Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Medusa Mining Limited: Co-O Drilling Update
Published : July 10, 2012
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Philippines | Report |

COMO, WESTERN AUSTRALIA--(Marketwire - July 9, 2012) - Medusa Mining Limited ("Medusa" or the "Company") (News - Market indicators)(LSE:MML), through its Philippines operating company Philsaga Mining Corporation, announces an update of the Co-O Mine surface and underground drilling undertaken from 31 March 2012 to 30 June 2012.

Highlights include:

Hole Number Width
(metres)
Grade (uncut)
(g/t gold)
EXP 144 1.00 21.70
EXP 145 2.15 52.06
EXP 146 1.20 21.40
EXP 156 1.35 185.21
EXP 157 2.90 78.94
L5-092 2.05 18.76
L5-20W-004 1.15 24.75
L6-028 1.10 25.60
L6-23E-031 1.55 31.33
L6-23E-033 1.20 45.03

Surface drilling since 31 March 2012 continues to provide resource infill and extension information for mine planning mainly to the east of the Oriental Fault, including the multiple East Agsao Veins and veins associated with the Roysan Vein. Two surface drill rigs are drilling to the west of the Oriental Fault and four on the east side of the fault.

Underground drilling continues to confirm vein continuity. Recent statistical studies indicate that 3 to 5 holes out of every 10 holes in a particular vein are required to return ore-grades to indicate that the vein will be mineable.

Peter Hepburn-Brown, Managing Director of Medusa, commented:

"The Co-O Mine drilling continues to deliver high grade intersections. These drill results are the last set of results for this financial year that will be incorporated into the annual resource estimate.

"I am pleased to report that for the first time we are achieving significant vein intersections to the west of the Tinago Fault which truncates the known veins at the western end of the mine. Whilst assays are awaited, in EXP 167 the veins are identical to the veins in the mine area. Continued success in extending the vein system westwards may have a significant positive impact on the future mine plans.

"Drilling at the current rate will continue for the foreseeable future."

Co-O MINE DRILLING

Discussion

This report lists the surface and underground drill holes with new assay results returned from 31 March 2012 to 30 June 2012.

Previous detailed drilling reports for Co-O Mine are available on the Company's website: www.medusamining.com.au.

Results down to 0.2 metres wide are reported since underground development shows that in many cases as the veins approach cross-cutting faults, they narrow down on both sides of the fault over 5 to 10 metres before widening out, and hence the narrower intersections are important in defining vein continuity. There is also some pinching and swelling of veins along strike. Most drilling is sub-parallel to the cross-cutting fault direction (and perpendicular to the strike of the veins) and rarely intersects the faults, which are subsequently identified by underground on-vein development or underground drilling.

It should also be emphasised that drilling of vein systems rarely provides ore-grade intersections in every intersection in a vein. A recent statistical assessment of the percentage of ore-grade drill hole intersections required in each vein to indicate the vein will be mineable shows that 3 to 5 holes out of every 10 holes is required to intersect ore grades. This is consistent with other large vein systems in the Eastern Goldfields of Western Australia.

Drill hole collar positions are surveyed by a qualified surveyor and surface drill holes are surveyed downhole at regular intervals using a digital multi-shot downhole camera.

It is important to note that the drilling of narrow epithermal veins generally provides an indication of the presence of the gold mineralised vein but may not always provide good quantitative data with respect to accurate grade and volume estimations for some or all of the following reasons:

  • Veins commonly pinch and swell and may be brecciated or displaced by faults;
  • Gold distribution may be erratic; and
  • Drill core recovery may be reduced because of the brecciation and soft unconsolidated material and hence the recovered material may not be representative of the material drilled.

The Company regards the initial drilling as indicative only and operates the policy of using drilling to locate the position and extent of the mineralised veins. This is then followed by on-vein development to support the drilling results, and to provide a more accurate estimate of vein grades which results in the upgrading of the resource category from Inferred to Indicated. The development supports the estimation of resources and facilitates the conversion of resources to reserves.

Further information on narrow veins and the Company's policies regarding exploration, development and resources-reserves is contained on the Company's website, www.medusamining.com.au.

Drilling Results

Figure 1 (attached) shows the locations of the recently completed and in progress surface drill holes EXP146 to EXP175. Completed holes (excluding EXP169, EXP170, and EXP172 to EXP175 in progress) comprise 25 holes for a total of 16,315 metres. Assay results are awaited for holes EXP 154, EXP161, EXP163 and EXP165 to EXP175 and will not be included in the resource estimate.

Table I shows the results ≥ 3 g/t gold over ≥ 0.2 metres for holes EXP138 to EXP164. The locations of holes EXP138 to EXP145 were shown in the announcement of 16 April 2012.

Figure 2 (attached) shows the locations of the recently completed underground drill holes totalling 7,932 metres in 46 holes. Table II lists underground drill hole results ≥ 3 g/t gold over ≥ 0.2 metres received since 31 March 2012 as well as some previously completed holes whose locations were shown on Figure 2 in the announcement dated 16 April 2012. Assays are awaited for holes L2-2E-001, L5-35W-109, L5-43E-012, L5-20W-008 and L6-23E-034 and will not be included in the resource estimate.

Table I. Surface drill hole results ≥ 3 g/t gold and ≥ 0.2 metres downhole for previously completed holes EXP138 to EXP145 and new holes EXP146 to EXP164. 

Hole number East North Dip
(degrees)
Azimuth
(degrees)
From
(metres)
Width
(metres)
Grade
(uncut)
(g/t gold)
EXP 140 614659 913216 -54 180 309.20 1.00 3.07*
          421.20 0.25 3.01*
          484.35 1.20 15.73*
          488.05 1.00 6.08*
          499.90 1.45 6.91*
          504.20 0.20 24.60*
          604.60 0.50 27.93*
          609.45 1.45 7.76*
          640.15 1.35 5.94*
          732.40 0.30 4.75*
EXP 141 614550 912992 -69 180 266.30 0.35 7.23*
          344.20 1.00 4.30*
          397.50 0.20 101.60*
          472.60 0.45 4.50*
          481.20 0.25 3.79*
          568.85 0.55 4.77*
          656.10 0.35 69.50*
          746.00 1.00 3.75*
EXP 142 614604 913032 -55 180 391.50 0.20 11.33*
          593.75 1.00 4.22*
          637.65 3.00 3.79*
EXP 144 614519 913082 -51 180 219.00 1.00 3.87*
          231.60 0.30 3.70*
          459.00 1.00 8.93*
          496.85 1.00 21.70*
          531.15 0.35 8.03*
          532.70 0.90 7.19*
          633.85 0.20 7.67*
          634.45 1.00 8.47*
EXP 145 614442 912987 -69 180 397.30 2.15 52.06*
          489.50 0.20 21.00*
          618.35 0.25 3.13*
          620.00 2.25 3.25*
          765.30 0.25 8.35*
          800.50 0.20 4.93*
EXP 146 614550 913122 -66 180 370.80 1.60 3.27*
          432.90 1.20 21.40*
          494.10 0.40 3.71*
          527.50 0.75 60.46*
          571.70 0.35 3.46*
          582.30 0.30 8.50*
          620.50 1.00 3.53*
          735.05 1.35 16.66*
          746.40 0.25 4.87*
EXP 147 614394 913026 -67 180 381.15 0.20 6.03*
          394.85 0.40 3.87*
          415.75 0.20 53.23*
          418.80 0.20 5.23*
          520.60 1.00 9.70*
          773.65 0.45 3.53*
EXP 149 61439 913101 -64 180 141.20 1.40 3.41*
          362.55 1.45 6.12*
          385.95 0.30 17.40*
          528.25 0.50 8.43*
          675.70 0.20 7.00*
          682.05 2.00 3.15*
          742.25 2.10 3.32*
          766.10 0.20 55.19*
EXP 150 614129 913260 -51 180 154.45 0.55 3.28*
          234.60 0.30 16.37*
          517.10* 1.00 4.73*
EXP 151 614442 912987 -57 180 349.60 2.70 5.67*
          384.40 1.20 3.82*
          423.00 0.45 13.77*
          535.30 1.85 5.20*
          602.90 2.75 6.60*
          644.15 0.90 52.33*
EXP 153 614195 912789 -58 180 153.70 0.30 44.67*
          169.45 0.35 5.53*
EXP 156 614199 913138 -55 180 187.05 0.75 15.33*
          193.10 0.55 7.07*
          303.00 1.00 3.86*
          377.60 1.45 3.33*
          423.85 1.00 3.32*
          483.45 0.90 31.84*
          536.05 1.35 185.21*
EXP 157 614510 913158 -49 180 246.10 0.40 7.00*
          283.40 0.35 8.83*
          310.30 1.00 4.19*
          441.45 2.90 78.94*
          468.85 0.20 20.15*
          474.05 0.20 523.07*
          543.90 3.00 10.20*
          701.10 0.45 52.87*
          779.10 0.40 3.67*
          792.60 0.25 6.50*
EXP 160 614354 912823 -52 180 226.60 1.50 8.17*
 
Notes:
(i) Intersection widths are downhole drill widths not true widths;
(ii) Assays denoted by * are by Philsaga Mining Corporation's laboratory, all other assays are by Intertek McPhar Mineral Services in Manila;
(iii) Grid coordinates based on the Philippine Reference System 92.

Table II. Underground drill hole results ≥ 3 g/t gold and ≥ 0.2 metres downhole for new holes and previously completed holes designated †.

Hole number East North Dip
(degrees)
Azimuth
(degrees)
From
(metres)
Width
(metres)
Grade
(uncut)
(g/t gold)
LEVEL 2

L2-057†

 613275

 912928


 0

 61

 20.90


 1.00

 4.41*
LEVEL 3

L3-027†


 613737


 912900


 3


 195


 53.70


 0.20


 3.50*
          96.30 0.30 11.22*
L3-028† 613733 912898 3 143 83.45 0.55 3.138
LEVEL 5              
L5-087†         25.50 0.70 4.80*
          82.75 0.90 16.50*
          85.80 0.50 17.41*
          127.55 0.70 3.32*
          134.80 0.40 4.67*
          136.35 0.45 4.33*
L5-091† 613615 912851 0 63 4.95 0.45 3.66*
          47.95 1.05 17.57*
          288.80 0.90 3.47*
L5-092† 613951 912921 -60 226 14.20 2.05 18.76*
          57.65 0.35 3.40*
          97.65 1.05 3.42*
          121.30 1.35 4.34*
          129.35 0.25 3.43*
          240.45 1.70 4.50*
          243.60 0.70 3.59*
          358.60 0.45 8.29*
L5-096† 613613 912853 0 27 0.00 0.80 3.84*
          30.00 0.20 32.60*
          32.80 0.40 4.80*
          46.20 0.25 57.30*
L5-105† 614196 912960 0 202 2.15 0.65 15.17*
          67.15 0.95 9.37*
L5-20W-003 613760 912853 0 177 5.30 0.55 26.40*
L5-20W-004 613759 912853 0 204 6.45 1.15 24.75*
          97.60 0.45 12.87*
L5-20W-005 613758 912854 0 219 90.85 0.20 6.57*
L5-20W-007 613764 912855 -18 133 5.00 2.30 10.01*
L5-35W-107 613608 912813 0 134 1.23 0.37 6.10*
          30.52 0.33 15.20*
L5-35W-108 613606 912814 0 171 1.10 0.90 5.34*
          18.80 0.25 6.70*
          74.15 0.20 34.00*
          86.70 0.20 18.66*
L5-35W-109 613605 912814 0 189 6.50 0.50 3.62*
L5-35W-110 613604 912814 0 215 2.60 0.40 3.74*
          61.00 0.60 29.33*
L5-35W-111 613602 912814 0 230 34.50 0.80 10.18*
          60.80 0.60 8.50*
L5-35W- 112 613606 912814 0 243 67.50 0.40 3.27*
          90.90 0.20 5.59*
L5-42E-013 614377 912690 -22 305 27.35 0.95 45.18*
          70.05 0.75 13.25*
          74.00 2.10 12.59*
          246.80 1.60 26.85*
          268.00 0.40 46.87*
          397.20 2.00 6.02*
L5-42E-014 614378 912690 -22 314 137.60 1.60 10.92*
          159.50 2.30 17.44*
          184.70 1.00 4.61*
          275.70 0.35 6.20*
L5-42E-015 614379 912691 0 321 22.50 0.50 7.50*
          130.85 0.75 3.57*
          156.30 1.60 10.71*
LEVEL 6              
L6-024† 614212 912729 3 204 3.55 0.35 39.90*
          30.60 0.30 5.27*
L6-025† 614209 912724 3 24 72.00 0.25 12.20*
          80.10 0.40 11.00*
          90.00 0.30 9.57*
L6-026 614213 912728 3 38 23.00 0.30 64.33*
L6-027 614213 912727 3 71 77.80 0.50 13.40*
L6-028 614213 912727 3 68 79.40 1.10 25.60*
L6-029 614213 912726 3 139 10.80 0.45 23.23*
          29.90 1.35 3.81*
L6-23E-030 614212 912724 0 167 5.30 1.20 23.37*
L6-23E-031 614208 912725 0 206 5.65 1.55 31.33*
L6-23E-032 614207 912727 0 251 24.00 0.40 3.60*
L6-23E-033 614207 614207 0 225 8.40 1.20 45.03*
          10.70 2.50 23.47*
Notes:
(i) Intersection widths are downhole drill widths not true widths;
(ii) Assays denoted by * are by Philsaga Mining Corporation's laboratory, all other assays are by Intertek McPhar Mineral Services in Manila;
(iii) Grid co-ordinates based on the Philippine Reference System 92.

DRILL HOLE SAMPLING AND ASSAYING PROCEDURES

Samples are taken from mainly HQ sized (hole outside diameter 96 mm, hole inside diameter 63.5 mm) and some NQ sized (hole outside diameter 75.8 mm, hole inside diameter 47.6 mm) drill core. The selected sample intervals are halved by diamond saw and half the core is bagged, numbered and sent to the Company laboratory. In a small number of cases to confirm the geological logging, the selected interval was re-split and 1/4 core re-submitted for assay.

Initial sample preparation and assaying is undertaken at the Company's on-site laboratory. Samples are dried at 105ºC for 10 to 16 hours, crushed to less than 1.25 cm by jaw crusher, re-crushed to less than 50 mm using a secondary crusher followed by ring grinding of 1 kilogram of sample to nominal particle size of less than 200 mesh. Barren rock wash is used after every five samples in the preparation equipment. The samples are assayed by fire assay with Atomic Absorption Spectrometer (AAS) finish on a 30 gram sample. All assays over 5 g/t gold are re-assayed using gravimetric fire assay techniques on a 30 gram sample. Duplicate samples are inserted every 10 samples and standard samples are included in every sample batch.

Check assaying of approximately 50% of samples used in the yearly resource estimates is undertaken by Intertek McPhar Mineral Services ("Intertek"), a NATA and ISO 9001/2000 accredited laboratory in Manila. The pulps are airfreighted to Intertek who fire assay 30 grams of samples using AAS finish and a selected number of samples are checked using gravimetric fire assay techniques. Duplicate samples and standards are included in each batch of check samples. When reporting results, where available, the assays of Intertek as an independent laboratory have been given priority over the Company laboratory's results.

To view Figure 1, please visit the following link: http://media3.marketwire.com/docs/mml0709fig1.pdf.

To view Figure 2, please visit the following link: http://media3.marketwire.com/docs/mml0709fig2.pdf.

Information in this report relating to Exploration Results has been reviewed and is based on information compiled by Mr. Geoff Davis, who is a member of The Australian Institute of Geoscientists. Mr. Davis is the Non-Executive Chairman of Medusa Mining Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a "Competent Person" as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr. Davis consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

DISCLAIMER

This announcement may contain certain forward-looking statements. The words 'anticipate', 'believe', 'expect', 'project', 'forecast', 'estimate', 'likely', 'intend', 'should', 'could', 'may', 'target', 'plan' and other similar expressions are intended to identify forward-looking statements. Indications of, and guidance on, future earnings and financial position and performance are also forward-looking statements.

Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Medusa, and its officers, employees, agents and associates, that may cause actual results to differ materially from those expressed or implied in such statements.

Actual results, performance or outcomes may differ materially from any projections and forward-looking statements and the assumptions on which those assumptions are based.

You should not place undue reliance on forward-looking statements and neither Medusa nor any of its directors, employees, servants or agents assume any obligation to update such information.

ABN: 60 099 377 849



Australia: Medusa Mining Limited
Peter Hepburn-Brown
Managing Director
+61 8 9367 0601
+61 8 9367 0602 (FAX)
or
Medusa Mining Limited
Geoffrey Davis
Non-Executive Chairman
+61 8 9367 0601
+61 8 9367 0602 (FAX)
admin@medusamining.com.au
www.medusamining.com.au
or
United Kingdom: Fairfax I.S. PLC
Ewan Leggat/Laura Littley
Financial Adviser and Broker
+44 (0)20 7598 5368
Données et statistiques pour les pays mentionnés : Philippines | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Philippines | Tous

Medusa Mining Ltd

EXPLORATEUR
CODE : MML.AX
ISIN : AU000000MML0
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Medusa Mining est une société de production minière d'or et de cuivre basée en Australie.

Medusa Mining détient divers projets d'exploration aux Philippines.

Ses principaux projets en exploration sont CO-O, CORPLEX, ABACUS, ANOLING et APICAL aux Philippines.

Medusa Mining est cotée au Canada, au Royaume-Uni, en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 125,7 millions AU$ (90,7 millions US$, 79,5 millions €).

La valeur de son action a atteint son plus haut niveau récent le 03 juin 2011 à 8,60 AU$, et son plus bas niveau récent le 27 juin 2017 à 0,27 AU$.

Medusa Mining possède 207 790 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Medusa Mining Ltd
05/09/2016Investor Presentation September 2016
14/02/2011Investor Presentation February 2011
18/08/2008Aegis report
16/06/2008 BGF Equities Research Report
12/03/2008Fairfax ResearchContent-class: urn:content-classes:message
31/07/2007 Quarterly Activity Report
11/03/2007Investor Presentation
Dans les médias de Medusa Mining Ltd
17/06/2008Building a low cost production base with blue sky potential
13/03/2007Broker Report
Rapports annuels de Medusa Mining Ltd
: 2013 Annual Report
: 2011 Annual Report
Annual Report and Notice of Meeting
2006 Annual Report
Nominations de Medusa Mining Ltd
31/05/2013: Retirement and Appointment of CFO
25/01/2013: New Board Appointments
09/06/2011Board Restructure Following TSX Delisting to Oversee the Nex...
09/07/2010Appointment of Non-Executive Chairman
15/02/2010Appointment of director
15/09/2009Appointment of Director
Rapports Financiers de Medusa Mining Ltd
21/02/2012: Interim Financial Results
27/04/2011March 2011Quarterly Report
22/02/2011MEDUSA ACHIEVES RECORD HALF-YEAR PROFIT
07/09/2009Records strong 2009 financial results
Projets de Medusa Mining Ltd
08/04/2013(Co-o): Co-O Mill & Mine Expansion Update
21/02/2013(Co-o): Co-O Drilling Update
18/10/2012(Co-o): Co-O Mine Shafts Update
15/08/2012(Co-o): Co-O Mine Geology and Mineralisation Update
10/07/2012(Co-o): Co-O Drilling Update
10/07/2012(Co-o)Limited: Co-O Drilling Update
16/04/2012(Co-o): Co-O Drilling Update
21/03/2012(Co-o): Co-O Operations-Unscheduled Mill Maintenance
05/04/2011(Co-o)Co-O DRILLING CONTINUES HIGH GRADE RESULTS
01/12/2010(Saugon) - Saugon Drilling Expands High-Grade Gold-Silver Potential
30/06/2010(Co-o)Co-O Mine Update
29/03/2010(Co-o)Co-O Mine drilling update
16/03/2010(Co-o)Co-O expanded mill commissionning
17/07/2009(Co-o)Co-O mine reserve now 500 000 ounces
19/01/2009(Co-o) Co-O MINE RESOURCES INCREASED 40% TO 1.2 MILLION OUNCES
01/12/2008MAJOR NEW HIGH GRADE VEIN DISCOVERY
12/08/2008(Co-o)Co-O MINE RESOURCE EXPANSION
07/05/2008(Co-o)WIDE-HIGH GRADE INTERSECTION AT Co-O MINE
26/03/2008(Co-o)Co-O MPSA GRANTED
21/01/2008(Co-o)NEW CATTO VEIN EXTENSIONS DISCOVERED
01/10/2007(Co-o)Co-O Mine Expansion
04/09/2007713,000 resource ounces and growing
15/08/2007CO-O MINE RESOURCE DRILL HOLE RESULTS
09/07/2007New Discoveries
20/06/2007(Anoling)POSITIVE RESULTS FROM ANOLING GOLD PROJECT
16/05/2007(Co-o)Co-O Mine Update
19/03/2007(Anoling)Anoling Gold Project tenements granted
23/05/2006Tambis project exploration, Philippines
Communiqués de Presse de Medusa Mining Ltd
20/06/2016Relocation of Office Premises
09/05/2016Investor Presentation May 2016
06/05/2016Market Briefing May 2016 – Medusa Mining Ltd
02/05/2016Cancellation of Unquoted Securities (Options)
05/04/2016Terms of Appointment of CEO
21/03/2016CEO Appointment
22/01/2016CEO Appointment Update
20/01/2016Exploration Pipeline and Tenement Review
18/01/2016L8 Shaft Upgrade
18/01/2016Mineral Resources and Reserves Statement Addendum to 2014 An...
18/01/2016Cancellation of Unquoted Securities
09/10/2015Notice of Annual General Meeting and Proxy Form
05/10/2015Investor Presentation October 2015
25/09/2015Annual Mineral Resources & Ore Reserve Update Statement
04/09/2015Annual Mineral Resources Update Statement
03/09/2015Asset Impairment of US260M
27/08/2015ASX Appendix 4E and Financial Results for ended year June 30...
27/08/2015Full Year Results 2015
28/07/2015Investor Presentation July 2015
27/07/2015Quarterly Report June 2015
07/07/2015Co-O Mine Service Shaft Update
13/04/2015Investor Presentation April 2015 – Zurich and London
09/04/2015Co-O Mine Geology & Service Shaft Updates
21/01/2015Exploration Pipeline and Tenement Review
16/01/2015L8 Shaft Upgrade
12/01/2015Cancellation of Unquoted Securities
12/01/2015Mineral Resources and Reserves Statement Addendum to 2014 An...
09/12/2014Appendix 3Z – Directors Final Notice (Gary Raymond Powell)
21/11/2014Results of Annual General Meeting November 2014
20/11/2014Executive Appointments
13/02/2014Fatality Underground
13/02/2014Medusa Mining Limited: Fatality Underground
31/01/2014Medusa Mining Limited Quarterly Activities Report: Period En...
28/01/2014Operations Update
28/01/2014Medusa Mining Limited: Operations Update
21/01/2014Operations Update
29/10/2013: Quarterly Activities Report Period Ended 30 September 2013
23/10/2013: SAG Mill Update
04/09/2013: Operations Update-New Mill and Level 8
31/07/2013: Quarterly Activities Report Period Ended 30 June 2013
08/07/2013(Co-o): Co-O Operations Update
02/05/2013: Quarterly Activities Report Period Ended 31 March 2013
15/04/2013: Investor Presentation April 2013
30/10/2012: Quarterly Activities Report Period Ended 30 September 2012
29/08/2012: Full Year Results
06/08/2012(Co-o): Co-O Mine Mineral Resource Update
31/07/2012: Quarterly Activities Report Period Ended 30 June 2012
30/04/2012: Investor Presentation May 2012
24/04/2012: Quarterly Activities Report Period Ended 31 March 2012
10/02/2012: Investor Presentation February 2012
30/01/2012December 2011 Quarterly Report
17/01/2012: Bananghilig Deposit Drilling Update
16/12/2011: Appendix 3B
05/12/2011: Issue of Performance Rights
24/10/2011: Investor Presentation
29/08/2011Achieves Record Full Year Profit
24/08/2011ASX Announcement
22/08/2011(Co-o): Co-O Mine Mineral Reserve Estimate
28/07/2011ASX Announcement - Quarterly Report
25/01/2011- Medusa Quarterly Report
24/05/2010AIM cancellation & admission to the official list
07/05/2010Copper portfolio - Lingig update
08/03/2010Bonus issue of shares
25/01/2010Notice of no corporate associations
09/10/2009Lingig drilling extends mineralisation
12/08/2009ASX Announcement
03/07/2009MML - ASX Ann - S&P/ASX 200 Index
22/06/2009ASX Announcement
01/06/2009MML - ASX Announcement
26/02/2009UNDERWRITTEN A$24.5 MILLION PLACEMENT
28/01/2009Quarterly Report
05/11/2008ASX Announcement
23/09/2008ASX Announcement
19/09/2008Crosby Makes $182 Million Takeover Bid for Medusa Mining
20/08/2008ASX Announcement
25/07/2008ASX Announcement
10/06/2008ASX Announcement
11/04/2008Joint Venture With Bunawan Mining Corporation
14/03/2008Half Year Financial Report – 31 December 2007
25/02/2008IRON ORE TARGETS IDENTIFIED
13/11/2007LINGIG PORPHYRY COPPER DISCOVERY
31/10/2007 QUARTERLY ACTIVITIES REPORT PERIOD ENDING 30 SEPTEMBER 2007
16/08/2007Ambrian Morning Research
01/08/2007Heads of Agreement and Placement with Sierra Mining Ltd
16/07/2007Barobo Mineralised Corridor
13/06/2007 Acquisition of Co-O Mine Royalty
25/05/2007Equity Research
15/05/2007ASX Announcement
30/04/2007Quarterly Report March 2007
21/03/2007Releases
08/03/2007 Dismissal of motion for reconsideration on CO-o mise
13/06/2006appointement of nominated advisor & broker - AIM London
17/05/2006Acquisition of Apical gold project, Philippines
10/04/2006Alternative Investment Market (AIM) London
16/03/2006half year financial report 31 december 2005
30/01/2006Gold Production started, increasing quickly from here
21/01/2006ANALYSIS : MEDUSA MINING
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (MML.AX)TORONTO (MLL.TO)
0,605-15.38%7,43-0.80%
AUSTRALIA
AU$ 0,605
08/07 11:00 -0,110
-15,38%
Cours préc. Ouverture
0,715 0,615
Bas haut
0,600 0,625
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,605 -%
Volume var. 1 mois
123 619 -%
24hGold TrendPower© : -44
Produit
Développe
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 02/03/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2022-14,79%0,950,60
2021-7,79%0,990,66
20200,00%1,070,40
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :