Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Marathon PGM Corporation

Publié le 19 août 2008

Growth Continues, Ore Fault Property Acquisition Completed

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Nickel | Palladium |

Marathon's Growth Continues, Ore Fault Property Acquisition Completed

     TORONTO, Aug. 19 /CNW/ - Marathon PGM Corporation ("Marathon" or "the
Company", MAR-TSX) is pleased to announce that it has acquired the Ore Fault
Property ("OFP") from Bird River Mines Inc (CNQ:BRMI). The OFP consists of 19
claims which cover 446 hectares and is located at the eastern margin of
Marathon's Bird River Project, which is under option from Gossan Resources
(GSS:TSX.V). The Gossan portion of the Bird River Project consists of 65
claims which cover 8,781 hectares.

     Highlights:

     -   acquisition of OFP will be subject to a Joint Venture with Gossan
         Resources
     -   the entire Bird River Project covers 22 km strike length of
         prospective ground
     -   multiple exploration targets identified
     -   two NI 43-101 compliant resource estimates for Bird River Project to
         be delivered in Q4
     -   Marathon is well financed with $20 million cash

     "Acquisition of the Ore Fault gives us a very prospective land package in
the Bird River Sill," said Phillip Walford, President and CEO "and gives us an
excellent opportunity to develop the Page and Ore Fault resources in just the
first year of exploration."

     Completed and Planned Work

     The initial campaign on the OFP consisted of prospecting, surface
sampling and drilling of twenty-one holes (4,308m). Marathon will release an
NI 43-101 compliant resource estimate for the OFP in Q4. Marathon is planning
a detailed mapping program of the OFP in order to enhance the exploration
model and define further drill targets. Marathon's success to date has been
the result of careful planning, hard work and technical proficiency.
     Multiple lenses of massive sulphide have been intersected at both the
Page and Ore Fault Zones, including 15m grading 1.71% Ni at Ore Fault and 6.5m
grading 1.65% Ni at Page. The lenses are contained within a 'footprint' of
larger zones of lower grade mineralization, as is typical of other magmatic
sulphide deposits. There is good potential for discovering other massive
sulphide lenses along the 20km strike length of the Bird River Sill by
following the footprint as identified in historic drilling. As an example, at
Coppermine Bay, located 20 km west of Page Zone, disseminated mineralization
with up to 3g/t PGM+Au occurs along 800m of strike length. A single hole
located at the east end of the Coppermine Zone drilled by Canex Placer Ltd in
1973 (assessment file report 91832, Manitoba Mining District) contained an
intersection grading 0.24% nickel, 0.42% copper, 1.02 g/t platinum and
1.19 g/t palladium over 12.2 m.
     Dr. David Good, Marathon's VP of Exploration, completed an extensive
3-year study with the Geological Survey of Canada on global magmatic nickel
and PGM deposits. His familiarity with these types of deposits plays a
critical role in further enhancing and refining the exploration at the Bird
River Sill.
     "We accelerated our exploration plans because results exceeded
expectations and in less than a year we have enough data to calculate a
resource at two locations," said David Good, VP of Exploration.

     OFP Purchase

     Once Marathon's interest in the OFP reached 70%, Marathon exercised its
option to require BRMI to sell the remaining 30% interest in the OFP. Marathon
purchased the outstanding 30% interest in the OFP for a purchase price of
$1,450,000. BRMI shall retain a 1.0 % net smelter return royalty (the "NSR")
in all minerals and metals extracted from the OFP.
     Marathon had earned a 70% interest in the OFP by making aggregate cash
payments of $250,000 to BRMI and carrying out, as operator, $600,000 in
exploration expenditures on the OFP before August 1, 2008.

     Gossan-Marathon Joint Venture

     Acquisition of the OFP will be part of a 50/50 Joint Venture between
Marathon and Gossan Resources. The earn-in for the joint venture requires
Marathon to make payments of $500,000 to Gossan and spend $3 million on the
Gossan property by 30-April-2011. The expenditures on the Gossan and Ore Fault
properties now exceed the $3 million vesting requirements and payment of the
remaining cash to Gossan will trigger formation of the joint venture. As
operator of the JV, Marathon has the options of continuing with the 50/50
joint venture with a dilution clause or elect within 120 days of the formation
of the JV to go to a 65% interest by assuming all costs for a feasibility with
an additional 5% for completing the financing.
     Phillip Walford, P.Geo., President and CEO, is Marathon's Qualified
Person in compliance with National Instrument 43-101 with respect to this
release. Mr. Walford has reviewed the contents for accuracy and has approved
this press release on behalf of Marathon.

     About Marathon PGM Corporation:

     Marathon is in the process of completing a definitive feasibility study
on the Marathon PGM-Cu deposit, which is on track for completion in September.
Marathon also has development and exploration stage properties in southeastern
Manitoba and western Newfoundland and Labrador. Marathon's management plans to
build on this focus through the advancement of its properties, focusing on
resource development and by examining other strategic PGM and base metal
opportunities within Canada.

     Cautionary Statement Regarding Forward Looking Information:

     Except for statements of historical fact relating to the Company, certain
information contained herein constitutes "forward-looking statements".
Forward-looking statements are frequently characterized by words such as
"plan," "expect," "project," "intend," "believe," "anticipate" and other
similar words, or statements that certain events or conditions "may" or "will"
occur. Forward-looking statements are based on the opinions and estimates of
management at the date the statements are made and are subject to a variety of
risks and uncertainties and other factors that could cause actual events or
results to differ materially from those projected in the forward-looking
statements. These risks and uncertainties include but are not limited to those
identified and reported in Management's Discussion and Analysis for the year
ended December 31, 2007. Circumstances or management's estimates or opinions
could change, and management disclaims any obligation to revise or update
forward-looking statements, whether for new information, future events or
otherwise. The reader is cautioned not to place undue reliance on
forward-looking statements.

     On Behalf of Marathon PGM:

     "Phillip C. Walford"
     Phillip C. Walford, P.Geo.
     President, Chief Executive Officer
     Tel: +1.416.987.0711
     gen@marathonpgm.com

     %SEDAR: 00020574E
For further information: David Leng, P.Geo: Tel: (416) 849-3432, Fax: (416)
861-1925, dleng@marathonpgm.com

.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Marathon PGM Corporation

EXPLORATEUR
CODE : MAR.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Marathon PGM est une société d’exploration minière de nickel et de zinc basée au Canada.

Marathon PGM détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont BIRD RIVER - PAGE BLOCK, MARATHON, BIRD RIVER - NI ZONE, BIRD RIVER - ZN & CU ZONE et GEORDIE LAKE au Canada.

Marathon PGM est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 9,2 millions CA$ (7,1 millions US$, 6,2 millions €).

La valeur de son action a atteint son plus bas niveau récent le 14 août 1998 à 0,02 CA$, et son plus haut niveau récent le 03 juin 2011 à 7,50 CA$.

Marathon PGM possède 17 700 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Marathon PGM Corporation
18/12/2009 Closes First Tranche of Non-Brokered Private Placement Flow...
Nominations de Marathon PGM Corporation
08/08/2007 appoints Raymond Mason as VP of Operations
Rapports Financiers de Marathon PGM Corporation
15/08/2008Announces 2008 Q2 Financial Results
14/11/2007 Announces 2007 Q3 Financial Results
02/08/2007 Announces 2007 Q2 Financial Results
15/05/2007Announces 2007 Q1 Financial Results
Projets de Marathon PGM Corporation
12/09/2013(Marathon)Marathon Trenching Adds 300m Strike-length to Mineralized Zo...
27/07/2010Cu Project Advances: Permitting, Financing and Metallurgy
21/07/2010(Marathon)Hits 33.54 g/t (uncut) Gold Across 4 m (0.98 oz/ton uncut ac...
22/03/2010(Geordie Lake)Excellent Geordie Lake Drill Results
24/11/2009(Marathon) Receives Optimized Definitive Feasibility Study - Significa...
07/10/2009(Geordie Lake)Development Plans for Geordie Lake Deposit
29/09/2009(Marathon) Wraps Up 2009 Campaign with 4.31 g/t PGM+Au and 0.19% Cu ov...
16/09/2009(Marathon)Drilling Program Hits High Grade Outside Pit Shell
10/09/2009(Marathon)Announces Analyst Day at Marathon PGM-Cu Project
08/09/2009(Marathon)Marathon's Drilling Pushing New Boundaries
06/07/2009(Marathon)Project DFS Being Optimized
10/06/2009(Marathon)Completes Purchase of Bamoos Land Package
12/06/2009(Bird River - Page Block)Marathon Intersects Sulphide Lenses at Coppermine Zone
01/06/2009(Marathon)Better Metallurgy and Economics
11/03/2009(Bird River - Page Block) Reports Positive Drill Results at Bird River
27/02/2009(Bird River - Page Block)Bird River Resource Expansion Continues
03/02/2009(Bird River - Page Block)Marathon Files Technical Report on Feasibility Study and Res...
15/01/2009(Bird River - Page Block) Develops Two Resources on Bird River Project
19/12/2008(Marathon)Project Receives Positive Feasibility Study
06/11/2008(Marathon)Project Receives Support from Pic River First Nation
12/08/2008Definitive Feasibility Study Update
29/07/2008(Marathon)Hits Thickest Ever Intersection of PGM-Cu Mineralization, 18...
16/07/2008(Bird River - Page Block)Ore Fault Drilling Hits 4.5m of 1.32% Ni, 0.14% Cu, and 1.31...
28/01/2008(Marathon) Entering into Option and JV Agreement with Benton Resources...
12/12/2007(Bird River - Page Block)Reviews Progress of 2007 and Plans for 2008
24/10/2007(Marathon)reports final holes of 2007 campaign and hits thickest ever ...
11/09/2007 intersects 44 m of 1.48 g/t PGM and gold and 0.36% copper o...
26/07/2007(Marathon)Drilling intersects 14.6 g/t PGM and gold and 0.18% copper o...
18/04/2007(Marathon)drills 8 m of 3.1 g/t PGM+Au in W Zone
04/04/2007(Marathon)drilling continues to expand W and RD Zones
21/03/2007(Marathon)Drilling Expands High Grade W Zone and Establishes New Poten...
17/02/2007(Marathon)hits high-grade Palladium, Platinum and Rhodium in 2 holes, ...
Communiqués de Presse de Marathon PGM Corporation
28/07/2015Marret Resource Corp. Releases Q2 2015 Financial Statements
17/07/2015Marret Asset Management Inc. - Issuance of Early Warning Rep...
07/07/2015Marret Resource Corp. Announces Record Date and Distribution
29/06/2015Marret Resource Corp. Announces Results of Annual and Specia...
12/05/2015IIROC Trade Resumption - MAR
12/05/2015Marret Resource Corp. announces shareholder proposal
12/05/2015IIROC Trading Halt - MAR
06/05/2015Marret Resource Corp. Releases Q1 2015 Financial Statements
20/04/2015Marret Resource Corp. provides update
31/03/2015Marret Resource Corp. Releases 2014 Year End Financial State...
01/12/2014IIROC Trade Resumption - MAR
01/12/2014Marret Resource Corp. suspends dividend; Provides update
20/08/2014Marret Resource Corp. Announces Monthly Dividend
20/08/2014Marret Resource Corp. Announces Monthly Dividend
11/12/2013Completes Financing with Rambler and Announces Exploration P...
01/05/2013(Marathon)Marathon Intersects Multiple High-Grade Intervals while Unde...
16/01/2013Marret Resource Corp. announces participation in Cline Minin...
16/01/2013Marret Resource Corp. announces participation in Cline Minin...
06/10/2011(Marathon)Marathon Intersects Best Interval at the Leprechaun Gold Dep...
03/10/2011(Marathon)Marathon Continues to Expand the Leprechaun Gold Deposit wit...
11/08/2010Receives Initial Metallurgical
13/05/2010Announces 8,000 Meter Drilling
04/05/2010New Geordie Lake Resource: Increased Metals, Grade and
27/04/2010Joseph G. Spiteri Appointed to Marathon PGM
17/03/2010Drilling Confirms Near Surface Gold Mineralization at Leprec...
23/12/2009Enters Option and JV Agreement for Mountain Lake's Valentine...
26/08/2009Marathon Converting Waste to Ore
15/07/2009Improving Resources Classifications at Marathon
11/12/2008Project accepted into MPMO Projects List
04/09/2008Completes 2008 Drilling Program on BCF JV Property, Intersec...
27/08/2008Acquires Remaining Discovery Shares Pursuant to Compulsory A...
19/08/2008Growth Continues, Ore Fault Property Acquisition Completed
04/02/2008Cabo Awarded Marathon PGM Corporation Contract
07/01/2008 Fault Agreement Approved by Bird River Mines Shareholders, ...
01/11/2007Finalizes Option Agreement for Ore Fault and Plans Drill Cam...
11/10/2007and Bird River Mines Inc., Announce an Option Agreement for ...
04/10/2007 completes 40,000 m drilling campaign and expects new minera...
03/10/2007: CEO Interview
02/10/2007signs Memorandum of Understanding with the Ojibways of Pic R...
21/09/2007 Samples 7.09 g/t PGM and gold,
29/08/2007extends mineralized zone to 800 m at the Coppermine Zone, Bi...
24/08/2007acquires PGM-Ni-Cu property in the Steel Mountain Complex, N...
16/08/2007- CEO Interview
13/08/2007hits 6 m of 7.48 g/t PGM and gold and 0.06% copper in W Hori...
12/07/2007discovers additional mineralization outside perimeter of exi...
28/06/2007drilling discovers mineralization outside of resource open p...
25/06/2007drilling hits mineralization at WD zone 3 km south of Malach...
11/06/2007Promising First Results from Bird River Property for Maratho...
11/05/2007Drilling Continues Expansion of W Zone and Southern Resource
18/04/2007acquires Bird River Ni-Cu+PGM Property through option
25/01/2007Measured and Indicated In-Pit Resource Grows 39%
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (MAR.TO)Other OTC (MRPGF)
0,520+0.00%4,52+4.63%
TORONTO
CA$ 0,520
05/10 10:30 -
0%
Cours préc. Ouverture
0,520 0,520
Bas haut
0,520 0,520
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,520 -%
Volume var. 1 mois
1 000 -%
24hGold TrendPower© : 20
Produit
Développe
Recherche Copper - Gold - Nickel - Palladium - Platinum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 03/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :