Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Tenajon Resources Corp.

Publié le 15 septembre 2008

Announces High Grade Drill Results from Moly Brook, Newfoundland

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | K Street |

 
A NORTHAIR GROUP COMPANY

SUITE 860 - 625 HOWE STREET ? VANCOUVER, BC  ? V6C 2T6  CANADA ? TEL: 604-687-7545  FAX: 604-689-5041

PRESS RELEASE

FOR IMMEDIATE RELEASE

SEPTEMBER 15, 2008                                                                                                                                                                                                                                                                                                                         #08-19                                                                                                                                            

 

Tenajon Announces High Grade Drill Results from Moly Brook, Newfoundland

Results Include 112.81 Metres Averaging 0.110% Molybdenum


Tenajon Resources Corp (TSX-V:TJS) (the "Company" or "Tenajon") today announced that it has received the results for eight additional diamond drill holes recently completed at its Moly Brook Molybdenum Property, located on the south coast of Newfoundland.

 

Significant results were encountered in four holes including intercepts of 204.7 metres located in Hole MB08-27 averaging 0.081% molybdenum and 210.37 metres located in Hole MB08-29 averaging 0.054% molybdenum.  Both holes contain higher grade sections, in particular Hole MB08-27 intersecting a 112.81 metre section averaging 0.110% molybdenum.

 

The holes were part of a 10,000 metre drill program designed to determine the limits of the Moly Brook Zone and test the along strike to the south and width of the zone including dip extensions of the molybdenum mineralization outside of the central core of molybdenum mineralization previously identified on the property.

 

Holes MB08-27 and MB08-29 were drilled to test the continuity of the western portion of the Moly Brook Zone, approximately 80 metres to the south of Hole MB08-13 (409.14 metres averaging 0.061% molybdenum including a section of 240.79 metres averaging 0.074% molybdenum).  Hole MB08-27 intersected a 307.93 metre section averaging 0.063% molybdenum.  Within the section there are higher grade intercepts including 112.81 metre section averaging 0.110% molybdenum.  Hole MB08-29 tested the continuity of the intersection in Hole MB08-29 100 metres up dip and intersected a 210.37 metre section averaging 0.054% molybdenum.  Within the section there are higher grade intercepts including a 73.17 metre section averaging 0.084% molybdenum.   

 

Holes MB08-22 and MB08-24 were drilled to test the continuity of the zone to the south of Hole MB08-28 at an 80 metre step-out.  Both holes intersected widespread molybdenum values.  Hole MB08-22 intersected several sections containing anomalous molybdenum values throughout its length including a 103.66 metre intercept averaging 0.050% molybdenum.  Within the intercept there is a 21.34 section averaging 0.071 % molybdenum.  Hole MB08-24 intersected several sections containing anomalous molybdenum values including a 106.72 metre section averaging 0.045% molybdenum.  Within the section there is a 42.67 metre intercept averaging 0.053% molybdenum.

 

Hole MB08-31, drilled 90 metres to the south of MB08-24 intersected widespread low grade 0.01-0.02% molybdenum corresponding with the zone.

Hole MB08-26 was drilled to test the up dip continuity of the section intersected in Hole 24.  Several narrow sections, up to 18 metre wide, were intercepted with the best section averaging 0.064% molybdenum over 9.10 metres.  It appears that the zone on this section is increasing in width and grade with depth. 

 

Hole MB08-30 was drilled to test the continuity of the mineralization intersected in Hole MB08-28 (results pending).  The hole intersected several weakly mineralized zones corresponding with the projection of the mineralization intersected in Hole MB 08-28.  Based on the visual observations it appears that the zone is getting stronger with depth. 

 

Hole MB08-33 was drilled to test the up dip continuity of the zone intersected in hole MB 08-25.  The hole intersected widespread, low grade 0.010 to 0.030% molybdenum values corresponding with the zone.    

 

It is interpreted that the zone to the west and south is steepening with overburden cover increasing.  Holes MB08-24, MB08-31, MB08-28 and MB08-30 appear to confirm this model.  Additional drilling will be required to confirm the model that in the southern portion of the deposit grades will improve with depth.

 

The Moly Brook Zone is one of three zones of molybdenum mineralization located within a 2.2 km long trend.  The Moly Brook Zone is located on the north side of Long Pond, the Wolf and the Chimney Zones are to the south.  Long Pond lies along an east-west fault.  It is interpreted that the fault has resulted in the southern bloc being shifted upwards resulting in molybdenum values occurring at surface at the Wolf and Chimney Pond Zones.  The Wolf Pond Zone is located 800 metres south of the Moly Brook Zone.  Recent sampling and mapping at the Wolf Pond Zone have identified molybdenum within a sheeted quartz vein system over a 200 metre width.  Presently mapping and sampling are being undertaken to determine the grade and extent of the zone. The Chimney Pond Zone is located 1.5 km south of the Moly Brook Zone.  Previous work in the 1960?s outlined an extensive molybdenum in soil anomaly.  Both pack sack holes drilled in to the zone intersected widespread molybdenum values with one of the holes averaging 0.057% molybdenum over its 27.44 metre length with the last 7.62 metres averaging 0.118% molybdenum.

 

For current drill hole locations along with detailed cross sections please view the accompanying maps:

http://www.tenajon.com/i/maps/MolyBrook/2008-09-15DHLocationMap.jpg

http://www.tenajon.com/i/maps/MolyBrook/2008-09-15SectionB.jpg

 

http://www.tenajon.com/i/maps/MolyBrook/2008-09-15SectionD.jpg

 

The following is a listing of the results for the holes reported above.

                                   

Hole

Length     (m)

From    (m)    

To            (m)

Int.       (m)

Mo      (%)

MoS2       (%)

MBO8-22

641.0 

72.26

90.55

18.29

0.054

0.09

 

 

96.65

127.13

30.48

0.040

0.07

 

 

270.43

291.77

21.34

0.059

0.10

 

 

310.06

413.72

103.66

0.050

0.08

 

INC

374.09

395.43

21.34

0.071

0.12

 

 

432.01

438.11

6.10

0.046

0.08

 

 

450.31

480.49

30.18

0.033

0.05

 

 

523.90

526.95

3.05

0.093

0.15

 

 

544.82

566.15

21.33

0.033

0.05

MB08-24

523

43.90

62.20

18.30

0.077

0.13

 

INC

43.90

50.00

6.10

0.206

0.34

 

 

254.27

266.46

12.19

0.062

0.10

 

 

312.20

418.92

106.72

0.045

0.07

 

INC

312.20

354.87

42.67

0.053

0.09

 

OR

367.07

391.47

24.40

0.057

0.09

 

 

470.73

482.93

12.20

0.056

0.09

MB08-26

535

171.95

175.00

3.05

0.058

0.10

 

 

193.29

199.39

6.10

0.045

0.07

 

 

235.98

254.27

18.29

0.033

0.05

 

 

300.00

306.10

6.10

0.047

0.08

 

 

333.54

342.68

9.14

0.064

0.11

 

 

388.41

391.46

3.05

0.053

0.09

 

 

412.80

415.85

3.05

0.054

0.09

MB08-27

478.5

7.01

314.94

307.93

0.063

0.10

 

OR

110.67

314.94

204.27

0.081

0.13

 

Inc

116.76

229.57

112.81

0.110

0.18

 

 

138.11

226.52

88.41

0.122

0.20

MB08-29

380

17.07

227.44

210.37

0.054

0.09

 

INC

26.22

142.06

115.84

0.067

0.11

 

or

26.22

99.39

73.17

0.084

0.14

 

or

26.22

47.55

21.35

0.158

0.26

MB08-30

357.6

1.50

3.96

2.46

0.030

0.05

 

 

25.30

28.35

3.05

0.044

0.07

 

 

64.94

67.99

3.05

0.042

0.07

 

 

119.82

141.16

21.34

0.038

0.06

MB08-31

484

1.83

10.98

9.05

0.040

0.07

 

 

35.37

47.56

12.19

0.037

0.06

 

 

90.24

96.34

6.10

0.040

0.07

MB08-33

291.7

23.48

38.72

6.10

0.036

0.06

 

 

47.87

57.01

9.14

0.046

0.08

 

 

178.96

182.01

3.05

0.045

0.07

 

 


The Moly Brook Property is located 2.5 km from the hamlet of Grey River on the south coast of Newfoundland, less than 4 km from a deep water, ice free, navigable fjord. The community is serviced daily by provincial ferries. For the duration of the program the crew is operating out of a recently established 25 person camp, centrally located on the property.


The Moly Brook Zone is located at the north end of a 2.5 km long trend of sheeted quartz veining, stockwork and fracturing in which molybdenum occurs. At the Moly Brook Zone drilling has intersected molybdenum within sheeted quartz veins, in quartz vein stockwork and along fracture faces. Drilling has traced the zone along strike for 750 metres to depths of up to 300 metres below surface. The zone is open to the north and south and at depth. Assuming a general sub vertical orientation to the zone the width is variable to 500 metres.  Based on the data the zone appears to be oval shaped.  The central portion of the zone is exposed on surface while the western portion dips under cover. 


The drill program at Moly Brook is being completed by Geoscott Consultants under the supervision of Dave Visagie, P. Geo., a Qualified Person as defined by NI 43-101.


At Moly Brook, drill core is sawn into halves with on half being sent for analysis and the other kept for future reference. All samples are prepared at Accurassay Labs' prep facility in Gambo, Newfoundland using a 600 gram split with the resultant pulp being analyzed at Accurassay Labs, Thunder Bay, Ontario using a 4 acid digestion with analysis by Induced Couple Polarization (ICP). A stringent program of check, blank and duplicate sampling is employed.

 

On Behalf of the Board of Directors

TENAJON RESOURCES CORP.

 

Per:  D. Bruce McLeod

                                               

D. Bruce McLeod, President

Investor Contacts:

Bruce McLeod 604-687-7545 or Chris Curran 604-331-2288

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

 

Cautionary Statement Regarding Forward-Looking Information

 

All statements, trend analysis and other information contained in this press release relative to markets about anticipated future events or results constitute forward-looking statements.  Forward-looking statements are often, but not always, identified by the use of words such as ?seek?, ?anticipate?, ?believe?, ?plan?, ?estimate?, ?expect? and ?intend? and statements that an event or result ?may?, ?will?, ?should?, ?could? or ?might? occur or be achieved and other similar expressions.  Forward-looking statements are subject to business and economic risks and uncertainties and other factors that could cause actual results of operations to differ materially from those contained in the forward-looking statements.  Forward-looking statements are based on estimates and opinions of management at the date the statements are made.  The Company does not undertake any obligation to update forward-looking statements even if circumstances or management?s estimates or opinions should change.  Investors should not place undue reliance on forward-looking statements.

 

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Tenajon Resources Corp.

EXPLORATEUR
CODE : TJS.V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Tenajon Res. est une société d’exploration minière d'or et d'argent basée au Canada.

Tenajon Res. détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont SUMMIT LAKE MINE, KANSAS CLAIMS, SILVER COIN, AJAX, MOLY BROOK, SUMMIT LAKE, STAR (LUPIN JV) et KANSAS au Canada.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Projets de Tenajon Resources Corp.
15/09/2008(Moly Brook)Announces High Grade Drill Results from Moly Brook, Newfound...
08/07/2008(Moly Brook)Announces High grade Near Surface Results From Moly Brook, N...
26/03/2008(Burn) Intersects Anomalous Molybdenum Values Over 150m Strike Len...
29/02/2008(Moly Brook)Commences Mobilization of 2008 Drilling Program for the Moly...
21/02/2008(Moly Brook) Intersects 36.6 metres averaging 0.087% Molybdenum at Moly ...
05/02/2008(Ajax) Announces Drilling On Ajax Continues to Intersect Near Sur...
Communiqués de Presse de Tenajon Resources Corp.
26/08/2009Closing of Business Combination
29/06/2009Creston Moly Signs Definitive Agreement to Acquire Tenajon R...
27/05/2009Business Combination with Tenajon Resources Corp.
12/06/2008Closes Gold Asset Sale to Kansas PartnerThread-Topic: Tenajo...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (TJS.V)Other OTC (TJRUF)
0,180-10.00%0,160-11.11%
TSX-V
CA$ 0,180
25/08 09:35 -0,020
-10%
Cours préc. Ouverture
0,200 0,200
Bas haut
0,180 0,200
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,180 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : 7
Produit
Développe
Recherche Gold - Molybdenum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 25/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :