Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Bell Copper Corporation

Publié le 14 décembre 2009

Begins Drillhole K-8 at Kabba Project

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Zinc |

Bell Begins Drillhole K-8 at Kabba Project

Monday, December 14, 2009


VANCOUVER, British Columbia: Bell Copper Corporation (TSXV: BCU) has initiated drilling of hole K-8 on its Kabba porphyry copper-molybdenum project located midway between the operating Bagdad and Mineral Park copper mines in northwestern Arizona. The diamond cored tail of drillhole K-7A was completed to a depth of 388 meters, encountering oxidized, fluorite-rich granite beneath 366 meters of cover rocks. The Kabba drill program is targeting a faulted, major copper-molybdenum porphyry system beneath 100 to 500 meters of cover.

A recent geological reinterpretation of the direction of slip on the main fault that truncated and offset the porphyry copper system has led in the past two weeks to the discovery of previously unmapped porphyry outcrops containing strongly anomalous arsenic, lead, zinc, and copper levels. These outcrops extend in a northwesterly direction beyond the northern end of the newly reinterpreted target area. Also discovered in the same general area were drill cuttings from a 500 meter deep water well. Cuttings from the bottom of the well consisted of sericitized porphyry and pyritic granite, further supporting the concept of a large porphyry system in the new target area. Porphyry-related features including dikes and mineralized veinlets are now known to extend over 40 square kilometres in the targeted hangingwall block of the system. Consistent vein-filling mineral sequences including early lead-zinc sulfides and sulphosalts followed by iron-rich carbonates and terminated by the zeolite mineral laumontite are observed across a north-south distance of 10 kilometers, suggesting that these widely separated observations are all genetically related products of a single very large hydrothermal system.

Drillhole K-7A is interpreted to have intersected fluorine-enriched wallrock granite just west of the outer pyritic fringe of the porphyry target. Induced polarization responses beneath the K-7A drill site are believed to have been caused by thin clayey beds in the cover rocks rather than by disseminated sulfide mineralization in bedrock. Drillhole K-8 is being drilled using an airlift percussion drill on what is believed to be the eastern pyritic fringe of the decapitated porphyry system. The 2.7 kilometers between these two drillholes is expected to span much of the width of the target. Ongoing permitting for a subsequent drillhole, to be designated K-9, will allow the core of the target area to be tested upon the completion of K-8.

Timothy Marsh, PhD, P.E., the Company's VP of Exploration and a Qualified Person continues to oversee the drilling operation. No mineral resource has yet been identified on the Kabba Project. There is no certainty that the present exploration effort will result in the identification of a mineral resource or that any mineral resource that might be discovered will prove to be economically recoverable.

About Bell Copper

Bell Copper is focused on the exploration and development of copper assets in the Americas through internal efforts and via strategic partnerships.

More information on Bell Copper: www.bellcopper.net

On behalf of the Board of Directors of
Bell Copper Corporation


"Brian Leeners"

Brian Leeners, CFO & Director

For further information please contact the Company
Tel: 604 669-1484 or email: info@bellcopper.net

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

View Kabba Update in PDF Format

You can also view this News Release on our website at:
http://www.bellcopper.net/s/News_Releases.asp?ReportID=377037

Bell Copper Corporation

EN DÉVELOPPEMENT
CODE : BCU.V
ISIN : CA0778862080
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Bell Copper est une société d’exploration minière de cuivre basée au Canada.

Bell Copper est en développement de projets de cuivre et d'or au Mexique, et détient divers projets d'exploration au Canada et au Mexique.

Son principal projet en développement est LA BALSA au Mexique et ses principaux projets en exploration sont SOMBRERO BUTTE, KABBA et LEDUC au Canada et SILVER BELL et COPPER SPRINGS (BELLCOPPER) au Mexique.

Bell Copper est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 3,1 millions CA$ (2,3 millions US$, 2,1 millions €).

La valeur de son action a atteint son plus haut niveau récent le 13 avril 2006 à 6,20 CA$, et son plus bas niveau récent le 06 mars 2015 à 0,01 CA$.

Bell Copper possède 41 410 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Bell Copper Corporation
Annual Report 2007
Financements de Bell Copper Corporation
29/03/2012Announces Amendments to Private Placement Financing
03/06/2011Closes Balance of $4.5 Million Financing
12/05/2011Closes First Tranche of Financing
27/04/2011Increases Financing to $4 Million and Announces Board and Ma...
17/06/2010Shares Issued to Macquarie, Expiration & Exercise of Share P...
17/05/2010Non-Brokered Private Placement
10/03/2010Closing of Private Placement
21/01/2010Non-brokered Private Placement Increase
30/11/2009Non-Brokered Private Placements
02/11/2009Closing of Private Placement and Warrant Amendment
29/10/2009Non-Brokered Private Placement
13/08/2009Private Placement Closed and Warrant Amendment Approved
11/08/2009Private Placement Increased
29/07/2009Non-Brokered Private Placement
10/03/2009Non-Brokered Private Placement
17/12/2008Kabba Project Drilling - Increased Private Placement
11/12/2008Non-Brokered Convertible Debenture Private Placement
03/11/2008Non Brokered Private Placement
25/09/2008Second Tranche Closing of Private Placement
08/09/2008First Tranche Closing of Private Placement
07/08/2008Non-Brokered Private Placement Terms Amended
09/07/2008Non Brokered Private Placement
18/04/2008Brokered Private Placement Of Units
Nominations de Bell Copper Corporation
29/02/2012Announces Changes to Board of Directors
07/10/2011Announces Appointment of New Corporate Secretary
08/05/2007Appointment to the Board & Exercising of Warrants
Projets de Bell Copper Corporation
07/08/2013(La Balsa)Completes Sale of the La Balsa Project & SXEW Plant - Procee...
09/07/2013(La Balsa)Agreement to Sell the La Balsa Project & SXEW Plant Proceeds...
10/09/2012(Sombrero Butte)Amends Purchase Agreement with Copper Fox Metals and Complet...
12/04/2012(Kabba)Options 60% Interest in Kabba Project to AKA Ventures
21/03/2012(La Balsa)Provides Update on its La Balsa Project
12/03/2012to Complete Van Dyke Acquisition
01/09/2011(Kabba)Intersects Significant Base Metal Mineralization in Kabba Po...
30/06/2010(La Balsa)Drilling Update
18/05/2010(La Balsa)Update
13/05/2010Sombrero 43-101 Technical Report
06/05/2010(La Balsa)Exploitation Agreement
04/05/2010(La Balsa)Drilling commences
11/02/2010(Kabba)Completes Drillhole K-8, Cores K-9
16/12/2009(Granduc Copper Mine)Begins Geophysical Survey of Granduc Mine
14/12/2009(Kabba)Begins Drillhole K-8 at Kabba Project
23/11/2009(Kabba)Kabba Drilling Update
06/11/2009(Kabba)Kabba Drilling Update
02/11/2009(Kabba)Kabba Phase II Drill Update:
07/07/2009(Kabba)Kabba Drilling Update
11/06/2009(Kabba)Kabba Drilling Re-Commences
10/03/2009(Kabba)Kabba Drilling Update
02/03/2009(Kabba)Kabba Drilling Commences
27/01/2009(Sombrero Butte)Mineral Exploration Roundup Core Shack 2009
13/01/2009(Sombrero Butte)Creek-Sombrero Option Agreement Amendment
24/06/2008(Kabba)Kabba Data Compilation Supports Large Porphyry Mo-Cu Target
17/03/2008(Fox River Mafic Belt)Drilling Begins at Fox River Project
06/02/2008Phase II Drilling Complete at Sombrero Butte in Arizona
28/01/2008(La Balsa) Reports La Balsa NI 43-101 Technical Report
04/07/2007(Fox River Mafic Belt)Fox River Exploration Update
24/05/2007More High Grade Copper from Arizona: Bell cuts 66 meters of ...
23/05/2007(Kabba)Drilling of Cu-Mo Porphyry Target Begins at Kabba Project
Communiqués de Presse de Bell Copper Corporation
17/09/2015Bell Issues Units, Shares For Debt And Announces Annual Meet...
25/03/2015Non-brokered Private Placement Financing
20/11/2013(Kabba)Kabba NI43-101 Report
24/09/2012Announces Management Changes/Advance Notice Policy
09/07/2012(Sombrero Butte)Signs Purchase Agreement with Copper Fox Metals in Respect o...
28/06/2012Announces Results of Annual and Special Meeting of Sharehold...
21/06/2012Provides Corporate Update
08/06/2012Announces Defaults Under Secured Term Credit Facility
31/05/2012Announces Proposed Share Consolidation
27/06/2011(Kabba)Commences Drilling a 3 km by 5 km Copper-Molybdenum Porphyry...
20/06/2011(La Balsa)Advances La Balsa Feasibility Study and Van Dyke Programs fo...
11/03/2011Announces $2,500,000 Brokered Private Placement Financing
19/08/2010La Balsa Iron Ore Exploitation Agreement
02/06/2010Drillhole K-9 Update
12/05/2010New Director Appointed
03/05/2010Shares Issued To Macquarie
29/04/2010Retains Renmark Financial Communications Inc.
09/04/2010Shares Issued to Macquarie
08/04/2010Van Dyke Copper Mine Purchase
06/04/2010Granduc Option Agreement
02/03/2010Shares Issued To Macquarie
04/02/2010Shares Issued to Macquarie
21/01/2010Management Addition
15/12/2009New Management
09/12/2009Acquisition of 100% Interest in Silver Leduc Mineral Claims
07/12/2009Proposes Spin-Off Transaction
05/11/2009Shares Issued To Macquarie
02/10/2009Shares Issued To Macquarie
02/09/2009Shares Issued to MacQuarie
13/08/2009Gryphon Summit Litigation
03/07/2009Shares Issued To Macquarie
04/03/2009Shares Issued To Macquarie
26/02/2009Debenture Financing Completed
06/02/2009Options
23/01/2009Extension of Macquarie Demand Debenture
17/12/2008Investor Relations
04/12/2008Strategic Plan
15/11/2008CFO, Brian Leeners provides update on Bell Copper's upcoming...
23/08/2008Disclosure Review
16/07/2008Options Interest in Arizona Project
14/07/2008Brian Leeners explains the significance of new breccia pipes...
08/07/2008Discovers Advanced Argillic Alteration in New Breccia Pipes ...
25/06/2008Executive Interview
12/04/2008Announces Final Court Hearing Date for Grandcru-Rogue River ...
08/04/2008 Grandcru Resources and Rogue River Resources Announce Propo...
03/04/2008 Retains Agoracom To Provide Investor Relations, Social Netw...
03/04/2008Exhibiting at the Calgary Resource Investment Conference
29/03/2008, Grandcru Resources And Rogue River Resources Receive Major...
28/02/2008Phase II Drilling Confirms More Copper at Sombrero Butte in ...
19/12/2007Options Outland Silver Bar Property to Glen Hawk Minerals Lt...
31/10/2007Continued Drilling at La Balsa Finds More Copper in New
30/10/2007 Phase II Drilling at Sombrero Butte Targets Suspected Under...
16/10/2007Begins Phase One Drilling Program at Gryphon Project
10/10/2007Provides Gryphon Summit Property Overview
25/09/2007Option Agreement With Golden Gryphon USA, Inc.
20/09/2007Reports La Balsa Project Drill Results of Rogue River Resour...
19/09/2007Drilling Begins at Mesa Well Project in Arizona
04/09/2007Grandcru Resources & Rogue River Resources to Complete Three...
15/08/2007 Continues to Expand Presence in Arizona With New Copper Pro...
08/08/2007Introduces New Porphyry Copper Project in Arizona
10/07/2007Extends Copper Mineralization at Sombrero Butte Project
05/07/2007Engages Barnes McInerney
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (BCU.V)
0,075-6.25%
TSX-V
CA$ 0,075
19/04 16:59 -0,010
-6,25%
Cours préc. Ouverture
0,080 0,075
Bas haut
0,075 0,075
Année b/h Var. YTD
0,070 -  0,110 -25,00%
52 sem. b/h var. 52 sem.
0,070 -  0,200 -63,41%
Volume var. 1 mois
152 150 -31,82%
24hGold TrendPower© : -21
Produit
Développe Copper
Recherche Copper - Molybdenum
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-46,43%
20237,69%0,250,12
2022-18,75%0,730,11
2021-52,94%0,360,11
2020423,08%0,450,03
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,22 US$+1,63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$-1,59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-2,63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,83 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :