Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dans la même rubrique
ALACER GOLD ANNOUNCES FIRST QUARTER OPERATING RESULTS
Published : April 29, 2011
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

TORONTO, April 29 /CNW/ - Alacer Gold Corp ("Alacer" or the "Corporation") (TSX: ASR) (ASX: AQG) is pleased to announce its first quarter 2011 operating results at its four mines in Australia and Turkey.  The complete report can be found on our website at www.AlacerGold.com and on www.SEDAR.com.

Quarterly Highlights

  • Alacer Gold created through the merger of equals of Anatolia Minerals and Avoca Resources
  • Full quarter production: 91,259 total gold ounces from four mines
  • Reserves increased to 5.7 million contained gold ounces

Higginsville Gold Operations (100%)

  • Drilling at Trident has confirmed thick mineralization north of the current Apollo Reserve boundary and continuation of Artemis at least 200 meters to the north of Artemis Reserve boundary
  • Chalice open pit dewatering continued in preparation for underground mine development and production
  • Vine open pit operations commenced, with gold production expected in Q2

South Kalgoorlie Operations (100%)

  • Waste stripping continued for the HBJ North Phase 2 Cutback

Çöpler Gold Operations (95%)

  • Sulfide prefeasibility study increased expected life-of-mine production to 3.7 million gold ounces; sulfide feasibility study commencing
  • Successful production ramp up, with Alacer Gold announcing commercial production achieved effective April 1, 2011
  • Crusher construction and commissioning continued with expected Q2 crusher start-up
  • Drilling recommenced at Çöpler; identified potential extensions to known mineralization in both oxide and sulfide zones

Frog's Leg Joint Venture (49%)

  • Underground resource update successfully replaced prior mine production

Operations
The merger between Anatolia Minerals and Avoca Resources to form Alacer Gold was completed on February 18, 2011, with Anatolia Minerals being treated as the accounting acquirer. As such, results presented in the table below represent the full results of Anatolia Minerals' operations for the first quarter 2011 and the prorated results of Avoca Resources' operations from the date of the merger ("Merger Basis"). However, for the Australian mines we also report full quarter results in the complete report to provide continuity and comparability to prior quarter operating results.

Alacer Gold group production summary for the first quarter 2011

Operation   Higginsville2 South
Kalgoorlie2
Frog's Leg
JV2 (49%)
Çöpler3 Alacer Gold
Total
U/G ore mined(HG) (tonnes) 103,272 - 34,207 - 137,479
U/G mined grade (g/t) 4.2 - 7.6 - 5.0
U/G mined ounces (ounces) 13,859 - 8,374 - 22,233
O/P ore mined (tonnes) - 36,150 - 1,593,583 1,629,733
O/P waste mined   - 653,140 - 2,107,604 2,760,744
O/P mined grade (g/t) - 1.2 - 1.1 1.14
O/P ounces mined (ounces) - 1,380 - 57,638 59,018
Total HG tonnes mined (tonnes) 103,272 36,150 34,207 1,593,583 1,767,212
Total mined grade (g/t) 4.2 1.2 7.6 1.1 1.4
Total mined ounces (ounces) 13,859 1,380 8,374 57,638 81,251
Ore treated (tonnes) 155,806 83,025 51,970 1,695,816 1,986,617
Head grade (g/t) 3.2 1.0 5.0 1.2 1.4
Recovery (%) 96.8 89.5 91.7 53.6 66.7
Gold produced1 (oz) 15,921 2,906 8,962 33,296 61,085
Gold sold (oz) 19,472 2,839 7,715 26,450 56,476
Attributable gold
produced: Merger Basis
(oz) 15,921 2,906 8,962 31,631 59,420
Attributable gold sold (oz) 19,472 2,839 7,715 25,128 55,154

1Ounces produced is gold poured and includes net change of gold-in-circuit, except Çöpler which is ounces poured.
2Represents results for the post-merger period (February 18, 2011 through March 31, 2011)
3Represents results for the full first quarter 2011 (January 1, 2011 through March 31, 2011)

Edward Dowling, CEO of Alacer stated, "This Quarterly Report represents the first announcement of operating results by Alacer Gold since successfully completing the merger of Anatolia Minerals and Avoca Resources. Overwhelming support by the shareholders of both predecessor companies has created a new leading intermediate global gold producer - the only producing company entering this important segment of the gold sector within the past year.

Alacer Gold emerges with immediate scale as represented through gold production, reserves, resources and growth potential. In March 2011, our first full month of combined production, Alacer Gold produced 37,040 gold ounces. This represents an annualized rate of more than 440,000 gold ounces, which is well above our 2011 target annualized production rate of 400,000 ounces. The prefeasibility study announced for Çöpler sulfide ore increased our total gold reserve base. Ongoing exploration at all our current operating mines will ensure future reserve and resource growth. Alacer Gold ended the first quarter with cash of $105.4 million and strong cash flows from operations, which will finance ongoing exploration and development programs to produce exceptional growth and capital returns in years to come."

About Alacer

Alacer is a leading intermediate gold company with operations in both Australia and Turkey.

Australia
Alacer has three operating gold mines in Australia, namely the Higginsville and South Kalgoorlie operations; and a 49% interest in the Frog's Leg underground mine. The South Kalgoorlie operations and the Frog's Leg interest were acquired following the successful takeover of Dioro Exploration NL, which was completed in March 2010. In the financial year ended June 2010, production was 230,000 ounces of gold, of which 183,000 ounces were produced at Higginsville at A$503 per ounce (excluding royalties) with the balance produced at South Kalgoorlie which included the 49% interest in Frog's Leg. The Australian operations are targeting 280,000 ounces of gold in 2011.

Turkey
Alacer is recognized as a leader in exploration and development in Turkey and, with the start-up of Çöpler, will soon be among Turkey's leading gold producers. Çöpler is 95% owned by Alacer and 5% by Lidya Mining (formerly known as Çalık Mining, see Anatolia News Release, August 13, 2009). Initial plans at Çöpler are to produce approximately 1.42 million leachable ounces of gold at costs consistent with the lower end of industry standards. Average annual production is expected to be about 175,000 gold ounces. Additional production expansion from the sulfide gold reserve is expected to add 2.25 million ounces. A detailed feasibility study is underway. In addition, Alacer holds a significant pipeline of prospective gold and base metal projects.

Alacer Gold currently has 277.0 million common shares issued and outstanding, 297.3 million fully diluted.

Cautionary Statements

Certain statements contained in this news release constitute forward-looking information, future oriented financial information, or financial outlooks (collectively "forward-looking information") within the meaning of Canadian securities laws. Forward-looking information may relate to this news release and other matters identified in Alacer's public filings, Alacer's future outlook and anticipated events or results and, in some cases, can be identified by terminology such as "may", "will", "could", "should", "expect", "plan", "anticipate", "believe", "intend", "estimate", "projects", "predict", "potential", "continue" or other similar expressions concerning matters that are not historical facts and include, but are not limited in any manner to, those with respect to proposed exploration, communications with local stakeholders and community relations, status of negotiations of joint ventures, commodity prices, mineral resources, mineral reserves, realization of mineral reserves, existence or realization of mineral resource estimates, the timing and amount of future production, the timing of construction of proposed mine and process facilities, capital and operating expenditures, economic conditions, availability of sufficient financing, exploration plans and any and all other timing, exploration, development, operational, financial, economic, legal, social, regulatory, political factors that may influence future events or conditions. Such forward-looking statements are based on a number of material factors and assumptions, including, but not limited in any manner, those disclosed in any other Alacer filings, and include exploration results and the ability to explore, the ultimate determination of mineral reserves, availability and final receipt of required approvals, titles, licenses and permits, sufficient working capital to develop and operate the proposed mine, access to adequate services and supplies, commodity prices, foreign currency exchange rates, interest rates, access to capital markets and associated cost of funds, availability of a qualified work force, ability to negotiate, finalize and execute relevant agreements, lack of social opposition to the mine, lack of legal challenges with respect to the property or the Company and the ultimate ability to mine, process and sell mineral products on economically favorable terms. While we consider these assumptions to be reasonable based on information currently available to us, they may prove to be incorrect. Actual results may vary from such forward-looking information for a variety of reasons, including but not limited to risks and uncertainties disclosed in other Alacer filings at www.sedar.com and other unforeseen events or circumstances. Other than as required by law, Alacer does not intend, and undertakes no obligation to update any forward-looking information to reflect, among other things, new information or future events.

For further information:

please contact Edward Dowling, President and CEO, or Douglas Tobler, CFO at (303) 292-1299 or visit www.alacergold.com

Alacer Gold Corp.

PRODUCTEUR
CODE : ASR.TO
ISIN : CA0329001022
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Alacer Gold est une société de production minière d'or basée aux Etats-Unis D'Amerique.

Alacer Gold est productrice d'or, d'argent et de cuivre en Australie et en Turquie, et détient divers projets d'exploration en Australie et en Turquie.

Ses principaux projets en production sont HIGGINSVILLE - CHALICE, SOUTH KALGOORLIE GOLD MINE, HIGGINSVILLE - TRIDENT, HIGGINSVILLE - FAIRPLAY, HIGGINSVILLE - PALAEOCHANNELS et TRIDENT GOLD MINE en Australie et ÇÖPLER GOLD PROJECT en Turquie et ses principaux projets en exploration sont KARAGOZ, BURSA EAST, TORUL, BAYBURT, IKIZTEPE - SARP, KEN-FOL, ARTVIN, KARAKARTAL, CEVIZLIDERE et YENIPAZAR en Turquie, MT FISHER au Canada et REDHILL, MT ZEPHYR et MUNGARI en Australie.

Alacer Gold est cotée au Canada, aux Etats-Unis D'Amerique, en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 5,9 millions CA$ (5,5 millions US$, 3,8 millions €).

La valeur de son action a atteint son plus bas niveau récent le 14 septembre 2009 à 0,02 CA$, et son plus haut niveau récent le 21 octobre 2011 à 9,99 CA$.

Alacer Gold possède 292 850 016 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Alacer Gold Corp.
2007 Annual report
Financements de Alacer Gold Corp.
22/05/2011ANNOUNCES AMENDMENT TO PROPOSED RESTRICTED STOCK UNIT PLANS
Nominations de Alacer Gold Corp.
15/09/2014announces the appointment of two new independent directors t...
30/06/2014announces changes to its Board of Directors
10/09/2013Announces changes to the Board of Directors
02/10/2011Chief Strategic Officer Rohan Williams steps down
11/08/2011Chief Financial Officer To Depart
21/04/2011TurkPower Corporation Appoints James Davidson to Its Board o...
20/02/2008Appoints Edward C. Dowling Jr. as New President and Chief Ex...
Rapports Financiers de Alacer Gold Corp.
27/07/2015Announces Second Quarter 2015 Operating and Financial Result...
28/04/2014announces 2014 first quarter results
13/03/2013announces 2012 year-end financial results
01/11/2012Announces Third Quarter 2012 Financial Statements and Relate...
12/05/2011FILES FIRST QUARTER FINANCIAL RESULTS AND THE RELATED MANAGE...
06/05/2011ANNOUNCES 2011 FIRST QUARTER FINANCIAL RESULTS RELEASE DATE ...
29/04/2011ANNOUNCES FIRST QUARTER OPERATING RESULTS
Projets de Alacer Gold Corp.
05/12/2013announces a further 10% increase in 2013 production guidance...
23/09/2013announces a 15% increase in 2013 production guidance at Çöpl...
17/01/2013achieves strongest quarterly production of the year of 103,4...
23/10/2012announces attributable gold production of 90,951 ounces for ...
01/06/2011(Çöpler Gold Project)ANNOUNCES SIGNFICANT EXTENSION TO SULFIDE MINERALIZATION AT ...
11/04/2011(Çöpler Gold Project)ACHIEVES COMMERCIAL PRODUCTION AT ITS ÇÖPLER MINE
29/03/2011(Çöpler Gold Project)REPORTS POSITIVE SULFIDE PREFEASIBILITY STUDY AND INCREASES ...
23/09/2008(Çöpler Gold Project)Commences Çöpler Gold Mine Construction
25/08/2008(Çöpler Gold Project)MANDATES LEAD ARRANGER FOR SENIOR PROJECT FINANCING
19/08/2008(Çöpler Gold Project)RECEIVES ÇÖPLER FORESTRY PERMIT
11/08/2008(Çöpler Gold Project)PROVIDES ÇÖPLER GOLD PROJECT UPDATE
20/05/2008(Çöpler Gold Project)OUTLINES STRATEGY FOR ÇÖPLER MINE DEVELOPMENT
16/04/2008(Çöpler Gold Project)Approved for Anatolia's Copler Gold Project
25/02/2008(Çöpler Gold Project)PROVIDES ÇÖPLER GOLD PROJECT UPDATE
06/02/2008(Çöpler Gold Project)FILES SULFIDE SCOPING STUDY FOR 2.3 MILLION OUNCES AT ÇÖPLER...
21/12/2007 POSITIVE SCOPING STUDY FOR 2.3 MILLION OUNCES OF ÇÖPLER GOL...
30/05/2006(Çöpler Gold Project)2006 Technical report
Communiqués de Presse de Alacer Gold Corp.
24/07/2016Alacer Gold Announces Second Quarter 2016 Operating & Financ...
17/07/2016Alacer Gold Comments on Recent Events in Turkey
13/07/2016AGM Vote Results 2016
07/07/20162016 07 07 Q2 Earnings Conference Call Details
07/07/2016Alacer Gold Announces Release Date for Second Quarter 2016 O...
24/06/2016Alacer Gold Continues to De-Risk Sulfide Project with Execut...
17/06/2016Alacer Gold Signs $350 Million Project Finance Facility
02/06/2016Alacer Gold Announces Appointment of Chief Operating Officer
27/05/2016Voting Results
26/05/2016Alacer Gold Announces Results of Annual and Special Meeting ...
12/05/20162016 12 05 Q1 2016 Earnings Release FINAL
12/05/2016Alacer Gold Announces First Quarter 2016 Operating & Financi...
12/05/2016Alacer Gold Announces Çöpler Sulfide Project Approval
05/05/20162016 05 05 Q1 Earnings Conference Call Details FINAL
05/05/2016Alacer Gold Announces Release Date for Çöpler Sulfide Projec...
20/04/2016Alacer Gold Receives Approval of Numerous Land Use Permits f...
20/04/20162016 04 20 Receipt of Final LUP - FINAL2
31/03/2016Alacer Gold Announces Further Exploration Results for The Çö...
31/03/2016Appendix to Exploration Announcement
30/03/2016Appendix to Exploration Announcement
25/01/2016Alacer Gold Announces 2015 Year-end Operating & Financial Re...
25/01/2016Alacer Gold announces 2015 year-end operating and financial ...
15/01/2016Alacer Gold Meets 2015 Production Guidance, Provides 2016 Gu...
14/01/2016Alacer Gold Meets 2015 Production Guidance, Provides 2016 Gu...
25/10/2015Alacer Gold Announces Third Quarter 2015 Operating and Finan...
09/10/2015Alacer Gold Announces Third Quarter 2015 Operating & Financi...
09/10/2015Alacer Gold announces third quarter 2015 operating & financi...
07/10/20152 Metals Stocks BMO Analysts Are Downgrading
21/09/2015Alacer Gold Signs $250 Million Project Finance Facility
20/08/2015Alacer Gold Announces Its One Millionth Ounce of Gold Poured...
29/07/2015Edited Transcript of ASR.TO earnings conference call or pres...
27/07/2015Alacer Gold Announces Second Quarter 2015 Operating & Financ...
27/07/2015Alacer Gold Announces Second Quarter 2015 Operating and Fina...
14/07/2015Alacer Gold Announces Second Quarter Operating & Financial R...
14/07/2015Alacer Gold Announces Second Quarter 2015 Operating & Financ...
14/07/2015Announces Second Quarter 2015 Operating & Financial Results ...
09/07/2015Alacer Gold Announces Results of Annual and Special Meeting ...
09/07/2015Announces Results of Annual and Special Meeting of Sharehold...
09/04/2015Alacer Gold Announces Release Date for First Quarter 2015 Fi...
09/04/2015Announces Release Date for First Quarter 2015 Financial Resu...
09/04/2015Alacer Gold's Board Approves Advancement of Çöpler Sulfide P...
30/03/2015Appendix 1 - JORC Code Table 1
30/03/2015Alacer Gold Increases its Life-of-Mine Gold Production Profi...
11/02/2015Alacer Gold Announces 2014 Year-end Operating & Financial Re...
11/02/2015Alacer Gold Announces 2014 Year-end Operating & Financial Re...
02/02/2015Alacer Gold announces 2014 year-end operating & financial re...
20/01/2015Alacer Exceeds 2014 Production Guidance and Provides 2015 Gu...
20/01/2015Alacer exceeds 2014 production guidance and provides 2015 gu...
12/01/2015Alacer Gold Announces Çöpler Sulfide Project Development Tea...
12/01/2015Alacer Gold Announces Çöpler Sulfide Project Development Tea...
28/12/2014Alacer Gold Receives Approval of the Environmental Impact As...
28/12/2014Alacer Gold receives approval of the Environmental Impact As...
18/12/2014Alacer Gold Increases Heap Leach Pad Capacity by 14% at Çöpl...
18/12/2014Alacer Gold increases heap leach pad capacity by 14% at its ...
15/12/2014Alacer Gold Commissions Chemical Facility with SART Plant Se...
15/12/2014Alacer Gold Commissions Chemical Facility with SART Plant - ...
15/12/2014Alacer Gold Commissions Chemical Facility with Sart Plant
15/12/2014Commissions Chemical Facility with Sart Plant
27/10/2014Alacer Gold Reports 27% Increase In Gold Production At Lower...
27/10/2014Reports 27% Increase in Gold Production at Lower Costs for T...
14/10/2014Alacer Gold announces release date for third quarter 2014 fi...
18/09/2014Alacer Responds to Market Activity
29/07/2014announces results for second quarter 2014 and files NI 43-10...
14/07/2014Announces Release Date for Second Quarter 2014 Financial Res...
12/06/2014announces conference call on The Çöpler Sulfide Project Defi...
15/04/2014announces release date for first quarter 2014 financial resu...
12/03/2014announces 2013 year-end financial results and declares annua...
24/02/2014announces results of exploration in Turkey
27/01/2014announces President Howard Stevenson to resign
04/11/2013to pursue POX as sulfide ore processing method
24/10/2013Announces Approval of Australian Business Unit Sale
16/10/2013announces release date for third quarter 2013 financial resu...
12/08/2013announces leadership changes and update on Australian asset ...
22/07/2013announces release date for second quarter 2013 financial res...
12/06/2013announces decision to pursue sale of Australian assets
02/04/2013announces December 2012 Resources and Reserves statement
26/03/2013Significant Results from Alacer's Australian Exploration Pro...
10/02/2013announces completion of major strategic review
13/11/2012announces updated North American conference call time and di...
13/11/2012announces updated North American conference call time and di...
10/09/2012Çöpler Resource estimate increases by 27% or 2.2 million oun...
22/08/2011Extends Çöpler Mineralization Including 100.1m @ 4.1g/t in ...
04/07/2011RECEIVES ASX LISTING RULE WAIVERS
20/02/2011Anatolia and Avoca Resources complete merger to become Alace...
25/07/2008MR. RICHARD GRAFF NAMED TO ANATOLIA BOARD
09/05/2008ANNOUNCES PRESENTATION BY EDWARD C. DOWLING, PRESIDENT AND C...
20/12/2007CEO, Richard C, Moores, II, announces resignation for person...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (ASR.TO)AUSTRALIA (AQG.AX)
0,020+100.00%9,40+0.00%
TORONTO
Cours préc. Ouverture
Bas haut
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  - -100,00%
Volume var. 1 mois
-100,00%
Produit Gold
Développe
Recherche Copper - Gold - Lead - Molybdenum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 08/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202039,47%9,9810,02
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,95 US$-1,44%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,39 CA$-3,24%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,28 CA$+0,23%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,76 CA$-1,68%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,00 US$-1,09%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :