Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Golden Dawn Minerals Inc.

Publié le 01 septembre 2011

Announces Drilling Program on Boundary Falls

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Precious Metals | Zinc |
Email not displaying correctly? View it in your browser.
Golden Dawn Minerals Prepares for Drilling May Mac Mine Area, Boundary Falls Property, Greenwood Mining District, British Columbia, Canada


Vancouver, September 1st, 2011 � Golden Dawn Minerals Inc. (TSX-V: GOM; FRANKFURT: 3G8), (the �Company� or �Golden Dawn�) is pleased to announce that final soil geochemical results have been received along with a National Instrument 43-101 Technical Report for its 100% owned Boundary Falls Property, west of Greenwood, British Columbia, Canada.

Golden Dawn has approved and is preparing to conduct a 3,000 m surface diamond drilling program during the upcoming months to test, not only anomalies associated with the historic Skomac vein system and the May Mac Mine workings, but also a number of newly identified targets. The drilling program will be accompanied by follow-up ground geophysical surveys, trenching and surface sampling to evaluate the historic showings and the newly identified targets.

The Boundary Falls property is contiguous to the south of the Wild Rose Property, where the Company has delineated 279,300 ounces of gold as an inferred mineral resource (see news release of July 13, 2011). The area of this inferred resource is about 2-4 km north of the May Mac Mine on the Boundary Falls Property.  Golden Dawn has started the next phase of its drilling program on the Wild Rose Property to expand this known resource.


Historic May Mac Mine Workings (Skomac Vein System)

The original May Mac showing, discovered and staked in 1894, was developed by several shafts and three adit tunnels (Adits #�s 1, 2 & 3) on what is presently termed the Lower Skomac Vein. Some 32 tonnes (metric) (35 tons) of mineral were shipped over the subsequent nine years, grading 319 grams per tonne (g/t) gold (9.3 ounces per ton [oz/ton]). By 1904, a new parallel vein, termed the Upper Skomac, was discovered, developed by a new adit tunnel (Adit #4) and mined, sporadically yielding 670 tonnes (790 tons) over the ensuing 33 years, grading in the range of 3,000 g/t (100 oz/ton) silver. Between 1937 and 1960, no development or production was recorded.

Skomac Mines Ltd. acquired the property in 1960. Between 1961 and 1965, a fifth adit tunnel (Adit #5) was developed on the Upper Skomac vein, from which some 553 tonnes (609 tons) of mineral were extracted, averaging 1.37 g/t (0.04 oz/ton) gold, and 185 g/t (5.41 oz/ton) silver, plus 2.1% lead and 1% zinc. During the same period, a diamond drill hole apparently intersected a new vein, with an intersected width of six feet, grading 21.5 g/t (0.62 oz/ton) gold, 14,400 g/t (420 oz/ton) silver, 19.9% lead and 2.1% copper. To date, no follow-up work has been done to further investigate this vein which lies a short distance west of the underground workings. However, follow-up ground geophysical surveys, trenching and diamond drilling are being planned at this target during the upcoming months. 

In 1972, Robert Mine Ltd. acquired the property and between 1974 and 1976, developed another tunnel (Adit #6) on the Upper Skomac vein. Four mineral shoots were encountered and mined above the Adit #6, producing 950 tonnes (1,050 tons) of mineral averaging 3.66 g/t (0.107 oz/ton) gold, 593 g/t (17.3 oz/ton) silver, 3.2% lead, 2.0% zinc and 0.25% copper. The following year, another adit tunnel (Adit #7) was collared and driven for some 215 m (700 ft). According to verbal communication with the operator who owned the mine at that time, a vein was encountered some 60 m (200 ft) in the tunnel from the portal, which averaged in the range of 15 g/t (0.43 oz/ton) gold over a length of 15 m (50 ft) and an average width of 60 cm (2 ft). No silver values were mentioned. Due to the narrow width and low grades at that time, it was not further developed. This new vein has not been inspected, sampled or assayed, however, a program of underground sampling is being considered for the upcoming exploration program. 

Underground diamond drilling by Robert Mine Ltd. in 1977 and 1978 consisted of several short holes which intersected three additional, parallel, hanging wall veins within ten meters of the Upper Skomac vein. While the narrow veins encountered contained only low precious metals values, it is typical in epithermal deposits of this type, that narrow low grade veins can blossom out into high grade veins of mineable width. 

An 80 tonne per day flotation mill (90 tons/day) was installed in 1982. In 1983, some 1,570 tons of low grade ore were milled, yielding 100 tonnes (110 tons) of bulk concentrate averaging 15.5 g/t (0.43 oz/ton) gold, 2,194 g/t (64 oz/ton) silver, plus lead and zinc. The mine has been inactive since that time. The May Mac Mine, mill and tailings pond are all currently permitted. Should the Company decide to reactivate mine, safety and environmental features to today�s standards will have to be implemented.


2011 Soil Sampling Survey

Although the property is almost entirely covered by a thin mantle of overburden, some thirteen parallel quartz veins are known to outcrop within a favorable meta-sediment/volcanic complex measuring some 200 m in width and stretching for a strike length of well over one kilometer. 

During the history of the property, operations have been consistently under-funded. As a result, little surface drilling and exploration have been performed at the property. The Company commissioned a property wide soil geochemical survey during June, 2011. A total of 2,211 standard B-horizon soil samples were collected at a line spacing of 100 m with sample stations at 25 m covering the bulk of the Boundary Property west of Highway 3. A total of 132 soil samples yielded gold assays greater than or equal to 50 parts per billion (ppb) with a total of 22 samples yielding assays between 100 ppb and 9,614 ppb gold (9.614 g/t). A total of 84 samples yielded copper assays greater than or equal to 200 parts per million (ppm) copper up to 542 ppm copper. A total of 63 samples assayed greater than or equal to 200 ppm zinc up to 15,700 ppm (1.57%) zinc. Anomalous gold-in soil samples show an excellent correlation with anomalous concentrations of arsenic, copper and zinc.

The 2011 soil survey yielded more than 20 discreet gold-in soil target areas. A number of the high priority soil geochemical anomalies are spatially associated with or are adjacent to the present May Mac Mine workings and vein system. There are also a number of other soil anomalies that are not associated with any known surface mineralization but are spatially associated with discreet electromagnetic and/or magnetic anomalies of interest identified in the prior Aeroquest airborne geophysical survey.

Future Work

The Company has planned a 3,000 m surface diamond drilling program along with a $250,000 exploration program. The program will include one or more of follow-up close-spacing ground geophysical surveys, the excavation of up to thirty cross-trenches, along with underground geological mapping and sampling. The objectives of the program include expanding the known vein systems within and near the historical mine workings, and the discovery of several new mineralized zones within this strongly geochemically anomalous property. A Notice of Work application has been filed with the British Columbia Ministry of Energy and Mines. Once the appropriate permits are received, the planned work program will be commenced.

There are no known mineral resources on the Boundary Falls Property. Historical references are related here for background information only. There can be no assurance that any mineral resource will be located on the property, or if located that such mineral resource might be profitably mined.

This press release was prepared by Wayne Ash, P.Eng. of Ash and Associated Consulting Ltd. and Michael Dufresne, P.Geol., of APEX Geoscience Ltd., both Qualified Persons as defined by National Instrument 43-101. Mr. Ash and Mr. Dufresne have reviewed and verified the contents of this release. National Instrument 43-101 technical report, authored by Mr. Ash, has been filed on SEDAR.

 

On behalf of the Board of Directors:

GOLDEN DAWN MINERALS INC.


�Wolf Wiese�

_______________________________

Wolf Wiese

Chief Executive Officer

 

For Further Information, please contact:

Mike Poulin

Investor Relations

604-630-6793

mike@goldendawnminerals.com


THIS PRESS RELEASE WAS PREPARED BY MANAGEMENT WHO TAKES FULL RESPONSIBILITY FOR ITS CONTENTS. NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. THIS DOCUMENT CONTAINS CERTAIN FORWARD LOOKING STATEMENTS WHICH INVOLVE KNOWN AND UNKNOWN RISKS, DELAYS, AND UNCERTAINTIES NOT UNDER THE COMPANY�S CONTROL WHICH MAY CAUSE ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS OF THE COMPANY TO BE MATERIALLY DIFFERENT FROM THE RESULTS, PERFORMANCE, OR ACHIEVEMENTS IMPLIED BY THESE FORWARD LOOKING STATEMENTS. WE SEEK SAFE HARBOR.



About Golden Dawn Minerals

Golden Dawn Minerals Inc. is a junior exploration company with a well positioned portfolio of properties prospective for precious and base metals in British Columbia, Canada. If you would like to learn more about us, please visit www.goldendawnminerals.com. You can also visit us on Twitter: www.twitter.com/goldendawninc


You are receiving this email because you a) are a shareholder b) have signed up on our website to receive updates. If we have mistakenly sent you an email without your permission, please click the unsubscribe button to be removed from our contact list.

.com from this list | Forward to a friend | Update your profile
Our mailing address is:
Golden Dawn Minerals
575 1111 West Hastings Street
Vancouver, BC V6E 2J3

Add us to your address book

Copyright (C) 2011 Golden Dawn Minerals All rights reserved.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Golden Dawn Minerals Inc.

EXPLORATEUR
CODE : GOM.V
ISIN : CA3808956070
CUSIP : 380895 10 2
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Golden Dawn est une société d’exploration minière d'or basée au Canada.

Golden Dawn détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont TAM O'SHANTER, CENTRAL CATHARINE, 80 FOOT FALL, LINK-CATHARINE et WILD ROSE BC au Canada.

Golden Dawn est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 3,1 millions CA$ (2,4 millions US$, 2,1 millions €).

La valeur de son action a atteint son plus haut niveau récent le 27 mai 2011 à 2,85 CA$, et son plus bas niveau récent le 17 octobre 2014 à 0,01 CA$.

Golden Dawn possède 101 870 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Golden Dawn Minerals Inc.
08/05/2013Announcing Proposed Private Placement
04/04/2013Private Placement of $66,810
08/01/2013Private Placement of $ 162,156
06/11/2012Closing of Private Placement of $140,500
Nominations de Golden Dawn Minerals Inc.
19/12/2013Results of AGM - Appointment of New Director
15/02/2011Announces New Appointment to Board
Projets de Golden Dawn Minerals Inc.
25/01/2016Golden Dawn reports final results of 2015 drilling at May-Ma...
11/12/2012Receives Updated Inferred Mineral Resource for Deadwood Gold...
25/01/2012Announces Exploration & Bulk Sampling Intentions on its Gree...
01/09/2011Announces Drilling Program on Boundary Falls
19/08/2011Announces Drilling Program on Wild Rose, Tam O'Shanter
04/08/2011and Nass Valley Gateway Announce NI 43-101
13/07/2011Receives Technical Report for NI 43-101
26/05/2011Receives Initial Mineral Resource Estimate
02/05/2011Renews Mine Evaluation at May Mac Mine
21/04/2011Schedules Resource Calculation
04/04/2011Intersects 127m Grading 0.43 g/t Gold
Communiqués de Presse de Golden Dawn Minerals Inc.
02/06/2016Golden Dawn Minerals Inc. Appoints New Executive Director & ...
12/05/2016Golden Dawn Drilling Intersects Gold And Silver Values Below...
25/04/2016Golden Dawn Completes Second Of Three Phases Of Huakan Green...
13/04/2016Golden Dawn Reports Positive Preliminary Economic Assessment...
13/04/2016Golden Dawn Signs Option Agreement With Huakan And Solicits ...
18/12/2015Closing of the Second Tranche of the Company’s Private Place...
18/12/2015Golden Dawn Minerals Inc.: Closing of the Second Tranche of ...
17/12/2015Golden Dawn Confirms Mineralized Zone Extends Below #6 And #...
23/11/2015IIROC Trading Resumption - GOM
23/11/2015Golden Dawn Drilling Intersects Mineralized Zone from #6 to ...
23/11/2015IIROC Trading Halt - GOM
22/10/2015Golden Dawn Minerals Inc. Assays Rock Channel Samples at 529...
15/10/2015GOLDEN DAWN MINERALS INC. STARTS DRILLING AT GREENWOOD PRECI...
14/10/2015Completion of the Financing for $268,147.40
13/10/2015Golden Dawn Minerals Inc.: Completion of the Financing for $...
01/10/2015GOLDEN DAWN MINERALS INC. SAMPLES 12.97 G/T GOLD OVER 0.87 M...
24/09/2015GOLDEN DAWN MINERALS INC. APPOINTS DR MATHEW BALL TO MANAGE ...
24/09/2015Golden Dawn Minerals Inc. Appoints Dr. Mathew Ball to Manage...
12/09/2015Golden Dawn Minerals Inc. Drops Tam O’Shanter Property
12/09/2015Golden Dawn Minerals Inc. Drops Tam O'Shanter Property
08/09/2015Golden Dawn Minerals Inc. Appoints a New German Director
02/09/2015Golden Dawn Minerals Inc. Upgrades Its Current Frankfurt Lis...
15/08/2015Completion of the Financing for $207,600
14/08/2015Golden Dawn Minerals Inc.: Completion of the Financing for $...
17/07/2015Golden Dawn Minerals Inc. Options Tam O'Shanter Property fro...
08/07/2015Golden Dawn Minerals Inc.: Completion of the Financing for $...
13/06/2015Closing of the First Tranche of the Company’s Non-Brokered P...
13/06/2015Golden Dawn Provides Update for Greenwood Exploration and Bu...
13/04/2015Golden Dawn Minerals Inc. Purchases 100% of Amigo Property, ...
13/04/2015Golden Dawn Minerals Inc. Granted Stock Options
02/04/2015Golden Dawn Minerals Inc. Granted Stock Options
26/03/2015Golden Dawn Minerals Inc. Purchases 100% of Amigo Property, ...
11/03/2015Closing of Private Placement
06/03/2015Company Update
05/02/2015Golden Dawn Announces Development Of Greenwood Project, Brit...
09/01/2015Final Tranche Closing of Private Placement
30/12/2014Closing the Private Placement of $ 65,250
28/10/2014Golden Dawn Announces Private Placement to Existing Sharehol...
17/04/2014Golden Dawn Drops Tam O' Shanter Property
04/04/2014Golden Dawn Announces the Resignation of Director
07/01/2014Announces Consolidation
12/06/2013News Release
14/03/2013Purchases the Boundary Falls Property Hosting the May Mac Mi...
29/01/2013Files National Instrument 43-101 Technical Report For Update...
11/12/2012News Release
02/10/2012News Release
02/10/2012s Exploration and Sampling Schedules for Greenwood Project W...
30/05/2012News Release
29/05/2012News Release
14/05/2012News Release
22/03/2012News Release
23/01/2012News Release
24/10/2011News Release
24/10/2011News Release
23/09/2011signs with Lichtfield
10/05/2011Schedules Drilling on Royal Attwood
09/05/2011s from Golden Dawn
09/05/2011SCHEDULES DRILLING OF MULTIPLE PRIORITY TITAN 24 GEOPHYSICAL...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (GOM.V)FRANKFURT (3G8.F)
0,030+0.00%0,029+0.00%
TSX-V
CA$ 0,030
14/10 10:30 -
0%
Cours préc. Ouverture
0,030 0,030
Bas haut
0,030 0,030
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,030 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : 25
Produit
Développe
Recherche Copper - Gold - Nickel - Platinum
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2022-80,00%0,210,03
20213,45%0,310,11
202026,09%0,200,04
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,11 US$+2,21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX+2,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,47 CA$+3,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,25 CA$-3,42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-3,76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :