Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Kalimantan Gold Corporation Ltd.

Publié le 15 septembre 2015

Asiamet Reports Further High Grade Copper Mineralization at BKM

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper |

Asiamet Reports Further High Grade Copper Mineralization at BKM


Asiamet Resources Limited ("ARS" or the "Company") is pleased to announce that recent drilling as part of the Resource evaluation program in progress on the Beruang Kanan Main ("BKM") copper deposit in Central Kalimantan, Indonesia has identified a second zone of higher grade copper mineralization within the BKM Resource. The delineation of these two shallow, higher grade zones is expected to have a very positive impact on the BKM project economics.

Assay results were received for an additional nine holes drilled to increase confidence and expand the BKM Resource. In total, 66 holes and 5605 meters of the planned 80 hole/ 6500 meter resource evaluation drilling program have now been completed and two holes are currently in progress.

Higher grade copper mineralization has now been identified in two separate parts of the BKM deposit, namely the northern BK044 Zone and the southern BK058 Zone (refer Figure 1). Within the BK044 Zone, hole BKM32350-02 (125.9m end of hole ("EOH")) intersected shallow, high grade copper mineralization very similar to that reported previously to the northwest in hole BKM32450-01 (refer ARS Press Release Wednesday May 13, 2015) and southwest in hole BK045 (refer ARS Press Release Monday June 10, 2013). Better results include:

BKM32350-02 35.0 meters at 1.73% Cu, (from 20 meters depth)
  • Including 11 meters at 3.49% Cu (from 20 meters)
  • Includes 2 meters at 10.15% Cu (from 20 meters)

BKM32350-02 14.0 meters at 1.42% Cu, (from 65 meters depth)
  • Including 6 meters at 2.53% Cu (from 72 meters)


Two additional holes have also been completed on this line and assays are expected shortly.

A drill hole location plan and a table of full assay results are provided in Figure 1 and Table 1 respectively. An updated list of drill hole details is provided in Table 2.

Infill and expansion drilling at the BKM deposit will be completed by mid-September and an updated Resource estimate is being prepared for release in late September or early October subject to receipt of final assays for all drill holes. Scout drilling of the BKS and BKW targets is expected to commence by the end of September.

Tony Manini, Asiamet Resource's Chief Executive Officer commented:

"The delineation of these two discrete areas of higher grade copper mineralization within the BKM Resource envelope is a promising development for the Beruang Kanan copper project. With further drilling we expect the continuity of these two shallow zones to be confirmed and anticipate that they will have a highly positive impact on the project economics when our evaluation of various mining scenarios commences in Q4, 2015. Asiamet looks forward to providing further results from ongoing drilling and metallurgical test work, and a Resource update for BKM, in the coming weeks"

Table 1: Recent drill intercepts.
HOLE ID From To Length Copper (%) Cumulative Cu Mineralized Interval
BKM31850-03 14.5 24.5 10.0 0.93 10 Meters
BKM31850-04 74.5 77.5 3.0 0.68 4 Meters
BKM31850-04 88.2 892 1.0 1.69
BKM31850-05 No Significant Intervals
BKM32050-03 No Significant Intervals
BKM32150-01 No Significant Intervals
BKM32150-02 3.15 55.0 51.85 0.46 51.85 Meters
Including 9.0 22.0 13.0 0.65
BKM32200-01 2.0 57.0 55.0 0.58 64.0 Meters
Including 4.0 11.0 7.0 0.86
Including 36.0 45.0 9.0 0.72
BKM32200-01 76.0 82.0 6.0 2.47
Including 76.0 77.0 1.0 12.50
BKM32200-01 89.0 92.0 3.0 1.06
BKM32350-02 20.0 55.0 35.0 1.73 57.0 Meters
Including 20.0 31.0 11.0 3.49
Includes 20.0 22.0 2.0 10.15
BKM32350-02 65.0 79.0 14.0 1.42
Including 72.0 78.0 6.0 2.53
BKM32350-02 84.0 92.0 8.0 0.72
BKM32350-03 4.5 14.5 10.0 0.78 72.0 Meters
BKM32350-03 22.5 37.5 15.0 0.42
BKM32350-03 45.5 54.5 9.0 0.93
BKM32350-03 60.5 66.0 5.5 0.79
BKM32350-03 104.0 119.0 15.0 0.53
Including 109.0 115.0 6.0 0.83
BKM32350-03 124.0 141.5 17.5 0.42
Notes: Grade intercepts are calculated as a weighted average grade ≥0.3% copper (uncut). True widths are interpreted to be between 80-100% of the reported lengths, unless otherwise stated.

Figure 1: Location map showing section lines and drill collars

Table 2: Updated Drill Hole Details
Hole ID Easting Northing RL Depth Azi Dip Status Assays
BKM31550-01 768877.2 9931550.0 428.0 75.0 270 -60 Completed Assays Pending
BKM31550-02 769078.3 9931550.0 379.1 70.4 270 -60 Completed Assays Pending
BKM31650-01 768684.3 9931647.4 403.7 81.9 270 -60 Completed Final Assays Received
BKM31650-02 768766.2 9931653.3 435.6 81.3 270 -60 Completed Final Assays Received
BKM31650-03 768824.1 9931652.5 427.2 69.3 270 -60 Completed Final Assays Received
BKM31650-04 768883.2 9931653.2 426.0 72.6 270 -60 Completed Final Assays Received
BKM31650-05 768999.3 9931648.3 408.9 81.6 270 -60 Completed Final Assays Received
BKM31650-06 769093.6 9931649.3 358.7 90.2 270 -60 Completed Final Assays Received
BKM31750-01 769085.8 9931753.1 375.6 75.1 270 -60 Completed Final Assays Received
BKM31750-02 769001.2 9931758.6 400.5 85.0 270 -60 Completed Final Assays Received
BKM31750-03 768950.0 9931764.0 418.9 75.0 270 -60 Completed Final Assays Received
BKM31750-04 768892.2 9931750.8 419.1 75.3 270 -60 Completed Final Assays Received
BKM31750-05 768839.9 9931751.0 417.1 90.3 270 -60 Completed Final Assays Received
BKM31750-06 768786.9 9931756.6 402.1 90.4 270 -60 Completed Final Assays Received
BKM31750-07 768706.0 9931746.2 394.8 90.2 270 -60 Completed Final Assays Received
BKM31750-08 768656.7 9931753.0 388.8 88.1 270 -60 Completed Final Assays Received
BKM31750-09 769202.6 9931750.0 333.6 56.3 270 -60 Completed Final Assays Received
BKM31800-01 769008.5 9931799.9 401.7 85.8 270 -60 Completed Assays Pending
BKM31800-02 769069.4 9931800.0 375.2 80.1 270 -60 Completed Assays Pending
BKM31800-03 769119.9 9931799.0 353.5 65.8 270 -60 Completed Assays Pending
BKM31850-01 769201.6 9931850.0 339.0 75.7 270 -60 Completed Final Assays Received
BKM31850-02 769106.0 9931850.0 377.4 69.6 270 -60 Completed Final Assays Received
BKM31850-03 769019.1 9931850.0 426.0 101.1 270 -60 Completed Final Assays Received
BKM31850-04 768900.9 9931850.0 415.3 97.7 270 -60 Completed Final Assays Received
BKM31850-05 768797.0 9931850.1 430.1 75.5 270 -60 Completed Final Assays Received
BKM31850-06 769157.2 9931850.0 318.0 50.0 270 -60 Completed Assays Pending
BKM31850-07 769060.5 9931850.0 351.0 46.6 270 -60 Completed Assays Pending
BKM31950-01 769094.6 9931950.0 380.5 75.2 270 -60 Completed Final Assays Received
BKM31950-02 768991.0 9931950.0 417.4 100.9 270 -60 Completed Final Assays Received
BKM31950-03 768888.0 9931950.0 447.9 75.0 270 -60 Completed Final Assays Received
BKM31950-04 768779.0 9931950.0 462.4 75.0 270 -60 Completed Final Assays Received
BKM32050-01 768702.3 9932050.0 485.2 71.6 270 -60 Completed Final Assays Received
BKM32050-02 768854.6 9932050.0 441.1 104.3 270 -60 Completed Final Assays Received
BKM32050-03 768998.2 9932050.0 397.8 70.2 270 -60 Completed Final Assays Received
BKM32150-01 768970.3 9932150.0 410.9 100.5 270 -60 Completed Assays Pending
BKM32150-02 768922.1 9932150.0 427.0 110.1 270 -60 Completed Assays Pending
BKM32150-03 768828.5 9932150.0 458.4 120.0 270 -60 Completed Assays Pending
BKM32150-04 768729.5 9932150.0 479.5 100.3 270 -60 Completed Assays Pending
BKM32200-01 768835.2 9932201.1 470.9 110.2 270 -60 Completed Final Assays Received
BKM32200-02 768901.0 9932200.9 463.2 110.2 270 -60 Completed Assays Pending
BKM32200-03 768949.7 9932200.8 426.0 111.0 270 -60 Completed Assays Pending
Hole ID Easting Northing RL Depth Azi Dip Status Assays
BKM32250-01 768731.7 9932249.9 504.1 84.3 270 -60 Completed Assays Pending
BKM32250-02 768836.9 9932250.0 483.3 110.8 270 -60 Completed Assays Pending
BKM32250-03 768881.0 9932249.9 457.6 101.9 270 -60 Completed Assays Pending
BKM32250-04 768973.8 9932249.9 402.9 25.0 270 -60 In-Progress Assays Pending
BKM32350-01 768999.7 9932350.0 386.5 45.7 270 -60 Completed Final Assays Received
BKM32350-02 768896.7 9932350.0 447.3 125.9 270 -60 Completed Final Assays Received
BKM32350-03 768839.3 9932350.0 460.0 143.1 270 -60 Completed Final Assays Received
BKM32350-04 768737.7 9932350.1 489.6 111.5 270 -60 Completed Assays Pending
BKM32350-05 768666.0 9932350.1 517.0 124.7 270 -60 Completed Assays Pending
BKM32450-01 768849.2 9932443.7 422.4 92.4 270 -60 Completed Final Assays Received
BKM32450-02 768745.4 9932452.6 442.5 70.6 270 -60 Completed Final Assays Received
BKM32450-03 768710.3 9932454.5 451.3 75.2 270 -60 Completed Final Assays Received
BKM32450-04 768616.4 9932457.4 484.7 65.4 270 -60 Completed Final Assays Received
BKM32450-05 768567.6 9932457.5 495.6 65.4 270 -60 Completed Final Assays Received
BKM32450-06 768519.9 9932462.8 521.9 75.8 270 -60 Completed Final Assays Received
BKM32450-07 768470.7 9932455.1 536.8 50.5 270 -60 Completed Final Assays Received
BKM32450-08 768423.1 9932457.5 544.7 46.6 270 -60 Completed Final Assays Received
BKM32450-09 769101.1 9932450.0 374.7 46.4 270 -60 Completed Final Assays Received
BKM32450-10 768978.2 9932450.0 395.6 33.5 270 -60 Completed Final Assays Received
BKM32500-01 768674.4 9932503.0 460.3 116.7 270 -60 Completed Assays Pending
BKM32500-02 768775.6 9932502.0 427.7 120.9 270 -60 Completed Assays Pending
BKM32550-01 768523.7 9932550.5 505.4 65.2 270 -60 Completed Final Assays Received
BKM32550-02 768623.2 9932550.3 475.1 75.5 270 -60 Completed Final Assays Received
BKM32550-03 768782.1 9932550.2 432.1 125.8 270 -60 Completed Final Assays Received
BKM32550-04 768883.7 9932550.2 407.0 125.3 270 -60 Completed Final Assays Received
BKM32550-05 768991.9 9932526.7 381.2 50.7 270 -60 Completed Final Assays Received
BKM32550-06 768934.5 9932550.0 391.8 0.0 270 -60 In-Progress Assays Pending

Qualified Person

Data disclosed in this press release have been reviewed and verified by ARS's qualified person, Stephen Hughes, P. Geo, Vice President Exploration of the Company and a Qualified Person within the meaning of NI 43-101 and for the purposes of the AIM Rules.

ON BEHALF OF THE BOARD OF DIRECTORS

Tony Manini, Deputy Chairman and CEO

For further information please contact:

-Ends-

Tony Manini
Deputy Chairman and CEO, Asiamet Resources Limited
Telephone: +61 3 8644 1300
Email:

VSA Capital Limited
Andrew Raca / Justin McKeegan
Telephone: +44 20 3005 5004 / +44 20 3005 5009
Email:

Asiamet Resources Nominated Adviser
RFC Ambrian Limited
Andrew Thomson / Oliver Morse
Telephone: +61 8 9480 2500
Email: /

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

Lire la suite de l'article sur www.noodls.com

Kalimantan Gold Corporation Ltd.

CODE : KLG.V
ISIN : BM4834061049
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Kalimantan Gold est une société d’exploration minière d'or basée au Canada.

Kalimantan Gold détient divers projets d'exploration en Indonesie.

Ses principaux projets en exploration sont JELAI MEWET SIPP et KSK COW en Indonesie.

Kalimantan Gold est cotée au Canada, au Royaume-Uni et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 12,5 millions CA$ (9,6 millions US$, 8,7 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2004 à 0,71 CA$, et son plus bas niveau récent le 26 septembre 2014 à 0,01 CA$.

Kalimantan Gold possède 622 984 168 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Kalimantan Gold Corporation Ltd.
06/05/2011Closes Private Placement With Freeport
29/04/2011Prices Private Placement With Freeport
22/05/2008Private Placement
Nominations de Kalimantan Gold Corporation Ltd.
05/07/2011Appoints Commissioner to Subsidiary
Projets de Kalimantan Gold Corporation Ltd.
05/02/2008(Jelai Mewet Sipp)Continued drilling at Jelai encounters near-surface signific...
Communiqués de Presse de Kalimantan Gold Corporation Ltd.
01/02/2016Asiamet clarifies previous technical disclosure
06/01/2016Preliminary Economic Assessment Underway on BKM Copper Depos...
03/12/2015Asiamet Resources Files Technical Report for the Beruang Kan...
27/11/2015Asiamet's Third Quarter Results 2015
06/11/2015Asiamet Resources Closes Private Placement
30/10/2015Asiamet Resources Financing
21/10/2015Asiamet Resources BKM Deposit Mineral Resource Update
14/10/2015BKM -- Latest Drill Results Confirm and Extend High Grade Co...
08/10/2015Asiamet Drilling Confirms High Grade Copper Zone at BKM
15/09/2015Asiamet Reports Further High Grade Copper Mineralization at ...
04/09/2015Asiamet CEO Share Purchase
01/09/2015Asiamet Resources Grants Options
01/09/2015Asiamet Resources Half-Year Results 2015
26/08/2015High Grade Copper Zone Identified at BKM
21/08/2015Asiamet Signs MOU for Contract of Work Amendments
30/07/2015BK Copper Project -- Positive Initial Metallurgical Testwork...
24/07/2015Kalimantan Gold changes name to Asiamet Resources
22/07/2015Positive Drill Results Expand Near Surface Copper at BKM
17/07/2015BK Copper Project -- Positive Initial Metallurgical Testwork...
17/07/2015BK Copper Project - Positive Initial Metallurgical Testwork ...
08/04/2015Beurang Kanan Copper Project - 2015 Program Update
24/12/2014IIROC Trading Resumption - KLG
24/12/2014IIROC Trading Halt - KLG
31/07/2014KSK Copper Project Update
16/04/2014Kalimantan Gold Board Changes
26/03/2014Kalimantan Gold - Jelai Gold Project
26/03/2014Kalimantan Gold - Jelai Gold Project
13/07/2011Copper and Coal Project Updates
23/06/2011Extends Jelai Gold Mining Exploration Licence
17/06/2011Reports CEO Buys Shares
19/04/2011Signs Definitive Agreement With Freeport
21/02/2011on KSK Joint Venture Option
16/02/2011Signs Definitive Agreement
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (KLG.V)LSE (KLG.L)
0,020-20.00%2,50+4.17%
TSX-V
CA$ 0,020
24/07 15:48 -0,010
-20%
Cours préc. Ouverture
0,025 0,020
Bas haut
0,020 0,020
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,020 -%
Volume var. 1 mois
20 000 -%
24hGold TrendPower© : 2
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,22 US$+1,63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$-1,59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-2,63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,83 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :