit
and the terms of the agreement with Weyburn can be found in numerous
news releases and on Thundermin's and Cornerstone's respective websites
and on SEDAR.

Qualified Person

Mr. Andrew Hussey, P.Geo., Project Geologist and Lands Manager,
Cornerstone Resources Inc., is the Q.P. responsible for supervising the
drilling program on the property for the purposes of NI 43-101. Mr.
Hussey has also reviewed the contents of this news release for
accuracy. All holes drilled by Cornerstone and Thundermin are NQ in
size. Specific gravity measurements, rock quality designations and
photographic logging of significant mineralized intersections are
performed systematically prior to assaying. The core is logged and the
mineralized sections, where appropriate, are sawn in half at a core
logging facility in Springdale. Half of the core is submitted for
analyses to Eastern Analytical Limited, an independent and qualified
assayer located in Springdale, and the remaining half of the core is
kept for future reference. Blanks, duplicates and standards are
routinely used as part of the assay procedures.

About Cornerstone
Cornerstone Capital Resources Inc. is a mineral exploration company
based in Mount Pearl, Newfoundland and Labrador, Canada, with a
diversified portfolio of projects in Canada and Ecuador and a strong
technical team that has proven its ability to identify, acquire and
advance properties of merit. The company's business model is based on
generating exploration projects whose subsequent development is funded
primarily through joint venture partnerships.

Further information is available on Cornerstone's website:
www.cornerstoneresources.com  or for investor, corporate or media
inquiries, please contact:

Martti Kangas,
Investor Relations
North America toll-free: 1 (877) 277-8377
Direct Line: 1 (647) 521-9261
Email: communications@crigold.com

Cautionary Notice:
This news release may contain 'Forward-Looking Statements' that involve
risks and uncertainties, such as statements of Cornerstone's plans,
objectives, strategies, intentions and expectations.  The words
"potential," "anticipate," "forecast," "believe," "estimate," "expect,"
"may," "project," "plan," and similar expressions are intended to be
among the statements that identify 'Forward-Looking Statements.'
Although Cornerstone believes that its expectations reflected in these
'Forward-Looking Statements' are reasonable, such statements may
involve unknown risks, uncertainties and other factors disclosed in our
regulatory filings, viewed on the SEDAR website at www.sedar.com.  For
us, uncertainties arise from the behaviour of financial and metals
markets, predicting natural geological phenomena and from numerous
other matters of national, regional, and global scale, including those
of an environmental, climatic, natural, political, economic, business,
competitive, or regulatory nature.  These uncertainties may cause our
actual future results to be materially different than those expressed
in our Forward-Looking Statements.  Although Cornerstone believes the
facts and information contained in this news release to be as correct
and current as possible, Cornerstone does not warrant or make any
representation as to the accuracy, validity or completeness of any
facts or information contained herein and these statements should not
be relied upon as representing its views subsequent to the date of this
news release.   While Cornerstone anticipates that subsequent events
may cause its views to change, it expressly disclaims any obligation to
update the Forward-Looking Statements contained herein except where
outcomes have varied materially from the original statements.

On Behalf of the Board,
Colin B. McKenzie
President & CEO

Neither TSX Venture Exchange nor its Regulation Services Provider (as
that term is defined in the policies of the TSX Venture Exchange)
accepts responsibility for the adequacy or accuracy of this release.

=======================================================================
Copyright (c) 2010 CORNERSTONE CAPITAL RESOURCES INC. (CGP)  All rights
reserved.  For more information visit our website at
http://www.cornerstoneresources.com/ or send
mailto:info@cornerstoneresources.com
Message sent on Thu Jul 29, 2010 at 5:15:00 AM Pacific Time
=======================================================================
.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Cornerstone Capital Resources Inc

EN DÉVELOPPEMENT
CODE : CGP.V
ISIN : CA21922J2083
CUSIP : 21922J208
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Cornerstone est une société d’exploration minière basée au Canada.

Cornerstone est en développement de projets d'uranium au Canada, et détient divers projets d'exploration au Canada, au Chili et en Equateur.

Son principal projet en développement est AILLIK au Canada et ses principaux projets en exploration sont CHALEUR, ANAKTALIK, AUCOIN, LABRADOR TROUGH, VOISEY'S BAY PROPERTY, DEER LAKE PROJECT, DORCHESTER, GOSHEN, EL STRATO, LONG LAKE, NOTAKWANON LAKE, TRUE GRIT, CAPE RAY, COLCHESTER, CODROY PROJECT, LONG HARBOUR, OKAK, GARLAND, KAUK, KONRAD, NOEL PAUL'S BROOK, BOBBY'S POND, LITTLE DEER, CONEY ARM et INDIAN ARM au Canada, MACARA, BELLA MARIA, MONTERREY et SIERRAMIN en Equateur et LA FORTUNA CHILE au Chili.

Cornerstone est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 1,2 milliards CA$ (934,1 millions US$, 818,3 millions €).

La valeur de son action a atteint son plus bas niveau récent le 04 mars 2016 à 0,02 CA$, et son plus haut niveau récent le 18 septembre 2020 à 6,53 CA$.

Cornerstone possède 299 560 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Cornerstone Capital Resources Inc
26/04/2016Corporate Presentation
23/01/2014Corporate Presentation
Rapports annuels de Cornerstone Capital Resources Inc
Annual Report 2007
Financements de Cornerstone Capital Resources Inc
13/05/2016 Announces Completion of $4.5 Million Financing
07/04/2016Cornerstone Announces $4.5 Million Financing
09/04/201414-11 - Cornerstone Announces Completion of Financing
14/03/201414-09 - Cornerstone Announces $4 Million Financing
28/08/201313-17 - SolGold Private Placement
30/09/201111-32 - Cornerstone private placement completed
28/06/201010-14 - Cornerstone Private Placement Completed
15/06/201010-12 - Cornerstone arranges $1.2M Private Placement
04/03/2008Newmont Completes Private Placement in Cornerstone
17/10/2007 Private Placement Completed
Attributions d'options de Cornerstone Capital Resources Inc
24/02/2011Issue of 1,250,000 stock options to purchase shares in Corne...
Nominations de Cornerstone Capital Resources Inc
09/09/201313-19 - Cornerstone appoints Glen McKay to Advisory Board
24/02/2011 - H. Brooke Macdonald appointed President of Cornerstone
30/12/2010Engages MI3 as Investor Relations Advisor
03/08/201010-17 - Cornerstone announces management changes
11/06/201010-11 - Cornerstone announces appointment to the Board of Di...
02/11/2007appoints Ian Slater as Director and makes changes to the Man...
Projets de Cornerstone Capital Resources Inc
20/07/2016(Cascabel Ecuador)16-18 - Cascabel Hole 17 upgraded assay results
07/07/2016(Cascabel Ecuador) 14 porphyry targets identified to date at Cascabel Project,...
14/06/201616-12 - Cornerstone signs definitive joint exploration agree...
25/02/201414-05 - SolGold elects to increase ownership to 85%
16/12/201313-31 - Cascabel Project Update -- Alpala Prospect - Strongl...
05/11/201313-27 - Cornerstone intersects 126m @ 0.38% copper, 0.43 g/t...
16/10/2013Final Assay Results Lift Copper Grades for First Cascabel Dr...
08/10/2013Cascabel Project Update
17/09/2013(Little Deer).: Sale of Interest in Little Deer Joint Venture
11/09/201313-20 - Cascabel Drilling Update
03/09/201313-18 - Drilling begins at Cascabel project in Ecuador
26/08/201313-16 - Cornerstone receives 4-year environmental license to...
22/08/201313-15 - Cornerstone receives key environmental approval at C...
30/07/2013(Little Deer)13-14 - Cornerstone offers to sell its 50% interest in the L...
24/07/2013(Cape Ray)13-13 - Cornerstone completes sale of Cape Ray gold project
08/07/201313-12 - Cascabel Project Update
05/07/2013(Cape Ray)13-11 - Cornerstone sells Cape Ray Property to Benton
04/07/2013(Cape Ray)Sells Cape Ray Property to Benton
13/06/201313-10 - Channel sampling further expands zone of copper - go...
31/01/201313-03 - Cornerstone Provides Exploration Update
08/11/201212-23 - Cornerstone Announces Completion of Airborne Geophys...
16/10/201212-22 - Cornerstone Provides Exploration Update
27/09/201212-20 - Cornerstone announces Phase 3 drilling program at th...
17/09/201212-18 - Cornerstone and SolGold Identify Large Gold-Copper P...
24/07/201212-15 - Cornerstone and SolGold Plc sign definitive option a...
04/06/2012(Bella Maria)12-12 - Cornerstone announces receipt of environmental licen...
11/05/2012(Bella Maria)12-11 - Cornerstone announces receipt of authorization to re...
09/05/201212-09 - Cornerstone Announces Final Trenching Results and Pr...
04/05/2012(Miocene)12-08 - Cornerstone issues first tranche of shares for Mioce...
30/04/2012(Shyri)12-07 - Cornerstone announces further exploration programs o...
10/04/201212-06 - Cornerstone and Solomon Gold sign letter of intent f...
23/02/201212-05 - Cornerstone and Thundermin Intersect High Grade Copp...
22/02/201212-04 - Cornerstone Reports Further Trenching Results at La ...
09/02/201212-03 - Cornerstone and Intrepid report results for Phase 2 ...
08/12/201111-37 - Cornerstone and Thundermin Commence 3,800 Metre Diam...
28/11/201111-36 - Phase 2 Drilling and Exploration Program Started at ...
13/10/2011(Shyri)11-33 - Intrepid approves Phase 2 drilling at Gama prospect ...
31/08/2011(Little Deer)11-29 - Cornerstone and Thundermin Exercise Their Option to ...
17/08/201111-27 - Environmental license granted for La Encrucijada pro...
11/08/201111-26 - Cornerstone and Intrepid report final results for Ph...
03/08/2011(El Strato)- Cornerstone intersects 3.15 g/t Au over 3.2 m on the El St...
22/07/2011(Cascabel Ecuador) Environmental license granted for Cascabel project in Ecuad...
28/06/201111-22 - Work to resume at Cornerstone's La Encrucijada proje...
22/06/2011(Little Deer)11-21 - Cornerstone and Thundermin announce 66% increase in ...
20/06/2011(Shyri)- Environmental license granted for Gama prospect in Ecuador
16/06/2011(Little Deer) Cornerstone and Thundermin report final drill results for t...
10/06/2011(El Strato)- Cornerstone commences diamond drilling program on the El S...
01/06/2011(Shyri) Cornerstone and Intrepid intersect Gold-Copper Porphyry at ...
30/03/2011(Red Cliff - Cornerstone)Cornerstone announces diamond drilling results on the Red Cl...
23/03/2011(Little Deer)- Cornerstone and Thundermin intersect 4.1% Copper over 10.6...
16/03/2011(La Fortuna Chile) Cornerstone acquires La Fortuna Copper-Silver-Gold project ...
09/03/2011(Shyri)Diamond Drilling has commenced at Cornerstone's Flagship Shy...
01/03/2011(Chaleur) Cornerstone signs option agreement with Great Western Miner...
22/02/2011(Miocene) Cornerstone acquires new Gold-Silver-Copper project in Chil...
22/02/2011(Miocene)Acquires New Gold-Silver-Copper Project in Chile
17/02/2011(Cascabel Ecuador) Cornerstone acquires new Gold-Silver-Copper projects in Ecu...
17/02/2011(La Encrucijada Ecuador) Cornerstone acquires new Gold-Silver-Copper projects in Ecu...
27/01/2011(Little Deer) Cornerstone and Thundermin mobilize two drills to the Littl...
29/07/2010(Little Deer) and Thundermin intersect 2.3% Cu over 18.0 m, including 4.2...
22/06/2010(El Strato)Provides exploration update on the El Strato gold property i...
04/05/2010(Red Cliff - Cornerstone)Options sediment-hosted stratiform copper projects in Newfou...
18/03/2010(Shyri)Updates its exploration approval process in Ecuador
13/04/2010(Little Deer)Cornerstone and Thundermin continue to intersect copper mine...
27/08/2009(Little Deer)Cornerstone and Thundermin intersect additional copper and z...
21/08/2009(Little Deer)Technical Report on Little Deer Mineral Resources
12/08/2009(La Plata)Completes sale of La Plata interest
16/07/2009(Little Deer)extend option on the Little Deer copper deposit, Newfoundlan...
07/07/2009(Little Deer)43-101 Mineral Resources for the Little Deer Copper D
17/06/2009(Little Deer)intersect 3.8% Cu over 9.1 metres on the Little Deer Deposit
05/03/2009(Shyri)Coastport withdraws from the Shyri Project
25/02/2009(Little Deer)09-03 - Cornerstone and Thundermin provide update on the Lit...
26/01/2009(Chaleur)provides update on Chaleur uranium property, New Brunswick
26/11/2008(Little Deer)Intersect 2.7% Cu over 46.6 m, including 4.7% Cu over 16.6 m...
30/04/2008(Macara)and Newmont announce force majeure in Ecuador
30/04/2008(Shyri) and Coastport Announce Force Majeure in Ecuador
24/04/2008(Cape Ray)announces letter of intent for Cape Ray and results of the A...
09/04/2008(Little Deer) and Thundermin update the on-going Diamond Drilling Program...
10/03/2008(Shyri)Update
03/03/2008(Konrad)Geophysical surveys define drill targets at Cornerstone?s Ko...
02/03/2008(Aillik)and Cash Minerals Announce 2008 Uranium Exploration Program ...
28/01/2008(Sierramin)Earns a 100% interest in Sierramin projects in Ecuador
24/01/2008 and Thundermin Commence 6,200 Metre Follow-Up Diamond Drill...
Communiqués de Presse de Cornerstone Capital Resources Inc
06/07/201616-16 - 14 porphyry targets identified to date at Cascabel P...
30/06/201616-15 - Cascabel Exploration Update -- Hole 15R extends Alpa...
15/06/201616-13 - Cornerstone grants stock options
25/04/201616-08 - Cascabel Exploration Update -- Holes 15R2 and 17
12/04/201616-07 - Cascabel Exploration Update - Mineralization at Surf...
02/02/2016Cornerstone Capital Resources Inc.: Cascabel Exploration Upd...
31/12/2015Cornerstone Appoints New CFO
10/12/201515-26 - Cornerstone announces partial assays from Hole 13 at...
10/12/201515-26 - Cornerstone announces partial assays from Hole 13 at...
10/12/201515-26 - Cornerstone announces partial assays from Hole 13 at...
10/12/201515-26 - Cornerstone announces partial assays from Hole 13 at...
10/12/201515-26 - Cornerstone announces partial assays from Hole 13 at...
10/12/201515-26 - Cornerstone announces partial assays from Hole 13 at...
10/12/201515-26 - Cornerstone announces partial assays from Hole 13 at...
20/10/2015Cornerstone Announces Longest and Highest Grade Intercepts t...
09/10/2015Cornerstone Capital Resources Inc.: Cascabel Exploration Upd...
18/09/2015Cornerstone Announces Termination of Macara Project (Ecuador...
01/09/2015Cornerstone Capital Resources Inc.: Hole 12 Continues to Int...
31/08/2015Cornerstone Capital Resources Inc.: Phase 1 Drill Program Pr...
24/08/2015Aguinaga Prospect
19/08/2015Cornerstone Capital Resources Inc.: Cascabel Hole 12 Update
27/07/2015Cornerstone Capital Resources Inc.: Hole 12 at Cascabel Inte...
09/07/2015Cornerstone Capital Resources Inc.: Hole 12 Commences at Cas...
30/06/2015IIROC Trading Resumption - CGP
20/04/2015Cornerstone Corporate Update
14/04/2015Cornerstone Signs Strategic Alliance Letter of Intent With E...
10/04/2015Cornerstone Capital Resources Inc.: Drilling at Hole 11 Begi...
01/04/2015Cornerstone Announces Hole 11 to Begin at Cascabel
01/04/2015Announces Hole 11 to Begin at Cascabel
27/03/2015Cornerstone Capital Resources Inc.: Assay Results from Upper...
26/02/2015Cornerstone Announces Exploration Results for the Caña Brava...
02/02/2015Cornerstone Resources Inc.: Cascabel Hole 10 Begins Targetin...
12/01/2015Drill Core Intercept of 1,058m @ 0.68% Cu & 0.92g/t Au (Appr...
09/01/2015Cornerstone Capital Resources Inc.: Ecuador Enacts Tax Chang...
09/12/2014Cornerstone Capital Resources Inc.: Cascabel Exploration Upd...
08/12/2014Cornerstone Capital Resources Inc.: Cascabel Exploration Upd...
04/12/2014Cornerstone Capital Resources Inc.: Final IP Interpretations...
02/12/2014Drill Core Intercept at Cascabel of 80m @ 2.72 g/t Gold and ...
01/12/2014Cornerstone Capital Resources Inc.: Cascabel Exploration Upd...
25/11/2014Cornerstone Capital Resources Inc.: Cascabel Exploration Upd...
10/11/2014Cornerstone Capital Resources Inc.: Cascabel Exploration Upd...
04/11/2014Cornerstone Initiates Exploration on its Miocene Project, No...
27/10/2014Cornerstone Capital Resources Inc.: Cascabel Exploration Upd...
10/09/2014Cascabel Exploration Update: Hole 8 Intersects Copper Sulphi...
26/08/2014Cornerstone Capital Resources Inc.: Cascabel Exploration Upd...
08/08/2014Cornerstone Capital Resources Inc.: Warrant Listing
06/08/2014Cornerstone Capital Resources Inc.: Cascabel Update: Hole 7 ...
16/07/2014Cornerstone Intersects 597.26m @ 0.46 % Copper and 0.18 g/t ...
03/07/2014Cornerstone Reduces Miocene (Chile) Property Work Commitment...
23/06/2014Cornerstone Capital Resources Inc.: Cascabel Exploration Upd...
20/02/201414-04 - Cascabel Project Update - Copper Sulphide Mineraliza...
10/02/201414-03 - Cascabel Project Update - Copper Mineralization Exte...
30/01/201414-02 - Cascabel Project Update - Drilling Recommences at Ho...
22/01/2014Presentations - Executive Summary
14/01/201414-01 - Strong Porphyry Copper Gold Assays over 845 Metres i...
02/12/201313-30 - Cascabel Project Update -- Alpala Prospect - Drill H...
13/11/201313-28 - Cascabel Project Update -- Alpala Prospect - Drill H...
04/11/2013.: Drill Hole CSD-13-003 Intersects Long Runs of Visual Copp...
17/10/2013Company Update / Comments - The National Investor
13/10/2013Crystal becomes Cornerstone Investor in Rey
11/10/2013Company Updates / Comments
11/10/2013Released ASX Announcement: CNX Secures $3.4 million Cornerst...
10/10/2013Drills 100m of 0.50% Copper and 1 g/t Gold at Cascabel Proje...
25/07/2013CNX Announces New Cornerstone Investor and Rights Issue
11/06/201313-09 - Cornerstone appoints VP Exploration and grants incen...
01/05/201313-08 - Cascabel Project Update - 3D Geophysical Modeling, C...
01/04/201313-07 - Cornerstone Provides Corporate Update
25/03/201313-06 - Cornerstone reports 56.93 m at 1.16 g/t Gold and 0.3...
19/02/201313-04 - Cascabel Copper Porhyry Earn-In Agreement Re-negotia...
31/01/2013Provides Exploration Update
24/01/201313-02 - Cornerstone reports 46 m at 0.81 g/t Gold and 0.59% ...
11/01/2013Announces Results for Phase 3 Drilling at the Gama Prospect,...
11/01/2013Announces Results for Phase 3 Drilling at the Gama Prospect,...
14/11/201212-24 - Cornerstone Recovers Rights to Ca=F1a Brava Gold-Sil...
14/11/2012Recovers Rights to Caña Brava Gold-Silver Property, Ecuador
08/11/2012Announces Completion of Airborne Geophysical Survey and Prov...
15/10/2012Provides Exploration Update
15/10/2012Provides Exploration Update
03/10/2012Announces Prospecting Results on La Encrucijada Project, Ecu...
27/09/2012Announces Phase 3 Drilling Program at the Gama Prospect, Ecu...
20/09/2012(Cape Ray)12-19 - Cornerstone and Benton Resources sign letter of inte...
26/07/201212-16 - Cornerstone and Thundermin announce significant copp...
18/07/2012(Cape Ray)12-14 - Cornerstone Announces Initial NI 43-101 Compliant Mi...
29/06/20122012 AGM Presentation and Remarks
28/06/201212-13 - Cornerstone and Thundermin Retain P&E Mining Consult...
10/05/2012(Little Deer)12-10 - Cornerstone and Thundermin Extend Copper Mineralizat...
18/01/201212-02 - Wall Street Reporter Senior Analyst Interviews Corne...
13/01/201212-01 - Cornerstone Grants Incentive Stock Options
12/01/2012$5m Cornerstone Investment Agreement
30/12/201111-39 - Cornerstone Announces Management Changes
20/12/2011(Little Deer)11-38 - Cornerstone and Thundermin File NI 43-101 Technical ...
02/12/2011d Cornerstone Fact Sheet
26/09/2011Interview With the President, Brooke Macdonald
21/09/2011Corporate Update- September 21, 2011
13/09/201111-30 - Significant Porphyry Copper-Gold mineralization disc...
30/08/201111-28 - Cornerstone Reports 1.34% Copper and 58.0 g/t Silver...
25/05/2011Exploration Update
26/04/2011(Little Deer)11-15 - Cornerstone and Thundermin continue to intersect hig...
26/04/2011(Little Deer)and Thundermin Continue to Intersect High Grade Copper Over ...
15/04/2011Exploration Update
18/02/2011- No Material Change
25/01/2011CEO Letter to Shareholders
19/05/2010Options New Brunswick REE property
18/05/2010Corporate Update
17/05/201010-09 - Cornerstone reports significant progress on Ecuador ...
03/05/2010Intersect 4.6% Cu over 5.9 metres, including 14.5% copper ov...
16/04/2010Corporate Update
30/03/201010-05 - Cornerstone announces Phase II of Macar=E1 Strategic...
16/02/201010-03 - Cornerstone options Labrador rare metals and REE pro...
17/11/200909-26 - Cornerstone engages Investor Relations consultant
05/11/200909-24 - Ecuador Mining Regulations signed into law
16/10/2009Government of Ecuador confirms date of approval of Mining Re...
14/10/200909-21 - Cornerstone acquires new Lithium and Rare Metals pro...
29/09/200909-20 - Cornerstone acquires new Rare Metals and REE propert...
09/06/2009Corporate Update
04/06/200909-12 - Cornerstone to resume work on Macar=E1 project=2CEcu...
26/05/200909-11 - Cornerstone update on recommencement of work in Ecua...
03/03/200909-04 - Cornerstone updates mining law in Ecuador
27/02/2009Corporate Update
15/01/2009Cornerstone Update
13/01/2009 New Mining Law Approved in Ecuador
21/11/2008Cornerstone Update
30/09/2008approves new constitution, clears way for new mining law
25/09/2008Cornerstone Update
11/08/2008Monthly Update - Monday, August 11, 2008
14/07/2008personnel change
19/06/2008Update on Little Deer
11/06/2008and Altius form alliance to explore for copper in the Labrad...
22/05/2008adds claims in the Bay St. George evaporite basin
20/05/2008Report on the drilling on the Little Deer Copper project
07/05/2008acquires new uranium property
29/04/2008acquires property with potash potential
25/04/2008Participates in Industry- Canadian Government Meeting With E...
23/04/2008 Evaluates Impact of Mining Mandate in Ecuador
23/04/2008 Update
12/02/2008 and Newmont Sign Definitive Agreement on Ecuador Strategic ...
04/02/2008John C. Crosbie resigns from Cornerstone's Board. Mr. Crosb...
10/01/2008Monthly review
06/12/2007 Monthly Review
08/11/2007 Monthly Review
22/10/2007and Newmont to Explore Southern Ecuador
17/10/2007La Plata Update
16/10/2007provides update on the La Plata VMS project, Ecuador
11/10/2007September Update
10/09/2007August Update
29/08/2007partners with Phelps Dodge Corporation of Canada, Limited to...
03/08/2007July Update
26/07/2007announces 4.7% Zinc intercept in drilling by Mountain Lake R...
10/07/2007 and Thundermin Commence Drill Program on the Little Deer Co...
11/06/2007 May update - the Drills start turning
07/06/2007(Shyri)Provides update on geophysics at GAMA, Shyri project, southe...
15/05/2007Signs JV Agreement and Commences Drill Program on Cornerston...
07/05/2007plans to drill 26,000 metres on five projects in Canada and ...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (CGP.V)Other OTC (CTNXF)
3,90+8.64%2,86+10.00%
TSX-V
CA$ 3,90
28/02 15:59 0,310
8,64%
Cours préc. Ouverture
3,59 3,65
Bas haut
3,65 4,00
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  3,90 -%
Volume var. 1 mois
98 425 -%
24hGold TrendPower© : 24
Produit
Développe Uranium
Recherche Copper - Gold - Lead - Nickel - Rare earth - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 19/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20240,00%
20230,78%4,403,20
2022-6,75%5,282,57
2021-17,82%5,483,40
202094,98%6,531,36
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,21 US$+1,54%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,46 CA$-2,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,82 CA$-1,43%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,82 CA$-4,21%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,75 US$+0,62%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :