Isabel Nickel Project Phase 2 drilling update
24 November 2015
Highlights
-
Phase 2 of resource definition drilling continues, with encouraging results including 12.0m @ 1.34% Ni from surface including 5.0m @ 1.82% Ni from 3.0m.
-
Additional results highlighting both high grade limonite and saprolite intersections include:
-
14.2m @ 1.73% Ni from surface including 2.0m @ 1.65% Ni from 4.0m (limonite) and 7.5m @ 2.17% Ni from 6.0m (saprolite)
-
11.0m @ 1.74% Ni from surface including 2.5m @ 2.05% Ni from 3.0m (limonite) and 4.7m @ 2.35% Ni from 5.5m (saprolite)
-
9.8m @ 1.61% Ni from 1.0m including 3.0m @ 1.22% Ni from 1.0m (limonite) and 5.0m @ 2.09% Ni from 4.0m (saprolite)
-
14.0m @ 1.49% Ni from 4.0m including 5.0m @ 1.64% Ni from 6.0 (limonite) and 4.4m @ 2.04% Ni from 11.0m (saprolite)
-
14.0m @ 1.49% Ni from 2.0m including 3.0m @ 1.87% Ni from 6.0 (limonite) and 6.0m @ 1.96% Ni from 9.0m (saprolite)
-
Upgrade of JORC Resource estimate on track for announcement next month.
Axiom Mining Limited ('Axiom') is pleased to announce further drilling results from Phase 2 of its resource definition drilling program on the Isabel Nickel Project in Solomon Islands.
The latest results further affirm the presence of high grade laterite in other areas within the tenement.
These drilling results will upgrade Axiom's Maiden JORC Resource Estimate initially released on 30 September 2015.
Continues on page 2
Figure 1 New drilling highlights at Kolosori and Suma prospect areas
ASX Announcement
24 November 2015
Page 2
Figure 2 New drilling highlights at Kolosori and Havihua prospect areas