Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

HudBay Minerals Inc.

Publié le 23 juin 2010

Discovers Additional Gold and Copper

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Zinc |

 
 
HudBay Minerals Inc.
TSX: HBM
Other Recent News

June 23, 2010
HudBay Discovers Additional Gold and Copper at Lalor

Highlights

-Copper-Gold zone extended 120 meters down plunge and remains open

-New copper-gold mineralization intersected on a separate horizon supports possibility of multiple copper-gold zones

-Strong in-fill drilling results demonstrate continuity of Gold zones

-High grade intersections in Base Metal zone, including gold and copper mineralization

TORONTO, ONTARIO--(Marketwire - June 23, 2010) - HudBay Minerals Inc. ("HudBay", the "company") (TSX:HBM) today announced additional drill results from its 100% owned Lalor deposit near its Snow Lake concentrator in Manitoba's Flin Flon Greenstone Belt.

Down plunge drilling in the previously reported Copper-Gold zone yielded a notable result in DUB270, which assayed 7.01 g/t Au, 21.13 g/t Ag, 4.83% Cu, and 0.23% Zn over 4.81 meters from 1410.56 to 1415.37 meters. This intersection confirms the Copper-Gold zone remains open down plunge and extends the zone 120 metres beyond the previously reported DUB265W01.

New copper-gold mineralization was intersected on a separate horizon in DUB267W01, which assayed 6.74 g/t Au, 16.52 g/t Ag, 2.00% Cu, and 0.04% Zn over 10.96 meters from 1120.82 to 1131.78 meters in a large step out down plunge from Base Metal zone 10. This new zone supports the geological interpretation that several copper-gold zones may exist at Lalor.

"These latest drill results confirm there remains significant potential at the Copper-Gold zone," said W. Warren Holmes, executive vice chairman and interim chief executive officer. "The discovery of new copper-gold mineralization clearly shows the prospective nature of the deposit and the potential for expansion of the current resource estimates."

HudBay also has received assays for several drill holes testing the continuity of the mineralization in the Gold zones. Notable results include DUB215W01, which assayed 39.88 g/t Au, 32.60 g/t Ag, 0.48% Cu and 0.51% Zn over 10.07 meters from 942.00 to 952.07 meters, DUB215W02, which assayed 18.27g/t Au, 42.96 g/t Ag, 0.60% Cu and 0.27% Zn over 19.50 meters from 936.00 to 955.50 meters, and DUB 258W02, which intersected 12.63 g/t Au, 92.1 g/t Ag, 1.12% Cu and 0.84% Zn over 17.69 meters from 928.71 to 946.40.

The close spaced drilling in the Gold zones (approximately 25 meters) demonstrates that the gold mineralization is continuous between holes and indentifies local areas of high grade. These results are being compiled and HudBay is encouraged that some of the gold resource may be able to be classified as inferred in advance of underground exploration.

Drill hole DUB258 intersected notable mineralization in Base Metal zone 20, which assayed 15.97 g/t Au, 128.01 g/t Ag, 3.86% Cu and 5.41% Zn over 16.65 meters from 903.00 to 919.65 meters. The results from DUB258W01, located 60 meters from DUB258, were equally impressive intersecting mineralization that assayed 36.18 g/t Au, 70.11 g/t Ag, 0.52% Cu and 11.28% Zn over 14.10 meters from 946.00 to 960.10 meters. These intersections provide evidence of the existence of local high grade domains within the previously reported resource.

"In-fill drill results from the Gold zones and the Base Metal zones reinforce our confidence that the current mine development plan will generate attractive returns," said Mr. Holmes. "Development of Lalor is continuing on an expedited basis and we expect to move into the next phase of project development later this year when shaft collaring and sinking begins."

Please refer to tables 1-5 for additional assay results and drill hole locations. For additional detail on the location of notable drill holes, see the "Lalor Deposit Map" and the "Cu-Au Zone Plan map", available on HudBay's website at (www.hudbayminerals.com/hbm/presentations.cfm). Additional assay results are also available on the website.

HudBay continues to explore Lalor with two drills on the Copper-Gold zone targeting the periphery to the west. One drill is targeting the new copper-gold mineralization intersected in DUB267W01. Two other drills are conducting cementing operations in preparation for underground development. HudBay anticipates that surface drilling activity on the Copper-Gold zone will be reduced over the next several months given the relatively high cost and complexity of deep exploration drilling. Once the underground ramp from the Chisel North mine is complete in 2012, HudBay expects to significantly increase its exploration activity in the Gold zones and Copper-Gold zone to further delineate the zones and add them to the Lalor mine plans.

Table 1: Copper-Gold Zone Drill Results

----------------------------------------------------------------------------
                                        Core                                
                                      Length                                
                       From       To  meters                                
HOLE                 meters   Meters   (1,2)  Au g/t  Ag g/t     Cu%     Zn%
----------------------------------------------------------------------------
DUB246W02           1173.00  1178.00    5.00    3.41   21.40    1.80    0.31
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                    1174.00  1176.00    2.00    6.49   43.50    3.50    0.69
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB246W02           1187.00  1191.00    4.00    2.11    2.25    0.45    0.01
----------------------------------------------------------------------------
DUB246W02           1228.00  1228.58    0.58    5.94   35.00    3.54    0.12
----------------------------------------------------------------------------
DUB246W02           1293.00  1293.50    0.50    4.59   36.00    3.81    0.16
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB265W02           1313.24  1321.41    8.17    2.31   10.46    3.04    0.29
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                    1317.82  1318.78    0.96    8.65   39.00   14.48    0.90
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB266              1217.00  1221.00    4.00   58.66  148.15    0.06    0.01
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                    1217.00  1218.00    1.00  203.53  559.00    0.13    0.02
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB270              1410.56  1415.37    4.81    7.01   21.13    4.83    0.23
----------------------------------------------------------------------------

1.  Lengths are core lengths and not true thicknesses. 
2.  Intersection assays are a composite of assays calculated from interval
    weighted assays over the intersection length.
 
Table 2: Gold Zone In-fill Drill Results

----------------------------------------------------------------------------
                                        Core                                
                                      Length                                
                       From       To  meters                                
HOLE                 meters   Meters   (1,2)  Au g/t  Ag g/t     Cu%     Zn%
----------------------------------------------------------------------------
DUB215W01            942.00   952.07   10.07   39.88   32.60    0.48    0.51
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     948.66   949.00    0.34  768.93  321.00    0.14    0.01
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB215W01           1004.40  1006.62    2.22   21.39  124.92    0.05    0.00
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB215W02            936.00   955.50   19.50   18.27   42.96    0.60    0.27
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     953.00   954.00    1.00  145.13  285.00    2.65    0.60
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB226W01            903.30   917.00   13.70    3.37    8.71    0.15    0.09
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     914.00   915.52    0.52   23.93   85.00    0.81    0.54
----------------------------------------------------------------------------
                     916.13   916.38    0.25   29.59   50.00    0.54    1.91
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB226W02            901.43   919.13   17.70    7.80   28.91    0.57    0.55
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     905.07   905.36    0.29   56.50  402.00    9.45   16.29
----------------------------------------------------------------------------
                     908.27   908.68    0.41   63.70  402.00    7.80    7.03
----------------------------------------------------------------------------
                     918.68   919.13    0.45  123.12   65.00    0.14    0.02
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB226W02            954.23   965.61   11.38    2.50   19.79    0.41    2.69
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB226W02           1015.00  1029.81   14.81    4.02    9.30    0.28    0.14
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                    1016.65  1017.58    0.93   24.90   97.39    2.48    0.60
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB226W03            894.50   908.00   13.50    3.09    6.18    0.17    0.01
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     903.55   903.87    0.32   41.56  140.00    3.11    0.31
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB226W03            939.00   952.00   13.00    2.87   28.32    0.17    0.82
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     948.28   948.60    0.32   25.32  501.00    0.15    0.00
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB226W04            888.45   913.10   24.65    3.58   15.69    0.40    0.70
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     889.75   891.14    1.39   22.81  124.00    3.53    4.18
----------------------------------------------------------------------------
                     892.54   893.00    0.46   27.99   21.00    0.23    0.05
----------------------------------------------------------------------------
                     911.45   911.90    0.45   31.09   86.00    1.63    1.09
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB226W05            888.00   903.29   15.29    3.77    8.33    0.25    0.02
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     890.50   891.00    0.50   38.14   17.00    0.19    0.02
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB226W05            910.40   922.49   12.09    5.78   21.87    0.31    1.66
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB226W07            921.00   928.26    7.26   15.76  213.21    0.55    0.04
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     925.49   926.26    0.77   55.11  500.00    0.27    0.03
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB230W01            871.57   884.74   13.17    8.19   27.97    0.51    0.31
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     871.57   871.80    0.23   51.87  362.00    2.42    0.83
----------------------------------------------------------------------------
                     880.75   882.19    1.44   41.80   87.65    1.90    2.25
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB230W01            890.68   903.77   13.09    8.26   28.19    0.31    0.39
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     890.68   892.28    1.60   51.22  162.21    2.03    0.98
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB233W01            934.30   942.66    8.36    8.30   16.47    0.22    0.06
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     940.51   940.78    0.27   59.45   135.0    4.60    1.22
----------------------------------------------------------------------------
                     941.08   941.33    0.25   70.35  277.00    0.72    0.27
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB244W04            791.93   799.59    7.66    9.81   27.35    0.60    0.35
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB255W02            928.94   960.00   31.06    5.28   49.66    0.34    2.60
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     928.94   939.16   10.22   11.53  107.18    0.83    0.25
----------------------------------------------------------------------------
                     939.16   946.43    7.27    1.85   59.84    0.24   10.72
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB256               916.29   933.79   17.50    8.02   23.52    0.70    0.49
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     917.10   917.57    0.47   27.35  140.00    3.72   15.05
----------------------------------------------------------------------------
                     929.50   930.00    0.50   37.52    4.00    0.01    0.00
----------------------------------------------------------------------------
                     933.06   933.79    0.73   35.80   95.00    2.74    0.24
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB257W01           1027.00  1030.00    3.00    8.49   11.89    0.03    0.05
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB258W01            905.10   920.85   15.75    5.99   27.09    0.66    1.10
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     912.00   912.30    0.30   46.37  168.00    2.29    0.35
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB258W02            928.71   946.40   17.69   12.63   92.10    1.12    0.84
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     929.68   932.48    2.80   21.94  250.52    5.93    5.06
----------------------------------------------------------------------------
                     945.40   946.40    1.00   92.91  186.86    0.12    0.03
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB264               875.55   927.60   52.05    5.45   13.18    0.25    0.65
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     900.35   900.47    0.12  400.47  340.00    2.83    0.53
----------------------------------------------------------------------------
                     906.65   922.92   16.27   11.37   21.73    0.21    1.28
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB264W01            866.00   885.00   19.00    8.11   20.52    0.46    0.18
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB264W01            896.00   899.22    3.22    7.26   59.83    0.35    3.77
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     868.54   868.89    0.35   57.67   92.00    1.84    0.11
----------------------------------------------------------------------------
                     870.70   871.70    1.00   32.40   23.00    0.39    0.03
----------------------------------------------------------------------------
                     878.35   878.72    0.37   57.53  426.00   10.21    7.12
----------------------------------------------------------------------------
                     881.35   881.65    0.30   36.38  121.00    3.20    0.60
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB264W02            859.07   879.50   20.43    4.47   23.94    0.61    1.60
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     875.14   875.51    0.37   30.54   95.00    7.64    5.22
----------------------------------------------------------------------------
                     877.28   877.91    0.63   52.96  110.00    1.77    1.49
----------------------------------------------------------------------------

1.  Lengths are core lengths and not true thicknesses. 
2.  Intersection assays are a composite of assays calculated from interval
    weighted assays over the intersection length.
 
Table 3: Base Metal Zone In-fill Results

----------------------------------------------------------------------------
                                        Core                                
                                      Length                                
                       From       To  meters                                
HOLE                 meters   Meters   (1,2)  Au g/t  Ag g/t     Cu%     Zn%
----------------------------------------------------------------------------
DUB170W02            826.38   843.90   17.52    2.17   35.98    1.15   17.28
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB226W02            887.73   893.38    5.65   16.89  148.78    3.41    2.26
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     891.51   892.22    0.71   77.47  235.00    3.38    1.82
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB226W07            911.46   917.59    6.13    2.40   50.91    0.70   19.78
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB244W04            799.59   804.13    4.54    9.07   72.59    1.45   13.19
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB255               817.53   822.75    5.22    0.09   23.97    0.41   15.00
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB255               847.70   853.11    5.41    0.82   18.86    0.65    8.17
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB255W02            798.93   803.34    4.41    0.09   27.71    0.52   26.17
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB255W02            825.77   837.08   11.31    1.04   42.99    0.61    8.62
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB258               903.00   919.65   16.65   15.97  128.01    3.86    5.41
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     903.00   903.37    0.37  295.39  644.00    0.45    0.08
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB258W01            946.00   960.10   14.10   36.18   70.11    0.52   11.28
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                     946.00   946.48    0.48  892.15 1164.00    0.43    0.19
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB258W03            919.68   936.21   16.53    0.64   18.51    0.42   13.86
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB259               819.35   837.38   18.03    0.23   18.15    0.66   17.40
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB260               771.61   794.62   23.01    1.08   28.10    0.85    7.62
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB264W04            885.30   894.62    9.32    1.01   25.73    0.66   16.16
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
DUB267W01           1120.82  1131.78   10.96    6.74   16.52    2.00    0.04
----------------------------------------------------------------------------
Including                                                                   
----------------------------------------------------------------------------
                    1124.14  1124.78    0.64   89.67   75.00    1.75    0.04
----------------------------------------------------------------------------
                    1125.42  1126.55    0.54    6.04   93.00   13.95    0.23
----------------------------------------------------------------------------

1.  Lengths are core lengths and not true thicknesses.
2.  Intersection assays are a composite of assays calculated from interval
    weighted assays over the intersection length.
 
Table 4: Coordinate Location of Copper-Gold zone and Gold Zone Intersections

----------------------------------------------------------------------------
                                       Core                                 
                                     Length       East      North      Depth
HOLE               From       To  meters(1)  meters(2)  meters(2)  meters(3)
----------------------------------------------------------------------------
DUB246W02       1173.00  1178.00       5.00   426771.6  6081428.7     1170.6
----------------------------------------------------------------------------
DUB246W02       1187.00  1191.00       4.00   426772.1  6081429.4     1184.1
----------------------------------------------------------------------------
DUB246W02       1228.00  1228.58       0.58   426773.5  6081431.2     1223.3
----------------------------------------------------------------------------
DUB246W02       1293.00  1293.50       0.50   426775.3  6081433.6     1288.2
----------------------------------------------------------------------------
DUB215W01        942.00   952.07      10.07   426549.0  6081295.0      942.2
----------------------------------------------------------------------------
DUB215W01       1004.40  1006.62       2.22   426550.1  6081284.0      999.0
----------------------------------------------------------------------------
DUB215W02        936.00   955.50      19.50   426548.0  6081290.2      940.0
----------------------------------------------------------------------------
DUB226W01        903.30   917.00      13.70   426572.9  6081117.0      899.8
----------------------------------------------------------------------------
DUB226W02        901.43   919.13      17.70   426630.2  6081138.0      907.1
----------------------------------------------------------------------------
DUB226W02        954.23   965.61      11.38   426632.5  6081139.3      956.7
----------------------------------------------------------------------------
DUB226W02       1015.00  1029.81      14.81   426635.3  6081139.7     1019.1
----------------------------------------------------------------------------
DUB226W03        894.50   908.00      13.50   426602.2  6081145.4      896.1
----------------------------------------------------------------------------
DUB226W04        888.45   913.10      24.65   426629.3  6081118.5      897.4
----------------------------------------------------------------------------
DUB226W05        888.00   903.29      15.29   426541.8  6081137.9      875.8
----------------------------------------------------------------------------
DUB226W05        910.40   922.49      12.09   426533.7  6081138.7      894.9
----------------------------------------------------------------------------
DUB226W07        921.00   928.26       7.26   426551.5  6081118.2      910.6
----------------------------------------------------------------------------
DUB230W01        871.57   884.74      13.17   426598.2  6081065.4      870.9
----------------------------------------------------------------------------
DUB230W01        890.68   903.77      13.09   426598.7  6081063.1      889.8
----------------------------------------------------------------------------
DUB233W01        934.30   942.66       8.36   426550.2  6081356.8      935.0
----------------------------------------------------------------------------
DUB244W04        791.93   799.59       7.66   426502.7  6080876.7      784.3
----------------------------------------------------------------------------
DUB255W02        928.94   960.00      31.06   426750.3  6080869.9      933.0
----------------------------------------------------------------------------
DUB256           916.29   933.79      17.50   426578.9  6081225.8      909.6
----------------------------------------------------------------------------
DUB257W01       1027.00  1030.00       3.00   426701.3  6081377.0     1018.8
----------------------------------------------------------------------------
DUB258W01        905.10   920.85      15.75   426571.9  6031161.2      886.3
----------------------------------------------------------------------------
DUB258W02        928.71   946.40      17.69   426503.2  6081235.8      902.6
----------------------------------------------------------------------------
DUB264           875.55   927.60      52.05   426624.5  6081052.1      894.5
----------------------------------------------------------------------------
DUB264W01        866.00   885.00      19.00   426576.2  6081061.8      864.0
----------------------------------------------------------------------------
DUB264W02        859.07   879.50      20.43   426588.7  6081034.4      855.8
----------------------------------------------------------------------------
DUB265W02       1313.24  1321.41       8.17   426783.1  6081602.4     1308.6
----------------------------------------------------------------------------
DUB266          1217.00  1221.00       4.00   426915.3  6081470.5     1202.9
----------------------------------------------------------------------------
DUB270          1410.56  1415.37       4.81   426751.9  6081807.8     1377.8
----------------------------------------------------------------------------

1.  Lengths are core lengths and not true thicknesses. 
2.  Coordinates are stated in UTM NAD83 Zone 14 
3.  Depth is vertical distance from the collar of the hole to the center of
    the intersection.
 
Table 5: Coordinate Location of Base Metal Zone Intersections

----------------------------------------------------------------------------
                                       Core                                 
                                     Length       East      North      Depth
HOLE               From       To  meters(1)  meters(2)  meters(2)  meters(3)
----------------------------------------------------------------------------
DUB170W02        826.38   843.90      17.52   426894.0  6080719.8      791.8
----------------------------------------------------------------------------
DUB226W02        887.73   893.38       5.65   426629.2  6081137.0      887.4
----------------------------------------------------------------------------
DUB226W07        911.46   917.59       6.13   426554.5  6081118.1      901.2
----------------------------------------------------------------------------
DUB244W04        799.59   804.13       4.54   426501.5  6080875.6      790.2
----------------------------------------------------------------------------
DUB255           817.53   822.75       5.22   426797.0  6080925.6      817.0
----------------------------------------------------------------------------
DUB255           847.70   853.11       5.41   426797.7  6080922.6      847.1
----------------------------------------------------------------------------
DUB255W02        798.93   803.85       4.41   426767.1  6080897.5      793.7
----------------------------------------------------------------------------
DUB255W02        825.77   837.08      11.31   426763.3  6080891.9      822.9
----------------------------------------------------------------------------
DUB258           903.00   919.65      16.65   426517.2  6081178.6      878.4
----------------------------------------------------------------------------
DUB258W01        946.00   960.10      14.10   426571.7  6081151.7      925.2
----------------------------------------------------------------------------
DUB258W03        919.68   936.21      16.53   426467.9  6081262.9      878.3
----------------------------------------------------------------------------
DUB259           819.35   837.38      18.03   426723.6  6080893.5      913.0
----------------------------------------------------------------------------
DUB260           771.61   794.62      23.01   426837.4  6080701.9      719.2
----------------------------------------------------------------------------
DUB264W04        885.30   894.62       9.32   426547.6  6081046.4      871.0
----------------------------------------------------------------------------
DUB267W01       1120.82  1131.78      10.96   427183.9  6081261.0     1103.3
----------------------------------------------------------------------------

1.  Lengths are core lengths and not true thicknesses. 
2.  Coordinates are stated in UTM NAD83 Zone 14 
3.  Depth is vertical distance from the collar of the hole to the center of
    the intersection.
 
ABOUT LALOR

The Lalor deposit was discovered in March 2007. The deposit is located in the Chisel basin portion of the Flin Flon Greenstone Belt and is believed to be the largest VMS deposit found in this region to date.

Zinc rich base metal zone: Mineralization occurs in six separate stacked lenses of zinc rich polymetallic near solid to solid sulphide mineralization approximately 570 meters to 1,170 meters below surface. In October 2009 an Indicated Resource of 12.3MT 1.6 g/t Au, 24.2 g/t Ag, 0.66% Cu, 8.70% Zn, and an Inferred Resource of 5.0MT 1.4 g/t Au, 25.5 g/t Ag, 0.57% Cu, 9.39% Zn were disclosed.

Gold zone: Low sulphide precious metal intersections associated with chalcopyrite and galena. In January 2009, HudBay reported the discovery of a new gold zone with the potential to have principal credits derived from gold mining and on October 8, 2009 announced a conceptual estimate of a potential gold zone, interpreted as five discrete mineralized lenses that can contact the near solid sulphide zinc rich mineralization.

Copper-Gold zone: Disseminated to near solid chalcopyrite with lesser pyrrhotite and minor pyrite, sphalerite and galena located to the north of Gold zone 27 at approximately 15 to 20 degrees down plunge and at vertical depths of between 1,200 and 1,400 meters.

For more details on the Lalor deposit, including the resource estimate for the zinc-rich Base Metals zone and the conceptual estimate of the potential Gold zone, please refer to the NI 43-101 compliant technical report for Lalor dated October 8, 2009 and the company's December 17, 2009 and February 22, 2010 news releases, available at www.SEDAR.com.

The Lalor deposit is approximately 15 kilometers from HudBay's concentrator in Snow Lake, Manitoba, an area that is a significant past producer of gold. The ongoing evaluation, exploration and development of the Lalor deposit is a primary focus for the company, as the Lalor deposit could be of significant financial benefit to HudBay and support substantial long term activity in the Snow Lake area.

HudBay's board of directors has approved total exploration expenditures of $41.7 million in 2010, of which approximately $6.8 million will be dedicated to the Chisel Basin.

HudBay Minerals Inc.: Strength to Build the Future

HudBay Minerals Inc. (TSX:HBM) is a Canadian integrated mining company with assets in North and Central America principally focused on the discovery, production and marketing of base metals. The company's objective is to maximize shareholder value through efficient operations, organic growth and accretive acquisitions, while maintaining its financial strength. A member of the S&P/TSX Composite Index and the S&P/TSX Global Mining Index, HudBay is committed to high standards of corporate governance and sustainability.

QUALITY ASSURANCE AND QUALITY CONTROL

Exploration core drilling was NQ size. The core was logged and mineralized intersections were marked for sampling and assaying by geologists and geotechnicians employed by HudBay's Hudson Bay Exploration and Development Company Limited (HBED) subsidiary. The marked intersections or intervals were sawn in half by a diamond saw and one half of the core was placed in plastic bags and tagged with unique sample numbers, while the second half was returned to the core box and stored. Each bagged core sample was transported to HudBay's Hudson Bay Mining and Smelting Co., Limited (HBMS) subsidiary's assay laboratory in Flin Flon, Manitoba where it was dried, crushed and pulverized and a 250-gram sample was prepared for assaying at Acme Analytical Laboratories Ltd., an independent company in Vancouver, B.C., or the HBMS assay laboratory. From each 250 gram sample 0.25 grams was removed and leached in aqua regia and analyzed by ICP-AES for Ag, Cu, Zn, As, Pb, Ni and Fe. Also from the 250 gram sample, 30 grams was removed for gold determination by fire assaying with an ICP-AES or gravimetric finish at the Acme laboratory or an Atomic Absorption or gravimetric finish at the HBMS laboratory.

Assaying integrity is monitored internally with a quality control program, which includes the use of assay sample standards, blanks, duplicates and repeats and externally through national and international programs. In addition, within each group of 20 core samples, one core sample has a second 250 gram split collected that was check assayed at a different laboratory, either the HBMS laboratory in Flin Flon or at the Acme laboratory in Vancouver, B.C. This news release provides core lengths and estimates of vertical thickness only. True widths are not provided. Where metal assays are provided for intersections they are either a single assay of a sample of the entire intersection length or a composite of assays calculated from interval weighted assays over the intersection length.

QUALIFIED PERSON

The data herein and the contents of this news release have been reviewed by Kelly Gilmore, B.Sc. P. Geo., Chief Exploration Geologist with HBED, who is a Qualified Person within the meaning of NI 43-101, with the ability and authority to verify the authenticity and validity of the data.

FORWARD-LOOKING INFORMATION

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, information concerning HudBay's interpretation of exploration results and exploration prospects at Lalor, potential plans for Lalor as well as HudBay's exploration and development plans and its strategies and future prospects. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects", or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "does not anticipate", or "believes" or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might", or "will be taken", "occur", or "be achieved". Forward-looking information is based on the opinions and estimates of management at the date the information is made, and is based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Many of these assumptions are based on factors and events that are not within the control of HudBay and there is no assurance they will prove to be correct.

Factors that could cause actual results to vary materially from results anticipated by such forward-looking information include changes in market conditions, variations in ore grade or recovery rates, risks relating to international operations, fluctuating metal prices and currency exchange rates, economic factors, government regulation and approvals, environmental and reclamation risks, costs, timing and amount of future production, capital expenditures and requirements for additional capital, changes in project parameters, the possibility of project cost overruns or unanticipated costs and expenses, permitting timelines, labour disputes and the availability of skilled labour, results of exploration and other risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, as well as those risk factors discussed in the Annual Information Form for the year ended December 31, 2009 for HudBay Minerals Inc. available at www.sedar.com. Although HudBay has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. HudBay undertakes no obligation to update forward-looking information if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking information.

(HBM-G)

CONTACT INFORMATION:

HudBay Minerals Inc.
John Vincic, Vice President
Investor Relations and Corporate Communications
(416) 362 0615
john.vincic@hudbayminerals.com
www.hudbayminerals.com

INDUSTRY: Manufacturing and Production - Mining and Metals


.

HudBay Minerals Inc.

PRODUCTEUR
CODE : HBM.TO
ISIN : CA4436281022
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

HudBay est une société de production minière de cuivre et de molybdène basée au Canada.

HudBay est productrice de cuivre, de molybdène, d'argent, d'or et de zinc au Canada, et détient divers projets d'exploration au Canada, au Perou et en Argentine.

Ses principaux projets en production sont 777 MINE, TROUT LAKE MINE et CHISEL NORTH au Canada et ses principaux projets en exploration sont FENIX et WHITE PINE au Guatemala, BRAMPTON, REED LAKE, BUR, BALMAT, TOM, JASON, LALOR, WATTS RIVER, BACK FORTY, WINDSOR et NOME CASSIAR au Canada, CONSTANCIA au Perou et CORCOVADO PROPERTY en Argentine.

HudBay est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 2,5 milliards CA$ (1,8 milliards US$, 1,7 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 13 mars 2020 à 1,66 CA$, et son plus haut niveau récent le 24 avril 2024 à 10,60 CA$.

HudBay possède 237 270 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de HudBay Minerals Inc.
22/05/2019Hudbay said to prepare sale of Arizona copper mine stake
14/03/2019Hudbay buys out Rosemont partner for $75m
19/02/2019Waterton steps up efforts to oust Hudbay Minerals' CEO, boar...
17/01/2019Hudbay Minerals investor Waterton seeks to replace CEO, boar...
19/12/2018Hudbay completes acquisition of Mason Resources
18/10/2018Hudbay investor is said to seek changes to miner's board
06/11/2014HudBay's offer for Augusta finally given the nod
Financements de HudBay Minerals Inc.
04/11/2009Exercises Warrants of Polar Star Mining
27/02/2009Lenders Refuse to Renew $80 Million Credit Facility Due to S...
27/06/2008and Skye Announce Closing of $95 Million Private Placement
Attributions d'options de HudBay Minerals Inc.
28/08/2012Announces Semi-Annual Dividend
Nominations de HudBay Minerals Inc.
13/05/2013Announces Election of Directors
12/11/2009Announces CEO Planned Retirement andAppoints Executive Vice-...
10/03/2009Announces Resignation of CEO and Appointment of Interim CEO
01/05/2008Announces Appointment of H. Maura Lendon as Vice President
09/04/2008 Announces Appointment of Two New Directors
22/11/2007 Appoints Director of Tax
26/10/2007 Appoints Director Corporate Relations
08/06/2007Appointing Vice President, Mining
Rapports Financiers de HudBay Minerals Inc.
31/07/2013Releases Second Quarter 2013 Results
01/05/2013Releases First Quarter 2013 Results Summary
01/11/2012Releases Third Quarter 2012 Results
15/08/2012Releases Second Quarter 2012 Results
10/05/2012Releases First Quarter 2012 Results
08/03/2012Releases Fourth Quarter 2011 Results
17/05/2011Releases First Quarter 2011 Results
14/03/2011Releases Fourth Quarter and Year-End 2010 Results
04/08/2010Releases Second Quarter 2010 Results; Announces Production D...
04/05/2010Releases First Quarter 2010 Results
04/03/2010Releases Fourth Quarter and Year End 2009 Results
03/11/2009Releases Third Quarter 2009 Results
06/08/2009Releases Second Quarter 2009 Results; Announces Intention to...
05/03/2009Releases Fourth Quarter andYear End 2008 Financial Results
04/11/2008Reports Third Quarter Results
07/05/2008Reports First Quarter 2008 Results
18/03/2008 Reports Fourth Quarter and Annual 2007 Results
10/05/2007Reports Strong First Quarter 2007 Results
Projets de HudBay Minerals Inc.
31/03/2017Hudbay Provides Update on Operations and Growth Projects
05/11/2013(Constancia)Announces Additional US$135 Million Constancia Precious Meta...
27/03/2013Announces Increases in Metals Reserves and Resources and Dec...
08/08/2012(Constancia)Begins Construction of Constancia Copper Mine in Peru and An...
02/04/2012Announces Increases in Metals Reserves and Resources
06/08/2011(Fenix)Announces Sale of Fenix Project
06/07/2011Announces Completion of Compulsory Acquisition of Norsemont ...
15/06/2011(Constancia)Intersects 2=2E4% Copper Equivalent Over 120 Meters at Const...
25/04/2011(Lalor)Announces Funding for Snow Lake Waste Water Treatment Plant
03/04/2011(Constancia)Announces Near Quadrupling of Metals Reserves; US$116 Millio...
23/06/2010(Lalor)Discovers Additional Gold and Copper
22/02/2010(Lalor)Updates Drilling at Lalor Deposit: Copper-Gold Zone Remains ...
17/12/2009(Lalor)Drilling on Copper-Gold Zone at the Lalor Deposit
30/10/2009(Chisel North)Re-Start Chisel North Mine and Snow Lake Concentrator
22/09/2009(Lalor)Major New Copper-Gold Intersections at Lalor
09/01/2009(Chisel North)CORRECTION FROM SOURCE: HudBay to Suspend Operations at Its ...
09/01/2009(Chisel North)to Suspend Operations at Its Chisel North Mine and Snow Lake...
20/11/2008Files Fenix Project Technical Report
03/03/2008(Lalor)Updates Drill Results for Lalor Lake
14/01/2008(Flin-d)43-101 Mineral Resource Estimates for Bur and Watts River De...
02/08/2007 Announces High-Grade Lalor Lake Drill Results
Communiqués de Presse de HudBay Minerals Inc.
28/07/2016HudBay Minerals reports 2Q loss
26/07/2016Coverage Initiated on Industrial Metals and Minerals Stocks ...
05/07/2016Hudbay to Host Conference Call for Second Quarter 2016 Resul...
09/06/2016Hudbay to Attend Upcoming June Investor Conferences
19/05/2016Hudbay Announces Election of Directors
06/05/2016HudBay to Attend Bank of America Merrill Lynch 2016 Global M...
28/04/2016Hudbay Announces First Quarter 2016 Results
06/04/2016Hudbay to Host Conference Call for First Quarter 2016 Result...
01/04/2016VMS Reports Update on Reserves and Resources at Reed Mine
25/02/2016HudBay Minerals reports 4Q loss
01/02/2016Hudbay Updates Early Warning Report for VMS Ventures
22/01/2016Hudbay to Attend Upcoming January Investor Conferences
15/01/2016Hudbay to Attend Upcoming January Investor Conferences
15/01/2016Hudbay Announces 2016 Production Guidance and Capital and Ex...
14/01/2016The Zacks Analyst Blog Highlights: Compañia de Minas Buenave...
13/01/2016Hudbay Announces 2016 Production Guidance and Capital and Ex...
17/12/2015HudBay Minerals (HBM) Jumps: Stock Moves 7.6% Higher
05/11/2015HudBay Minerals reports 3Q loss
05/11/2015Hudbay Releases Third Quarter 2015 Results
05/11/2015Star Mountain Resources, Inc. Closes Acquisition of Balmat Z...
04/11/2015VMS Ventures Announces Drill Program Update on Exploration T...
09/10/2015Hudbay to Host Conference Call for Third Quarter 2015 Result...
21/09/2015VMS Ventures Provides Update on Reed Mine
03/09/2015Hudbay to Attend Bank of America Merrill Lynch 21st Annual C...
31/07/2015Edited Transcript of HBM.TO earnings conference call or pres...
29/07/2015HudBay Minerals reports 2Q loss
29/07/2015Hudbay Releases Second Quarter 2015 Results
14/07/2015Hudbay to Host Conference Call for Second Quarter 2015 Resul...
15/04/2015VMS Provides Reed Mine Operations Update
07/04/2015Hudbay to Host Conference Call for First Quarter 2015 Result...
07/04/2015to Host Conference Call for First Quarter 2015 Results
01/04/2015VMS Reports Update on Reserves and Resources at Reed Mine
19/03/2015Hudbay to Attend Barclays Select Series: Metals & Materials ...
19/03/2015to Attend Barclays Select Series: Metals & Materials Cross A...
13/03/2015Hudbay Expands Corporate Revolving Credit Facility to US$300...
13/03/2015Hudbay Expands Corporate Revolving Credit Facility to US$300...
13/03/2015Expands Corporate Revolving Credit Facility to US$300 millio...
25/02/2015VMS Provides Reed Mine Operations Update
19/02/2015Hudbay Releases Fourth Quarter 2014 Results
11/02/2015Hudbay to Attend BMO Capital Markets 24th Global Metals & Mi...
11/02/2015Hudbay to Attend BMO Capital Markets 24th Global Metals & Mi...
11/02/2015to Attend BMO Capital Markets 24th Global Metals & Mining Co...
27/01/2015Hudbay to Attend Upcoming January Investor Conferences
27/01/2015Hudbay to Host Conference Call for Fourth Quarter 2014 Resul...
27/01/2015Hudbay to Host Conference Call for Fourth Quarter 2014 Resul...
22/01/2015Hudbay Announces 2015 Production Guidance and Capital and Ex...
21/01/2015Hudbay to Attend Upcoming January Investor Conferences
16/01/2015Canada Stocks to Watch: Bombardier, Iamgold, HudBay and more
15/01/2015Hudbay Announces 2015 Production Guidance and Capital and Ex...
14/01/2015Canada Stocks to Watch: Suncor, Magna, Shaw, Cogeco and more
18/12/2014VMS Provides Reed Mine Update
03/12/2014VMS Provides Reed Mine Update
26/11/2014Hudbay to Attend Upcoming December Investor Conferences
30/10/2013to Host Conference Call for Third Quarter 2013 Results
15/10/2013to Attend Canaccord Genuity Global Resources Conference
12/09/2013to Attend Upcoming September Investor Conferences
02/07/2013to Host Conference Call for Second Quarter 2013 Results
26/06/2013Receives US$125 Million Deposit Payment from Silver Wheaton
10/06/2013Announces Offering of US$150,000,000 Senior Unsecured Notes
10/06/2013Announces Offering of US$150,000,000 Senior Unsecured Notes
28/05/2013to Attend Upcoming June Investor Conferences
14/05/2013to Attend 2013 Bank of America Merr =?ISO-8859-1?Q?ill=20Lyn...
15/04/2013to Host Conference Call for First Quarter 2013 Results
12/03/2013to Attend Upcoming March Investor Conferences
19/02/2013to Present at the BMO Capital Markets 22nd Global Metals & M...
24/01/2013to Host Conference Call for Fourth Quarter 2012 Results
17/01/2013to Present at Upcoming January Investor Conferences
17/01/2013to Present at Upcoming January Investor Conferences
09/01/2013Announces 2013 Production Guidance and Capital and Explorati...
12/11/2012to Present at GMP Latin American Mining Conference
12/10/2012to Host Conference Call for Third Quarter 2012 Results
28/09/2012Announces Closing of Precious Metals Stream Transaction
13/09/2012Completes Offering for US$500,000,000 Senior Unsecured Notes
06/09/2012Announces Offering of US$400,000,000 Senior Unsecured Notes
09/07/2012to Host Conference Call for Second Quarter 2012 Results
19/05/2012Discontinues Planned Offering of US$4 =?ISO-8859-1?Q?00,000,...
14/05/2012Announces Offering of US$400,000,000 Senior Unsecured Notes
17/04/2012to Host Conference Call for First Quarter 2012 Results
08/03/2012Makes Investment in Panoro Minerals
24/02/2012Aligns All Operations Under Hudbay Brand to Support Growth a...
16/02/2012to Present at the BMO Capital Markets 2012 Global Metals & M...
10/02/2012to Host Conference Call for Fourth Quarter 2011 Results
10/02/2012to Host Conference Call for Fourth Quarter 2011 Results
02/02/2012Makes Investment in Northern Shield
12/01/2012to Present at Upcoming January Investor Conferences
19/12/2011Announces 2012 Production Guidance and Capital and Explorati...
28/11/2011to Present at Upcoming Investor Conferences
06/10/2011to Host Conference Call for Third Quarter 2011 Results
16/09/2011to Present at the Credit Suisse Global Steel and Mining Conf...
09/09/2011(Fenix)Announces Completion of Sale of Fenix Project and Key Manage...
01/09/2011to Present at the Bank of America Merrill Lynch 17th Annual ...
04/08/2011to Present at Jefferies 2011 Global Industrial and A&D Confe...
18/07/2011to Host Conference Call for Second Quarter 2011 Results
05/07/2011(Lalor)Announces Results of Lalor O =?ISO-8859-1?Q?ptimization=20St...
30/06/2011Makes Investment in MacDonald Mines
20/06/2011to Present at RBC Capital Markets' 2011 Global Mining & Mate...
04/05/2011Announces Commencement of Compulsory Acquisition of Remainin...
21/04/2011Makes Investment in CuOro Resources
17/03/2011Announces Expiry of Offer and Additional Take-Up of Norsemon...
14/03/2011to Exercise Compulsory Acquisition Rights After Expiry of Of...
02/03/2011Announces Take-up of Over 90% of Norsemont Mining Inc=2E's S...
16/02/2011Makes Investment in Aquila Resources
14/02/2011Makes Investment in VMS Ventures
27/01/2011Hudbay Minerals Makes Investment in Copper Reef Mining Corpo...
25/01/2011Hudbay and Norsemont Mining Announce Mailing of Offer and Ta...
10/01/2011Announces Agreement to Acquire Norsemont Mining
24/08/2010Makes Investment in Augusta Resource Corporation
28/07/2010to Help Establish Northern Manitoba Mining Academy
06/07/2010Joint Venture With VMS Ventures
01/04/2010New Resource and Significant Increase in Nickel Grade at Fen...
04/03/2010Enters Into Letter of Intent With VMS Ventures
03/02/20102009 Production and 2010 Outlook
08/01/2010Provides Update on Polar Star Holdings
22/12/2009Announces Option Agreement with Halo Resources Ltd.
08/10/2009$85 Million Production Ramp to Lalor Deposit
29/09/2009Files Normal Course Issuer Bid
29/09/2009Provides Update on CGN
06/08/2009Announces Subscription, Option and Joint Venture Agreement w...
22/06/2009CEO Unveils Strategic Plan at AGM
19/06/2009Expects to Close Flin Flon Copper Smelter by July 2010
27/02/2009Urges Shareholders to Vote Against SRM Nominee Slate
24/02/2009 Agree to Terminate Arrangement Agreement
16/02/2009Sets Record Date for March 25, 2009 Shareholders' Meeting
04/02/2009Announces That Unions Ratify Collective Agreements
27/01/2009Reaches Tentative Collective Agreements With Unions
26/01/2009Announces Superior Court Hearing Adjourned
23/01/2009OSC Sets Aside TSX Decision
13/01/2009to Defend Application Vigorously
09/01/2009Discovers New Gold Zone at Lalor
08/01/2009Notified of Request for OSC Hearing and Review
30/12/2008Schedules Meeting of Shareholders for March 31, 2009
23/12/2008Announces Lundin Mining's Receipt of Interim Order
19/12/2008Receives Meeting Requisition From Shareholder
11/12/2008Reports Progress in Lundin Acquisition
09/12/2008Responds to the Concerns of Certain Shareholders
02/12/2008Media Advisory: HudBay Launches Special WebSite Section With...
26/11/2008Recommends Shareholders Take no Action in Response to Jaguar...
21/11/2008and Lundin Announce Friendly Business Combination
26/08/2008Completes Business Combination With Skye Resources; Announce...
22/08/2008Announces Closure of Balmat Zinc Mine
21/08/2008Announces $1 Million 80th Anniversary Fund to Support Commun...
19/08/2008Skye Resources Securityholders Approve Business Combination ...
23/06/2008and Skye Resources AnnounceProposed Business Combination
02/06/2008Reports on U.S. Mine Fatality
15/02/2008 Announces 2007 Production and 2008 Outlook
12/02/2008Announces Updated Mineral Reserves and Resources
25/01/2008Announces Allen J. Palmiere as New President and CEO
21/01/2008 Celebrates 80 Years of Mining Success
14/12/2007 Share Buy Back Program Approved-Normal Course Issuer Bid
12/12/2007Announces Share Buy Back Program-Normal Course Issuer Bid
11/12/2007 Plans $42.8 Million for 2008 Exploration
05/11/2007Announces Exploration Drilling in South West Ontario
24/10/2007Announces Significant New Zinc Discovery at Lalor Lake
16/10/2007First Half 2007 Exploration Update
23/08/2007Confirms No Investments in Asset-Backed Commercial Paper
01/06/2007President & CEO Peter R. Jones to Appear on BNN TV
24/05/2007to Hold Annual & Special Meeting of Shareholders
02/05/2007Renews Shareholder Rights Plan
03/03/2007Second half exploration update
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (HBM.TO)NYSE (HBM)
10,60+0.47%7,74+0.19%
TORONTO
CA$ 10,60
24/04 17:00 0,050
0,47%
Cours préc. Ouverture
10,55 10,53
Bas haut
10,53 10,77
Année b/h Var. YTD
6,89 -  10,85 46,01%
52 sem. b/h var. 52 sem.
5,62 -  10,85 58,92%
Volume var. 1 mois
1 255 844 14,97%
24hGold TrendPower© : 27
Produit Copper - Gold - Silver - Zinc
Développe
Recherche Copper - Gold - Lead - Molybdenum - Nickel - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/06/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202456,57%
2023-1,02%8,095,61
2022-24,42%9,9810,00
20211,57%9,9510,05
202065,92%9,541,66
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :