Chart eurGOLD   Chart eurSILVER  
 
Matière à reflexion
Le papier monnaie est la méfiance endormie
Benjamin Disraeli  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1386,37-1,23
Silver 22,43-0,06
Platinum 1455,00-2,50
Palladium 730,00-5,00
MARCHES MONDIAUX
DOWJONES 15295-6
NASDAQ 3459-4
NIKKEI 14612128
ASX 4964-77
CAC 40 39692
DAX 8300-52
HUI 2592
XAU 97-3
MONNAIES (€)
AUS $ 1,3410
CAN $ 1,3422
US $ 1,2965
GBP (£) 0,8584
Sw Fr 1,2510
YEN 131,7480
RATIOS & INDEXES
Gold / Silver61,81
Gold / Oil14,43
Dowjones / Gold11,03
MATIERES PREMIERES
Copper 3,300,00
WTI Oil 96,05-0,11
Nat. Gas 4,290,03
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
Lake Shore Gold Intersects Wide, High-Grade Mineralization at Timmins Mine, Confirms and Expands Ultramafic and Main Zones
Published : February 24, 2011

( 0 vote, 0/5 ) Imprimer l'article
     
Tweet

TORONTO, ONTARIO--(Marketwire - Feb. 24, 2011) - Lake Shore Gold Corp. (News - Market indicators) -

  • Drilling from 525 Level to test up plunge extension of Ultramafic Zone above 610 Level intersects high-grade mineralization within next planned area of mining, Zone remains open up dip to at least 550 Level and for 25 metres to east Among key intercepts are 16.58 grams per tonne ("gpt") over 19.10m ("m"), including 51.25 gpt over 5.90m, 7.59 gpt over 9.30m and 3.88 gpt over 13.80m, including 9.99 gpt over 3.80m 

    • 525-069 intersects 6.27 grams per tonne ("gpt") over 30.00 metres ("m"), including 19.92 gpt over 4.30m, 525-066 intersects 5.18 gpt over 25.60m, 525-056 intersects 6.88 gpt over 11.90m and 525-046 intersects 27.98 gpt over 6.70m, including 54.40 gpt over 3.30m

  • Drilling from 260 Level confirms and expands recently reported 400 metre extension to Main Zone, high-grade intercepts in close proximity to mine workings highlight potential for near-term mining

    • Among key intercepts are 16.58 gpt over 19.10m, including 51.25 gpt over 5.90m, 7.59 gpt over 9.30m and 3.88 gpt over 13.80m, including 9.99 gpt over 3.80m

  • Drilling from 525 Level into Main Zone also intersects wide, high-grade mineralization

    • 525-036 intersects 5.52 gpt over 9.40m, 525-035 intersects 5.61 gpt over 4.00m and 4.93 gpt over 6.70m and 525-040 intersects 19.78 gpt over 1.70m.

Lake Shore Gold Corp. ("Lake Shore Gold" or the "Company") today announced results from an additional 72 holes (10,871 metres) of underground drilling at the Timmins Mine. The holes were drilled from platforms on the 260 and 525 levels. Of the results being reported, 32 holes (4,164 metres) were designed to test the upward extension of the Ultramafic Zone ("UM") from the 610 Level, which is the upper limit of recent mining between the 610 and 650 levels. The new holes through the UM Zone represent the first phase of detailed infill and expansion drilling being conducted above the 610 Level to aid in designing the next phase of major stoping in the UM Zone. An additional 40 holes (6,707 metres) were designed to confirm and expand the recently identified 400 metre extension to the Main Zone below the 260 Level with wide, high-grade intersections being reported within close proximity to existing mine infrastructure.

Tony Makuch, President and CEO of Lake Shore Gold, commented: "Today's results are highly significant as they confirm that the wide, high-grade mineralization recently mined from the UM Zone between the 650 and 610 levels continues above the 610 Level into the next major area of the UM Zone we plan to mine. Stoping above the 610 Level is expected to commence around the end of the second quarter. In addition, today's results also confirm the excellent potential for the Main Zone to host significant new resources and establish the Zone as a priority target given the excellent grades and widths we have encountered and the location of the Zone close to our existing mine workings."

Among significant results from drilling on the 525 Level into the UM Zone are 6.27 gpt over 30.00m, including 19.92 gpt over 4.30m, in 525-069, 5.18 gpt over 25.60m in 525-066, 6.88 gpt over 11.90m in 525-056 and 54.40 gpt over 3.30m within a broader intercept of 27.98 gpt over 6.70m in 525-046. These holes were drilled above and at the east limit of recently extracted mining blocks between the 610 and 650 levels and strongly confirm the extension of wide, high-grade mineralization into the next phase of major stoping being planned in the UM Zone, which is expected to commence around the end of the second quarter. The UM Zone remains open up dip to at least the 550 Level and for approximately 25 metres to the east of holes 525-046 and 525-066. As with previously reported intersections from the UM Zone between the 610 and 650 levels, mineralization observed in the drill core is closely associated with swarms of quartz veining, surrounded by strong carbonate alteration and 5-20 percent pyrite.

Significant results from drilling in the Main Zone on the 260 Level are 16.58 gpt over 19.10m, including 51.25 gpt over 5.90m in 260-041, 7.59 gpt over 9.30m in 260-017 and 3.88 gpt over 13.80m, including 9.99 gpt over 3.80m, in 260-022. Of these results, the wide, high-grade intersection from 260-041 is located approximately 25 metres west of previously reported 260-013, which intersected 5.09 gpt over 13.84m (see press release November 11, 2010) and is open to the west. Intercepts from holes collared on the 525 Level include 5.52 gpt over 9.40m in 525-036 and 5.61 gpt over 4.00m and 4.93 gpt over 6.70m in 525-035. These intersections are located approximately 300 metres down plunge and to the west of the zones being defined near the 260 Level.

The results from drilling in the Main Zone suggest that the bulk of mineralization is contained in a series of stacked lenses within a second, more northerly fold nose structure, which is similar to the structure hosting the UM Zone but is located 50 to 100 metres to the north. Individual lenses within the second fold nose appear to vary between 80 to 120 metres in length and between 2 and 20 metres in width. The current lowest level of testing on the more northerly fold nose is at the 610 Level, with this structure remaining open to depth.

Drilling is continuing at the Timmins Mine with four drills, including two drills on the 260 Level, one drill on the 525 Level and one drill on the 630 Level. Four underground drills are also operational at Thunder Creek with two near the 730 Level and two near the 300 Level. Drilling at Thunder Creek is largely focused on achieving the Company's goal to establish an initial National Instrument 43-101 resource at Thunder Creek during the second half of 2011, as well as to test the depth potential of both the Rusk and Porphyry zones.

Quality Control

The Company's Qualified Person ("QP") for the underground drill program at the Timmins Mine property is Dean Crick, P.Geo. and the QP for resource estimation at Timmins Mine is Bob Kusins, P.Geo. As QPs, they have prepared or supervised the preparation of the scientific or technical information for the property and have verified the data disclosed in this press release. Both QPs are employees of Lake Shore Gold.

Lake Shore Gold has implemented a quality-control program to ensure best practice in the sampling and analysis of the drill core. Samples are obtained from BQTK-sized diamond drill core, with roughly 25% of sampled core being sawn in half and the remaining 75% being whole core sampled. All remaining core materials, including the remaining half of sawn core is retained on site in a secure location. Drill core samples are stored for sample preparation and gold analysis performed by ALS Chemex. ALS Chemex is an ISO 9001-200 registered laboratory, preparing for ISO 17025 certification. Drill core samples are transported in security-sealed bags to ALS Chemex's Timmins Sample Preparation Facility. Sample preparation is completed in Timmins, and the prepared sample pulps are then transported to ALS Chemex's analytical laboratory in Vancouver, BC. Gold grades are obtained on all samples via Fire Assay with Atomic Absorption finish, using 50g aliquots. For samples that return a gold content greater than 10 gpt, the sample is re-analyzed via Fire Assay with Gravimetric finish, again using a 50g aliquot.

Additional information regarding exploration and resources at Timmins Mine is set out in the technical report entitled, "Updated NI 43-101 Technical Report on the Timmins Mine Property, Ontario, Canada," dated October 1, 2009, filed on SEDAR on October 6, 2009 (www.sedar.com).

About Lake Shore Gold Corp.

Lake Shore Gold is a rapidly growing mining company with a vision to become a mid-tier gold producer through the successful exploration, development and operation of its properties in the Abitibi Greenstone belt in Northern Ontario and Quebec, starting with its strong base in Timmins, Ontario. In Timmins, the Company is in commercial production at the Timmins Mine, has intersected underground, and is developing along, mineralization at the adjacent Thunder Creek deposit and is advancing an underground advanced exploration program at its Bell Creek Mine. Mine production is delivered to the Company's mill (also located in Timmins), which has been refurbished and currently has an operating capacity of 2,000 tonnes per day. The Company continues to invest aggressively in exploration in the Timmins Camp and in its other properties in Northern Ontario and Quebec, and owns a large and prospective land position in Mexico. The Company's common shares trade on the TSX under the symbol LSG.

Forward-looking Statements

Certain statements in this press release relating to the Company's exploration activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" within the meaning of securities legislation. The Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward-looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects according to schedule, and that actual mineralization on properties will not be less than identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements. More information about risks and uncertainties affecting the Company and its business is available in Lake Shore Gold's most recent Annual Information Form and other regulatory filings which are posted on sedar at www.sedar.com.

There is no guarantee that drill results reported in this news release will lead to the identification of a deposit that can be mined economically, and further work is required to identify resources and reserves. 

Lake Shore Gold – Timmins Mine Main Zone (260 and 525 Levels)
Hole From To Assay Length Comments
Number (m) (m) (gpt) (m)  
260-017 96.00 105.30 7.59 9.30 MZ
  including 99.20 100.50 11.44 1.30 MZ
260-019 94.40 109.50 2.54 15.10 MZ
  including 94.40 98.60 5.66 4.20 MZ
260-022 98.60 112.40 3.88 13.80 MZ
  including 98.60 102.40 9.99 3.80  
  including 107.40 109.60 4.93 2.20  
  116.90 124.00 3.05 7.10  
260-025 135.60 140.70 2.37 5.10 MZ
260-035 115.00 119.50 3.22 4.50 MZ
260-037 87.90 93.80 2.24 5.90 MZ
  98.10 102.90 2.36 4.80 MZ
  137.10 143.30 2.03 6.20 FW LENS
260-038 150.70 155.90 2.36 5.20 FW LENS
  including 155.40 155.90 17.80 0.50 FW LENS
260-040 150.00 152.60 7.74 2.60 FW LENS
260-041 95.50 114.60 16.58 19.10 MZ
  including 107.70 113.60 51.25 5.90  
260-045 165.00 168.00 4.20 3.00 FW LENS
525-034 80.10 87.70 4.17 7.60 MZ
525-035 89.20 93.20 5.61 4.00 MZ
  108.90 115.60 4.93 6.70  
525-036 77.90 87.30 5.52 9.40 MZ
525-037 134.70 139.60 4.55 4.90 MZ
525-040 103.70 105.40 19.78 1.70 MZ
525-041 70.90 73.60 3.94 2.70 MZ
  80.80 85.50 4.67 4.70  
  including 83.00 83.90 13.49 0.90  
525-042 114.90 116.50 14.76 1.60 MZ
Notes:
1) Assays are reported uncut.
2) True widths are not reported at this time.
260-018, 20, 21, 24, 26, 27, 28, 30, 31, 32, 36, 38, 39 - Mainly lower grade results
260-023, 29, 33, 34, 42, 43, 44 - Pending
525-038, 39, 43, 44, 45 - Mainly lower grade results
 
 
Lake Shore Gold – Timmins Mine Ultramafic Zone (525 Level)
Hole From To Assay Length Comments
Number (m) (m) (gpt) (m)  
525-046 72.80 79.50 27.98 6.70 UM1
  including 72.80 76.10 54.40 3.30  
525-056 61.20 73.10 6.88 11.90 UM1
  including 61.20 66.00 12.72 4.80  
525-066 61.70 87.30 5.18 25.60 UM1
  including 62.00 70.70 6.40 8.70  
  including 76.80 85.00 8.23 8.20  
525-069 61.00 91.00 6.27 30.00 UM1
  including 66.00 68.20 14.87 2.20  
  including 71.30 75.60 19.92 4.30  
525-057 63.70 65.90 27.99 2.20 UM1
525-048 53.00 54.40 44.10 1.40 UM1
525-052 54.70 56.40 7.80 1.70 UM1
 
Notes:
1) Assays are reported uncut.
2) True widths are not reported at this time.
525-045 – mainly lower grades
525-049, 50, 51, 53, 54, 55 – pending
525-057, 58, 59, 60, 61, 62, 63, 64, 65 – pending
525-067,68 – pending
525-070, 71, 72, 73, 74, 75, 76 – pending

To view Figure 1 – Isometric View: http://media3.marketwire.com/docs/lsg0224fig1.pdf.

To view Figure 2 – Cross Section: http://media3.marketwire.com/docs/lsg0224fig2r.pdf.

For more information, please contact

Lake Shore Gold Corp.
Tony Makuch
President & CEO
(416) 703-6298
info@lsgold.com
or
Lake Shore Gold Corp.
Mark Utting
Vice-President, Investor Relations
(416) 703-6298
info@lsgold.com
www.lsgold.com
Tweet

Lake Shore Gold Corporation

PRODUCTEUR
CODE : LSG.TO
ISIN : CA5107281084
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Lake Shore Gold Corporation
12/01/2013Haywood paints rosier picture for Lake Shore Gold in 2013
12/04/2012Lake Shore Gold underpins mill expansion with Sprott debt
03/04/2012Employee killed at Lake Shore Gold's Ontario mine
19/07/2011Lake Shore Gold hammered on lacklustre quarterly production
07/01/2010BRIEF-Lake Shore Gold says acquires interest in RT Minerals
27/03/2009UPDATE 1-Lake Shore Gold starts ore processing at Timmins Mi...
26/03/2009Lake Shore Gold starts processing ore from Timmins mine
Financements de Lake Shore Gold Corporation
28/02/2011Completes US$50 Million Corporate Revolving Credit Facility
26/10/2010Exercises Warrants in Northern Superior Resources
28/07/2010Secures US$50m credit facility
28/07/2010Signs Term Sheet for Corporate Revolving Credit Facility of ...
16/02/2010Closing of Second Tranche of Flow-Through Financing
31/12/2009Announces Closing of First Tranche of Flow-Through Financing
04/12/2009Announces Closing of Private Placement Financing
19/02/2008 Announces Private Placement of $64.5 Million at 30% Premium...
Nominations de Lake Shore Gold Corporation
13/03/2009Announces Appointment of Ignacio Bustamante to Board of Dire...
30/05/2008Announces Management Appointments
27/02/2007Appoints Hannu Virtanen as VP, Project Development
Rapports Financiers de Lake Shore Gold Corporation
09/08/2012Lake Shore Gold Reports Strong Second Quarter Results
12/01/2012Reports 2011 Operating Results, Pours 26,550 Ounces in Fourt...
10/11/2011Announces Third Quarter 2011 =?ISO-8859-1?Q?=20Financial=20R...
10/08/2011Announces Second Quarter 201 =?ISO-8859-1?Q?1=20Financial=20...
26/05/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Results,=20In...
04/05/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Production=20...
11/08/2010Continued Progress During Second Quarter 2010
15/05/2008Announces First Quarter 2008 Results
Projets de Lake Shore Gold Corporation
14/10/2011(Timmins Mine)Reports Higher Commercial Production from Timmins Mine in Th...
16/08/2011(Bell Creek)Reports 400 Metre Extension of Gold Mineralization at Bell C...
29/03/2011(Band Ore)to Acquire 19% of Golden Share Through Sale of 100% Interest
04/03/2011(Thunder Creek)Reports Wide Intersections With High-Grade Sections Within P...
28/02/2011(Timmins Mine)Lake Shore Gold Discovers Significant New Gold Zone at 144 P...
24/02/2011(Timmins Mine)Intersects Wide, High-Grade Mineralization at Timmins Mine, ...
25/01/2011(Timmins Mine)Lake Shore Gold to Nearly Triple Gold Production in 2011
25/01/2011(Thunder Creek)Confirms Broad Mineralized Envelope With High-Grade Sections...
11/01/2011(Thorne)Demonstrates Near Surface Resource Potential and Extends Min...
06/01/2011(Timmins Mine)Declares Commercial Production =?ISO-8859-1?Q?=20at=20Timmin...
01/12/2010(Bell Creek)Announces Initial Resource a Bell Creek Mine, Large Deposit ...
24/11/2010(Thunder Creek)Confirms and Expands Large Gold System in Thunder Creek Por...
24/11/2010(Thunder Creek)Confirms and Expands Large Gold System in Thunder Creek Porp...
11/11/2010(West Timmins)Announces New High-Grade Intercepts, Major Extension of Main...
03/11/2010(Bell Creek)Extends High-Grade Core to Depth at Bell Creek
03/11/2010(Bell Creek)=?ISO-8859-1?Q?Lake=20Shore=20Gold=20Reaches=202,000=20Tonne...
01/11/2010(Thunder Creek)Continues to Confirm and Expand Thunder Creek Rusk Horizon
30/08/2010Expands Thunder Creek Rusk =?ISO-8859-1?Q?=20Zone,=20Announc...
30/08/2010Lake Shore Gold Expands Thunder Creek Rusk Zone, Announces A...
29/06/2010(Thunder Creek)Ramp Reaches & Intersects High-Grade Gold Mineralization
29/06/2010Ramp Reaches Thunder Creek Deposit, Intersects High-Grade Go...
23/06/2010Intersects High-Grade Mineralization at Thorne...
04/05/2010(West Timmins)Advances Third Major Gold Target
01/04/2010(Ti-pa-haa-kaa-ning (tpk))Agrees to Sell 50% Interest in Ti-pa-haa-kaa-ning Gold Prope...
18/02/2010(Timmins Mine)Major Extensions to Timmins Mine Mineralization, Thunder Cre...
17/02/2010(Timmins Mine)Reports Results of Underground Exploration at 650-Level Test...
17/02/2010(Casa Berardi)Extends Casa Berardi "G Zone"
26/01/2010(Thunder Creek)Extends Thunder Creek to Depth, Confirms High-Grade Core and...
18/01/2010(Bell Creek)Continues to Define and Extend Large New Gold System at Bell...
06/11/2009(Bell Creek)Confirms Presence of Large New Gold System
29/10/2009(Timmins Mine)Results of Underground Drilling and Development at Timmins M...
07/10/2009Releases Updated National Instrument 43-101 Report for Timmi...
01/10/2009(Bell Creek)Reports Extension to High grade mineralization at Bell Creek
25/08/2009(Thunder Creek)Continues to Establish Large Gold System at Thunder Creek
24/08/2009Reports High-Grade Intercepts From Underground Drilling at T...
21/07/2009(Bell Creek)Discovers Substantial New High-Grade Extension at Bell Creek
21/07/2009Lake Shore Gold discovers substantial new high-grade extensi...
07/07/2009(Bell Creek)Confirms Deep Extensions of Gold Mineralization at Bell Cree...
05/05/2009(Thunder Creek) Reports Additional High-Grade intercepts at Thunder Creek
28/04/2009(Bell Creek)Commences Advanced Underground Exploration Program at the Be...
31/03/2009(Thunder Creek)Discovery of Second Mineralized Horizon in Porphyry
26/03/2009(Bell Creek)Commences Processing at Bell Creek Mill
16/12/2008Significantly Extends Rusk Zone and Announces New High-Grade...
10/12/2008(Bell Creek)Significantly Extends Bell Creek Mineralization
10/07/2008(Bell Creek)Intersects New Gold Zone and Extends Mineralization at Bell ...
31/03/2008(Thunder Creek)Intersects 8.57 Grams Gold Per Tonne Over 9.00 Metres at the...
Communiqués de Presse de Lake Shore Gold Corporation
07/05/2013Announces Details of First Quarter 2013 Conference Call and ...
12/03/2013Announces Details of Full Year and Fourth Quarter 2012 Confe...
10/01/2013Achieves 2012 Production Target, Company Poised for Sharply ...
11/12/2012on Track for Strong Finish to 2012, Processing Capacity Incr...
25/10/2012Announces Details of Third Quarter 2012 Conference Call and ...
18/09/2012Announces Exercise of Underwriters' Over-Allotment Option fo...
07/09/2012Completes C$90 Million Convertible Senior Unsecured Debentur...
16/08/2012Announces C$75 Million Convertible Senior Unsecured Debentur...
13/07/2012Announces Details of Second Quarter 2012 Conference Call and...
04/07/2012Reports Strong Second Quarter Production of 24,426 Ounces of...
10/05/2012Exceeds Targets and Achieves Continued Operating Improvement...
23/03/2012Announces Details of Fourth Quarter and Full-Year 2011 Confe...
02/11/2011Announces Details of Third Quarter 2011 Conference Call and ...
05/08/2011Announces Details of Second Quarter 2011 Conference Call and...
19/07/2011Releases Production Resultsfor Second Quarter and First Six-...
01/04/2011Announces Adoption of Shareholder Rights Plan
14/03/2011Lake Shore Gold Achieves Major Milestones in 2010, on Track ...
01/02/2011Increases Interest in Northern Superior Resources Inc.
03/12/2010Disposal of remaining 6% stake in Lake Shore Gold by Hoschil...
14/10/2010Hochschild reduces stake in Lake Shore Gold to 6%
22/07/2010Confirms & Expands Mineral
27/05/2010Completes Sale of 50% Interest in Ti-pa-haa-kaa-ning JV
12/05/2010Changes to Board of Directors
05/05/2010Announces Continued Progress
27/04/2010Expands Resource Potential at Timmins Mine
11/03/20102009 Year End Results
17/12/2009Completes Acquisition of "Bell Creek West" Properties
15/12/2009Announces Management Changes
15/12/2009Added to S&P/TSX Composite Index
24/11/2009Announces Changes to Board of Directors
06/11/2009and West Timmins Mining Complete Business Combination
27/08/2009and West Timmins Agree to Business Combination
06/08/2009Advances Projects on Schedule and Budget and Achieves Explor...
24/06/2009Reports 12.75 Grams Per Tonne Over 83.40 Metres at Thunder C...
05/05/2009Continues to Expand Mineralion at Bell Creek
05/05/2009Continues to Advance Projects on Schedule and Budget and to ...
12/03/2009Completes 2008 on Schedule and Under Budget
20/05/2008Provides 2008/2009 Budget Plan
16/05/2008Announces Approval of Special Resolutions at Annual and Spec...
05/05/2008Comments on May 15, 2008 Shareholder Vote
16/04/2008Announces Revised Agreement With Hochschild Mining; Second P...
16/04/2008 Announces Management Changes
28/03/2008Announces 2007 Year End Results and Provides 2008 Outlook
24/03/2008Announces Management Changes
18/03/2008Announces Annual Meeting and Revised Date for Special Meetin...
25/02/2008 Completes Financing and Enters Into Strategic Alliance With...
17/07/2007Commences Drilling at Blakelock and Expands its Property Pos...
23/04/2007Completes Due Diligence on Bell Creek Acquisition
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (LSG.TO)Other OTC (LSGGF.PK)
0,320+3.23%2,29-0.87%
TORONTO
CA$ 0,320
23/05 16:15 0,010
3,23%
Cours préc. Ouverture
0,310 0,320
Bas haut
0,310 0,330
Année b/h Var. YTD
0,290 -  0,910 -58,44%
52 sem. b/h var. 52 sem.
0,290 -  1,15 -64,44%
Volume var. 1 mois
746 376 -20,00%
24hGold TrendPower© : -23
Produit Gold
Développe
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
2013-65,59%
2012-23,77%1,730,74
2011-70,46%4,421,10
2010-1,20%4,322,48
2009266,67%4,371,10
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois