Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Erdene Resource Development Corporation

Publié le 31 mars 2015

Erdene Reports Initial Resource Estimate for Altan Nar Gold-Polymetallic Project

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | G Mexico | Hong Kong | Report | Zinc |

Erdene Reports Initial Resource Estimate for Altan Nar Gold-Polymetallic Project

HALIFAX, NOVA SCOTIA--(Marketwired - Mar 31, 2015) -

Editors Note: There is a map associated with this press release.

Erdene Resource Development Corp. (ERD.TO) ("Erdene" or "Company") is pleased to announce receipt of the initial mineral resource estimate ("Mineral Resource") for Discovery Zone and Union North, two of 18 target areas identified to date at the Company's 100%-owned Altan Nar Gold-Polymetallic Project ("Altan Nar" or the "Project") in southwest Mongolia. The Mineral Resource is contained in a report produced by RungePincockMinarco Limited ("RPM") in accordance with National Instrument 43-101 ("NI 43-101") guidelines (the "Resource Report"). The Resource Report is available on SEDAR (click here for link).

"We are very pleased to have reached this major milestone for the Altan Nar Project," said Peter Akerley, President and CEO of Erdene. "Delivering this initial resource on time, under budget and having it exceed our targeted size and grade, is a reflection of the quality of the project and the dedication of the discovery team involved. Although we feel we are just getting started, the reported, near-surface resource will allow us to begin to explore more fully our mining and processing options within an expedited development plan while continuing to expand the resource throughout the large 5.6 km Altan Nar target area. Based on our recent drilling success and this maiden resource, our excitement and confidence about the ultimate size potential of Altan Nar continues to build."

Resource Report Highlights

  • Indicated Resource of 147,000 ounces ("oz") gold equivalent ("AuEq") averaging 2.5 g/t AuEq and Inferred Resource of 102,000 oz AuEq averaging 2.1 g/t AuEq, at a 1.0 g/t AuEq cut-off grade within 1.8 million tonnes ("Mt") Indicated and 1.5 Mt Inferred, respectively
  • Indicated Resource includes 102,000 oz gold, 24.7 million pounds ("Mlbs") zinc, 22.1 Mlbs lead and 657,000 oz silver, while the Inferred Resource contains 72,000 oz gold, 17.7 Mlbs zinc, 12.8 Mlbs lead and 498,000 oz silver
  • 90% of the mineral resources are within 150 m of surface with all zones open along strike and at depth
  • Multiple undrilled and scout-drilled prospects along the 5.6 km Altan Nar trend have the potential for hosting additional gold-polymetallic resources
  • Metallurgical test work is at an early stage; however, samples tested to date have generally shown a good response to leaching with average gold recoveries of 80% for low arsenic material. Higher arsenic samples, which appear to make up only a relatively small portion of the deposit, returned up to 95% gold recoveries through a more intensive, though nonetheless proven, processing method

Statement of Mineral Resources

The Resource Report is based on information provided to RPM by Erdene and verified where possible by RPM. All statistical analysis and mineral resource estimations were carried out by RPM. RPM developed three dimensional digital resources for the concentration of the gold, silver, zinc and lead metals and developed the resource estimates based on the statistical analysis of the data provided.

Table 1 below shows the Indicated and Inferred Mineral Resource estimate for the Discovery Zone and Union North prospects as at February 19, 2015. The Mineral Resource was completed by RPM in accordance with the recommended guidelines of the CIM Definition Standards referenced in NI 43-101. The Mineral Resources are provided at a number of AuEq cut-offs, however RPM suggests reporting the Mineral Resource at a 1.0 g/t AuEq cut-off. The 0.6 g/t AuEq and 1.4 g/t AuEq cut-off grade Mineral Resources are provided for illustrative purposes.

Table 1- Altan Nar Project - Mineral Resource Estimate Summary as at February 19, 2015

Grade Contained Metal
AuEq Resource Tonnes Au Ag Zn Pb AuEq Au Ag Zn Pb AuEq
Cut-Off
g/t
Classi-
fication
Mt g/t g/t % % g/t kOz kOz Mlbs Mlbs kOz
0.6 Indicated 3.4 1.0 9.4 0.57 0.47 1.7 112 1,014 42.4 34.8 186
0.6 Inferred 3.0 0.8 9.4 0.51 0.35 1.4 83 913 33.9 23.5 135
1.0 Indicated 1.8 1.7 11.1 0.61 0.54 2.5 102 657 24.7 22.1 147
1.0 Inferred 1.5 1.5 10.4 0.54 0.39 2.1 72 498 17.7 12.8 102
1.4 Indicated 1.3 2.3 12.1 0.61 0.58 3.1 92 486 16.8 15.9 130
1.4 Inferred 1.0 2.0 10.8 0.53 0.40 2.6 63 342 11.5 8.6 84

Notes:

1. The Mineral Resource Estimate Summary has been compiled under the supervision of Mr. Jeremy Clark who is a full-time employee of RPM and a Member of the Australian Institute of Geoscientists. Mr. Clark has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he has undertaken to qualify as a Qualified Person as defined in the CIM Standards of Disclosure.
2. All Mineral Resource figures reported in the table above represent estimates as at 19th February, 2015. Mineral Resource estimates are not precise calculations, being dependent on the interpretation of limited information on the location, shape and continuity of the occurrence and on the available sampling results. The totals contained in the above table have been rounded to reflect the relative uncertainty of the estimate. Rounding may cause some computational discrepancies.
3. Mineral Resource grades are reported in accordance with the CIM Standards.
4. Mineral Resources reported on a dry in-situ basis.
5. Totals may differ due to rounding.

The Mineral Resource was completed by RPM using ordinary kriging and inverse distance squared interpolation methods. The Mineral Resource is reported using a cut-off grade which is deemed appropriate for the style of mineralization and the current state of the Mineral Resources. Of importance for mine planning, the model accommodates in-situ and contact dilution but excludes mining dilution. Block size (25 x 5 x 5 m, sub-blocked to 3.25 x 1.25 x 1.25 m) is similar to the expected small-mining units conventionally used in this type of deposit, and appropriate for an open pit mine.

Included for reference with this press release is a plan map of the Altan Nar mineralized trend showing the location of the initial Mineral Resource and additional 16 target areas.

Altan Nar 2015 Work Plan

With the initial resource established, Erdene will look towards the completion of a preliminary scoping study in 2015 which will consider options for expedited development including evaluating the concept of producing a potentially high value gold, silver, lead and zinc concentrate(s) to be sold into China (rail link 175 km to the south of Altan Nar) for final processing. As stated by RPM in the Resource Report, this option has the potential to enable relatively low capital and operating costs during start up and for the generation of early cash flow. Simultaneously, in the first half of 2015, Erdene intends to complete additional evaluation of the remaining target areas to assist in determining the high priority areas for defining additional near-surface resources at Altan Nar. The potential for increasing the resource is considered by RPM to be good, with the Discovery Zone and Union North open along strike and at depth, and multiple priority targets throughout the remaining 16 prospects.

Key Parameters/Assumptions Considered in the Mineral Resource Estimate

Mineral Resource Classification

The Altan Nar deposit has been drilled using diamond drilling methods, on nominal 100 m section line spacing along strike with some local areas drilled on 50 m sections and infilled with a single hole on several 25 m spaced section lines. Drilling on each section is on average at 30 m spacing with holes orientated either east or west. Trench sampling has been conducted across the main mineralized lodes (i.e. domains) to verify outcropping of the lodes. RPM concluded that Erdene conducted a suitable program of quality assurance and quality control ("QA/QC") and has used certified laboratories for analysis of samples. The Mineral Resource was classified on the basis of sample quality, sample spacing, and continuity of the interpreted lodes as modelled during the geostatistical analysis. The mineral resource classification was applied to each of the gold and zinc lodes independently due to the more robust continuity of the broad base metal mineralization in comparison to the narrow gold mineralization. The Indicated Mineral Resource was defined within the main lodes where sample spacing was at a maximum of 35 m and the lodes were intersected by at least two drill holes along strike, and one drill hole down dip. The determined sample spacing was a reflection of the variogram ranges modelled during the geospatial analysis.

Resource Cut-off Grade

RPM have considered the costs, recoveries and dilutions expected by comparing the Altan Nar Project with other similar deposits in the region and adjusted these by considering the location of the Project and the deposit characteristics. RPM has concluded that the mineralization is potentially economically extractable via typical open cut mining methods, with a the life-of-mine ("LOM") mining cut-off grade estimated to be approximately 1.0 g/t AuEq which is based on a high level evaluation of expected mining/process and cost parameters. At this time, RPM considers a cut-off grade, which is appropriate for the Mineral Resources for the Project that could be economically extractable sometime in the future, to be 1.0 g/t AuEq. Although a 1.0 g/t AuEq cut-off grade is considered by Erdene management to be conservative for many gold deposits, based on the early stage and location of Altan Nar, a higher cut-off is being applied; however, it should be noted that in the future, as processing recoveries and costs are finalized with increasing volumes of ore and a mature mining operation, the lower grades may become economic. In regards to this possibility, there exists a sharp increase in the tonnage and ounces at cut-off grades from 0.6 g/t AuEq to 0.2 g/t AuEq, with a 50% increase in the resources while still maintaining greater than 1.0 g/t AuEq average grade.

Gold Equivalent

To assist in reporting the Mineral Resources in a transparent manner, Erdene requested that RPM report a AuEq value in an effort to express the combined value of gold, silver, lead and zinc as a percentage of gold, and is provided for illustrative purposes only. No allowances have been made for recovery losses that may occur should mining eventually result. Calculations assume metal prices of US $1,200/oz gold, US $18/oz silver, and US $0.90/lb for lead and zinc.

Sample and Assaying Methods

RPM accepts that the sampling and assaying methods and approach were reasonable for this style of mineralization. RPM reported that the samples are representative and there appears to be no discernible sample biases introduced during sampling.

Quality Control Data

RPM carried out a QA/QC testing program consisting of 14 types of commercial standards, laboratory internal standards as well as internal repeats. In addition, RPM arranged for 53 independent coarse reject samples from all phases of drilling programs to be re-submitted for check analysis to ALS Lab in Ulaanbaatar, Mongolia. RPM concluded that overall the QA/QC data does not indicate any bias and supports the assay data used in the Mineral Resource estimate.

Domain Cut-off

RPM used a 0.3 g/t gold cut-off to delineate the gold mineralized lodes at Altan Nar, based on statistical analysis of all samples at the Project. A minimum width of 2 m was applied. In addition, zinc/lead mineralized lodes were interpreted using a 1,200 ppm zinc cut-off, again based on statistical analysis, in conjunction with observed down-hole logging of alteration zones.

Top-Cuts

The top-cut analysis completed by RPM included evaluation of histograms, log probability plots and descriptive statistics for the data distributions within each interpreted gold and base metal lode. An analysis of correlation coefficients and observed breaks in the log probability plots was used to determine appropriate top-cuts. Visual analysis of the drill holes was used to determine if the high grades were isolated or part of continuous zones of high grades. Although the deposit is unlikely to have any nugget affect, due to its sub-micron gold character, a conservative approach was utilized with gold caps applied individually to the most significant gold domains with concentrations in the range of 5 to 22 g/t.

Block Size

The parent block size was determined based on the drill spacing and geological variability of the deposit. The Discovery Zone and Union North prospects have been drilled at spacing varying from 50 to 100 m along strike, and at 30 to 50 m on section. Drilling has been conducted along oblique lines to intersect the mineralized lodes as close to perpendicular as possible. In order to best represent the narrow gold lodes which have variable dips with depth, and variable strike orientation at the local scale, RPM has used a parent block size of 25 m (Y), 5 m (X), and 5 m (Z), with sub-cells to 3.125 m by 1.25 m by 1.25 m.

Qualified Person

The Resource Report was prepared by Jeremy Clark, RPM Hong Kong (Mineral Resource and overall report author), Dr Andrew Newell, RPM Brisbane (Metallurgy) and Stewart Coates, RPM Ulaanbaatar, (Site Visit, Sample Prep and Analysis). Messrs. Clark, Newell and Coates are each a Qualified Person within the meaning of such term under NI 43-101; Mr. Clark is a Member of the Australian Institute of Geoscientists (MAIG) Membership No 3567; Mr. Newell is Chartered Professional with the Australasian Institute of Mining and Metallurgy (CP(Met)) and a Chartered Professional of the Institute of Engineers, Australasia (CP(Eng)); and Mr. Coates is a registered member of the Association of Professional Engineers and Geoscientists of the Province of British Columbia (APEGBC), Registration No. 36146. Messrs. Clark, Newell and Coates consent to the inclusion in this release of the matters disclosed based on the information in the Resource Report in the form and context in which it appears.

Altan Nar Project Summary

Altan Nar is predominantly an intermediate sulfidation, carbonate base metal gold system, a style of deposit which has close magmatic relationships, often being base metal rich and locally associated with porphyry deposits. This style of gold mineralization represents the most prolific style of gold mineralization in the southeast Asia region and includes Rio Tinto Plc's formerly producing Kelian mine (Indonesia), Barrick Gold Corp.'s Porgera mine (Papua New Guinea), and elsewhere in the world, Lundin Gold Inc.'s Fruta del Norte project (Ecuador), AngloGold Ashanti Ltd.'s Cripple Creek and Victor gold mine (Colorado), Gabriel Resources Ltd.'s Rosia Montana project (Romania), and in Mexico five of the world's top silver producers including Goldcorp Inc.'s Penasquito mine. This type of deposit is often associated with breccia pipes (diatremes) and can extend vertically for greater than 1 kilometre. The Kelian open pit, for example, was 500 m deep.

The Altan Nar prospect is contained within the Tsenkher Nomin exploration license in southwest Mongolia, approximately 175 km northwest of the Ceke rail crossing on the Mongolia-China border. The exploration license was first acquired by Erdene in December of 2009 and is currently in its sixth year of a 12 year term, after which it can convert to a mining licence. Exploration work undertaken within the Tsenkher Nomin license by the Company during the past four years has established Altan Nar as a significant new epithermal intermediate-sulphidation gold-silver-lead-zinc mineralized system. Exploration, specifically the 2013 trenching program and 2014 surface mapping, geochemical and geophysical surveys, trenching and drilling, has greatly expanded the areas of known mineralization with 20 target areas now documented over a 6 x 10 km area with the main structural trend and primary location of gold mineralization being approximately 5.6 x 1.5 km, consisting of 18 target areas. In Q4 2014 the Company completed 1,676 m of resource delineation drilling which has culminated in the reporting of this Mineral Resource estimate. Since acquisition, Erdene has drilled 71 surface holes (total of 10,819 m) and excavated 39 trenches (total of 2,927 m) from 2011 to 2014.

About Erdene

Erdene Resource Development Corp. is a Canada-based resource company focused on the acquisition, exploration, and development of precious and base metals in underexplored and highly prospective Mongolia. For further information on the Company, please visit www.erdene.com. Erdene has 82,636,233 issued and outstanding common shares and, a fully diluted position of 93,317,283 common shares.

Forward-Looking Statements

Certain information regarding Erdene contained herein may constitute forward-looking statements within the meaning of applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, projections, guidance or other statements that are not statements of fact. Although Erdene believes that the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. Erdene cautions that actual performance will be affected by a number of factors, most of which are beyond its control, and that future events and results may vary substantially from what Erdene currently foresees. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration results, continued availability of capital and financing and general economic, market or business conditions. The forward-looking statements are expressly qualified in their entirety by this cautionary statement. The information contained herein is stated as of the current date and is subject to change after that date. The Company does not assume the obligation to revise or update these forward-looking statements, except as may be required under applicable securities laws.

NO REGULATORY AUTHORITY HAS APPROVED OR DISAPPROVED THE CONTENTS OF THIS RELEASE

To view the map associated with this press release, please visit the following link: http://www.marketwire.com/library/20150331-Altan_Nar_Resource_Areas_800.jpg

Lire la suite de l'article sur finance.yahoo.com
Données et statistiques pour les pays mentionnés : Canada | Hong Kong | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Hong Kong | Tous

Erdene Resource Development Corporation

EXPLORATEUR
CODE : ERD.TO
ISIN : CA29480N2068
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Erdene est une société d’exploration minière d'or et de cuivre basée au Canada.

Erdene détient divers projets d'exploration au Canada et en Mongolie.

Ses principaux projets en exploration sont DONKIN au Canada et DURVULJIN UUL, ERDENET et GALSHAR UUL en Mongolie.

Erdene est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 56,7 millions CA$ (41,2 millions US$, 38,7 millions €).

La valeur de son action a atteint son plus haut niveau récent le 06 juillet 2007 à 2,05 CA$, et son plus bas niveau récent le 01 novembre 2013 à 0,07 CA$.

Erdene possède 145 390 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Erdene Resource Development Corporation
14/06/2018Erdene becomes first cross-listed firm on the Mongolian Stoc...
31/05/2018Mongolia listing boosts investors confidence in Erdene Resou...
10/05/2018Erdene soars as Altan Nar project in Mongolia proves larger ...
03/05/2018Mongolian Copper Corp considers international fight for Erde...
08/12/2017Mongolian Gov't can't nationalize Erdenet Copper Mine — cour...
Financements de Erdene Resource Development Corporation
23/04/2013Closes Private Placement
12/12/2012Announces Private Placement
06/12/2011Completes Private Placement Financing
28/11/2011Closes $1,715,000 Financing Pursuant to Private Placement Th...
20/06/2008Closes $18.6 Million Private Placement
02/06/2008Announces $15 Million Private Placement
Rapports Financiers de Erdene Resource Development Corporation
17/08/2009Reports 2009 Second Quarter Financial Results and Provides P...
19/05/2009Reports 2009 First Quarter Financial Results and Provides Pr...
15/05/2008Reports First Quarter Operating and Financial Results
Projets de Erdene Resource Development Corporation
18/11/2013Completes Trenching Program on the Altan Nar Gold-Silver Pro...
08/08/2012(Donkin)Finalizes Agreement to Separate Donkin Coal and Mongolian Mi...
26/07/2012(Donkin)Provides Donkin Export Coking Coal Project Update
03/07/2012Completes US$3.35 Million Sale of the Granite Hill Quarry Pr...
28/06/2012(Donkin)to Separate into Two Public Companies focused on Donkin Coal...
17/01/2012Granite Hill Quarry Commences Production: Erdene Receives Mi...
27/07/2011(Nomin)Drill Results Confirm Continuity of Copper-Gold-Silver Sulfi...
30/06/2011(Donkin)Receives Independent Technical Report on Donkin Export Cokin...
01/06/2011(Zuun Mod Molybdenum)Receives Mining License for the Zuun Mod Molybdenum-Copper P...
04/03/2011(Zuun Mod Molybdenum)Reports Additional Results from Mongolian Copper Discovery: ...
28/11/2008(Donkin Coal Project)Provides Update on Donkin Coal Project
Communiqués de Presse de Erdene Resource Development Corporation
05/07/2016Morien Announces Appointment of CFO
03/11/2015Erdene Announces a Three Month Extension to Warrants
20/10/2015Erdene Announces Private Placement; Drilling to Commence on ...
15/10/2015RETRANSMISSION - Erdene Reports Multiple High-Grade Gold-Pol...
15/10/2015Erdene Reports Multiple High-Grade Gold-Polymetallic Interse...
05/10/2015IIROC Trade Resumption - ERD
05/10/2015Erdene Discovers Bonanza Grade Gold in Southwest Mongolia
05/10/2015IIROC Trading Halt - ERD
29/09/2015Erdene Drills 12 m of 5.3 g/t Gold Equivalent at Union North...
16/09/2015Metallurgical Testing at Erdene's Altan Nar Project Returns ...
15/07/2015Erdene and Tian Poh Amend Option Agreement; Drilling to Comm...
06/07/2015Erdene Appoints Layton Croft to the Board of Directors
17/04/2015Erdene Announces Private Placement
01/04/2015Erdene Provides Year-End Financial Results and Project Revie...
01/04/2015Provides Year-End Financial Results and Project Review
01/04/2015IIROC Trade Resumption - ERD
31/03/2015Reports Initial Resource Estimate for Altan Nar Gold-Polymet...
31/03/2015Erdene Reports Initial Resource Estimate for Altan Nar Gold-...
31/03/2015IIROC Trading Halt - ERD
12/02/2015IIROC Trade Resumption - ERD
12/02/2015Erdene Enters Agreement with Tian Poh Resources Ltd to Excha...
12/02/2015IIROC Trading Halt - ERD
09/02/2015IIROC Trade Resumption - ERD
09/02/2015Erdene Intersects Multiple High Grade Gold-Polymetallic Zone...
09/02/2015IIROC Trading Halt - ERD
12/01/2015Intersects 51 m of 2.5 g/t Gold Equivalent at Altan Nar Incl...
12/01/2015Erdene Intersects 51 m of 2.5 g/t Gold Equivalent at Altan N...
18/12/2014CWN Mining Acquisition Corporation Announces Private Placeme...
14/11/2014November 14, 2014 Erdene Secures Financing and Commences Res...
14/11/2014Erdene Secures Financing and Commences Resource Drilling on ...
07/10/2014IIROC Trade Resumption - ERD
06/10/2014Erdene Announces Private Placement; Altan Nar Gold-Polymetal...
06/10/2014IIROC Trading Halt - ERD
02/10/2014Erdene Provides Altan Nar Exploration Update
25/08/2014Erdene Provides Exploration and Corporate Update : Commences...
19/06/2014Erdene Provides Highlights of AGM and Project Updates
03/06/2014IIROC Trade Resumption - ERD
02/06/2014Erdene Intersects High Grade Gold and Base Metal Zone at Alt...
02/06/2014IIROC Trading Halt - ERD
23/01/2014Altan Nar Trenching Intersects Multiple High Grade Gold and ...
18/10/2013Announces Private Placement Altan Nar Gold Project - Explora...
18/10/2013Announces Private Placement : Altan Nar Gold Project-Explora...
07/10/2013Commences Exploration Program at Altan Nar Gold Project
02/07/2013Provides Highlights of AGM and Project Update
27/06/2013Reports Encouraging Metallurgical Results for Altan Nar Gold...
11/04/2013Establishes Strategic Alliance in Mongolia
03/04/2013Provides Year-End Financial Results and Project Review
09/11/2012and Morien Announce Completion of Plan of Arrangement and Co...
02/11/2012and APM Receive Final Court Approval for Plan of Arrangement...
26/10/2012and APM Shareholders Vote in Favor of Plan of Arrangement
09/10/2012Commences Drill Program on the Altan Nar Gold Project
02/10/2012Proposing Division into Two Public Companies
22/08/2012Provides Update on Mongolian Metals Projects
13/08/2012Morien Resources Corp. Selected as Proposed New Name and Joh...
30/05/2012Drilling Continues to Expand Altan Nar Gold Discovery
22/05/2012Announces Sale of its Land and Royalty Interest at the Grani...
17/05/2012Provides Project Updates and First Quarter Financial Results
26/04/2012(Donkin)Schedules Conference Call to Provide Update on Donkin Coal P...
29/03/2012Provides Project Updates and Reports Year End Financial Resu...
05/03/2012Announces Drilling Program for Altan Nar Gold-Silver Project
26/01/2012Confirms Continued Widespread Gold Mineralization at Altan N...
12/10/2011Drilling Confirms Significant Epithermal Gold Mineralization...
07/09/2011Announces Significant New Gold Discovery in Southwest Mongol...
15/08/2011Provides Project Updates and Second Quarter Financial Result...
06/07/2011(Nomin)Initial Drill Results Confirm Copper-Gold Sulfide Zone at Er...
21/06/20112010 Annual General Meeting-June 23, 2011
15/06/2011Provides Project Updates and First Quarter Financial Results
12/04/2011Provides Project Updates and Reports Year End Financial Resu...
17/02/2011Zuun Mod Results Continue to Enhance Potential of Copper and...
28/02/2009Concludes Reverse Takeover of Beta Minerals Inc.
15/09/2008Xstrata Coal Canada Increases Ownership in Erdene
29/05/2008Erdene Name Change Approved at Annual and Special Meeting
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (ERD.TO)Other OTC (ERDGF)
0,390+1.30%210 713,380
TORONTO
CA$ 0,390
18/04 16:51 0,010
1,3%
Cours préc. Ouverture
0,385 0,390
Bas haut
0,385 0,400
Année b/h Var. YTD
0,300 -  0,410 14,71%
52 sem. b/h var. 52 sem.
0,280 -  0,410 4,00%
Volume var. 1 mois
167 190 -2,50%
24hGold TrendPower© : 21
Produit
Développe
Recherche Coal
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202425,81%
20238,77%0,450,29
2022-34,48%0,500,25
20217,41%0,500,33
2020138,24%0,710,13
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :