Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Minera Andes Inc

Publié le 10 janvier 2009

Announces Remaining Results From 2008 San Jose Drilling

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Johnson | Precious Metals |
 


MINERA ANDES ANNOUNCES REMAINING RESULTS
FROM 2008 SAN JOS� DRILLING

  
TSX: MAI   
NASD-OTCBB: MNEAF   
   

SPOKANE, WA - January 09, 2009 - Minera Andes Inc. (TSX: MAI and US OTC: MNEAF) today announced results received from drilling that was recently completed at the San Jos� mine in southern Argentina. The San Jos� project is operated by Minera Santa Cruz S.A. ("MSC") owned 51% by Hochschild Mining plc ("Hochschild") (HOC.L: Reuters and HOC.LN: Bloomberg - London Stock Exchange) and 49% by Minera Andes. Hochschild is the operator of MSC. Infill and step-out drilling on several veins continues to indicate further potential to expand the areas of mineralization on the property. One of the highest-grade intercepts from this drilling campaign was in hole SJD-478 and encountered 30.92 grams per metric ton "g/t" (0.90 ounces per short ton "opt") gold and 778 g/t (22.7 opt) silver over an intercept thickness of 1.56 meters (see table below).

Between August and December 2008, 46 core holes totaling 11,278 meters were completed as part of the 2008 drilling program in which a total of 18,694 meters were drilled on the Frea, Odin, Ayelen and Kospi veins. These high-grade gold/silver veins were discovered in late 2005 through reconnaissance drilling of blind geophysical targets. A NI 43-101 technical report is underway to update the reserves and resources at San Jos�. This technical report will reflect approximately 27,478 meters of drilling covering the 12 month period that occurred between June 30, 2007 and June 30, 2008 but will not contain the results that are the subject of this news release. The report is anticipated to be completed in the first quarter of 2009 upon receipt of technical information to be provided by MSC. The results described in this news release are expected to be part of another technical report due out later this year that will reflect drilling results to year end 2008.

The majority of the 2008 drilling has been concentrated on the Odin and Ayel�n veins covering approximately 2.8 kilometers of strike length along these open-ended mineralized veins. Drilling completed last year extended the known mineralization along the Odin and Ayel�n vein trends for 1,000 meters along strike - or a 64% increase from the discovery drilling in 2005. The drill results presented here focused on the Odin vein and a subsidiary structure at the Frea vein. Several holes were also drilled on the Kospi, Frea and Huevos Verde veins.

The development and discovery of new mineralization demonstrates the large mineral potential of the San Jos� property where more than 40 kilometers of vein-trend target is currently known to exist, of which less than 15% has been explored to date.

Odin Vein
During the 2008 campaign 37 holes have been completed on the Odin vein (bringing the total to 88 holes) along approximately 1600 meters along the strike of the vein, to a depth of approximately 200 meters. Highlights of the program included the identification of massive and banded quartz veining with disseminated pyrite and argillic alteration. The Odin vein remains open to the west along strike and to depth.

The highest-grade intercept was in hole SJD-478 (described above). Hole SJD-483 intercepted 2.12 meters of 6.91 g/t (0.20 opt) gold and 486 g/t (14.2 opt) silver (SJD-483).

Frea Vein
The Frea vein is located 2 kilometers northeast of the Huevos Verdes vein, and both veins are currently being mined on several levels. The drill results presented here are for veins subsidiary to the main Frea vein which is currently in production (see table below for results).

2008 Drilling Results from July 31 to December 31, San Jos� Project

Drill Hole/Vein

From
(meters)

To
(meters)

Interval*
(meters)

Au
(g/t)

Ag
(g/t)

SJD-478 ODIN

122.44

124.00

1.56

30.92

778

SJD-479 FREA**

185.10

185.58

0.48

3.67

163

 

210.69

212.20

1.51

7.84

52

 

224.24

224.54

0.30

5.07

499

 

227.78

228.12

0.34

3.23

104

SJD-480 ODIN

182.90

183.26

0.36

<0.15

9

SJD-481 ODIN

No vein encountered

SJD-482 ODIN

172.80

174.65

1.85

18.69

1,506

SJD-483 ODIN

132.25

133.50

1.25

3.91

280

 

251.73

253.85

2.12

6.91

486

SJD-484 FREA **

203.80

204.50

0.65

10.30

1176

SJD-485 FREA **

251.50

252.05

0.55

0.20

17

SJD-486 FREA**

No vein encountered

SJD-487 ODIN

No vein encountered

SJD-488 ODIN

249.2

249.6

0.40

<0.15

3

SJD-489 ODIN

184.30

184.74

0.44

9.27

946

SJD-490 KOSPI

110.44

110.90

0.46

<0.15

<2

 

155.15

155.45

0.30

<0.15

<2

 

166.30

166.60

0.30

<0.15

<2

SJD-491 FREA* *

196.26

197.10

0.84

No results reported

SJD-492 ODIN

220.46

221.25

0.79

1.50

115

 

300.27

302.02

1.75

1.13

59

SJD-493 ODIN

240.48

243.45

2.97

<0.15

<2

SJD-494 ODIN

225.10

225.40

0.30

10.90

92

 

302.00

302.60

0.60

<0.15

<2

SJD-495 ODIN

252.50

255.20

2.70

6.03

952

SJD-496 FREA

170.45

172.65

2.2

1.63

193

SJD-497 ODIN

267.00

268.45

1.45

<0.15

<2

SJD-498 FREA**

132.25

132.90

0.65

1.43

108

 

140.20

140.55

0.35

1.40

113

(Frea vein)

149.10

154.20

5.10

2.84

203

 

224.15

225.00

0.85

21.73

1502

SJD-499 ODIN

174.95

175.55

0.60

2.10

45

SJD-500 ODIN

300.00

300.30

0.30

<0.15

<2

SJD-501 ODIN

259.35

261.42

2.07

0.97

42

SJD-502 HV OESTE

130.67

130.97

0.30

<0.15

<2

SJD-503 FREA**

220.85

223.60

2.75

6.63

837

 

239.25

240.60

1.35

2.33

116

SJD-504 HV SUR

119.58

120.58

1.00

<0.15

<2

SJD-505 HV SUR

90..40

90..77

0.37

<0.15

5

SJD-506 FREA

89..77

91..23

1.46

1.53

319

 

215.58

216.43

0.85

0.70

89

SJD-507 HV NORTE

89..03

94..15

5.12

<0.15

<2

 

96..00

99..86

3.86

0.22

71

SJD-508 HV NORTE

178.55

179.20

0.65

<0.15

<2

SJD-509 E. FREA/KOSPI

99.80

100.15

0.35

<0.15

3

 

144.00

145.55

0.55

<0.15

<2

SJD-510 E. FREA/KOSPI

201.70

202.25

0.55

<0.15

<2

SJD-511 E. FREA/KOSPI

134.70

135.90

1.20

<0.15

8

SJD-512 E. FREA/KOSPI

127.15

128.20

1.05

<0.15

<2

 

186.20

186.95

0.75

<0.15

<2

SJD-513 E. FREA**

100.05

103.50

3.45

0.99

57

SJD-514 KOSPI

111.90

112.65

0.75

<0.15

<2

 

135.45

135.80

0.35

<0.15

<2

SJD-515 AYELEN

232.90

235.75

2.85

<0.15

<2

 

245.30

259.30

14..00

<0.15

<2

SJD-516 KOSPI/FREA

No vein encountered

SJD-517 KOSPI

190.50

193.40

2.90

<0.15

<2

SJD-518 AYELEN

No vein encountered

SJD-519 KOSPI

NIL

SJD-520 AYELEN

85..50

86..50

1.00

0.47

82

SJD-521 FREA

No vein encountered

SJD-522 ODIN

159.40

160.25

0.85

0.20

34

 

267.40

268.40

1.00

<0.15

<2

SJD-523 HV OESTE

108.75

109.30

0.55

<0.15

<2

*All of the drill holes are angle holes. True thickness of the vein is undetermined. ** Subsidiary vein

Assay results were reported to Minera Andes by MSC, which is the operating company for the San Jos� joint venture. Assay results for the drilling were reviewed by Brian Gavin, Minera Andes' Vice President, Exploration, who is a qualified person as defined by National Instrument 43-101. All samples were collected in accordance with industry standards. Splits from the drill core samples were submitted to Alex Stewart Assayers, Argentina S.A. in Mendoza, Argentina, for fire assay and ICP analysis. Accuracy of results is tested through the systematic inclusion of standards, blanks and check assays.

Minera Andes is a gold, silver and copper exploration company working in Argentina. The Company holds about 304,000 acres of mineral exploration land in Argentina including the 49% owned San Jos� silver/gold mine. Minera Andes is also exploring the Los Azules copper project in San Juan province, where an exploration program has defined a resource and a scoping study is underway. Other exploration properties, primarily silver and gold, are being evaluated in southern Argentina. The Corporation presently has 190,158,851 shares issued and outstanding.

This news is submitted by Allen V. Ambrose, President and Director of Minera Andes Inc. For further information, please contact: Art Johnson at the Spokane office, or Krister A. Kottmeier, investor relations - Canada, at the Vancouver office. Visit our Web site: www.minandes.com.



For further information, please contact: Art Johnson at the Spokane office, or Krister A. Kottmeier, investor relations - Canada, at the Vancouver office. Visit our Web site: www.minandes.com.

Spokane Office
111 East Magnesium Rd.,
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: mineraandes@minandes.com

Vancouver Office
Suite 911 - 470 Granville St,
Vancouver, BC. V6C 1V5
Phone: (604) 689-7017 / 877-689-7018
E-mail: ircanada@minandes.com

Caution Concerning Forward-Looking Statements:
This press release contains certain "forward-looking statements", which may include, but are not limited to, statements regarding the Company's strategic plans, evolution of mineral resources and reserves, work programs, development plans and exploration budgets at the Company's San Jos� Project. The forward-looking statements express, as at the date of this press release, the Company's plans, estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements involve a number of risks and uncertainties, and there can be no assurance that such statements will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements include, but are not limited to, factors associated with fluctuations in the market price of precious metals, mining industry risks, risks associated with foreign operations, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral reserves and other risks. We refer readers to the risk factors and uncertainties described in the Company's continuous disclosure record, a copy of which is available under the Company's profile at www.sedar.com. Minera Andes' joint venture partner, a subsidiary of Hochschild Mining plc, and its affiliates do not accept responsibility for the use of project data or the adequacy or accuracy of this release.


THE TSX HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

 


<
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Minera Andes Inc

CODE : MAI.TO
ISIN : CA6029101012
CUSIP : 602910101
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Minera Andes est une société de production minière d'argent basée au Canada.

Minera Andes est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 730,0 millions CA$ (728,7 millions US$, 555,9 millions €).

La valeur de son action a atteint son plus bas niveau récent le 06 février 2009 à 0,32 CA$, et son plus haut niveau récent le 15 avril 2011 à 3,39 CA$.

Minera Andes possède 282 959 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Minera Andes Inc
23/03/2006New Analysis
16/10/2006Learning from the Iconoclast
Rapports annuels de Minera Andes Inc
2008 Annual report
2006 Annual Report
Financements de Minera Andes Inc
26/02/2009COMPLETES SECOND TRANCHE OF PRIVATE PLACEMENT WITH ROB McEWE...
17/02/2009revised C$40.0 million private placement with Robert R. McEw...
Rapports Financiers de Minera Andes Inc
11/08/2011Announces Second Quarter 2011 Financial Results
06/06/2011Announces First Quarter 2011 Financial Results and Restated ...
30/03/2011Announces 2010 Full Year Financial Results and Record Earnin...
17/07/2009(San Jose Argentina)second quarter 2009 San José Production
16/05/2009REPORTS FIRST QUARTER 2009 FINANCIAL RESULTS
23/01/2009(San Jose Argentina)ANNOUNCES FOURTH QUARTER GOLD/SILVER PRODUCTION INCREASES AT...
14/11/2008REPORTS THIRD QUARTER 2008 RESULTS
11/11/2008(San Jose Argentina)ANNOUNCES THIRD QUARTER GOLD/SILVER SALES AT THE SAN JOSE MI...
15/08/2008REPORTS NET INCOME FOR SECOND QUARTER OF $0.05 PER SHARE
30/07/2008ANNOUNCES SECOND QUARTER GOLD/SILVER SALES AT THE SAN JOSE M...
09/05/2008(San Jose Argentina)ANNOUNCES FIRST QUARTER 2008 PRODUCTION FOR SAN JOSE MINE TO...
Projets de Minera Andes Inc
07/12/2011(San Jose Argentina)Provides Update On Exploration Drilling at the San Jose Mine
30/08/2011(San Jose Argentina)Provides Update on Exploration Drilling at the San Jose Mine
27/06/2011(Los Azules Argentina)Reports Drill Results and Development Update for the Los Azu...
17/05/2011(Los Azules Argentina)on Litigation With TNR Gold Corp.
04/05/2011(San Jose Argentina)Announces Work Resumption at San Jose Mine
13/03/2011(San Jose Argentina)Announces Outstanding 2010 Exploration Drill Results at the ...
05/10/2009(San Jose Argentina) Production Has Resumed At TheSan Jos=E9 Mine
02/10/2009(Los Azules Argentina)Provides Confirmation of its 100% Earn-In on the Los Azules ...
06/06/2009(San Jose Argentina) Announces completion of NI 43-101 Technical report on the J...
06/06/2009(Los Azules Argentina) Announces delivery of Earn-in notice under option agreement...
16/01/2009(San Jose Argentina)ANNOUNCES INCREASE IN FORECAST PRODUCTION AT THE SAN JOSE GO...
10/01/2009(San Jose Argentina)Announces Remaining Results From 2008 San Jose Drilling
25/09/2008(Los Azules Argentina)ANNOUNCES EXCELLENT METALLURGICAL TESTING RESULTS FOR LOS AZ...
08/09/2008(Los Azules Argentina)announces a mineral resource estimate of 922 million tonnes ...
13/08/2008(San Jose Argentina)REPORTS SAN JOSE PRODUCTION CASH COSTS AT $322/oz GOLD AND $...
27/06/2008(Los Azules Argentina)Exploration Program Increases The Size Of The Los Azules Por...
16/04/2008(Los Azules Argentina)DRILLING CUTS 132 METERS (433FT) OF 1.11 PERCENT COPPER AT L...
28/03/2008(San Jose Argentina) PROVIDES SAN JOSE MINE UPDATE
12/03/2008(Los Azules Argentina)ANNOUNCES 113 METERS OF +1 PERCENT COPPER IN DRILLING AT LOS...
07/03/2008(San Jose Argentina)ANNOUNCES 1.69 OZ/TON GOLD AND 37 OZ/TON SILVER FROM SAN JOS...
11/12/2007(Los Azules Argentina) ANNOUNCES DRILLING COMMENCES AT LOS AZULES COPPER PROJECT
26/10/2007(San Jose Argentina) ENGAGES MACQUARIE BANK LIMITED FOR DEBT FINANCING FOR SAN J...
15/08/2007(San Jose Argentina)ANNOUNCES PROGRESS AND PLANS AT SAN JOSE MINE
31/05/2007(Los Azules Argentina)drills significant copper at Los Azules Project, Argentina
Communiqués de Presse de Minera Andes Inc
22/03/2012Files Annual 2011 Financial Statements and MD&A and Project ...
18/01/2012Announces Fourth Quarter and Full Year 2011 San Jose Mine Pr...
13/01/2012(Los Azules Argentina).: Response to TNR Gold Corp. News Release Regarding Los Azu...
21/12/2011Rob McEwen Letter to Shareholders of US Gold and Minera Ande...
03/10/2011(San Jose Argentina)Announces Full Repayment of Loans From San Jose Mine
22/09/2011US Gold and Minera Andes Enter Into Arrangement Agreement to...
20/07/2011Announces Second Quarter 2011 San Jose Mine Production
20/04/2011Announces First Quarter 2011 San Jose Mine Production
07/02/2011' Treasury Increases by $19 Million
24/01/2011Reminds Warrant Holders of Accelerated Expiry on January 31,...
03/07/2009'AGM Presentation On Video
23/02/2009Rob McEwen becomes Executive Chairman of Minera Andes - Two ...
06/02/2009Announces Results Of Preliminary Assessment At Los Azules Co...
01/10/2008Recent Media Coverage on Minera Andes Inc.
02/09/2008ANNOUNCES 2.05 OZ/TON GOLD AND 37 OZ/TON SILVER FROM ONGOING...
06/08/2008ADDS ROB MCEWEN AND OTHER MINING INDUSTRY EXECUTIVES TO ITS ...
30/07/2008Welcomes Lundin Mining Executive To Board
22/12/2007ANNOUNCES 1st CLOSING ON FINANCING
19/12/2007 ANNOUNCES PROPOSED FINANCING
27/11/2007 ANNOUNCES THE SAN JOSE MINE INCREASES SILVER AND GOLD MINE...
15/11/2007SIGNS DEFINITIVE AGREEMENT AT LOS AZULES COPPER PROJECT WITH...
09/11/2007 ANNOUNCES SAN JOSE UPDATE
12/10/2007SAN JOSE PROJECT DRILLING HITS 3.22 OUNCES PER TON GOLD AND ...
18/09/2007ANNOUNCES THE SAN JOSE MINE INCREASES SILVER AND GOLD RESOUR...
06/09/2007SAN JOSE PROJECT DRILLING HITS 1.86 OUNCES PER TON GOLD AND ...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (MAI.TO)OTC BB (MNEAF.OB)
2,58-2.64%2,54-3.05%
Dernières informations avant suppression de la cote
Cours préc. Ouverture
2,65 2,71
Bas haut
2,48 2,73
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  2,58 -%
Volume var. 1 mois
2 733 962 -%
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 07/09/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,22 US$+1,63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$-1,59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-2,63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,83 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :